SlideShare a Scribd company logo
FEED
Engineering
Procurement
Construction
Management
Commissioning
FRJJ TECHNICAL INC.
PROFESSIONAL SUPPORT FOR
EPC, EPCM OR DESIGN-BUILD
PROJECTS FARID GHORBANI P.ENG,PMP
 Cost of review resumes’ by technical staff or management team
 Interviews’ time of HR and technical staff or management team
 Keep employee busy or pay as overhead
 Employee being hired by projects’ client
 Projects are not in employee’s area of expertise
 Time control, accountants and HR to keep track of employee
 Not willing to work extra hours due to annual TAX
CHALLENGE IN
INDUSTRY
FRJJ TECHNICAL INC.
SERVICES
 PROPOSAL FOR RFP’s
 STRUCTURAL CALCULATION
 TECHNICAL SPECIFICATION
 IFC DRAWINGS
 REPLY TO RFI’s
 SITE VISIT / WALK DOWN
 CONSTRUCTION SUPPORT
FRJJ TECHNICAL INC.
 Do not spend time to review resumes’
 One time business negotiation not Interviews
 Expert to match team and hard working
 Use the service as per projects’ need
 Our wishes is your satisfaction
 Just one bill and issue check
 No worries of TAX due to extra hours of work
BENEFITS
FRJJ TECHNICAL INC.
 Lump sum cost for a project
 Hourly rate
 Hourly rate with limited hours
 Fixed hours for a project
 Cost plus to visit the site
FEES
FRJJ TECHNICAL INC.
List of Projects:
1) Roof structure top of 36 storey residential Tower
2) Communication Tower
3) Park office
4) Roof structure top of 37 storey residential Tower
5) Industrial Factory
6) Industrial Factory
7) Lab and Office
8) World Biggest Water Pak
9) Industrial Tower for a special production
10) Privet Warehouse
11) Roof structure top of 45 storey residential Tower
12) Wall Cladding support at front elevation of 35 storey residential Tower
13) A Luxury office
14) Extension inside a running Plastic Factory
15) Textile tailoring, and packing workshop
FRJJ TECHNICAL INC.
Photo of projects
Project: ROOF Structure
Responsibility: Design,
Fabrication, Painting
and Installation of
Feature structure above
36 storey building
Date: Summer 2004
FRJJ TECHNICAL INC.
Project:
Communication
Tower
Date:
Winter 2005
FRJJ TECHNICAL INC.
Project:
Park office
Date:
Winter 2005
Photo No.1 of 2
FRJJ TECHNICAL INC.
Project: Park office Photo No. 2 of 2
FRJJ TECHNICAL INC.
Project:
Marina Roof
Structure
Responsibility:
Design, Fabrication,
Painting and
Installation of
Feature structure
above 37 storey
building
Inspector: SGS
Date:
Spring 2005
FRJJ TECHNICAL INC.
Project:
Industrial Factory
Date:
Summer 2005
FRJJ TECHNICAL INC.
Project:
Industrial Factory
Date:
Winter 2006
FRJJ TECHNICAL INC.
Project:
Lab & office
Date:
Winter and
spring of 2006
FRJJ TECHNICAL INC.
Project:
WORLD BIGGEST
WATER PARK
Client: White Water-
Canada-Vancouver
Date:
Summer & Fall 2006
FRJJ TECHNICAL INC.
Project:
Industrial Tower
Client: CCC Parex from
France
Date: Winter 2007
FRJJ TECHNICAL INC.
Project: CCC PAREX Photo No. 2 of 3
FRJJ TECHNICAL INC.
Project: CCC PAREX Photo No. 3 of 3
FRJJ TECHNICAL INC.
Project:
Privet Warehouses
Date: Winter and
spring of 2007
FRJJ TECHNICAL INC.
Project:
Concord Tower
Responsibility:
Design,
Fabrication,
Painting and
Installation of
Feature
structure
above 45
storey
building
Date: Summer
& fall 2007
Photo 1 of 3
FRJJ TECHNICAL INC.
Project: Concord Tower Photo No. 2 of 3
FRJJ TECHNICAL INC.
Project: Concord Tower Photo No. 3 of 3
FRJJ TECHNICAL INC.
Scope of Work:
Supporting Steel truss for
Cladding
Date:
Winter 2008
FRJJ TECHNICAL INC.
Project:
Luxury Office
Scope of Work:
Supporting Steel truss
for Cladding
Date:
Spring 2008
FRJJ TECHNICAL INC.
Project:
Extension for a new PVC
production Plastic sheet
inside a factory
Client:
Kangaroo Plastic
Responsibility:
Removal of existing floor
and roof, new civil work
,electrical, Plumbing,
finishing and steel
structure ,Cladding and
water proofing of existing
roof
Date:
spring and summer 2008
FRJJ TECHNICAL INC.
Project: Kangaroo Plastic Photo No. 2 of 2
FRJJ TECHNICAL INC.
Project:
Textile workshop
Date:
Fall 08 till Winter 09
FRJJ TECHNICAL INC.
Project: Textile Workshop Photo No. 2 of 2
FRJJ TECHNICAL INC.
APPROCH TO YOUR NEED
 THINK OR BRAIN STORM ABOUT PROBLEMS
 FIND A SAFE AND ECONOMICAL SOLUTION
 EVALUATE THE COSTS
 STUDY THE RISKS
 MITIGATE THE RISKS
 PREPARE COMPARISION
 REPORT THE RESULTS
FRJJ TECHNICAL INC.
WILL IT YOUR
PROJECTS ALSO CAN
GO ABOVE THE CLOUD
LIKE AS MINE?
FRJJ TECHNICAL INC.

More Related Content

What's hot

HOW TO PREPARE YOUR REAL ESTATE DEVELOPMENT & CONSTRUCTION STANDARD OPERATING...
HOW TO PREPARE YOUR REAL ESTATE DEVELOPMENT & CONSTRUCTION STANDARD OPERATING...HOW TO PREPARE YOUR REAL ESTATE DEVELOPMENT & CONSTRUCTION STANDARD OPERATING...
HOW TO PREPARE YOUR REAL ESTATE DEVELOPMENT & CONSTRUCTION STANDARD OPERATING...
REDceo.net
 
CV-Gabriel Koncal-LinkedIn
CV-Gabriel Koncal-LinkedInCV-Gabriel Koncal-LinkedIn
CV-Gabriel Koncal-LinkedInGabriel Koncal
 
Cv bim coordinator & chief surveyor
Cv bim coordinator & chief surveyorCv bim coordinator & chief surveyor
Cv bim coordinator & chief surveyor
Atef Ali Abou Elwafa
 
Epc projects and cad tools
Epc projects and cad toolsEpc projects and cad tools
Epc projects and cad tools
Morteza Shahmoradi
 
Ahmed mahdi cv_planning_engineer
Ahmed mahdi cv_planning_engineerAhmed mahdi cv_planning_engineer
Ahmed mahdi cv_planning_engineer
Ahmed Mahdi, MRICS, PMP®, MSc, B.Eng
 
Kiran 8 years
Kiran 8 yearsKiran 8 years
Kiran 8 years
kiran kumar
 
Alok tiwari main profile presentation
Alok tiwari main profile presentationAlok tiwari main profile presentation
Alok tiwari main profile presentation
Alok Tiwari
 
CV - Mitesh Soriya - Project Manager
CV - Mitesh Soriya - Project ManagerCV - Mitesh Soriya - Project Manager
CV - Mitesh Soriya - Project ManagerSoriya Mitesh
 

What's hot (20)

HOW TO PREPARE YOUR REAL ESTATE DEVELOPMENT & CONSTRUCTION STANDARD OPERATING...
HOW TO PREPARE YOUR REAL ESTATE DEVELOPMENT & CONSTRUCTION STANDARD OPERATING...HOW TO PREPARE YOUR REAL ESTATE DEVELOPMENT & CONSTRUCTION STANDARD OPERATING...
HOW TO PREPARE YOUR REAL ESTATE DEVELOPMENT & CONSTRUCTION STANDARD OPERATING...
 
CV-Gabriel Koncal-LinkedIn
CV-Gabriel Koncal-LinkedInCV-Gabriel Koncal-LinkedIn
CV-Gabriel Koncal-LinkedIn
 
Cv bim coordinator & chief surveyor
Cv bim coordinator & chief surveyorCv bim coordinator & chief surveyor
Cv bim coordinator & chief surveyor
 
New resume
New resumeNew resume
New resume
 
Epc projects and cad tools
Epc projects and cad toolsEpc projects and cad tools
Epc projects and cad tools
 
Manikanta_Resume
Manikanta_ResumeManikanta_Resume
Manikanta_Resume
 
Process Designer
Process DesignerProcess Designer
Process Designer
 
Senior Planning Engineer.
Senior Planning Engineer.Senior Planning Engineer.
Senior Planning Engineer.
 
Resume
ResumeResume
Resume
 
Civil Engineer - CV
Civil Engineer - CVCivil Engineer - CV
Civil Engineer - CV
 
Eduardo updated NEW CV
Eduardo updated NEW CVEduardo updated NEW CV
Eduardo updated NEW CV
 
Mubeen-Mech
Mubeen-MechMubeen-Mech
Mubeen-Mech
 
Ahmed mahdi cv_planning_engineer
Ahmed mahdi cv_planning_engineerAhmed mahdi cv_planning_engineer
Ahmed mahdi cv_planning_engineer
 
C.V_for_Planning_Engg._Datta
C.V_for_Planning_Engg._DattaC.V_for_Planning_Engg._Datta
C.V_for_Planning_Engg._Datta
 
Kiran 8 years
Kiran 8 yearsKiran 8 years
Kiran 8 years
 
Alok tiwari main profile presentation
Alok tiwari main profile presentationAlok tiwari main profile presentation
Alok tiwari main profile presentation
 
Aftab CV.
Aftab CV.Aftab CV.
Aftab CV.
 
Simab CV sup.
Simab CV sup.Simab CV sup.
Simab CV sup.
 
sayed gawad resume , certifiates
sayed gawad resume , certifiates sayed gawad resume , certifiates
sayed gawad resume , certifiates
 
CV - Mitesh Soriya - Project Manager
CV - Mitesh Soriya - Project ManagerCV - Mitesh Soriya - Project Manager
CV - Mitesh Soriya - Project Manager
 

Viewers also liked

Point of View on Sourcing Strategies
Point of View on Sourcing StrategiesPoint of View on Sourcing Strategies
Point of View on Sourcing StrategiesMarjolein Dijkshoorn
 
Sourcing And Procurement Practice 5 2011
Sourcing And Procurement Practice 5 2011Sourcing And Procurement Practice 5 2011
Sourcing And Procurement Practice 5 2011
Michael Eckstut
 
Whats Next For The Branch Network
Whats Next For The Branch NetworkWhats Next For The Branch Network
Whats Next For The Branch Network
David Kerstein
 
Private Banking Business Models
Private Banking Business ModelsPrivate Banking Business Models
Private Banking Business Models
Alexander Osterwalder
 
Public Private Partnerships
Public Private PartnershipsPublic Private Partnerships
Public Private Partnershipsjamesrobinsonjnr
 
A view of procurement best practice
A view of procurement best practiceA view of procurement best practice
A view of procurement best practice
Dr Gordon Murray
 
Procurement: Strategies | Best Practices - May 2011
Procurement: Strategies | Best Practices - May 2011Procurement: Strategies | Best Practices - May 2011
Procurement: Strategies | Best Practices - May 2011
Marcel (Alex) Mesanza, PMP, CSSBB
 

Viewers also liked (7)

Point of View on Sourcing Strategies
Point of View on Sourcing StrategiesPoint of View on Sourcing Strategies
Point of View on Sourcing Strategies
 
Sourcing And Procurement Practice 5 2011
Sourcing And Procurement Practice 5 2011Sourcing And Procurement Practice 5 2011
Sourcing And Procurement Practice 5 2011
 
Whats Next For The Branch Network
Whats Next For The Branch NetworkWhats Next For The Branch Network
Whats Next For The Branch Network
 
Private Banking Business Models
Private Banking Business ModelsPrivate Banking Business Models
Private Banking Business Models
 
Public Private Partnerships
Public Private PartnershipsPublic Private Partnerships
Public Private Partnerships
 
A view of procurement best practice
A view of procurement best practiceA view of procurement best practice
A view of procurement best practice
 
Procurement: Strategies | Best Practices - May 2011
Procurement: Strategies | Best Practices - May 2011Procurement: Strategies | Best Practices - May 2011
Procurement: Strategies | Best Practices - May 2011
 

Similar to Linkedin presentation for engineering and managements

Adnan -updated CV
Adnan -updated CVAdnan -updated CV
Adnan -updated CVAdnan TV
 
Estimation & Technical Engr CV
Estimation & Technical Engr CVEstimation & Technical Engr CV
Estimation & Technical Engr CVmuhammad abdullah
 
Elamathi Panneerselvam CV
Elamathi Panneerselvam CVElamathi Panneerselvam CV
Elamathi Panneerselvam CVzetiengg
 
Senior Level Assignment
Senior Level AssignmentSenior Level Assignment
Senior Level AssignmentShetty Jeevan
 
Engineering Quality Process
Engineering Quality ProcessEngineering Quality Process
Engineering Quality Process
Earl Schneider
 
S.Kumar CV - Piping - Copy
S.Kumar CV - Piping - CopyS.Kumar CV - Piping - Copy
S.Kumar CV - Piping - CopySharvan kumar
 
SATHURAGIRI HVAC PROJECT ENGINEER
SATHURAGIRI  HVAC PROJECT ENGINEERSATHURAGIRI  HVAC PROJECT ENGINEER
SATHURAGIRI HVAC PROJECT ENGINEERSathura Giri
 
SUJITH RESUME (1)
SUJITH RESUME (1)SUJITH RESUME (1)
SUJITH RESUME (1)Sujith sv
 
Resume
Resume Resume
Isidro_Calayag Resume 11.20.16
Isidro_Calayag Resume 11.20.16Isidro_Calayag Resume 11.20.16
Isidro_Calayag Resume 11.20.16Sid Calayag
 

Similar to Linkedin presentation for engineering and managements (20)

Adnan -updated CV
Adnan -updated CVAdnan -updated CV
Adnan -updated CV
 
Kumaresan CV
Kumaresan CVKumaresan CV
Kumaresan CV
 
Estimation & Technical Engr CV
Estimation & Technical Engr CVEstimation & Technical Engr CV
Estimation & Technical Engr CV
 
CV_Sitthikorn P-(20-Jun-15)
CV_Sitthikorn P-(20-Jun-15)CV_Sitthikorn P-(20-Jun-15)
CV_Sitthikorn P-(20-Jun-15)
 
Elamathi Panneerselvam CV
Elamathi Panneerselvam CVElamathi Panneerselvam CV
Elamathi Panneerselvam CV
 
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEERResume_ARIE HIDAYATI_SNR HVAC ENGINEER
Resume_ARIE HIDAYATI_SNR HVAC ENGINEER
 
Senior Level Assignment
Senior Level AssignmentSenior Level Assignment
Senior Level Assignment
 
CV_Piyapol
CV_PiyapolCV_Piyapol
CV_Piyapol
 
Engineering Quality Process
Engineering Quality ProcessEngineering Quality Process
Engineering Quality Process
 
CV
CVCV
CV
 
Resume
ResumeResume
Resume
 
vinoth-projects
vinoth-projectsvinoth-projects
vinoth-projects
 
CV-latest
CV-latestCV-latest
CV-latest
 
Kuldeep Updated C.V
Kuldeep Updated C.VKuldeep Updated C.V
Kuldeep Updated C.V
 
S.Kumar CV - Piping - Copy
S.Kumar CV - Piping - CopyS.Kumar CV - Piping - Copy
S.Kumar CV - Piping - Copy
 
SATHURAGIRI HVAC PROJECT ENGINEER
SATHURAGIRI  HVAC PROJECT ENGINEERSATHURAGIRI  HVAC PROJECT ENGINEER
SATHURAGIRI HVAC PROJECT ENGINEER
 
SUJITH RESUME (1)
SUJITH RESUME (1)SUJITH RESUME (1)
SUJITH RESUME (1)
 
Resume
Resume Resume
Resume
 
Isidro_Calayag Resume 11.20.16
Isidro_Calayag Resume 11.20.16Isidro_Calayag Resume 11.20.16
Isidro_Calayag Resume 11.20.16
 
randy san andres resume
randy san andres resumerandy san andres resume
randy san andres resume
 

Recently uploaded

一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
Kamal Acharya
 
An Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering TechniquesAn Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering Techniques
ambekarshweta25
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
Kamal Acharya
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
zwunae
 

Recently uploaded (20)

一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
 
An Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering TechniquesAn Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering Techniques
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
 

Linkedin presentation for engineering and managements

Editor's Notes

  1. Project: Marina TerraceConsultant: NORRInspector: SGS internationalScope of Work: Feature Steel StructureResponsibility: Fabrication, Painting and Installation of Feature structure above 36 story buildingDate: Summer 2004Amount: Can$ 750,000
  2. Project: Marina TerraceScope of Work: Feature Steel StructureResponsibility: Fabrication, Painting and InstallationDate: Summer 2004Amount: Can$ 750,000