SlideShare a Scribd company logo
Teresa A. Seidel, RPLS
KFW Surveying
Vice President
Mrs. Seidel has 28 years of professional experience in surveying related experience and
management. Mrs. Seidel joined forces with KFW Engineers in 2008, opening KFW Surveying
as Vice President. Her experience includes a wide range of surveying work to include
boundary, tree, topographical, design, improvements, route and construction surveying for all
types of infrastructure projects including municipal,
transportation, utilities, commercial, industrial, multi family,
residential, military bases and flood studies.
Graytown Road Wastewater Collection System Phase III
Project, San Antonio, TX: The third phase of this project
involved topographic, improvement and tree surveys throughout a
150 foot wide alignment corridor. The total project length was
14,127 linear feet. KFW Surveying also performed construction
staking and cut sheets for the sewer main and preparing
easement documents for sewer alignment.
SAWS UIC Test Injection Well Project, San Antonio, TX: This project involved topographical,
improvement and tree surveys of the well site area and proposed access road. KFW Surveying
also provided latitude and longitude for proposed well locations and construction staking.
City of New Braunfels Sanitary Sewer & Water Replacement Improvement Project -
Comal County. TX:
Surveying services for construction staking of sanitary sewer lines and water lines; Horizontal
and Vertical Controls; Construction Staking; Our services for this project included setting
horizontal and vertical control and construction staking sanitary sewer and water lines in
residential areas.
Apache Creek, Linear Park- San Antonio, TX:
Development of a Linear Park along Apache Creek from General McMullen to Commerce
Street; Boundary, Topographical, Tree, and Improvement Surveys; Research chain of title,
Surveying Services provided for a 3,442 x 80 foot strip of land running parallel to Apache
Creek and 36 adjoining properties. We verified the boundary, located improvements and trees
and prepared a Topographical Survey of the site.
SAWS DSP New World Tank and Pump Station Improvements- San Antonio, TX
Surveying services for expansion of the New World facility site. Our services included a
boundary, improvement, tree and topographical survey of a 4.060 acre site.
Quiet Creek Subdivision, San Antonio, TX: Surveys were performed on this 215 acre site for
its development into a residential subdivision. The project included boundary, improvements,
topographical and tree survey of the site for design, platting and construction. This project also
required rezoning exhibits and descriptions and a route survey for 16,000 linear feet of offsite
water line to service the tract.
Education
Austin Community College
Registrations
Registered Professional Land
Surveyor No. 5672 (TX)
Registered - 2002
KFW - 2008
Years of Experience in Role - 28
Office Location - San Antonio
Affiliations- Texas Society of
Professional Surveyors
Bluewing Solar, San Antonio, TX: This project consists of the development of a 140 acre tract
into a solar array farm located at the intersection of Bluewing Road and IH 37 in South San
Antonio. This is the first solar farm project in San Antonio and with over 14 megawatts of power
producing capability, it will be one of the largest in the United States. A topographic and tree
survey was performed of the entire site to make sure the site conformed to project
specifications in regards to grade and shading. Finally, during the construction phase KFW
Surveying was selected by the general contractor to perform all construction staking. This
included surveying over 12,000 locations for panel support posts which had to be installed
within a 2” tolerance. It also included staking of over a mile of roadway, 2 miles of perimeter
fencing, 15 pipe culvert drains, 12 power station structures, lightning rod locations, and finally
the locations of the power poles for interconnection into CPS’s grid. After all construction was
completed, KFW Surveying did a detailed final as-built of the site.
Camp Bullis Parking Improvements (Design Build), San Antonio, TX: This project
included improvement, topographical, tree and construction staking of a parking lot area to tie
into an existing gravel parking area for expanding parking and upgrading to a curbed asphalt
parking lot as part of a design build team.
Republic Oaks Subdivision, San Antonio, TX: Performed surveying services for this 67.79
acre site that is being developed into 300 residential lots. The project included boundary,
improvement, topographical, tree and construction staking for engineer designing, platting and
construction.
The Preserve at Fredericksburg, San Antonio, TX: 25 Acre Apartment Complex-
Preparations of Easement Documents and Construction Staking; Preparation of exhibits &
metes and bounds descriptions for variable width electric easements and construction staking
for electric, water, sewer, drainage, building, pool area and curb & gutter, and final as-built
survey of project.
Live Oak Railroad- Three Rivers, TX: Category 1B Condition 4 land title survey of a 52.43
acre tract, 208.05 acre tract, a 0.5936 acre utility easement, 0.6123 acre utility easement, a
4.4894 acre ingress/egress easement and a 7.6203 acre ingress/egress easement; Title,
Boundary and Improvement survey; Researched the chain of title for boundary resolution;
included improvements with visible existing utilities and easements; Prepared metes & bounds
for all tracts.
4949 Nasa Parkway- Houston, TX: Topographic survey of a 2.6529 acre tract; Boundary and
Improvement survey; Researched the chain of title for boundary resolution; included
improvements with visible existing utilities and easements; Researched floodplain area.
Floresville Hibbett Sports- Floresville, TX: Category 1A Condition I land title survey of Lot 3;
Title, Boundary, Topographic and Improvement survey; Researched the chain of title for
boundary resolution; included improvements with visible existing utilities and easements;
Researched floodplain area.

More Related Content

What's hot

MacDonald Dan Oct 1 2014 [1130 am Session A] TAC 2014 Montreal [Compat...
MacDonald Dan   Oct 1  2014 [1130 am  Session A]   TAC 2014  Montreal [Compat...MacDonald Dan   Oct 1  2014 [1130 am  Session A]   TAC 2014  Montreal [Compat...
MacDonald Dan Oct 1 2014 [1130 am Session A] TAC 2014 Montreal [Compat...
Dan MacDonald, P.Eng.
 
RESUME JULY 2016
RESUME JULY 2016RESUME JULY 2016
RESUME JULY 2016
James Andruski
 
2013 NEFCO ERTAC TANKS
2013 NEFCO ERTAC TANKS2013 NEFCO ERTAC TANKS
2013 NEFCO ERTAC TANKS
Timothy Antos
 
Terrain Evaluation with Landuse Planning
Terrain Evaluation with Landuse PlanningTerrain Evaluation with Landuse Planning
Terrain Evaluation with Landuse Planning
pankaj kumar
 
2006 AEG Godwin presentation
2006 AEG Godwin presentation2006 AEG Godwin presentation
2006 AEG Godwin presentation
William Godwin
 
Jones Branch Connector "Pardon Our Dust" meeting
Jones Branch Connector "Pardon Our Dust" meetingJones Branch Connector "Pardon Our Dust" meeting
Jones Branch Connector "Pardon Our Dust" meeting
VDOT Northern Virginia
 
Nikolai Tim (01-24-11) (3)
Nikolai Tim (01-24-11) (3)Nikolai Tim (01-24-11) (3)
Nikolai Tim (01-24-11) (3)
Timothy Nikolai
 
Resume JW ENG City 01-12
Resume JW ENG City 01-12Resume JW ENG City 01-12
Resume JW ENG City 01-12
Jerry Williams
 
GSG Project Experience
GSG Project ExperienceGSG Project Experience
GSG Project Experience
Kalyan (Kal) S. Chandhuri, P.E.
 
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Fairfax County
 
Oct. 17, 2016 town hall meeting presentation
Oct. 17, 2016 town hall meeting presentation Oct. 17, 2016 town hall meeting presentation
Oct. 17, 2016 town hall meeting presentation
VDOT Northern Virginia
 
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
The Piedmont Environmental Council
 
Continental Mapping Projects - USACE Pine Creek
Continental Mapping Projects - USACE Pine CreekContinental Mapping Projects - USACE Pine Creek
Continental Mapping Projects - USACE Pine Creek
Continental Mapping Consultants
 
Shazia-Resume
Shazia-ResumeShazia-Resume
Shazia-Resume
shazia baseer
 
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Fairfax County
 
Government Center Pond Retrofit - May 2013
Government Center Pond Retrofit - May 2013Government Center Pond Retrofit - May 2013
Government Center Pond Retrofit - May 2013
Fairfax County
 
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-FlowTA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
Mark Oberschmidt
 

What's hot (17)

MacDonald Dan Oct 1 2014 [1130 am Session A] TAC 2014 Montreal [Compat...
MacDonald Dan   Oct 1  2014 [1130 am  Session A]   TAC 2014  Montreal [Compat...MacDonald Dan   Oct 1  2014 [1130 am  Session A]   TAC 2014  Montreal [Compat...
MacDonald Dan Oct 1 2014 [1130 am Session A] TAC 2014 Montreal [Compat...
 
RESUME JULY 2016
RESUME JULY 2016RESUME JULY 2016
RESUME JULY 2016
 
2013 NEFCO ERTAC TANKS
2013 NEFCO ERTAC TANKS2013 NEFCO ERTAC TANKS
2013 NEFCO ERTAC TANKS
 
Terrain Evaluation with Landuse Planning
Terrain Evaluation with Landuse PlanningTerrain Evaluation with Landuse Planning
Terrain Evaluation with Landuse Planning
 
2006 AEG Godwin presentation
2006 AEG Godwin presentation2006 AEG Godwin presentation
2006 AEG Godwin presentation
 
Jones Branch Connector "Pardon Our Dust" meeting
Jones Branch Connector "Pardon Our Dust" meetingJones Branch Connector "Pardon Our Dust" meeting
Jones Branch Connector "Pardon Our Dust" meeting
 
Nikolai Tim (01-24-11) (3)
Nikolai Tim (01-24-11) (3)Nikolai Tim (01-24-11) (3)
Nikolai Tim (01-24-11) (3)
 
Resume JW ENG City 01-12
Resume JW ENG City 01-12Resume JW ENG City 01-12
Resume JW ENG City 01-12
 
GSG Project Experience
GSG Project ExperienceGSG Project Experience
GSG Project Experience
 
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
 
Oct. 17, 2016 town hall meeting presentation
Oct. 17, 2016 town hall meeting presentation Oct. 17, 2016 town hall meeting presentation
Oct. 17, 2016 town hall meeting presentation
 
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
 
Continental Mapping Projects - USACE Pine Creek
Continental Mapping Projects - USACE Pine CreekContinental Mapping Projects - USACE Pine Creek
Continental Mapping Projects - USACE Pine Creek
 
Shazia-Resume
Shazia-ResumeShazia-Resume
Shazia-Resume
 
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
Little Hunting Creek Sewer Replacement Community Meeting: 12-11-2017
 
Government Center Pond Retrofit - May 2013
Government Center Pond Retrofit - May 2013Government Center Pond Retrofit - May 2013
Government Center Pond Retrofit - May 2013
 
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-FlowTA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
TA-T3-02-Water-Sewer-and-Traffic-Its-All-About-The-Flow
 

Similar to KFW - TAS Resume

Resume-Taylor Harper
Resume-Taylor HarperResume-Taylor Harper
Resume-Taylor Harper
Taylor Harper
 
SCOTT RESUME
SCOTT RESUMESCOTT RESUME
SCOTT RESUME
Scott Loewen
 
Resume - Schoregge
Resume - SchoreggeResume - Schoregge
Resume - Schoregge
Gina-Marie Schoregge, P.E.
 
LP Linked In Resume
LP Linked In ResumeLP Linked In Resume
LP Linked In Resume
Lori Prentice
 
Yates,Jimmy resume
Yates,Jimmy resume Yates,Jimmy resume
Yates,Jimmy resume
Jimmy Yates
 
Eschenburg Resume 1
Eschenburg  Resume 1Eschenburg  Resume 1
Eschenburg Resume 1
Robert Eschenburg
 
Marc McIntire Resume_2015 general
Marc McIntire Resume_2015 generalMarc McIntire Resume_2015 general
Marc McIntire Resume_2015 general
Marc McIntire
 
Cover Letter & Resume
Cover Letter & ResumeCover Letter & Resume
Cover Letter & Resume
Richard Rask
 
NA
NANA
Ahmad mousa project list
Ahmad mousa   project listAhmad mousa   project list
Ahmad mousa project list
Ahmad Mousa
 
JM Portfolio 04-2016
JM Portfolio 04-2016JM Portfolio 04-2016
JM Portfolio 04-2016
Jeff Murcer, PMP
 
ACEC/SD 2009 Engineering Excellence Awards
ACEC/SD 2009 Engineering Excellence AwardsACEC/SD 2009 Engineering Excellence Awards
ACEC/SD 2009 Engineering Excellence Awards
ACECSDES
 
2009 Engineering Excellence Awards
2009 Engineering Excellence Awards2009 Engineering Excellence Awards
2009 Engineering Excellence Awards
ACECSDES
 
2009 Engineering Excellence Awards
2009 Engineering Excellence Awards2009 Engineering Excellence Awards
2009 Engineering Excellence Awards
ACECSDES
 
David Brotchie
David Brotchie David Brotchie
David Brotchie
Brotchie
 
Bokath Resume
Bokath ResumeBokath Resume
Bokath Resume
Brett Bokath
 
MTH 251 Lab 7 FALL 2016NAME 1. Inverse trigonometric .docx
MTH 251 Lab 7 FALL 2016NAME 1. Inverse trigonometric .docxMTH 251 Lab 7 FALL 2016NAME 1. Inverse trigonometric .docx
MTH 251 Lab 7 FALL 2016NAME 1. Inverse trigonometric .docx
gilpinleeanna
 
WALID_TANBEDAWY_2016 R Dom Comp
WALID_TANBEDAWY_2016 R Dom CompWALID_TANBEDAWY_2016 R Dom Comp
WALID_TANBEDAWY_2016 R Dom Comp
Walid Tanbedawy, PE, MCM
 
Jason Abendroth Project experience_10_2015
Jason Abendroth Project experience_10_2015Jason Abendroth Project experience_10_2015
Jason Abendroth Project experience_10_2015
Jason Abendroth, PE
 
Abugattas, Abraham
Abugattas, AbrahamAbugattas, Abraham
Abugattas, Abraham
Abraham (Frank) Abugattas
 

Similar to KFW - TAS Resume (20)

Resume-Taylor Harper
Resume-Taylor HarperResume-Taylor Harper
Resume-Taylor Harper
 
SCOTT RESUME
SCOTT RESUMESCOTT RESUME
SCOTT RESUME
 
Resume - Schoregge
Resume - SchoreggeResume - Schoregge
Resume - Schoregge
 
LP Linked In Resume
LP Linked In ResumeLP Linked In Resume
LP Linked In Resume
 
Yates,Jimmy resume
Yates,Jimmy resume Yates,Jimmy resume
Yates,Jimmy resume
 
Eschenburg Resume 1
Eschenburg  Resume 1Eschenburg  Resume 1
Eschenburg Resume 1
 
Marc McIntire Resume_2015 general
Marc McIntire Resume_2015 generalMarc McIntire Resume_2015 general
Marc McIntire Resume_2015 general
 
Cover Letter & Resume
Cover Letter & ResumeCover Letter & Resume
Cover Letter & Resume
 
NA
NANA
NA
 
Ahmad mousa project list
Ahmad mousa   project listAhmad mousa   project list
Ahmad mousa project list
 
JM Portfolio 04-2016
JM Portfolio 04-2016JM Portfolio 04-2016
JM Portfolio 04-2016
 
ACEC/SD 2009 Engineering Excellence Awards
ACEC/SD 2009 Engineering Excellence AwardsACEC/SD 2009 Engineering Excellence Awards
ACEC/SD 2009 Engineering Excellence Awards
 
2009 Engineering Excellence Awards
2009 Engineering Excellence Awards2009 Engineering Excellence Awards
2009 Engineering Excellence Awards
 
2009 Engineering Excellence Awards
2009 Engineering Excellence Awards2009 Engineering Excellence Awards
2009 Engineering Excellence Awards
 
David Brotchie
David Brotchie David Brotchie
David Brotchie
 
Bokath Resume
Bokath ResumeBokath Resume
Bokath Resume
 
MTH 251 Lab 7 FALL 2016NAME 1. Inverse trigonometric .docx
MTH 251 Lab 7 FALL 2016NAME 1. Inverse trigonometric .docxMTH 251 Lab 7 FALL 2016NAME 1. Inverse trigonometric .docx
MTH 251 Lab 7 FALL 2016NAME 1. Inverse trigonometric .docx
 
WALID_TANBEDAWY_2016 R Dom Comp
WALID_TANBEDAWY_2016 R Dom CompWALID_TANBEDAWY_2016 R Dom Comp
WALID_TANBEDAWY_2016 R Dom Comp
 
Jason Abendroth Project experience_10_2015
Jason Abendroth Project experience_10_2015Jason Abendroth Project experience_10_2015
Jason Abendroth Project experience_10_2015
 
Abugattas, Abraham
Abugattas, AbrahamAbugattas, Abraham
Abugattas, Abraham
 

KFW - TAS Resume

  • 1. Teresa A. Seidel, RPLS KFW Surveying Vice President Mrs. Seidel has 28 years of professional experience in surveying related experience and management. Mrs. Seidel joined forces with KFW Engineers in 2008, opening KFW Surveying as Vice President. Her experience includes a wide range of surveying work to include boundary, tree, topographical, design, improvements, route and construction surveying for all types of infrastructure projects including municipal, transportation, utilities, commercial, industrial, multi family, residential, military bases and flood studies. Graytown Road Wastewater Collection System Phase III Project, San Antonio, TX: The third phase of this project involved topographic, improvement and tree surveys throughout a 150 foot wide alignment corridor. The total project length was 14,127 linear feet. KFW Surveying also performed construction staking and cut sheets for the sewer main and preparing easement documents for sewer alignment. SAWS UIC Test Injection Well Project, San Antonio, TX: This project involved topographical, improvement and tree surveys of the well site area and proposed access road. KFW Surveying also provided latitude and longitude for proposed well locations and construction staking. City of New Braunfels Sanitary Sewer & Water Replacement Improvement Project - Comal County. TX: Surveying services for construction staking of sanitary sewer lines and water lines; Horizontal and Vertical Controls; Construction Staking; Our services for this project included setting horizontal and vertical control and construction staking sanitary sewer and water lines in residential areas. Apache Creek, Linear Park- San Antonio, TX: Development of a Linear Park along Apache Creek from General McMullen to Commerce Street; Boundary, Topographical, Tree, and Improvement Surveys; Research chain of title, Surveying Services provided for a 3,442 x 80 foot strip of land running parallel to Apache Creek and 36 adjoining properties. We verified the boundary, located improvements and trees and prepared a Topographical Survey of the site. SAWS DSP New World Tank and Pump Station Improvements- San Antonio, TX Surveying services for expansion of the New World facility site. Our services included a boundary, improvement, tree and topographical survey of a 4.060 acre site. Quiet Creek Subdivision, San Antonio, TX: Surveys were performed on this 215 acre site for its development into a residential subdivision. The project included boundary, improvements, topographical and tree survey of the site for design, platting and construction. This project also required rezoning exhibits and descriptions and a route survey for 16,000 linear feet of offsite water line to service the tract. Education Austin Community College Registrations Registered Professional Land Surveyor No. 5672 (TX) Registered - 2002 KFW - 2008 Years of Experience in Role - 28 Office Location - San Antonio Affiliations- Texas Society of Professional Surveyors
  • 2. Bluewing Solar, San Antonio, TX: This project consists of the development of a 140 acre tract into a solar array farm located at the intersection of Bluewing Road and IH 37 in South San Antonio. This is the first solar farm project in San Antonio and with over 14 megawatts of power producing capability, it will be one of the largest in the United States. A topographic and tree survey was performed of the entire site to make sure the site conformed to project specifications in regards to grade and shading. Finally, during the construction phase KFW Surveying was selected by the general contractor to perform all construction staking. This included surveying over 12,000 locations for panel support posts which had to be installed within a 2” tolerance. It also included staking of over a mile of roadway, 2 miles of perimeter fencing, 15 pipe culvert drains, 12 power station structures, lightning rod locations, and finally the locations of the power poles for interconnection into CPS’s grid. After all construction was completed, KFW Surveying did a detailed final as-built of the site. Camp Bullis Parking Improvements (Design Build), San Antonio, TX: This project included improvement, topographical, tree and construction staking of a parking lot area to tie into an existing gravel parking area for expanding parking and upgrading to a curbed asphalt parking lot as part of a design build team. Republic Oaks Subdivision, San Antonio, TX: Performed surveying services for this 67.79 acre site that is being developed into 300 residential lots. The project included boundary, improvement, topographical, tree and construction staking for engineer designing, platting and construction. The Preserve at Fredericksburg, San Antonio, TX: 25 Acre Apartment Complex- Preparations of Easement Documents and Construction Staking; Preparation of exhibits & metes and bounds descriptions for variable width electric easements and construction staking for electric, water, sewer, drainage, building, pool area and curb & gutter, and final as-built survey of project. Live Oak Railroad- Three Rivers, TX: Category 1B Condition 4 land title survey of a 52.43 acre tract, 208.05 acre tract, a 0.5936 acre utility easement, 0.6123 acre utility easement, a 4.4894 acre ingress/egress easement and a 7.6203 acre ingress/egress easement; Title, Boundary and Improvement survey; Researched the chain of title for boundary resolution; included improvements with visible existing utilities and easements; Prepared metes & bounds for all tracts. 4949 Nasa Parkway- Houston, TX: Topographic survey of a 2.6529 acre tract; Boundary and Improvement survey; Researched the chain of title for boundary resolution; included improvements with visible existing utilities and easements; Researched floodplain area. Floresville Hibbett Sports- Floresville, TX: Category 1A Condition I land title survey of Lot 3; Title, Boundary, Topographic and Improvement survey; Researched the chain of title for boundary resolution; included improvements with visible existing utilities and easements; Researched floodplain area.