LOAD SHEDDING IN
PAKISTAN
Group # 04
Roll # 04, 31, 32, 42, 50, 58.
Group Members
• Momina Naqvi
• Tooba Sadaqat
• Javeria Kousar
• Afia Ansar
• Syeda Farzeen
• Faizan Khalid
Contents
• Definition
• Types
• Causes
• Effects
• Solution
• Recommendations
Definition
• deliberate shutdown of power
• to prevent the failure of the entire
system
• demand strains the capacity of the
system.
Types
• Scheduled
The load shedding done according to the announced
schedule of the Government is called Scheduled Load
shedding.
• Unscheduled
The load shedding done besides the schedule announced
by the Government is called Unscheduled load
shedding.
Causes
• Fewer Dams
• Power theft
• Over Population
• Expenses on production
• Corruption
Effects
Severely effect the
• Domestic Life
• Education
• Health Services
• The Rate of Unemployment
• Economy
Jokes: How load shedding
effected the Routine life
Solutions
• Citizen Level
Switch of Extra Appliances
Should not Use Wrong Means
Electricity Efficient Devices
• Government Level
Building New Dams
Generating Power from Other Sources
End Corruption
Conclusion
Thank you!

Load shedding