This document provides details regarding a case seeking cancellation of a license issued to Unitech for violations of statutes and rules related to building plans and construction in Gurgaon, Haryana. Key points include:
1) Unitech was issued license 60 of 1996 to develop a project called Uniworld Garden with 496 approved dwelling units according to the sanctioned plan. However, the builder constructed extra floors and units violating the approved plan.
2) Documents submitted show discrepancies in the actual built area compared to the sanctioned plan, with extra area constructed and units sold without approval.
3) The builder is alleged to have violated various rules regarding submission of accounts and obtaining completion certificates. The license renewals
Power point presentation on "CMRL UNDER GROUND STATION CONSTRUCTION WORKS" Risks faced and mitigation measures and new risks and their mitigations by adopting innovative construction methods .LARSEN &TOUBRO is pioneer in risk methodology and its mitigations in its construction works. It's great honour for me as L&T employ associated with Risk mitigation team in CMRL package.
Power point presentation on "CMRL UNDER GROUND STATION CONSTRUCTION WORKS" Risks faced and mitigation measures and new risks and their mitigations by adopting innovative construction methods .LARSEN &TOUBRO is pioneer in risk methodology and its mitigations in its construction works. It's great honour for me as L&T employ associated with Risk mitigation team in CMRL package.
Highway planning and alignment: Different modes of transportation – historical Development of road construction- Highway Development in India –Classification of roads- Road pattern
– Highway planning in India- Highway alignment - Engineering Surveys for alignment – Highway Project- Important Transport/Highway related agencies in India. PMGSY project.
Introduction about IRC, NRRDA
Noise and vibrations in automobiles review and diagnostics ijmperd 2011Dr.Vikas Deulgaonkar
The present work describes various automotive noise & vibration sources and their contribution. Noise and vibration reduction technique is studied through energy flow path. Various international and Indian standards for vehicles consider two types of noise measurement i.e. pass by noise and
stationary noise. This paper discusses the appropriateness of SN test for in use
vehicle. A methodology for interior noise source identification and its analysis is descried. Two vehicles of same class but of different makes were compared and evaluated for interior noise and vibration levels. The effectiveness of the firewall, silencers and engine mounts are checked and compared. The correlation
between pressure and vibration levels of different sources with acoustical and structure transfer path are studied. Basic causes, design guidelines and validation techniques using lab simulation and data acquisition are discussed. Application of damping technology using viscous materials to control noise and vibration in vehicles is described.
Everyone can raise a question that how to prevent an Air pollution and so on. So here is our presentation on Control of Air pollution. So using the technique called adsorption sampling is an interesting one to all of the human beings
This Presentation Contains Railway engineering concepts. The contents covered are Points & crossings: Turnout, switches, throw switches, diamond crossing, cross-overs, single slip and double slip, scissor cross-over, Triangle & turntable. Feel free to write in Comment Section or drop a line in my Inbox amanbathla710@gmail.com
This the finest presentation by which you'll easy have the concept of the sight distance in highways engineering and also you'll learn the types of sight distance in the highways engineering.
Highway planning and alignment: Different modes of transportation – historical Development of road construction- Highway Development in India –Classification of roads- Road pattern
– Highway planning in India- Highway alignment - Engineering Surveys for alignment – Highway Project- Important Transport/Highway related agencies in India. PMGSY project.
Introduction about IRC, NRRDA
Noise and vibrations in automobiles review and diagnostics ijmperd 2011Dr.Vikas Deulgaonkar
The present work describes various automotive noise & vibration sources and their contribution. Noise and vibration reduction technique is studied through energy flow path. Various international and Indian standards for vehicles consider two types of noise measurement i.e. pass by noise and
stationary noise. This paper discusses the appropriateness of SN test for in use
vehicle. A methodology for interior noise source identification and its analysis is descried. Two vehicles of same class but of different makes were compared and evaluated for interior noise and vibration levels. The effectiveness of the firewall, silencers and engine mounts are checked and compared. The correlation
between pressure and vibration levels of different sources with acoustical and structure transfer path are studied. Basic causes, design guidelines and validation techniques using lab simulation and data acquisition are discussed. Application of damping technology using viscous materials to control noise and vibration in vehicles is described.
Everyone can raise a question that how to prevent an Air pollution and so on. So here is our presentation on Control of Air pollution. So using the technique called adsorption sampling is an interesting one to all of the human beings
This Presentation Contains Railway engineering concepts. The contents covered are Points & crossings: Turnout, switches, throw switches, diamond crossing, cross-overs, single slip and double slip, scissor cross-over, Triangle & turntable. Feel free to write in Comment Section or drop a line in my Inbox amanbathla710@gmail.com
This the finest presentation by which you'll easy have the concept of the sight distance in highways engineering and also you'll learn the types of sight distance in the highways engineering.
Dilley Children Jail Medical Services ContractsBryan Johnson
ICE contracted with private healthcare staffing corporation, Maxim Healthcare Services, to provide medical services to children and mothers detained at the South Texas Family Residential Center (STFRF) located in Dilley, Texas. From 09/22/2015 to 09/22/2016, ICE was obligated to pay Maxim $28,799,940.48. However, ICE apparently paid nearly $6 million more than the maximum allowed: $34,713,350.00, according to USAspending.gov
Rev ms 243 -Land Acquisition- Payment of ex-gratia to various categories of e...bansi default
Land Acquisition- Payment of ex-gratia to various categories of
encroachers/enjoyers of the Government lands required for Irrigation Projects-
Orders- Issued.
GO Ms.No.243 land acquisition payment- Payment of Ex-gratia to various categ...bansi default
GO Ms.No.243 land acquisition payment- Payment of Ex-gratia to various categories of encroachers/enjoyers of the Government lans required for irrigation Projects
Paper on status of taiwan law in international maritime law 08.07.2009 fresh ...National Citizens Movement
Responsibility of States for Internationally Wrongful Acts, 2001 UN General Assembly Resolution 56/83 of 12 December 2001 corrected by Document A/56/49(Vol.I)/Corr.4 Yearbook of the International Law Commission, 2001, vol. II (Part Two)
Earlier Document Version: https://www.slideshare.net/manioberoi/paper-on-status-of-taiwan-law-in-international-maritime-law-1697282
Omaxe Sports City Dwarka stands out as a premier residential and recreational destination, offering a blend of luxury and sports-centric living. Located in the thriving area of Dwarka, this project by Omaxe Limited is designed to cater to modern lifestyle needs while promoting a healthy, active living environment.
Brigade Insignia offers meticulously designed apartments with modern architecture and premium finishes. The project features spacious 3,3.5,4 and 5 BHK units, each thoughtfully planned to provide maximum comfort, natural light, and ventilation.
https://www.newprojectbangalore.com/brigade-insignia-yelahanka-bangalore.html
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...Volition Properties
=== Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szeto) ===
Ever been curious about Real Estate Investing in the US?? At Volition, for the past 14 years, we have been focused on helping investors invest in over $250M of real estate and generate $100M of wealth in the Toronto market, but we are always open to learning more about other business models and learning from other investors.
The US has always been an intriguing market to invest in. But the US is a big place… if you’re interested in investing in the US, you probably have a lot of questions, like:
☑️ Specifically WHERE should you invest?
☑️ What are the best markets to invest in and why?
☑️ How much are property prices there?
☑️ What are the returns like?
☑️ What is cashflow like?
☑️ Compared to investing in Toronto or other cities in Ontario, what are the benefits / tradeoffs?
☑️ What ownership structure should I use?
☑️ What are the tax implications?
☑️ Can I get financing?
☑️ What are tenants like?
Enter Erwin Szeto, a longtime friend of Volition. Since 2005, Erwin Szeto and his team have navigated the challenging landscape of being landlords in Ontario. Now, they are shifting their focus and guiding their clients' investments toward the more landlord-friendly environment of the USA. This decision comes after assisting Canadian clients in transacting over $440,000,000 in income properties. Faced with issues like affordability constraints, tenant-friendly laws, rent control, and rental licensing in Canada, Erwin sees a clear opportunity in the U.S. Here, there is a significant influx of investments leading to the creation of high-paying manufacturing jobs. Erwin and his clients are poised to capitalize on these opportunities where landlord rights are stronger and there is no rent control.
To facilitate this transition, Erwin has partnered with and become a client of SHARE, a one-stop-shop U.S. Asset Manager. Founded by Canadians for Canadians, SHARE enables as passive an ownership experience as possible for landlords in the U.S., while still maintaining direct, 100% ownership.
Erwin is “Making Real Estate Investing Great Again”!!
Website: https://www.infinitywealth.ca/
Facebook: https://www.facebook.com/iwinrealestate and https://www.facebook.com/ErwinSzetoOfficial
Podcast: https://www.truthaboutrealestateinvesting.ca/
Instagram: https://www.instagram.com/iwinrealestate/ and https://www.instagram.com/erwinszeto/
Total Environment Tangled Up In The Green - Residential Plots Where Nature an...JagadishKR1
Embark on a journey where lush landscapes and contemporary living converge at Total Environment's Tangled Up In The Green Residential Plots in Devanahalli, Bangalore. Surrounded by verdant expanses, these plots offer an idyllic setting for your dream home. Immerse yourself in the serenity of nature while enjoying the finest amenities and design, where every moment is a harmonious blend of luxury and tranquility.
500 acres of brilliance await you here at Riverview City which offers modern living, effortless convenience, and a beautiful natural setting. It is a mega township by Magarpatta City in Loni Kalbhor, Pune. Enjoy easy access to work, schools, and fun while experiencing a perfect work-life balance.
Visit - magarpattacity.developerprojects.in
Rams Garden Bahcelievler - Istanbul - ListingTurkeyListing Turkey
Implemented by Rams Global in Bahcelievler, the Rams Garden Bahcelievler Apartments includes 796 residences of different types from 2+1 to 5+1.
Next to the project, which will have 33 thousand square meters of green area, there will be 42 thousand 300 square meters of woodland. There will also be a 210-meter-long pond in the landscape of the project. There are 94.5 square meters of green space per flat.
Rams Garden Bahcelievler Apartments, which has 8 times more green space than the average of Istanbul with its 33 thousand square meters of green area located within a total of 75 thousand square meters, offers various housing options from 2+1 to 5+1.RAMS Garden has brought a lifeline to the construction industry.
Rams Global, which has signed projects in many places from Dubai to Phuket and delivered more than 20 thousand residences, is now starting new projects in Istanbul.
Rams Garden Bahcelievler is located 9 minutes from Metroport AVM, 5 minutes from Marmara Forum AVM, 12 minutes from Kazlıçeşme beach, 9 minutes from Yıldız Technical University, 7 minutes from Istinye University, 9 minutes from Ramada Hotel and Medicana Hospital.
https://listingturkey.com/property/rams-garden-bahcelievler-apartments/
Simpolo Tiles & Bathware
Tile ho,
toh Simpolo.
Since the first steps were taken in 1977, Simpolo Ceramics has carved its niche as a consistently growing organisation with unparalleled innovation and passion rooted in simplicity.
We endure gratification for every experience we offer, created to share something meaningful. It may not resonate with the majority, but that makes us a class apart. If only a handful were to understand the purpose of our existence, we would be proud to have found our believers. Rather, people with whom we can share our beliefs.
VISUALIZER
Design your space in your style with our very own Visualizer. Now, you can choose the tiles of your liking from our wide selection and see how they would look in a space. Select the tile from the multiple options and the visualiser will replace the surfaces in the image with the selected tiles. This way, instead of just your imagination, you can choose the tiles for your place by getting an actual picture of how they would look in a space. So, design your space the way you desire digitally and implement it in real life to get the best results!
You can also share this visualiser with others to help them design their space.
Committed to delighting customers with world-class ceramic products and services. Make Simpolo synonymous with the best quality and set new benchmarks of excellence for all stakeholders. Pursue best business practices with utmost integrity to make Simpolo an exciting organisation to work with, for vendors, channel partners, investors and employees alike.
Gain worldwide recognition in the field of ceramic building products through Research and Innovation and bring an enhanced lifestyle within reach for every household.
The SVN® organization shares a portion of their new weekly listings via their SVN Live® Weekly Property Broadcast. Visit https://svn.com/svn-live/ if you would like to attend our weekly call, which we open up to the brokerage community.
Need MCA leads? No sweat! MCAs are great for small biz funding. Learn how to snag top-notch leads: businesses needing cash, with repayment ability, decision-makers, and accurate contacts. Use content, social ads, lead platforms, partnerships, and capture processes for quality leads.
https://www.leadgeneration.media/blog/b/streamline-your-mca-sales-process-with-pre-qualified-leads
Elegant Evergreen Homes - Luxury Apartments Redefining Comfort in Yelahanka, ...JagadishKR1
Experience unmatched luxury at Elegant Evergreen Homes, offering exquisite 2, 3, and 4 BHK apartments in the serene locality of Yelahanka, Bangalore. These meticulously crafted homes blend modern design with timeless elegance, providing a harmonious living environment. Enjoy top-tier amenities and a prime location, making Elegant Evergreen Homes the ideal choice for discerning homeowners.
One FNG by Group 108 Sector 142 Noida Construction UpdateOne FNG
One FNG by Group 108 is launching a new commercial project in Sector 142 Noida. Office space and high street retail shops on the FNG and Noida Expressway. For more information visit the website https://www.onefng.com/
The KA Housing - Catalogue - Listing TurkeyListing Turkey
Welcome to KA Housing, a distinguished real estate development nestled in the heart of Eyüpsultan, one of Istanbul’s most promising districts.
Just 10 minutes from the bustling city center, Eyüpsultan offers a serene escape with the convenience of urban living. The direct metro line ensures seamless connectivity to all parts of Istanbul, making it an ideal location for residents who seek both tranquility and vibrancy.
KA Housing boasts unparalleled accessibility, with proximity to Istanbul Airport only 30 minutes away, facilitating easy international travel. Effortless city access is guaranteed by direct metro and transportation links to Istanbul’s cultural and commercial hubs. Quick access to key metro lines connects you to every corner of the city within minutes, making commuting and exploring the city hassle-free.
The development offers luxurious living spaces with a range of unit layouts from 1+1 to 4+1, designed with meticulous attention to detail. Each unit features balconies or terraces, providing stunning vistas of Istanbul and enhancing the living experience. High-quality materials and superior craftsmanship ensure durability and elegance, while sound-proof insulation and high ceilings (2.95 m) offer comfort and sophistication.
Residents of KA Housing enjoy exclusive on-site amenities, including a state-of-the-art gym, outdoor swimming pool, yoga area, and walking paths. Entertainment options abound with a private cinema, children’s playground, and a variety of dining options including a café and restaurant. Security and convenience are paramount with 24/7 security, a dedicated carpark garage, and an IP intercom system.
KA Housing represents a prime investment opportunity with limited availability in a high-demand area, ensuring enduring value and potential for lucrative returns. Homes in this development provide exceptional value without compromising on quality, offering affordable luxury for discerning buyers. The construction is of the highest quality, built to the latest seismic and disaster resistance standards, ensuring safety and resilience.
The community and surroundings of KA Housing are enriched by close proximity to prestigious universities such as Haliç University, Bilgi University, and Istanbul Ticaret University, making it an ideal location for students and academics. The development is adjacent to the Alibeyköy stream leading into the Halic waters, offering serene natural escapes amidst lush greenery. Residents can enjoy the cultural richness of the area, surrounded by historical and cultural landmarks that blend leisure, nature, and culture seamlessly.
https://listingturkey.com/property/the-ka-housing/
Rixos Tersane Istanbul Residences Brochure_May2024_ENG.pdfListing Turkey
Tersane Suites Residences is a luxurious real estate project located in the heart of Istanbul, next to the beautiful Golden Horn. This unique development offers hotel concept residences with Rixos management, making it the perfect choice for both homeowners and investors.
The Tersane Suites Residences offers a wide range of options, from studio apartments to spacious four-bedroom units, all designed to the highest standard. The suites are finished with high-quality materials and feature modern, open-plan living spaces, fully-equipped kitchens, and large balconies with stunning views of the city and sea.
One of the standout features of Tersane Suites Residences is the Rixos management, which provides a truly exclusive and upscale living experience. Residents will have access to a range of luxury amenities, including a fitness center, spa, and indoor and outdoor swimming pools. Plus, the on-site restaurants and cafes provide a taste of the local and international cuisine.
The Tersane Suites Residences also offers a great opportunity for investors, as it provides a rental guarantee program. This means that investors can enjoy a steady income stream, with the peace of mind that their property is being managed by a reputable and experienced team.
The location of Tersane Suites Residences is also unbeatable, with easy access to the city’s main transportation links and within close proximity to the historic center, making it the perfect base for exploring all that Istanbul has to offer.
Sense Levent Kagithane Catalog - Listing TurkeyListing Turkey
Sense Levent offers a luxurious living experience in the heart of Istanbul’s vibrant Levent district.
This cutting-edge development seamlessly integrates modern design with natural elements, featuring live evergreen plants maintained by an advanced irrigation system, ensuring lush greenery year-round.
The building’s elegant ceramic balconies are both stylish and durable, enhancing the overall aesthetic and functionality. Residents can enjoy the 700m Sky Lounge, which provides breathtaking views of Istanbul and a perfect space to relax and unwind.
Sense Levent promotes a healthy and active lifestyle with a full gym, swimming pool, sauna, and steam room, all available in the building. The interiors are crafted with high-quality materials, ensuring a luxurious and inviting living space.
Designed with young professionals in mind, Sense Levent features 1+1 and 2+1 units with smart floor plans and balconies. The project promises high investment returns, with an expected annual return of 6.5-7%, significantly above Istanbul’s average ROI.
Located in the rapidly growing and highly desirable Levent area, the development benefits from ongoing urban regeneration projects. Its prime location offers proximity to shopping malls, municipal buildings, universities, and public transportation, adding immense value to your investment.
Early investors can take advantage of discounted units during the construction phase, with an expected capital appreciation of +45% USD upon completion. Property Turkey provides comprehensive rental management services, ensuring a seamless and profitable investment experience.
Additionally, robust legal support and significant tax advantages are available through Property Turkey’s licensed Real Estate Investment Fund. Levent is a dynamic urban hub, ideal for young professionals with its numerous corporate headquarters and shopping malls.
Sense Levent is more than just a residence; it’s a place where dreams and opportunities come to life. Contact us today to secure your place in this exclusive development and experience the best of Istanbul living. Sense Levent: Sense the Opportunity. Live the Dream.
https://listingturkey.com/property/sense-levent/
2. 2
DTCP Memo No. RL-20/DS(R)/2013/ 60197 dt 11.12.13 in
the matter.
2. Kind request is made to adjudicate this matter seeking
cancellation of license for serious violations of statute and
rules etc by giving personal hearing on any of the following
dates, 22, 23, 27, 28, 29, 30 January, 2014. In the interests of
equity and justice, till such time the appellant/complainant is
heard Senior Town Planner, Gurgaon may kindly be
directed to place on hold any action on DTCP Memo No.
RL-20/DS(R)/2013/ 60197 dt 11.12.13 directing Senior Town
Planner, Gurgaon to “report regarding violation done by
applicant vis-à-vis approved building plans.”
3. The documents attached in support are listed below with
point or points sought to be established therefrom being
mentioned in remarks column which briefly explains most of
the intricate key issues involved:
Ser Document
1
Statement of objects
and
reasons
of
Haryana Act 10 of
1983
2
Haryana Gaz. Extra
No 3/3/82 dt 18.09.86
P. 1079-80
3
Haryana
Govt.
Notification
No.
17714 dt 10.11.97
4
DTCP Memo No.
STP(Enf.)-98/1367 dt
15.12.98
Remarks
Solving housing problem
and control of building
activities and ownership
rights in Group Housing.
Governor of Haryana
appoints that Act 10 of
1983 shall come into force
on the date.
Governor of Haryana
appoints that Act 10 of
1983 shall come into force
on the date.
Implementation of various
provisions of Haryana Act
120 of 1983
Page
14
1516
17
1822
3. 3
5
6
7
DTCP Memo No.
5DP(III)1478-82 dt
03.02.99 with letter dt
15.12.98
Draft Haryana Govt.
Notification
No.
DTCP-99/ dt (In
partial modification of
No. 17714 dt 10.11.97
Statement of objects
and
reasons
of
Haryana Act 10 of
2002 for amending
Haryana Act 10 of
1983
8
Order dt 11.08.08 of
CTP-cum-FAA
Haryana under RTI A
9
Order dt 17.06.09 of
Sh SS Dhillon, DTCP
Haryana Memo No.
DS-2009/5216
dt
17.06.09 at Page 15
10
Order dt 03.01.12 of
Sh KK Jalan AA of
DTCP Haryana at
Page 18
11
Affidavit of STP
Gurgaon dt 07.12.13
filed on behalf of
DTCP Haryana at
Page 2
Implementation
of 23
Haryana Act 10 of 1983
Governor of Haryana was
to notify applicability of
Act 10 of 1983 under
various Haryana Acts. (not
published)
In order to add new users
in addition to existing
“residential
properties,
which are submitted to the
provisions of this Act”, to
appoint two additional
competent authorities and
to
make
the
Act
mandatory.
Matter
of
direct
registration of AOA under
Act 10 of 1983 .. to be
examined
Since payment of cost of
development
of
community facilities by the
apartment owners could
not be substantiated by any
documents their ownership
cannot be considered in
favour of AOA.
“..cost of development of
community
facilities,
…schools,
dispensary..,
commercial centre etc by
the apartment owners is
substantiated - upon a
reading of the declaration
it is clear..the apartment
owners have been charged
for such facilities
Preliminary Submissions
Para
2
admits
that
approved building plan
(ANNEXURE D-1) clearly
specifies 496 dwelling
units and 88 EWS flats
(For 56 service personnel
as per sanctioned plan)
24
25
2628
2944
4562
6373
4. 4
12
DTCP
Haryana
Minute Sheets from
10.05.12 to 02.07.12
in SLP DLF Ltd Vs.
Manmohan Lowe at
Noting Sheets 4 & 5
13
HUDA Memo No.
CTP(H)/DTP(N)
17370-414
dt
28.09.06
14
Haryana Govt. DTCP
Notification No. Leg.
25/2010 dt 30.09.10
15
Haryana Govt. DTCP
Notification No. PF51 dt 29.03.11 to
amend
Haryana
Development
and
Regulation of Urban
Areas Rules, 1976
16
Unitech
letter
dt
07.04.11 for renewal
of Lic. 60 of 1996
DTCP Memo No. RL20/LC-238-JE(B)/
2011/10032 dt 22.7.11
17
Opinion given by DGTCP
Haryana dt 17.05.12 that
Community
Centres,
Schools, Dispensaries etc.
should
vest
in
the
Apartment
Association.
CM Haryana approved the
same on 27.06.12.
“All the violations not
covered
by
the
composition rates listed
above
are
noncompoundable
except
minor variations in Public
Health Services such as
construction
of
underground water tank etc
which are to be ignored.”
New sub-section (7) added
to Section 3 of Haryana
Development
and
Regulation of Urban Areas
Act, 1975 vide Act 16 of
2010
for
grant
of
“completion
or
partcompletion certificate on
such terms and conditions
and after recovery of
infrastructure
augmentation charges, as
may be prescribed:”
New Rule 16-A (2) “The
Director… shall decide to
conduct an independent
audit
of
books
of
account…….After…the
Director shall decide as to
the
grant
of
such
exemption…or refuse to
issue such exemption, by
means of a speaking
order..”
Reason given is “required
only for miscellaneous
jobs”
Not submitted documents
in compliance of Rules 26,
27 & 28
7476
7779
8081
82
8384
85
5. 5
18
Haryana Govt. Memo
No. PF-68/2012/5/38/
2012-2TCP
dt
14.06.12
19
DTCP Memo No. RL20/DS(R)/2012/12351
dt 12.07.12
Unitech
letter
dt
27.11.12
for
completion certificate
20
21
DTCP
Haryana
Minute Sheets from
26.04.11 to 06.12.13
in Lic. 60 of 1996
Sector 47 Gurgaon
LC-238
22
DTCP Memo No. RL20/DS(R)/2013/37305
dt 22.04.13
DTCP Memo No.
DS(R)-LC238/2013/38921
dt
07.05.13
23
24
25
26
Unitech
letter
dt
07.06.13
DTCP Memo No. RL20/DS(R)/2013/42460
dt 11.06.13
Unitech
letter
dt
20.06.13
Governor of Haryana
pleased
to
prescribe
composition
rates
for
compounding violations of
delay in submission of
accounts
Not submitted documents
in compliance of Rules 26,
27 & 28 for last one year
Applied LC VII without
reference to non renewal of
license due violation of
license conditions qua
Rules 26, 27 & 28
Gross delay in license
renewal. Appears to be
erroneous grant of license
renewal from 01.05.11 to
30.04.15 after request for
final completion since no
provision
exists
for
exemption
from
submission of accounts in
re Rules 26(2), 27 & 28.
See also Items 4, 5 & 6 of
Haryana Govt. Memo No.
PF-68/2012/5/38/
20122TCP dt 14.06.02
Not submitted documents
in compliance of Rules 26,
27 & 28 for last two years
Proposed rejection of LC
VIII due non compliance
of Rules 26, 27 & 28 etc.
Hearing at 11 AM on
24.06.13 for LC VIII
EWS advertisements of 7
Unitech projects - details
Hearing scheduled for
20.06.13 postponed to 11
AM 05.08.13 for LC VI
Wrong and incorrect Deed
of Declaration sought to be
filed. Waiver of Rules 24,
26, 27 & 28 wrongfully
sought whereas only delay
in submission of accounts
is
compoundable
qua
8687
88
8990
91114
115
116
117
118
119126
6. 6
27
Unitech
22.06.13
letter
dt
28
Unitech
letter
dt
30.07.13/01.08.13
29
DTCP Memo No. RL20/DS(R)/2013/50119
dt 30.08.13 with
DTCP
Order
dt
30.08.13
30
DTCP Memo No. RL20/DS(R)/2013/60197
dt 11.12.13 to STP
Gurgaon
period of delay. Water has
not been provided as yet.
Sewer connection is non
functional
as
yet.
Electricity connection is
not Bulk Domestic as yet
and industrial rates of over
Rs 9 per unit are being
charged
by
DHBVN.
Hence completion can not
be given to Unitech
Regarding renewal of
license
and
final
completion
LC VI renewal to 30.04.15
saying development works
have been completed and
renewal is only for
(unstated) miscellaneous
works
License renewed upto
30.04.15 in clear violation
of mandate of Rules 26, 27
& 28 – delay in submission
of accounts is compounded
but non-submission of
accounts is not at all
compoundable
STP directed to “report
regarding violation done
by applicant vis-à-vis
approved building plans”
127
128129A
130131
132
4. Certain additional points are now given regarding the
violations of builder/developer/colonizer/licensee:
(a) The Uniworld Garden DTCP Haryana Lic. 60 of 1996
(i) Per sanctioned plan Towers 1 to 8
T-1. 66
T-2. 58
T-3. 70
T-4. 62
7. 7
T-5. 54
T-6. 70
T-7. 62
T-8. 54 (Total 496)
(ii) As built Towers 1 to 8
T-1. 72
T-2. 62
T-3. 70
T-4. 62
T-5. 54
T-6. 70
T-7. 62
T-8. 54 (Total 506- not as per sanctioned plan- Well settled
that extra floors beyond sanction are non-compoundable.
(b) Area of Dwelling Units
(i) Per Sanctioned Plan (sq m.)
Gross
92548.172
Shops
50
EWS
(non-saleable)
2188.588 24.87x88
(reduced 1653.62 sq m 18.58x89)* (non-saleable)
Community Centre
1004.144
(non-saleable)
496 Apartments
89305.44
(saleable)
i.e.
961275.72 sq ft
* As per Indian Express, Delhi, Page 3 advertisement dated
06.06.13 (From sanctioned D.U. Area of 24.87 sq m the built
8. 8
area is “super area” of 18.58 sq m. Super area is disallowed
vide IS 3861 of 2002
(ii) EDC on 13.081 acres at Rs 36.6025 lacs per gross acre
or Rs 4,78,80,000
1079671 sq ft sold to first 496 buyers and EDC recovered:
1079456 sq ft x Rs 44.36 per sq ft = Rs 4,78,84,668
(Per plan sold for 496 Nos could only be 100284.75 sq m)
(iii) Actually Built 506 flats
Extra area: 2 floors x 671.597 sq m. or 1343.194 sq m.
2 D.U.s 284.380 sq m.- Total excess: 1627.574 sq m.
506 Apartments 90933.014 sq. m or 978794.78 sq ft
(c) Financial details:
(i) Average Rate: Rs 1826 per sq ft (including Rs 44.36 per sq
ft as EDC.) Total Rs 197 crores were admittedly recovered by
Unitech from first 496 purchasers. In addition Unitech
admittedly received Rs 7 crores from10 dis-entitled purchasers
without informing them of the fact that only 496 apartments
are sanctioned till date on the file of DTCP.
(ii) Unitech mis-sold 109962 sq ft against 961275.72 sq ft
sanctioned. Built 2 extra floors being non-compoundable.
EDC 1099962 sq ft x Rs 44.36 = Rs 48,79,4314
(Unitech mis-sold 102189.82 sq m against 89305.44 sq m)
5. As per Indian Express, Delhi, Page 3 advertisement dated
06.06.13 (received from Unitech vide Diary No. 51128 dated
20.06.13) (From sanctioned D.U. Area of 24.87 sq m the built
9. 9
area is “super area” of 18.58 sq m. The D.U. Area calculated
as per Statute is actually 14.86 sq m. which violates the
minimum norm under Rules/Statute. Super area is anyhow
disallowed vide IS 3861 of 2002 under National Building
Code of India 2005 read with Disaster Management Act, 2005
( brought into force on 07.05.07) as per mandate of Clause
6.2.1 & 6.4.1 of National Disaster Management Policy, 2009.
Extract of National Disaster Management Policy, 2009 is as
below:
“6.2.1 In view of the construction boom and rapid
urbanisation, municipal regulations such as development
control regulations, building bye-laws and structural safety
features need to be revisited. These regulations will be
reviewed periodically to identify safety gaps from seismic,
flood, landslide and other disasters and suitable modifications
will be made to align them to the revised building codes of the
Bureau of Indian Standards (BIS). Undesirable practices
compromising safety during disasters, that tend to crop up
from time to time, will need to be addressed in the regulations.
The utilisation of unsuitable areas for construction, without
necessary safeguards further enhances vulnerability and needs
to be guarded against through appropriate compliance
mechanisms. Similarly, the introduction of suitable regulations
for rural areas will also be emphasised. Where required, local
bodies will be provided with suitable financial incentives for
10. 10
the preparation of appropriate regulations. This process will
involve an all inclusive exercise involving due sensitisation of
governmental organisations at all levels, local authorities and
the community at large to accrue maximum results thereof.
xxxxx
6.4.1 Hazards like earthquakes and cyclones do not kill people
but inadequately designed and badly constructed buildings do.
Ensuring safe construction of new buildings and retrofitting of
selected lifeline buildings, as given in the Earthquake
Guidelines, is a critical step to be taken towards earthquake
mitigation. The design and specification of houses being
constructed, under the Indira Awas Yojana (IAY) and other
government welfare and development schemes, will also be
reexamined to ensure hazard safety. Building codes will be
updated every five years as a mandatory requirement and also
put in the public domain. Observance of the National Building
Code should be made mandatory in all the State/ Municipal
building bye-laws.”
6. That the names of 10 persons excluding first 496 purchasers
who were allotted Unitech Customer ID Nos lying between ID
Nos 603006 to 603508 and ID Nos 6030071 to 6034951 have
now been ascertained. These persons are disentitled for
allotment as they fall within the mischief of well settled law
established in Jayantilal Investments vs Madhuvihar CoOperative Housing (2007) 9 SCC 220 & Madhuvihar Co-
11. 11
operative Housing Society, Mumbai v. Jayantilal Investments
2011 (1) Mh.L.J. 641) read with Harsukh Jadhavji Joshi vs
Ramesh Himatlal Shah AIR 1974 Bom 87, (1973) 75 BOMLR
649, Ramesh Himmatlal Shah vs Harsukh Jhadavji Joshi
(1974) 76 BOMLR 375 & Ramesh Himmatlal Shah vs
Harsukh Jadhavji Joshi AIR 1975 SC 1470, 1975 SCR 270):
Cust ID
Name
SUNDEEP KHANNA
earlier HEMANT
6035001
KUMAR earlier
SAROJ SACHDEVA
Twr
Flat
Area
Mobile
1
003
1800
98100072850
N.A.
UMESH CHANDRA
SAHOO
1 1903
2027
9733101052
N.A.
NAWABUDDIN earlier
HINDUSTAN
THOMPSON ASSOC
1 1904
2027
9810831544
N.A.
RAMESH MALIK
2 1603
2027
9311530563
N.A.
SURYADEEP KR
VARMA earlier PREET
KAUR
3
004
1800
9871371275
N.A.
GR GUPTA
4
003
1800
9254344767
6034961 SAKSHI GURNANI
6 1601
3410
Related to
Unitech
promoter
Praveen
Gurnani
N.A.
SANJEEV BHASIN
7
003
1800
9999052888
N.A.
SANJAY MITTAL
7
004
1800
9810159141
N.A.
PUNEET CHOPRA
8
003
1800
9871339989
7. That whereas excess FAR is compoundable to an extent as
per Rule, there can be no builtup area by way of extra floor
beyond the sanctioned plan is very well settled in Priyanka
Estates International v State of Assam 2010 (2) SCC 27 AIR
2010 SC 1030:
"69. However, the said contention cannot be accepted
as construction of an extra floor does not fall within the
12. 12
category of compoundable items which is manifest from
Appendix III of the building bye-laws of the
Corporation reproduced hereinabove.
xxxx
79. The instant case is not a case of breach of contract.
It is a clear case of breach of the obligation undertaken
to erect the building in accordance with building
regulations and failure to truthfully inform the warranty
of title and other allied circumstances.
xxx
82. In the light of the foregoing discussions, these
appeals are dismissed with the directions contained
hereinabove. Respondent-authorities shall be at liberty
to proceed with demolition of half of the 5th floor, if not
ultimately compounded; 6th, 7th and 8th floors as
mentioned hereinabove."
8. That the competent authority may see also Esha Ekta v
Municipal Corporation of Mumbai (2012) 4 SCC 689 & Esha
Ekta v Municipal Corporation of Mumbai (2013) 5 SCC 357
for re-iteration of this facet of demolition of even one floor
beyond original sanctioned plan. Since sanctioned plan of The
Uniworld Garden shows 496 flats and 10 extra flats are built
by raising one and half extra floors in Tower 1 (6 flats) and
one extra floor in Tower 2 (4 flats) - whereas the latest
sanctioned plan submitted in court by DGTCP Haryana/ STP
13. 13
Gurgaon (vide Affidavit dated 27.09.13 & Affidavit dated
07.12.13) show only 496 flats. Actually 506 flats have been
constructed on ground by raising two and half extra floors
beyond sanctioned plan - even one extra floor was repeatedly
held to be non compoundable by SC. The DGTCP Haryana
Affidavits are silent on this point of 506 flats actually
constructed on extra floors added without any sanctioned plan.
89 EWS service personnel flats were thereby built as against
88 EWS service personnel flats existing in the sanctioned
plan.
9. That there are also grave violations of Disaster Management
Act, 2005 for which stringent provisions to deal with negligent
officers and ministers are provided in the law since 2007.
10. Kindly grant me early hearing on any of the dates 22, 23,
27, 28, 29, 30 January, 2014. In the interests of equity and
justice, till such time the appellant/complainant is heard
Senior Town Planner, Gurgaon may kindly be directed to
place on hold any action on DTCP Memo No. RL20/DS(R)/2013/ 60197 dt 11.12.13 directing Senior Town
Planner, Gurgaon to “report regarding violation done by
applicant vis-à-vis approved building plans.”
Place: Gurgaon
Date: 09.01.2014
Lt Col(Retd) Sarvadaman Singh Oberoi
Mobile:98187698349
Copy to:
Senior Town Planner, Gurgaon
Sector 14, Gurgaon 122001 – w.r.t. para 1, 2 & 10
77. 77
From
The Chief Administrator
HUDA (Town Planning Wing),
Panchkula.
To
1.The Director, Town & Country Planning, Haryana, Chandigarh.
2.The Administrators, HUDA, Panchkula, Gurgaon, Hisar, Faridabad, Rohtak.
3.The Senior Town Planners, Gurgaon, Panchkula, Hisar.
4.All the Estate Officers, HUDA.
5.All the District Town Planners.
Memo no. CTP (H) / DTP (N) – 17370-414 Dated: 28-09-2006
Subject: Composition Rates for compoundable violations in Plotted residential
development applicable to Town & Country Planning Department and HUDA.
The following composition rates for compoundable violations in plotted
residential development applicable to Town & Country Planning Department
and HUDA have been approved by the Govt. These rates shall come into force
with immediate effect.
Ser
Description of violation
Composition rates
1.
BUILDING WITHOUT PLAN:
Construction raised without getting plan
sanctioned and the construction so made
conform to the building bye laws /
zoning
a.
zoning.
b.
2.
Construction without building plans
revalidated.
Compounding @ Rs. 400/- per sq. mts.
Compoundable @ Rs. 100/- per sq. mts.
on constructed area.
COVERED AREA:
a.
Compoundable up to maximum limit of
10% of the set back to be compounded @
Rs. 10800/- per sq. mts.
Covered area beyond zoning line but
within permissible limits.
b.
Excess covered area beyond permissible
limit within zoned area.
Compoundable up to 10% of the total
permissible FAR. Up to 5% @ Rs. 3300/per sq. mts. and beyond 5% @ 6500/- per
sq. mts .
c.
Excess covered area beyond zoning line.
3.
a.
HEIGHT OF THE BUILDING:
Increase in height up to (including
parapet and mumty) beyond permissible
limit where no frame control is applicable.
(i) Up to 50 cm
(ii) Above 50cm to 1.00 meter.
Compoundable up to maximum limit of
10% of the set back to be compounded @
Rs. 10800/- per sq. mts. (This will be
over and above the composition fee of
excess covered area).
Compoundable
Nil
Rs.2000/- per sq. mts. Of covered area
subject to the maximum of 12 sq. mts.
78. 78
4.
a.
b.
5.
a.
6.
a.
7.
a.
b.
8.
a.
b.
c.
only.
d.
rules.
e.
LIGHT AND VENTILATION:
Non provision of exhaust fan / flue in
the Kitchen.
General light and ventilation including
toilets.
Compoundable @ Rs. 200/- each.
Variation up to 10% is compoundable @
Rs.1100/- per sq. mts.
HEIGHT AND SIZE OF HABITABLE
AND OTHER ROOMS.
Variation in Height and size of habitable
rooms, kitchen and toilets.
Reduction in height up to 10cm and
reduction in area up to 5% of the
minimum required is compoundable @
Rs. 500/- each.
HEIGHT OF BOUNDARY WALL AND
TYPE OF GATE.
Change of design, height, size and
location of the gate / wicket gate and
boundary wall.
Compoundable @ Rs. 1000/- each per
Violation up to the maximum of 10% in
size and height of gate / wicket gate and
boundary wall.
DAMP PROOF COURSE (DPC)
Construction without obtaining DPC
certificate bur according to approved
building plan.
Compoundable @ Rs.5/- per sq. mts of
the permissible ground coverage.
Changing DPC after obtaining DPC
certificate but confirming to building
bye-laws / zoning.
Compoundable @ Rs.10/- per sq. mts. of
the permissible ground coverage.
STAIR CASE:
Steps outside the zoned area on ground Steps shall not be counted towards
floor.
covered area and compoundable @
Rs.1000/- per step subject to the
maximum of five steps and maximum
width of 1.20 mts. Having maximum
tread of 30cm each.
Tread and riser not as per rules.
Variation up to 10% compoundable @
Rs. 100/- per step.
Provision of winder steps at landings
Compoundable @ Rs. 200/- each.
Width of stair case reduced from
minimum width prescribed under the
case.
Reduction only up to 10cm is
compoundable @ Rs. 500/- per stair
Head room height reduction from the
minimum prescribed under the rules.
Up to 10cm is compoundable @ Rs.
500/- each Head room.
79. 79
9.
CANTILEVER PROJECTION:
a.
Sanctionable projection but not shown in
the sanctioned building plan.
b.
Non-Sanctionable cantilever projection
but within zoning line.
Non-Sanctionable cantilever projection
outside zoning line.
c.
d.
Cantilever Cup Board / bay window
e.
Projection on Govt. Land
10.
a.
Compoundable @ Rs. 500/- per sq. mts.
Violation up to maximum limit of 10% of
the set back line is compoundable @
Rs.11000/- per sq mt .
To be counted in covered area violation.
Compoundable to the limit of 30 cm in
width @ Rs. 1000/- per sq. mts. at
door/window level only.
VENTILATION SHAFT:
Area of shaft is less than the permissible.
b.
Compoundable @ Rs. 100/- per sq. mts.
Shaft covered at 2.40 meters height.
Variation up to 10% is compounded @
Rs. 9000/- per sq. mts.
Compoundable @ Rs. 1000/- each light
and ventilation parameters met with.
?
11.
a.
MISCELLANEOUS:
Un-authorized occupation
Compoundable @ Rs. 50/- per sq. mts.
Of
b.
c.
d.
e.
Pipe shaft beyond zoning line.
Non load bearing architectural pillars.
To be counted in covered area violation.
Compoundable @ Rs. 1000/- each
provided is less than 30cm in dia not
touching roof or projection and
maximum up to 4 pillars.
Major changes like shifting of internal
wall, door, window, ventilator, left over
door and other changes in elevations.
Compoundable @ Rs. 100/- each.
Store converted into Kitchen, provided it
meets with the provisions of rules.
Compoundable @ Rs. 1500/-
NOTE: All the violations no covered by the composition rates listed above are
non- compoundable except minor variation in Public Health Services such as
construction of under ground water tank etc. which are to be ignored.
-sdDistrict Town Planner, For Chief Administrator, HUDA,