3. @270 lpcd i.e. Current demand
Parameter
@ current
occupancy
@ full
occupancy
Demand as
rainfall
1129.01
2388.08
Actual rainfall
of 2015
1188.5 1188.5
Sustainability 59.5 -1200
Average
Rainfall
930 930
Sustainability -199 -1458.1
@135 lpcd: Town planning norm estimate
Parameter
@ current
occupancy
@ full
occupancy
Demand as
rainfall
564.8 1195.05
Actual rainfall
of 2015
1188.5 1188.5
Sustainability 623.6 -6.55
Average
Rainfall
930 930
Sustainability 365.9 -265
Demand as rainfall
4. Sewage treatment plant
Current capacity 1.35 MLD
Full occupancy population 12750 No.
Total demand at full occupancy 3.4 MLD
Total supply needed 3.4 MLD
Wastewater generated (80%) 2.73 MLD
9. Withdrawal well, Lane 8
• Dimension: 5 ft diameter*25 deep
• Water struck at: 5ft depth
• Continuous dewatering to dig deep till 25 ft
On going steps:
• Water quality test
• Fitting a pump
• Integrating the well water into the existing water supply system
• Recharge wells
10. Recovery test
• Around 4 m of
water was
recovered during
2.5 days with 3 m
recovery in 1 day
• 5833 L/day
volume of water
recovered in a day
12. Vertical Electrical Sounding (VES) is a geophysical method for investigating a
geological units. This method is based on the estimation of the electrical resistivity of
the medium. Estimation is performed based on the measurement of voltage of
electrical field induced by the distant grounded current electrodes.