SlideShare a Scribd company logo
POST GRADUATE ENGINEERING EXPERIENCE
A SUMMARY REPORT
BY
Lawani, Odion Michael
B.ENG. (HONS.) ELECTRICAL & ELECTRONICS ENGINEERING
SUBMITTED IN PARTIAL FULFILMENT OF THE REQUIREMENTS
FOR REGISTRATION AS AN ENGINEER WITH THE COUNCIL FOR
REGULATION OF ENGINEERING IN NIGERIA (COREN)
MARCH, 2018
This report covers a summary of my industrial experience as a graduate engineer. I
am a trained Engineer from the University of Port Harcourt where I acquired my
bachelor degree (B.Eng) in Electrical / Electronic Engineering)
I currently work with the Port-Harcourt Refining Company (PHRC) where I have
served at different capacities such as Instrument Engineer, Workshop Planning and
Costing Engineer,Electrical and Instrumentation Workshop Engineer, Electrical
and Instrumentation Shift Engineer as well as Electrical and Instrumentation
Offsite Engineer.
In my capacity as Instrument Engineer, I was responsible for technical reviews on
instrumentation & control in OPHR & NPHR Rehabilitation projects, reviewed
job change order, participated in cost negotiation meetings and participated in
PHRC plant technical surveys.
my responsibilities as Workshop Planning and Costing Engineer includes
preparation and following-up daily scheduled maintenance activities in the process
plant/workshop, provided logistic support in the process plant/workshop and
sourcing for spare parts, Scheduled weekend/ holiday jobs, analyzed bids/follow-
up contract jobs, attended planning/other meetings as assigned, prepared memos
for Operations Executive Committee (OPEXCOM) and Management Executive
Committee (MEXCOM) as well as payment and job completion certificate,
Sourced materials from warehouse and prepared MRF for non available materials,
and Inspected procured material to meet specifications/standards
in this role(Electrical and Instrumentation Workshop Engineer ) , I Overhauled,
Calibrated and repaired Control valves/Transmitters/ controllers ;Checked,
commissioned and operateed instrument equipments,inspected and reassembled
valve manifolds/ pressure regulators/ensing elements /controllers;Overhauled
Electric Motors and Carried out Transformer oil test.
As an Electrical and Instrumentation Shift Engineer, iActively participated with the
instrument team in PHRC Phased Rehab Project for Fuels plant 1 Area
1,2&3,Successfully re-streamed Area 1 & 3 after the Rehab activities,Saved the
corporation a lot in cost working with the instrument team,Maintained proper
working conditions of all plant instrument (Transmitters, control valves etc),
diagnoseed faults and trends, recommended appropriate corrective actions ,
ensureed that Company and statutory safety requirements are adhered to in all
Maintenance activities undertaken by Company personnel and external
Contractors, developed a formal maintenance system for production facilities
Maintain close liaison with other discipline supervisors working in the area in
order to Coordinate all classes or work in the area Ensure that subcontractor
activities are carried out in accordance with the approved Subcontractor Quality
Plan Monitor daily progress within the area of assignment and keeps records of
quantities installed.Service & repair field instrument & attend to other field
jobsCarry out periodic maintenance of field instrumentsEnsure that instruments to
be calibrated are promptly delivered to the WorkshopFollow-up on all pending &
shutdown field instrument with the view to repairing themTake stock of the spare
parts needed for plant jobs Carry out isolation, connection & disconnection of
electric eqiupment/installation.Cover shift duty in the process units/log
activities.Carryout re-lamping activities in the process units.Carry out the
maintenance Of Elect Motors, transformers & dc systems. Carry out test running
of emergency diesel generators.
When I emergedas the Electricaland Instrumentation Offsite Engineer,I
Carry out maintenance Jobs at the Jetty areas and Offsite areas as required,Carry
out PM on all offsite field instruments ,Carry out substation Operations.,Liase with
workshop for calibration of field instruments,Isolate faulty electric motors and
deploy then to the workshop
I was preveleged to work withoceanic BANK INTERNATIONAL plc as the
ZONAL INFORMATION TECHNOLOGY SYSTEMS ADMIN. In this
function I initiated a discussion forum for the quick resolution of all bank wide IT
issues Excellent Customer Service
User’s application and system support (Inhouuse and outsourced
applications)Deploy, configure, diagnose and fix desktop & laptop computer
hardware and software issues. Troubleshoot LAN network and cabling issues & IP
address scheme allocation ATM, UPS, Inverter support ( First Level) CCTV
Custodian, monitoring and management ( Retrieval of footage on request)
Software applications deployment test-run Blackberry & Smartphones
configuration to acess dormain mail server Perform weekely branch backup/
Incidence Reporting Escalate WAN link faults to appropriate vendor and supervise
vendor’s job Preventive and Corrective maintenance of LAN infrastructure Site
inspection of vendors during new branch project implementation Training of
branch staff on new IT based products (KSS)/Hands On for new IT staff
Management of sharepoint portal Other Responssibilities as required by my
supervisors
I also worked with DIZENGOFF W.A as an acces unit installation technologies
wher I was responsible
Responsibilities:Deployment of RAD radios and configuration & Networking
My experience has been mainly in theoil and gas, power sector
andtelecommincatin sectors. I have had challenges ranging from exposure to high
voltage, community harassment, working under the sun and these have been taken
care of by using the right Protective equipment, regular technical training and strict
adherence to professional standards and safety rules.
It is my prayer that my knowledge, Experience and skills as contained in this
report, satisfies the requirements to be admitted as an Engineer by the Council for
the Regulation of Engineering in Nigeria (COREN).

More Related Content

What's hot

Electronics&I ENGINEER(1)
Electronics&I ENGINEER(1)Electronics&I ENGINEER(1)
Electronics&I ENGINEER(1)RIZWAN MALLICK
 
Adil Field Instrument without apprentice Cv
Adil Field Instrument  without apprentice CvAdil Field Instrument  without apprentice Cv
Adil Field Instrument without apprentice CvMuhammad Adil
 
Benjamin R. Remer Resume
Benjamin R. Remer ResumeBenjamin R. Remer Resume
Benjamin R. Remer ResumeBen Remer
 
Resume - Satnam Singh
Resume - Satnam SinghResume - Satnam Singh
Resume - Satnam SinghSatnam Singh
 
n electrical engineer resume
n electrical engineer resumen electrical engineer resume
n electrical engineer resumesukumar reddy
 
Resume instrumentation engineer
Resume instrumentation engineer Resume instrumentation engineer
Resume instrumentation engineer zahirtec
 
2016 Oct Matthew Turner_Resume_WA_NPI
2016 Oct Matthew Turner_Resume_WA_NPI2016 Oct Matthew Turner_Resume_WA_NPI
2016 Oct Matthew Turner_Resume_WA_NPIMatthew Turner
 
Technology Organizational Chart and Action Plan
Technology Organizational Chart and Action PlanTechnology Organizational Chart and Action Plan
Technology Organizational Chart and Action Plandeanhofer
 

What's hot (20)

Electronics&I ENGINEER(1)
Electronics&I ENGINEER(1)Electronics&I ENGINEER(1)
Electronics&I ENGINEER(1)
 
Adil Field Instrument without apprentice Cv
Adil Field Instrument  without apprentice CvAdil Field Instrument  without apprentice Cv
Adil Field Instrument without apprentice Cv
 
RESUME C&I
RESUME C&IRESUME C&I
RESUME C&I
 
Benjamin R. Remer Resume
Benjamin R. Remer ResumeBenjamin R. Remer Resume
Benjamin R. Remer Resume
 
JPCV engineer 311216
JPCV engineer  311216JPCV engineer  311216
JPCV engineer 311216
 
CV - Sherwin Tupas
CV - Sherwin TupasCV - Sherwin Tupas
CV - Sherwin Tupas
 
S M UMER WASI
S M UMER WASIS M UMER WASI
S M UMER WASI
 
Alfred CV
Alfred CVAlfred CV
Alfred CV
 
Resume - Satnam Singh
Resume - Satnam SinghResume - Satnam Singh
Resume - Satnam Singh
 
MUHAMMAD SHAHZAD FAISAL-CV
MUHAMMAD SHAHZAD FAISAL-CVMUHAMMAD SHAHZAD FAISAL-CV
MUHAMMAD SHAHZAD FAISAL-CV
 
n electrical engineer resume
n electrical engineer resumen electrical engineer resume
n electrical engineer resume
 
Mohammad Profile
Mohammad  ProfileMohammad  Profile
Mohammad Profile
 
KahsayResume (1)
KahsayResume (1)KahsayResume (1)
KahsayResume (1)
 
Resume instrumentation engineer
Resume instrumentation engineer Resume instrumentation engineer
Resume instrumentation engineer
 
raymundo froyalde 1
raymundo froyalde 1raymundo froyalde 1
raymundo froyalde 1
 
The W4 Group Presentation 1
The W4 Group Presentation 1The W4 Group Presentation 1
The W4 Group Presentation 1
 
CV
CVCV
CV
 
2016 Oct Matthew Turner_Resume_WA_NPI
2016 Oct Matthew Turner_Resume_WA_NPI2016 Oct Matthew Turner_Resume_WA_NPI
2016 Oct Matthew Turner_Resume_WA_NPI
 
Technology Organizational Chart and Action Plan
Technology Organizational Chart and Action PlanTechnology Organizational Chart and Action Plan
Technology Organizational Chart and Action Plan
 
Resume
ResumeResume
Resume
 

Similar to Lawani coren report summary

QAQC Coordinator CV
QAQC Coordinator CVQAQC Coordinator CV
QAQC Coordinator CVZAIDI Djahid
 
Resume Keith DiMarco
Resume Keith DiMarcoResume Keith DiMarco
Resume Keith DiMarcoKeith DiMarco
 
Engr iqbal Resume ,
Engr  iqbal  Resume ,Engr  iqbal  Resume ,
Engr iqbal Resume ,IQBAL KHAN
 
My updated cv
My updated cvMy updated cv
My updated cv
AdnanNoor10
 
Eng Ahmed Mostafa Helmy_ Instruments Engineer
Eng Ahmed Mostafa Helmy_ Instruments EngineerEng Ahmed Mostafa Helmy_ Instruments Engineer
Eng Ahmed Mostafa Helmy_ Instruments EngineerAhmed Helmy
 
Vipin Resume new qc
Vipin Resume new qcVipin Resume new qc
Vipin Resume new qcvipin joy
 
BILL_Lockwood_Res Apr 2016
BILL_Lockwood_Res Apr 2016BILL_Lockwood_Res Apr 2016
BILL_Lockwood_Res Apr 2016William Lockwood
 

Similar to Lawani coren report summary (20)

QAQC Coordinator CV
QAQC Coordinator CVQAQC Coordinator CV
QAQC Coordinator CV
 
Resume Keith DiMarco
Resume Keith DiMarcoResume Keith DiMarco
Resume Keith DiMarco
 
Vineeth biodata
Vineeth biodataVineeth biodata
Vineeth biodata
 
FREEBORN CV.NNPC POSITIVE
FREEBORN CV.NNPC POSITIVEFREEBORN CV.NNPC POSITIVE
FREEBORN CV.NNPC POSITIVE
 
MuhammadImran(CV)
MuhammadImran(CV)MuhammadImran(CV)
MuhammadImran(CV)
 
Engr iqbal Resume ,
Engr  iqbal  Resume ,Engr  iqbal  Resume ,
Engr iqbal Resume ,
 
roshan-CV1
roshan-CV1roshan-CV1
roshan-CV1
 
CV
CVCV
CV
 
Doc2015
Doc2015Doc2015
Doc2015
 
F. CV
F. CVF. CV
F. CV
 
My updated cv
My updated cvMy updated cv
My updated cv
 
CV_Sachin Lone
CV_Sachin LoneCV_Sachin Lone
CV_Sachin Lone
 
Eng Ahmed Mostafa Helmy_ Instruments Engineer
Eng Ahmed Mostafa Helmy_ Instruments EngineerEng Ahmed Mostafa Helmy_ Instruments Engineer
Eng Ahmed Mostafa Helmy_ Instruments Engineer
 
msanjuan_RESUME
msanjuan_RESUMEmsanjuan_RESUME
msanjuan_RESUME
 
Resume_Justin
Resume_JustinResume_Justin
Resume_Justin
 
Vipin Resume new qc
Vipin Resume new qcVipin Resume new qc
Vipin Resume new qc
 
Mark O
Mark OMark O
Mark O
 
Mike Leeper Resume
Mike Leeper ResumeMike Leeper Resume
Mike Leeper Resume
 
BILL_Lockwood_Res Apr 2016
BILL_Lockwood_Res Apr 2016BILL_Lockwood_Res Apr 2016
BILL_Lockwood_Res Apr 2016
 
Ogbonnaya Okoro CV
Ogbonnaya Okoro  CVOgbonnaya Okoro  CV
Ogbonnaya Okoro CV
 

Recently uploaded

Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
SupreethSP4
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 

Recently uploaded (20)

Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Runway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptxRunway Orientation Based on the Wind Rose Diagram.pptx
Runway Orientation Based on the Wind Rose Diagram.pptx
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 

Lawani coren report summary

  • 1. POST GRADUATE ENGINEERING EXPERIENCE A SUMMARY REPORT BY Lawani, Odion Michael B.ENG. (HONS.) ELECTRICAL & ELECTRONICS ENGINEERING SUBMITTED IN PARTIAL FULFILMENT OF THE REQUIREMENTS FOR REGISTRATION AS AN ENGINEER WITH THE COUNCIL FOR REGULATION OF ENGINEERING IN NIGERIA (COREN) MARCH, 2018
  • 2. This report covers a summary of my industrial experience as a graduate engineer. I am a trained Engineer from the University of Port Harcourt where I acquired my bachelor degree (B.Eng) in Electrical / Electronic Engineering) I currently work with the Port-Harcourt Refining Company (PHRC) where I have served at different capacities such as Instrument Engineer, Workshop Planning and Costing Engineer,Electrical and Instrumentation Workshop Engineer, Electrical and Instrumentation Shift Engineer as well as Electrical and Instrumentation Offsite Engineer. In my capacity as Instrument Engineer, I was responsible for technical reviews on instrumentation & control in OPHR & NPHR Rehabilitation projects, reviewed job change order, participated in cost negotiation meetings and participated in PHRC plant technical surveys. my responsibilities as Workshop Planning and Costing Engineer includes preparation and following-up daily scheduled maintenance activities in the process plant/workshop, provided logistic support in the process plant/workshop and sourcing for spare parts, Scheduled weekend/ holiday jobs, analyzed bids/follow- up contract jobs, attended planning/other meetings as assigned, prepared memos for Operations Executive Committee (OPEXCOM) and Management Executive Committee (MEXCOM) as well as payment and job completion certificate, Sourced materials from warehouse and prepared MRF for non available materials, and Inspected procured material to meet specifications/standards in this role(Electrical and Instrumentation Workshop Engineer ) , I Overhauled, Calibrated and repaired Control valves/Transmitters/ controllers ;Checked, commissioned and operateed instrument equipments,inspected and reassembled valve manifolds/ pressure regulators/ensing elements /controllers;Overhauled Electric Motors and Carried out Transformer oil test. As an Electrical and Instrumentation Shift Engineer, iActively participated with the instrument team in PHRC Phased Rehab Project for Fuels plant 1 Area 1,2&3,Successfully re-streamed Area 1 & 3 after the Rehab activities,Saved the corporation a lot in cost working with the instrument team,Maintained proper
  • 3. working conditions of all plant instrument (Transmitters, control valves etc), diagnoseed faults and trends, recommended appropriate corrective actions , ensureed that Company and statutory safety requirements are adhered to in all Maintenance activities undertaken by Company personnel and external Contractors, developed a formal maintenance system for production facilities Maintain close liaison with other discipline supervisors working in the area in order to Coordinate all classes or work in the area Ensure that subcontractor activities are carried out in accordance with the approved Subcontractor Quality Plan Monitor daily progress within the area of assignment and keeps records of quantities installed.Service & repair field instrument & attend to other field jobsCarry out periodic maintenance of field instrumentsEnsure that instruments to be calibrated are promptly delivered to the WorkshopFollow-up on all pending & shutdown field instrument with the view to repairing themTake stock of the spare parts needed for plant jobs Carry out isolation, connection & disconnection of electric eqiupment/installation.Cover shift duty in the process units/log activities.Carryout re-lamping activities in the process units.Carry out the maintenance Of Elect Motors, transformers & dc systems. Carry out test running of emergency diesel generators. When I emergedas the Electricaland Instrumentation Offsite Engineer,I Carry out maintenance Jobs at the Jetty areas and Offsite areas as required,Carry out PM on all offsite field instruments ,Carry out substation Operations.,Liase with workshop for calibration of field instruments,Isolate faulty electric motors and deploy then to the workshop I was preveleged to work withoceanic BANK INTERNATIONAL plc as the ZONAL INFORMATION TECHNOLOGY SYSTEMS ADMIN. In this function I initiated a discussion forum for the quick resolution of all bank wide IT issues Excellent Customer Service User’s application and system support (Inhouuse and outsourced applications)Deploy, configure, diagnose and fix desktop & laptop computer hardware and software issues. Troubleshoot LAN network and cabling issues & IP address scheme allocation ATM, UPS, Inverter support ( First Level) CCTV Custodian, monitoring and management ( Retrieval of footage on request) Software applications deployment test-run Blackberry & Smartphones
  • 4. configuration to acess dormain mail server Perform weekely branch backup/ Incidence Reporting Escalate WAN link faults to appropriate vendor and supervise vendor’s job Preventive and Corrective maintenance of LAN infrastructure Site inspection of vendors during new branch project implementation Training of branch staff on new IT based products (KSS)/Hands On for new IT staff Management of sharepoint portal Other Responssibilities as required by my supervisors I also worked with DIZENGOFF W.A as an acces unit installation technologies wher I was responsible Responsibilities:Deployment of RAD radios and configuration & Networking My experience has been mainly in theoil and gas, power sector andtelecommincatin sectors. I have had challenges ranging from exposure to high voltage, community harassment, working under the sun and these have been taken care of by using the right Protective equipment, regular technical training and strict adherence to professional standards and safety rules. It is my prayer that my knowledge, Experience and skills as contained in this report, satisfies the requirements to be admitted as an Engineer by the Council for the Regulation of Engineering in Nigeria (COREN).