Water & Risk Management
          Week 7


     Assoc. Professor Seungho Lee

Graduate School of International Studies
             1 May 2012
   Introduction
   Historical Background
   Specifications
   Dam Politics & Critical Issues
   Concluding Remarks

   Seminar
   Historical roots of construction of 3GD
   Specifications of 3GD
   Dam politics & critical issues including
    resettlement issues
   Early Stage
    ◦ First suggested by Sun Yat-sen in 1919 – potential
      for a large scale hydroelectricity generation
    ◦ Feasibility Study by US in the 30s & Soviet Union in
      1955
   Consensus building in the 1950s-1970s
    ◦ On-going debates on feasibility  Great Leap
      Forward (1958-1961) & Cultural Revolution (1966-
      1976) discussion halted
    ◦ Gezhouba Dam – a testing ground for resolving
      technical issues
      Construction 1970-75 planned  completed in 1989
   Reform period (1978~)
    ◦ More electricity for development required
      US Bureau of Reclamation study in the early 1980s
    ◦ Opposition – Political Consultation Committee, ‘No’
      & unfavourable public views (Dai Qing)
      Breakthrough in Tiananmen Square in 1989
    ◦ Emblematic event – opposition died, strong
      censorship on the media, big flood events in 1991
    ◦ Endorsed in 1992
   Primary purposes
    ◦ Flood control
      One of the most flood-prone areas
    ◦ Hydro-electricity generation
      Essential for central & eastern China, substituting 40
       million tons of coal/year
    ◦ Enhancement of inland navigation
      Golden Waterway – accounting for 80% of China’s
       waterborne traffic
   Further project details
    ◦ China Three Gorges Corporation Webpage
      http://www.ctgpc.com.cn/en/index.php
Items                         Contents
Construction period     1994-2009
Location                Sandouping near Yichang, Hubei Province
Total Cost*             RMB 200 billion (US$ 24 billion)
Size of reservoir       600 km long
Height                  175 m
Generation capacity     18.2GW (World No.1)
No. of resettlement     1.4 million


* Financing – 3 ways
1) 3GD Construction Fund, collected by levying RMB 0.015/kw of
    electricity sold annually
2) Revenue from Gezhouba Dam
3) Domestic loans – the China Construction Bank
Source: China Three Gorges Dam Corporation Http://www.ctgpc.com.cn
East

                      Big ships
                      (10,000
                      tons)




 West




Small ships
(3,000 tons)
Three Gorges Dam
   Political significance
    ◦ Undemocratic decision-making
      Little access to & manipulation of information
      Lack of freedom of speech (Dai Qing’s arrestment)
    ◦ Approval in midst of fierce opposition
    ◦ Favorable conditions – 1989, flood in 1991, Li Peng
   Leadership & actors
    ◦ Central government institutions – 3GD Construction
      Committee under the State Council
    ◦ 3GD Development firm, 3G Project Office – allocation of
      funds & construction
    ◦ Relationship between office & localities
      Responsibility of treating wastewater  local governments
      Financially poor, bankrupt (Wanzhou)
The State Council


           3GD Project Construction
                 Committee

   3GD Project
                                 3GD Project Office
  Development
  Corporation
                               3GD Project Ecological &
3GD Resettlement               Environmental Protection
     Office                    Coordinating Small Group
   Critical issues
    ◦ Human impacts – 1.4 million resettlement, more?
    ◦ Engineering concerns – alternative option, small dams?
    ◦ Cost over-run? – US$ 24 billion planned, more?
    ◦ Environmental effects – siltation, toxic
      wastes, earthquakes, rare species (white river dolphins)
    ◦ Water pollution – urban wastewater, toxic wastes
      (discharged from Chongqing Municipality, 40 million)
    ◦ Disease risks – malnutrition for relocatees, lack of
      medical services
   Wenchuan Earthquake, May 2008
    ◦ 7.9 Richter scale earthquake, perhaps caused by the
      Zipingu Dam, 5.5km away
    ◦ 80,000 people killed, 5 million homes lost
    ◦ Three Gorges Dam?
   Present state of 3GD Project
    ◦ 1st Phase: 1994-1997, 2nd Phase : 1998-2003
    ◦ 3rd Phase: 2004-2009 (November)
    ◦ Water level reached full capacity (175 m), 26 Oct
      2010
    26 generators to produce 84.7 bil kw/h, annually (6
      more generators installed)
   Government audit in early 2006
    ◦ No corruption so far but resettlement problem
      acknowledged later
    ◦ By end of 2003, misuse of US$ 7 million of funds
      for relocation, US$ 5.38 million retrieved
   Wushan, village affected by 3GD
    ◦ Many not received compensation, Yunyang county, RMB
      20,000 planned to allocated to each family, eventually only
      10,800
    ◦ Less job creation – laid off from SOEs
    ◦ Tourism – stinky & stagnated pool of water
    ◦ Landslide – moving the resettled up to hills in 99 & 03
    ◦ Many farmers forced to use their life savings on mortgages
      to pay for the new homes with US$ 25/month
   Challenges since its operation (as of Oct 2010, AFP)
    ◦ Landslides & mudflows: forced relocation of additional
      28,000 people, caused by rising water
    ◦ Layers of trash & debris building up in the reservoir
      threatening to jam the dam
     200,000 m3 of rubbish collected per annum  80 Olympic
      size pools, discharged by over 150 million people upstream
   3GD – Engine for modernization?
    ◦ Flood control, hydroelectricity generation &
      navigation
    ◦ Critical issues
   Dam politics
    ◦ Water flows uphill to power & money
    ◦ Sanctioned discourse
   Hydraulic Mission
    ◦ Not reached the post-modernism yet
    ◦ More development for the next stage against all
      odds?
   Dams for China
    ◦ Negative environmental impacts – developed countries
      decommissioning dams, i.e. US
    ◦ Hydropower/flood control – essential for China’s
      modernization?
   Yangtze drought (Guardian, 25 May 2010)
    ◦ Jan-April drought, Hubei worst hit 40% less than average
    ◦ Damage to crops, threatening wildlife, qustions on
      viability of SNWT Project
    ◦ A release of 5 bil m3 water from 3GD
    ◦ Sacrifice of hydroelectricity for irrigation, drinking water
      & ecosystem protection (finless porpoise)
     Why drought? Ma Jun, due to 3GD!
   Three Gorges Dam (Discovery Channel, 2007)
    ◦ 1998 Flood event: justification of 3GD
    ◦ Three Gorges Dam – specifications
    ◦ Energy (hydroelectricity), Coal, CO2
    ◦ Tourism & inland navigation
    ◦ Resettlement issues: 1.13 mil, 4,000 villages
    ◦ Dam safety: siltation, earthquakes
     Essential for China’s future?

More Related Content

What's hot

The Nile Basin Initiative (NBI): Current Status, Challenges and Prospects
The Nile Basin Initiative (NBI): Current Status, Challenges and Prospects The Nile Basin Initiative (NBI): Current Status, Challenges and Prospects
The Nile Basin Initiative (NBI): Current Status, Challenges and Prospects Zerihun Abebe
 
Environmental Issues and the Hydro-politics of the Eastern Nile Basin: Confli...
Environmental Issues and the Hydro-politics of the Eastern Nile Basin: Confli...Environmental Issues and the Hydro-politics of the Eastern Nile Basin: Confli...
Environmental Issues and the Hydro-politics of the Eastern Nile Basin: Confli...Zerihun Abebe
 
Egypt VS Ethiopia over the Nile River
Egypt VS Ethiopia over the Nile RiverEgypt VS Ethiopia over the Nile River
Egypt VS Ethiopia over the Nile Riveriakovosal
 
World Engineers Summit Conf, Singapore July 2015 [Compatibility Mode]
World Engineers Summit Conf, Singapore July 2015 [Compatibility Mode]World Engineers Summit Conf, Singapore July 2015 [Compatibility Mode]
World Engineers Summit Conf, Singapore July 2015 [Compatibility Mode]Roger Falconer
 
Kerala flood August 2018
Kerala flood August 2018Kerala flood August 2018
Kerala flood August 2018Ritesh Singh
 
RBD_Briefing_Book
RBD_Briefing_BookRBD_Briefing_Book
RBD_Briefing_BookRoni Meryl
 
Indus river basin paper hasrat
Indus river basin paper hasratIndus river basin paper hasrat
Indus river basin paper hasratHasrat Arjjumend
 
Causes of japan flood 2015
Causes of japan flood 2015Causes of japan flood 2015
Causes of japan flood 2015virgo_az
 
Floods In Bangladesh
Floods In BangladeshFloods In Bangladesh
Floods In Bangladeshwhiskeyhj
 
presentation ppt
presentation pptpresentation ppt
presentation pptuzmaakhter1
 
Right to water for agriculture in West Africa requires secure land rights
Right to water for agriculture in West Africa requires secure land rightsRight to water for agriculture in West Africa requires secure land rights
Right to water for agriculture in West Africa requires secure land rightsGlobal Water Initiative - West Africa
 
Nile Hydropolitics in the Nile Basin - Aalto University
Nile Hydropolitics in the Nile Basin - Aalto UniversityNile Hydropolitics in the Nile Basin - Aalto University
Nile Hydropolitics in the Nile Basin - Aalto UniversityAna Cascao
 
Multipurpose River Valley Projects and alternate water supply methods
Multipurpose River Valley Projects and alternate water supply methodsMultipurpose River Valley Projects and alternate water supply methods
Multipurpose River Valley Projects and alternate water supply methodsTannya
 
Reclamation presentation 2
Reclamation presentation 2Reclamation presentation 2
Reclamation presentation 2Enoch Chang
 

What's hot (20)

The Nile Basin Initiative (NBI): Current Status, Challenges and Prospects
The Nile Basin Initiative (NBI): Current Status, Challenges and Prospects The Nile Basin Initiative (NBI): Current Status, Challenges and Prospects
The Nile Basin Initiative (NBI): Current Status, Challenges and Prospects
 
Environmental Issues and the Hydro-politics of the Eastern Nile Basin: Confli...
Environmental Issues and the Hydro-politics of the Eastern Nile Basin: Confli...Environmental Issues and the Hydro-politics of the Eastern Nile Basin: Confli...
Environmental Issues and the Hydro-politics of the Eastern Nile Basin: Confli...
 
Water cooperation
Water cooperationWater cooperation
Water cooperation
 
Egypt VS Ethiopia over the Nile River
Egypt VS Ethiopia over the Nile RiverEgypt VS Ethiopia over the Nile River
Egypt VS Ethiopia over the Nile River
 
Soils final presentation
Soils final presentationSoils final presentation
Soils final presentation
 
Flood Management in Bangladesh
Flood Management in Bangladesh Flood Management in Bangladesh
Flood Management in Bangladesh
 
Floods
FloodsFloods
Floods
 
World Engineers Summit Conf, Singapore July 2015 [Compatibility Mode]
World Engineers Summit Conf, Singapore July 2015 [Compatibility Mode]World Engineers Summit Conf, Singapore July 2015 [Compatibility Mode]
World Engineers Summit Conf, Singapore July 2015 [Compatibility Mode]
 
Kerala flood August 2018
Kerala flood August 2018Kerala flood August 2018
Kerala flood August 2018
 
RBD_Briefing_Book
RBD_Briefing_BookRBD_Briefing_Book
RBD_Briefing_Book
 
Tehri dam ppt
Tehri dam pptTehri dam ppt
Tehri dam ppt
 
Indus river basin paper hasrat
Indus river basin paper hasratIndus river basin paper hasrat
Indus river basin paper hasrat
 
TOTO: Environmental strategy for water by Yasutoshi Shimizu, TOTO
TOTO: Environmental strategy for water by Yasutoshi Shimizu, TOTOTOTO: Environmental strategy for water by Yasutoshi Shimizu, TOTO
TOTO: Environmental strategy for water by Yasutoshi Shimizu, TOTO
 
Causes of japan flood 2015
Causes of japan flood 2015Causes of japan flood 2015
Causes of japan flood 2015
 
Floods In Bangladesh
Floods In BangladeshFloods In Bangladesh
Floods In Bangladesh
 
presentation ppt
presentation pptpresentation ppt
presentation ppt
 
Right to water for agriculture in West Africa requires secure land rights
Right to water for agriculture in West Africa requires secure land rightsRight to water for agriculture in West Africa requires secure land rights
Right to water for agriculture in West Africa requires secure land rights
 
Nile Hydropolitics in the Nile Basin - Aalto University
Nile Hydropolitics in the Nile Basin - Aalto UniversityNile Hydropolitics in the Nile Basin - Aalto University
Nile Hydropolitics in the Nile Basin - Aalto University
 
Multipurpose River Valley Projects and alternate water supply methods
Multipurpose River Valley Projects and alternate water supply methodsMultipurpose River Valley Projects and alternate water supply methods
Multipurpose River Valley Projects and alternate water supply methods
 
Reclamation presentation 2
Reclamation presentation 2Reclamation presentation 2
Reclamation presentation 2
 

Similar to Lecture 7 3 gd (1 may 12)

MBA - Project Management - Mega Projects and the Impact on Society
MBA - Project Management - Mega Projects and the Impact on SocietyMBA - Project Management - Mega Projects and the Impact on Society
MBA - Project Management - Mega Projects and the Impact on SocietyUmesha Gunasinghe
 
Displacement case study- three gorges, China
Displacement case study- three gorges, China Displacement case study- three gorges, China
Displacement case study- three gorges, China Aneisha Samuels-Sanford
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plantSiraskarCom
 
Three georges dam (china) real##
Three georges dam  (china) real##  Three georges dam  (china) real##
Three georges dam (china) real## Nomaan . zs
 
TEHRI DAM & ITS IMPLICATIONS
TEHRI DAM & ITS IMPLICATIONSTEHRI DAM & ITS IMPLICATIONS
TEHRI DAM & ITS IMPLICATIONSA Y V CHENULU
 
2016 GMekong Forum - S13 - Hydropower Developent in Upper Ayeyawady
2016 GMekong Forum - S13 - Hydropower Developent in Upper Ayeyawady2016 GMekong Forum - S13 - Hydropower Developent in Upper Ayeyawady
2016 GMekong Forum - S13 - Hydropower Developent in Upper AyeyawadyWater, Land and Ecosystems (WLE)
 
Three gorges dam,china
Three gorges dam,chinaThree gorges dam,china
Three gorges dam,chinaARJUMAND EJAz
 
The Scale Politics of Urban Water Governance: Beijing and the South–to-North ...
The Scale Politics of Urban Water Governance: Beijing and the South–to-North ...The Scale Politics of Urban Water Governance: Beijing and the South–to-North ...
The Scale Politics of Urban Water Governance: Beijing and the South–to-North ...Shuwei Huang
 
Pilgrim Pipelines: What Ulster County Residents Need to Know
Pilgrim Pipelines: What Ulster County Residents Need to KnowPilgrim Pipelines: What Ulster County Residents Need to Know
Pilgrim Pipelines: What Ulster County Residents Need to KnowJeremy Cherson
 
Potential & experience of dams in ethiopia
Potential & experience of dams in ethiopiaPotential & experience of dams in ethiopia
Potential & experience of dams in ethiopiaFeteneBefekadu
 
The impacts of Three Gorges Dam on ChinaWangjunyi GuoStude.docx
The impacts of Three Gorges Dam on ChinaWangjunyi GuoStude.docxThe impacts of Three Gorges Dam on ChinaWangjunyi GuoStude.docx
The impacts of Three Gorges Dam on ChinaWangjunyi GuoStude.docxrtodd33
 
Three gorges dam pptx
Three gorges dam pptxThree gorges dam pptx
Three gorges dam pptxAmit Kumar
 
Tipaimukh dam & Bangladesh- M Shahriar Sonet
Tipaimukh dam & Bangladesh- M Shahriar SonetTipaimukh dam & Bangladesh- M Shahriar Sonet
Tipaimukh dam & Bangladesh- M Shahriar SonetM Shahriar Sonet
 
Nichi.11 12-13.nasa.cynthia rosenzweig
Nichi.11 12-13.nasa.cynthia rosenzweigNichi.11 12-13.nasa.cynthia rosenzweig
Nichi.11 12-13.nasa.cynthia rosenzweigNICHI_USA
 

Similar to Lecture 7 3 gd (1 may 12) (20)

MBA - Project Management - Mega Projects and the Impact on Society
MBA - Project Management - Mega Projects and the Impact on SocietyMBA - Project Management - Mega Projects and the Impact on Society
MBA - Project Management - Mega Projects and the Impact on Society
 
Displacement case study- three gorges, China
Displacement case study- three gorges, China Displacement case study- three gorges, China
Displacement case study- three gorges, China
 
THE THREE GORGES ppt
THE THREE GORGES pptTHE THREE GORGES ppt
THE THREE GORGES ppt
 
The Three Gorges Dam
The Three Gorges DamThe Three Gorges Dam
The Three Gorges Dam
 
The Three Gorges Dam
The Three Gorges Dam The Three Gorges Dam
The Three Gorges Dam
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
 
Eco eng project ppt
Eco eng project pptEco eng project ppt
Eco eng project ppt
 
Three georges dam (china) real##
Three georges dam  (china) real##  Three georges dam  (china) real##
Three georges dam (china) real##
 
TEHRI DAM & ITS IMPLICATIONS
TEHRI DAM & ITS IMPLICATIONSTEHRI DAM & ITS IMPLICATIONS
TEHRI DAM & ITS IMPLICATIONS
 
2016 GMekong Forum - S13 - Hydropower Developent in Upper Ayeyawady
2016 GMekong Forum - S13 - Hydropower Developent in Upper Ayeyawady2016 GMekong Forum - S13 - Hydropower Developent in Upper Ayeyawady
2016 GMekong Forum - S13 - Hydropower Developent in Upper Ayeyawady
 
Three gorges dam,china
Three gorges dam,chinaThree gorges dam,china
Three gorges dam,china
 
The Scale Politics of Urban Water Governance: Beijing and the South–to-North ...
The Scale Politics of Urban Water Governance: Beijing and the South–to-North ...The Scale Politics of Urban Water Governance: Beijing and the South–to-North ...
The Scale Politics of Urban Water Governance: Beijing and the South–to-North ...
 
Pilgrim Pipelines: What Ulster County Residents Need to Know
Pilgrim Pipelines: What Ulster County Residents Need to KnowPilgrim Pipelines: What Ulster County Residents Need to Know
Pilgrim Pipelines: What Ulster County Residents Need to Know
 
Energy (Krems)
Energy (Krems)Energy (Krems)
Energy (Krems)
 
Dams
DamsDams
Dams
 
Potential & experience of dams in ethiopia
Potential & experience of dams in ethiopiaPotential & experience of dams in ethiopia
Potential & experience of dams in ethiopia
 
The impacts of Three Gorges Dam on ChinaWangjunyi GuoStude.docx
The impacts of Three Gorges Dam on ChinaWangjunyi GuoStude.docxThe impacts of Three Gorges Dam on ChinaWangjunyi GuoStude.docx
The impacts of Three Gorges Dam on ChinaWangjunyi GuoStude.docx
 
Three gorges dam pptx
Three gorges dam pptxThree gorges dam pptx
Three gorges dam pptx
 
Tipaimukh dam & Bangladesh- M Shahriar Sonet
Tipaimukh dam & Bangladesh- M Shahriar SonetTipaimukh dam & Bangladesh- M Shahriar Sonet
Tipaimukh dam & Bangladesh- M Shahriar Sonet
 
Nichi.11 12-13.nasa.cynthia rosenzweig
Nichi.11 12-13.nasa.cynthia rosenzweigNichi.11 12-13.nasa.cynthia rosenzweig
Nichi.11 12-13.nasa.cynthia rosenzweig
 

Recently uploaded

Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 

Recently uploaded (20)

Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 

Lecture 7 3 gd (1 may 12)

  • 1. Water & Risk Management Week 7 Assoc. Professor Seungho Lee Graduate School of International Studies 1 May 2012
  • 2. Introduction  Historical Background  Specifications  Dam Politics & Critical Issues  Concluding Remarks  Seminar
  • 3. Historical roots of construction of 3GD  Specifications of 3GD  Dam politics & critical issues including resettlement issues
  • 4. Early Stage ◦ First suggested by Sun Yat-sen in 1919 – potential for a large scale hydroelectricity generation ◦ Feasibility Study by US in the 30s & Soviet Union in 1955  Consensus building in the 1950s-1970s ◦ On-going debates on feasibility  Great Leap Forward (1958-1961) & Cultural Revolution (1966- 1976) discussion halted ◦ Gezhouba Dam – a testing ground for resolving technical issues  Construction 1970-75 planned  completed in 1989
  • 5. Reform period (1978~) ◦ More electricity for development required  US Bureau of Reclamation study in the early 1980s ◦ Opposition – Political Consultation Committee, ‘No’ & unfavourable public views (Dai Qing) Breakthrough in Tiananmen Square in 1989 ◦ Emblematic event – opposition died, strong censorship on the media, big flood events in 1991 ◦ Endorsed in 1992
  • 6. Primary purposes ◦ Flood control  One of the most flood-prone areas ◦ Hydro-electricity generation  Essential for central & eastern China, substituting 40 million tons of coal/year ◦ Enhancement of inland navigation  Golden Waterway – accounting for 80% of China’s waterborne traffic  Further project details ◦ China Three Gorges Corporation Webpage http://www.ctgpc.com.cn/en/index.php
  • 7. Items Contents Construction period 1994-2009 Location Sandouping near Yichang, Hubei Province Total Cost* RMB 200 billion (US$ 24 billion) Size of reservoir 600 km long Height 175 m Generation capacity 18.2GW (World No.1) No. of resettlement 1.4 million * Financing – 3 ways 1) 3GD Construction Fund, collected by levying RMB 0.015/kw of electricity sold annually 2) Revenue from Gezhouba Dam 3) Domestic loans – the China Construction Bank
  • 8.
  • 9. Source: China Three Gorges Dam Corporation Http://www.ctgpc.com.cn
  • 10.
  • 11. East Big ships (10,000 tons) West Small ships (3,000 tons)
  • 12.
  • 14.
  • 15. Political significance ◦ Undemocratic decision-making  Little access to & manipulation of information  Lack of freedom of speech (Dai Qing’s arrestment) ◦ Approval in midst of fierce opposition ◦ Favorable conditions – 1989, flood in 1991, Li Peng  Leadership & actors ◦ Central government institutions – 3GD Construction Committee under the State Council ◦ 3GD Development firm, 3G Project Office – allocation of funds & construction ◦ Relationship between office & localities  Responsibility of treating wastewater  local governments  Financially poor, bankrupt (Wanzhou)
  • 16. The State Council 3GD Project Construction Committee 3GD Project 3GD Project Office Development Corporation 3GD Project Ecological & 3GD Resettlement Environmental Protection Office Coordinating Small Group
  • 17. Critical issues ◦ Human impacts – 1.4 million resettlement, more? ◦ Engineering concerns – alternative option, small dams? ◦ Cost over-run? – US$ 24 billion planned, more? ◦ Environmental effects – siltation, toxic wastes, earthquakes, rare species (white river dolphins) ◦ Water pollution – urban wastewater, toxic wastes (discharged from Chongqing Municipality, 40 million) ◦ Disease risks – malnutrition for relocatees, lack of medical services  Wenchuan Earthquake, May 2008 ◦ 7.9 Richter scale earthquake, perhaps caused by the Zipingu Dam, 5.5km away ◦ 80,000 people killed, 5 million homes lost ◦ Three Gorges Dam?
  • 18.
  • 19. Present state of 3GD Project ◦ 1st Phase: 1994-1997, 2nd Phase : 1998-2003 ◦ 3rd Phase: 2004-2009 (November) ◦ Water level reached full capacity (175 m), 26 Oct 2010 26 generators to produce 84.7 bil kw/h, annually (6 more generators installed)  Government audit in early 2006 ◦ No corruption so far but resettlement problem acknowledged later ◦ By end of 2003, misuse of US$ 7 million of funds for relocation, US$ 5.38 million retrieved
  • 20. Wushan, village affected by 3GD ◦ Many not received compensation, Yunyang county, RMB 20,000 planned to allocated to each family, eventually only 10,800 ◦ Less job creation – laid off from SOEs ◦ Tourism – stinky & stagnated pool of water ◦ Landslide – moving the resettled up to hills in 99 & 03 ◦ Many farmers forced to use their life savings on mortgages to pay for the new homes with US$ 25/month  Challenges since its operation (as of Oct 2010, AFP) ◦ Landslides & mudflows: forced relocation of additional 28,000 people, caused by rising water ◦ Layers of trash & debris building up in the reservoir threatening to jam the dam  200,000 m3 of rubbish collected per annum  80 Olympic size pools, discharged by over 150 million people upstream
  • 21. 3GD – Engine for modernization? ◦ Flood control, hydroelectricity generation & navigation ◦ Critical issues  Dam politics ◦ Water flows uphill to power & money ◦ Sanctioned discourse  Hydraulic Mission ◦ Not reached the post-modernism yet ◦ More development for the next stage against all odds?
  • 22. Dams for China ◦ Negative environmental impacts – developed countries decommissioning dams, i.e. US ◦ Hydropower/flood control – essential for China’s modernization?  Yangtze drought (Guardian, 25 May 2010) ◦ Jan-April drought, Hubei worst hit 40% less than average ◦ Damage to crops, threatening wildlife, qustions on viability of SNWT Project ◦ A release of 5 bil m3 water from 3GD ◦ Sacrifice of hydroelectricity for irrigation, drinking water & ecosystem protection (finless porpoise)  Why drought? Ma Jun, due to 3GD!
  • 23. Three Gorges Dam (Discovery Channel, 2007) ◦ 1998 Flood event: justification of 3GD ◦ Three Gorges Dam – specifications ◦ Energy (hydroelectricity), Coal, CO2 ◦ Tourism & inland navigation ◦ Resettlement issues: 1.13 mil, 4,000 villages ◦ Dam safety: siltation, earthquakes  Essential for China’s future?