Lal Bahadur GuptaLal Bahadur Gupta
Mobile:Mobile: +91-+91-9759020772,+91-9359945117 /9759020772,+91-9359945117 / Email:lbg02005@gmail.comEmail:lbg02005@gmail.com
lbg02005@yahoo.co.in
Seeking A good Level Managerial assignments in Production planning with a growth
oriented organization.
PROFESSIONAL SYNOPSIS
 A dynamic professional with over 14 years of rich experience in Strategic Production, Planning &
Management, Process Enhancement, and Man Management.
 Presently associated with M/S Hamilton Housewares Pvt. Ltd. as an a Manager Production
(Plant Manager).
 Expertise in capacity enhancement by continuously improving the productivity, process operations, and
implementing cost savings techniques.
 Expertise in planning & controlling the Operations, scheduling activities. Skills in conceptualizing and
effecting process initiatives to enhance efficiency and productivity.
 PGD-PTCT, CIPET- 2002.
 An effective communicator with excellent relationship management skills and strong analytical, problem
solving & organizational abilities. Possess a flexible & detail oriented attitude.
CORE COMPETENCIES
 PRODUCTION
• Managing 56 Injection Molding Machines of different types of Manufacturing Supplier
(Ferromatic, Supermaster, L&T) Blow Molding & ISBM (ASB),Seven assembly lines, Four PU
foaming machine, Five Pad Printing machine,Five Hot stamping machine and Six Screen Printing
machine etc.
• To ensure implementation of manufacturing system (HHPL) in production Molding & assembly
department.
 PLANNING
 Identifying scope for
- Planning, implementing & monitoring of technological changes to enhance efficiency.
- Modifications in equipments, process flow, working practices, consumables etc. for controlling &
reducing conversion cost per unit produced.
o Implementing various techniques for cycle time / cost reduction,
entailing identification of opportunities, analysis of data, conducting tests, cost benefit analysis and
implementation.
 Man Management
o Recruiting, directing, leading & motivating workforce; imparting
continuous on job training for accomplishing better operational effectiveness/ efficiency.
o Working on succession planning of the workforce, rendering technical
guidance to the Manufacturing associates, shift management activities, appraising the member’s
performance & providing feedback.
 Customer Interaction
o Responsible for Daily plan adherence, Reduce Cost of the product and
improve Quality of the product at our end to meet the Quality satisfaction.
o Work on modify or made changes in the parts prescribed by the
Quality and Lab in some special orders or Change of Requirement.
o Member of CFT (Cross Functional Team) for development and Product
Quality requirements (Functional-Dimensional & esthetical).
Project Execution
1-Worked as a project member in Cello Houseware, Haridwar for set of Injection Molding plant.
2-Worked as a project member in Hamilton Houseware Pvt Ltd, Haridwar for set of Injection Molding
plant.
3-Working as a project leader in Hamilton Houseware Pvt Ltd ,Guwahati for set of Injection and blow
Molding plant.
ORGANISATIONAL EXPERIENCE & PROFILE
Since 2015 to till date with Hamiltion Houseware Pvt Ltd , Guwahati , Manager
Production ( Plant Manager).
From 2006 to 2015 with Hamilton Housewares Pvt Ltd, Haridwar as Deputy Production Manager
(PRODUCTION)
ORGANISATION PROFILE:
Hamilton Housewares Pvt. Ltd. is a manufacturing Unit of Milton Brand which comprises of six
business units employing over 10,000 people in all over India. HARIDWAR Unit manufacturing of Plastics
Injection Molding Parts with Assy and Printing, PU filling like Thermoware:- water Jug, Casseroles, Water
Bottle. Flask, Tiffin etc. Microware:- Micro casseroles, Micro Cooker. Hosuewares:- Bucket, Mug, Tub, Stool,
Storex Container, Wastepaper Bin, Paddle Bin, Pickle Jar, Sandwich Box etc.
Key Deliverables
 Preparing and execution of monthly production plan to achieve monthly Branches indents.
 Productivity analysis, Manpower planning
 Involved in Procurement & commissioning of all machines used in assembly shop floor and Molding shop
floor.
 Planning and execution of preventive maintenance of Injection molding machines and assembly equipment,
utilities.
 To give training to manufacturing associates of production team to reduce rejection/waste.
 Taking various initiatives for line rejection control with the help of SQC Tools and other SQC practice.
 To conduct daily plant performance morning meetings with engineers & line leaders and review dispatch
schedules and Marketing Requirement.
 To facilitate World class manufacturing methods like Kaizen, kanban, TPM, and 5S activities in the
production shop floor.
 To plan skill enhancement training calendar for associates.
 To monitor the production, procurement & dispatch vis-à-vis the original plan.
PREVIOUS EXPERIENCE
1 Aug. 2002 – Sept.’04 with M/S Vimal Plast India Pvt. Ltd. (Greater Noida) as Engineer
Production.
ORGANISATION PROFILE:
Vimal Plast India Pvt. Ltd. M/S Vimal Plast India doing jobs for LG, Samsang, Philips, Onida, Panasonic and for
their cabinet of Washing machine, Refrigerator parts used PP HIPS, ABS,GPPS, LLDPE,SAN & HDPE.
.2. Worked with M/s CELLO HOUSE WARE, IIE SIDCUL Roshnabad, Haridwar. As Shift In-charge Oct. 2004 to Oct., 2006.
Company Profile :
The Cello House Ware is ISO 9002 certified company engaged in manufacturing of injection molded
furniture, house hold & Thermo ware items.
JOB RESPONSIBILITIES
 Responsible for overall Production & Daily Production Reports
 Supervisor & operator training for quality & productivity Improvement.
 Production planning & Man power Planning. Calculation of manpower and machine
Requirement for monthly production indents.
 Material and mould trials
 Commissioning new Injection molding machines and minimize mold change time.
 Maintaining and improving of house keeping, material handling and storage in the factory for
Productivity improvement in molding and assembly shopfloor.
 Rejection & Rework review and analysis find root causes.
TRAININGS ATTENDED
 Six Sigma.
 CFT Training for Development plan
 Fire Fightening Training.
QUALIFICATIONS
 PGD-PTCT, CIPET, 2002.
 BSc. With Chemistry in 2001 From VBS Purvanchal University Jaunpur.
 MBA in Production Management in 2013 from Vinayaka Mission University , Tamilnadu.
PERSONAL DETAILS
Personal details:
 Father’s name : Late Shri J.N.Gupta
 Residential address : Vill- Ranipur
Post- Sathiaon
District- Azamgarh, U.P. 276406, INDIA
 Sex : Male.
 Date of Birth : 06-06-1981.
 Passport details :
Passport No : N7260516
 Marital Status : Married
 CTC : Rs 11 Lacks per annum.
Place: Haridwar
Date: 31/03/2016 (Lal Bahadur Gupta)

LBG Updated CV-1

  • 1.
    Lal Bahadur GuptaLalBahadur Gupta Mobile:Mobile: +91-+91-9759020772,+91-9359945117 /9759020772,+91-9359945117 / Email:lbg02005@gmail.comEmail:lbg02005@gmail.com lbg02005@yahoo.co.in Seeking A good Level Managerial assignments in Production planning with a growth oriented organization. PROFESSIONAL SYNOPSIS  A dynamic professional with over 14 years of rich experience in Strategic Production, Planning & Management, Process Enhancement, and Man Management.  Presently associated with M/S Hamilton Housewares Pvt. Ltd. as an a Manager Production (Plant Manager).  Expertise in capacity enhancement by continuously improving the productivity, process operations, and implementing cost savings techniques.  Expertise in planning & controlling the Operations, scheduling activities. Skills in conceptualizing and effecting process initiatives to enhance efficiency and productivity.  PGD-PTCT, CIPET- 2002.  An effective communicator with excellent relationship management skills and strong analytical, problem solving & organizational abilities. Possess a flexible & detail oriented attitude. CORE COMPETENCIES  PRODUCTION • Managing 56 Injection Molding Machines of different types of Manufacturing Supplier (Ferromatic, Supermaster, L&T) Blow Molding & ISBM (ASB),Seven assembly lines, Four PU foaming machine, Five Pad Printing machine,Five Hot stamping machine and Six Screen Printing machine etc. • To ensure implementation of manufacturing system (HHPL) in production Molding & assembly department.  PLANNING  Identifying scope for - Planning, implementing & monitoring of technological changes to enhance efficiency. - Modifications in equipments, process flow, working practices, consumables etc. for controlling & reducing conversion cost per unit produced. o Implementing various techniques for cycle time / cost reduction, entailing identification of opportunities, analysis of data, conducting tests, cost benefit analysis and implementation.  Man Management o Recruiting, directing, leading & motivating workforce; imparting continuous on job training for accomplishing better operational effectiveness/ efficiency. o Working on succession planning of the workforce, rendering technical guidance to the Manufacturing associates, shift management activities, appraising the member’s performance & providing feedback.  Customer Interaction o Responsible for Daily plan adherence, Reduce Cost of the product and improve Quality of the product at our end to meet the Quality satisfaction. o Work on modify or made changes in the parts prescribed by the Quality and Lab in some special orders or Change of Requirement. o Member of CFT (Cross Functional Team) for development and Product Quality requirements (Functional-Dimensional & esthetical). Project Execution 1-Worked as a project member in Cello Houseware, Haridwar for set of Injection Molding plant.
  • 2.
    2-Worked as aproject member in Hamilton Houseware Pvt Ltd, Haridwar for set of Injection Molding plant. 3-Working as a project leader in Hamilton Houseware Pvt Ltd ,Guwahati for set of Injection and blow Molding plant. ORGANISATIONAL EXPERIENCE & PROFILE Since 2015 to till date with Hamiltion Houseware Pvt Ltd , Guwahati , Manager Production ( Plant Manager). From 2006 to 2015 with Hamilton Housewares Pvt Ltd, Haridwar as Deputy Production Manager (PRODUCTION) ORGANISATION PROFILE: Hamilton Housewares Pvt. Ltd. is a manufacturing Unit of Milton Brand which comprises of six business units employing over 10,000 people in all over India. HARIDWAR Unit manufacturing of Plastics Injection Molding Parts with Assy and Printing, PU filling like Thermoware:- water Jug, Casseroles, Water Bottle. Flask, Tiffin etc. Microware:- Micro casseroles, Micro Cooker. Hosuewares:- Bucket, Mug, Tub, Stool, Storex Container, Wastepaper Bin, Paddle Bin, Pickle Jar, Sandwich Box etc. Key Deliverables  Preparing and execution of monthly production plan to achieve monthly Branches indents.  Productivity analysis, Manpower planning  Involved in Procurement & commissioning of all machines used in assembly shop floor and Molding shop floor.  Planning and execution of preventive maintenance of Injection molding machines and assembly equipment, utilities.  To give training to manufacturing associates of production team to reduce rejection/waste.  Taking various initiatives for line rejection control with the help of SQC Tools and other SQC practice.  To conduct daily plant performance morning meetings with engineers & line leaders and review dispatch schedules and Marketing Requirement.  To facilitate World class manufacturing methods like Kaizen, kanban, TPM, and 5S activities in the production shop floor.  To plan skill enhancement training calendar for associates.  To monitor the production, procurement & dispatch vis-à-vis the original plan. PREVIOUS EXPERIENCE 1 Aug. 2002 – Sept.’04 with M/S Vimal Plast India Pvt. Ltd. (Greater Noida) as Engineer Production. ORGANISATION PROFILE: Vimal Plast India Pvt. Ltd. M/S Vimal Plast India doing jobs for LG, Samsang, Philips, Onida, Panasonic and for their cabinet of Washing machine, Refrigerator parts used PP HIPS, ABS,GPPS, LLDPE,SAN & HDPE. .2. Worked with M/s CELLO HOUSE WARE, IIE SIDCUL Roshnabad, Haridwar. As Shift In-charge Oct. 2004 to Oct., 2006. Company Profile : The Cello House Ware is ISO 9002 certified company engaged in manufacturing of injection molded furniture, house hold & Thermo ware items. JOB RESPONSIBILITIES  Responsible for overall Production & Daily Production Reports
  • 3.
     Supervisor &operator training for quality & productivity Improvement.  Production planning & Man power Planning. Calculation of manpower and machine Requirement for monthly production indents.  Material and mould trials  Commissioning new Injection molding machines and minimize mold change time.  Maintaining and improving of house keeping, material handling and storage in the factory for Productivity improvement in molding and assembly shopfloor.  Rejection & Rework review and analysis find root causes. TRAININGS ATTENDED  Six Sigma.  CFT Training for Development plan  Fire Fightening Training. QUALIFICATIONS  PGD-PTCT, CIPET, 2002.  BSc. With Chemistry in 2001 From VBS Purvanchal University Jaunpur.  MBA in Production Management in 2013 from Vinayaka Mission University , Tamilnadu. PERSONAL DETAILS Personal details:  Father’s name : Late Shri J.N.Gupta  Residential address : Vill- Ranipur Post- Sathiaon District- Azamgarh, U.P. 276406, INDIA  Sex : Male.  Date of Birth : 06-06-1981.  Passport details : Passport No : N7260516  Marital Status : Married  CTC : Rs 11 Lacks per annum. Place: Haridwar Date: 31/03/2016 (Lal Bahadur Gupta)