The document introduces two new regulatory standards for liquidity risk - the Liquidity Coverage Ratio (LCR) and the Net Stable Funding Ratio (NSFR).
The LCR aims to ensure that banks maintain adequate high-quality liquid assets to meet net cash outflows over a 30-day stress period. It requires banks to hold liquid assets equal to or greater than estimated cash outflows. The NSFR aims to promote resilience over longer periods by creating incentives for banks to fund activities with stable sources of funding. It measures the amount of stable funding relative to required stable funding over a one-year period.
The document also outlines monitoring tools for supervisors, including contractual maturity mismatch, concentration of funding