VIVA COLLEGE OF ARTS,COMMERCE AND SCIENCE
S.Y.B.M.S

PRESENTED BY PRASHANT SIGNH (59)
1
FHD CURVED OLED CINEMA 3D SMART TV
2
3
CURVED OLED TV The world’s first curved screen by LG heralds a new paradigm
of display shape and quality, leading a transition from the flat screen to the
curved. The gently curved screen is the most optimal form for any display,
providing equal distance from all parts of the screen to the eyes

4
LG's remarkably thin CURVED OLED
TV opens up a whole new possibility
of style and design with a depth of
only 4.3mm thick at its thinnest point.
With just two layers, the LG CURVED
OLED TV is unbelievably lightweight
and wafer-thin.

5
LG OLED TV has finally achieved
perfect contrast, a realm previously
unattainable ordinary television The
independently lighted pixels do not
require a common lamp or
medium, and thus arecompletely
independent from each other Images
are now as alive as life, since the
contrast ratio is well beyond
conventional measurement.

6
The OLED TV is no longer restrained by the angle at which it is
viewed, unlike previous devices that experience contrast loss from
the sides, it shows incredibly consistent contrast from anywhere. On
top . On top of this, LG OLED TV with its color refiner has virtually
perfected the technology by ensuring no color distortions either.
Enjoy perfectly wide viewing angle with no distortion of contrast or
color with LG OLED TV, the perfect display all around

7
LG’s Clear Speakers offer
high quality sound to match
the picture quality of an
OLED TV. The two channel
speaker system consists of
thin ceramic film speakers
that produce elegant sound.
With refined sound at the
higher frequencies, you can
always enjoy crystal-clear
sound at any range or level.

8
LG OLED TV’s curved form enables innovation of design, and that is what is
presented in this captivating yet minimalist stand. The transparent Crystal
Stand is a novel achievement in design innovation, creating a delightful illusion
of a floating screen.
9
SEAMLESS FINISHING
The sleek design of LG OLED
TV is rendered complete by
premium grade carbon
fiber, which seamlessly
covers the rear of the TV.
Carbon Fiber Reinforced
Plastics (CFRP) is a high
quality
material
used
mainly for aircraft and
super cars, and is known for
its superb durability and
strength.

10
ABSOLUTE MOTION CLARITY
The response speed of LG OLED
TV is over one hundred times
faster than LED TV, allowing you
to enjoy fast moving scenes with
completely blur-free, crystalclear pictures. It is no longer
restrained by the slow response
rates and frame rates, the way it
is seen in real life.

11
2D TO 3D CONVERSION

Don’t worry about the lack of
3D content - simply convert 2D
t 3D! LG provides a remarkably
advanced and convenient 3D
conversion technology with
greater 3D effects and depth
control, so you can instantly
convert any 2D content into
surprisingly deep and realistic
3D.

12
Communicate to your TV and enjoy
interactive entertainment with Voice
Recognition. The TV can understand your
words and respond as you wish, enabling
you to conveniently control and enjoy
your TV.

13
Pointing, Wheel, Gesture, and
Voice – the most convenient and
advanced TV remote.
Pointing: Just point and click--a
smart remote for your smart tv.
Wheel: Scroll up and down,
zoom in and out with a wheel just like using a computer
mouse.
Gesture: Make a simple gesture
to perform complex commands,
saving time.
Voice: Speak to your Remote to
find what you want.
14
Browse and share files from external devices
wirelessly on your large TV screen or watch TV
on another smart device with LG Smart TV’s
Smart Share. Enjoy any content without
constraint.

15
16

Lg tv ppt

  • 1.
    VIVA COLLEGE OFARTS,COMMERCE AND SCIENCE S.Y.B.M.S PRESENTED BY PRASHANT SIGNH (59) 1
  • 2.
    FHD CURVED OLEDCINEMA 3D SMART TV 2
  • 3.
  • 4.
    CURVED OLED TVThe world’s first curved screen by LG heralds a new paradigm of display shape and quality, leading a transition from the flat screen to the curved. The gently curved screen is the most optimal form for any display, providing equal distance from all parts of the screen to the eyes 4
  • 5.
    LG's remarkably thinCURVED OLED TV opens up a whole new possibility of style and design with a depth of only 4.3mm thick at its thinnest point. With just two layers, the LG CURVED OLED TV is unbelievably lightweight and wafer-thin. 5
  • 6.
    LG OLED TVhas finally achieved perfect contrast, a realm previously unattainable ordinary television The independently lighted pixels do not require a common lamp or medium, and thus arecompletely independent from each other Images are now as alive as life, since the contrast ratio is well beyond conventional measurement. 6
  • 7.
    The OLED TVis no longer restrained by the angle at which it is viewed, unlike previous devices that experience contrast loss from the sides, it shows incredibly consistent contrast from anywhere. On top . On top of this, LG OLED TV with its color refiner has virtually perfected the technology by ensuring no color distortions either. Enjoy perfectly wide viewing angle with no distortion of contrast or color with LG OLED TV, the perfect display all around 7
  • 8.
    LG’s Clear Speakersoffer high quality sound to match the picture quality of an OLED TV. The two channel speaker system consists of thin ceramic film speakers that produce elegant sound. With refined sound at the higher frequencies, you can always enjoy crystal-clear sound at any range or level. 8
  • 9.
    LG OLED TV’scurved form enables innovation of design, and that is what is presented in this captivating yet minimalist stand. The transparent Crystal Stand is a novel achievement in design innovation, creating a delightful illusion of a floating screen. 9
  • 10.
    SEAMLESS FINISHING The sleekdesign of LG OLED TV is rendered complete by premium grade carbon fiber, which seamlessly covers the rear of the TV. Carbon Fiber Reinforced Plastics (CFRP) is a high quality material used mainly for aircraft and super cars, and is known for its superb durability and strength. 10
  • 11.
    ABSOLUTE MOTION CLARITY Theresponse speed of LG OLED TV is over one hundred times faster than LED TV, allowing you to enjoy fast moving scenes with completely blur-free, crystalclear pictures. It is no longer restrained by the slow response rates and frame rates, the way it is seen in real life. 11
  • 12.
    2D TO 3DCONVERSION Don’t worry about the lack of 3D content - simply convert 2D t 3D! LG provides a remarkably advanced and convenient 3D conversion technology with greater 3D effects and depth control, so you can instantly convert any 2D content into surprisingly deep and realistic 3D. 12
  • 13.
    Communicate to yourTV and enjoy interactive entertainment with Voice Recognition. The TV can understand your words and respond as you wish, enabling you to conveniently control and enjoy your TV. 13
  • 14.
    Pointing, Wheel, Gesture,and Voice – the most convenient and advanced TV remote. Pointing: Just point and click--a smart remote for your smart tv. Wheel: Scroll up and down, zoom in and out with a wheel just like using a computer mouse. Gesture: Make a simple gesture to perform complex commands, saving time. Voice: Speak to your Remote to find what you want. 14
  • 15.
    Browse and sharefiles from external devices wirelessly on your large TV screen or watch TV on another smart device with LG Smart TV’s Smart Share. Enjoy any content without constraint. 15
  • 16.