GWRS Groundwater Replenishment System
                                                   FOUNTAIN VALLEY, CALIFORNIA
Operating Company:
KDC Systems

Client / Owner:
Orange County Water District

General Contractor:
J.F. Shea

Architect / Engineer:
Camp Dresser & McKee Inc.

Control System(s):
Emerson Delta V
Allen Bradley
Phoenix

Instrumentation:
Endress + Hauser
Rosemount
Krohne

I/O Points:
8,000




                                                     PHOTO CREDIT: LARNY MACK
Owens Lake Dust Mitigation Phase VII
INYO COUNTY, CALIFORNIA
                                       Operating Company:
                                       KDC Systems

                                       Client / Owner:
                                       Los Angeles Department
                                       of Water and Power

                                       General Contractor:
                                       Barnard Construction
                                       Company

                                       Architect / Engineer:
                                       CDM

                                       Control System(s):
                                       GE iFix
                                       Allen Bradley

                                       Instrumentation:
                                       Siemens
                                       Foxboro
                                       Krohne

                                       I/O Points:
                                       3,000
Petco Distribution Center   Operating Company:
MIRA LOMA, CALIFORNIA
                            KDC Systems

                            Client / Owner:
                            Petco

                            General Contractor:
                            Advanced Material
                            Handling

                            Architect / Engineer:
                            KDC Systems

                            Control System(s):
                            Allen Bradley
                            SLC 500

                            Equipment Type(s):
                            Case Conveyor
                            Sortation Conveyor

                            Services Provided:
                            Engineering and Design
                            CAD
                            Procurement of Equipment
                            Specification of Equipment
                            Control Panel Fabrication
                            Field Wiring

                            I/O Points:
                            448
Safeway Yogurt                 Operating Company:
CITY OF COMMERCE, CALIFORNIA   KDC Systems

                               Client / Owner:
                               Safeway

                               General Contractor:
                               Equipment Systems

                               Architect / Engineer:
                               KDC Systems

                               Control System(s):
                               Allen Bradley
                               SLC 500

                               Equipment Type(s):
                               Case Conveyor
                               Industrial Robot
                               Palletizer
                               Automated Guided Vehicles

                               Services Provided:
                               Engineering and Design
                               CAD
                               Procurement of Equipment
                               Specification of Equipment
                               Control Panel Fabrication
                               Field Wiring

                               I/O Points:
                               416
Air Treatment Facility
NCOS- North Central Outfall Sewer
LOS ANGELES, CALIFORNIA
                                    Operating Company:
                                    KDC Systems

                                    Client / Owner:
                                    City of Los Angeles

                                    General Contractor:
                                    Steve P. Rados

                                    Architect / Engineer:
                                    Black & Veatch

                                    Control System(s):
                                    Siemens PLC
                                    Siemens OIT

                                    Instrumentation:
                                    Endress + Hauser
                                    Foxboro
                                    Rosemount

                                    I/O Points:
                                    200
Cal State Fullerton Trigeneration Plant
FULLERTON, CALIFORNIA




                                          Operating Company:
                                          KDC Systems

                                          Client / Owner:
                                          Cal State Fullerton

                                          General Contractor:
                                          C.W. Driver

                                          Architect / Engineer:
                                          AECOM

                                          Control System(s):
                                          Andover TAC
                                          Allen Bradley
                                          Matrikon OPC
                                          Siemens

                                          Instrumentation:
                                          Siemens
                                          Rosemount

                                          I/O Points:
                                          985
Cal State Fullerton Student Housing Phase III
                                                     FULLERTON, CALIFORNIA

Operating Company:
KDC Systems

Client / Owner:
Cal State Fullerton

General Contractor:
PCL Contractors

Architect / Engineer:
Steinberg Architects

Control System(s):
Andover TAC
Allen Bradley
ABB

Instrumentation:
Andover
Rosemount

I/O Points:
4,250
Children’s Hospital Los Angeles
LOS ANGELES, CALIFORNIA




                                  Operating Company:
                                  KDC Systems

                                  Client / Owner:
                                  Children’s Hospital Los
                                  Angeles

                                  General Contractor:
                                  Rudolph & Sletten

                                  Architect / Engineer:
                                  Zimmer Gunsul Frasca

                                  Control System(s):
                                  Johnson Controls

                                  Instrumentation:
                                  Johnson Controls

                                  I/O Points:
                                  7,000
San Gabriel Dam Butterfly Valve Actuator
Rehabilitation
ANGELES NATIONAL FOREST, CALIFORNIA




                                           Operating Company:
                                           KDC Systems

                                           Client / Owner:
                                           City of Los Angeles

                                           General Contractor:
                                           Wood Group

                                           Architect / Engineer:
                                           KDC Systems

                                           Control System(s):
                                           Allen Bradley
                                           Compact Logix PLC

                                           I/O Points:
                                           108

Kdc Systems Overview

  • 1.
    GWRS Groundwater ReplenishmentSystem FOUNTAIN VALLEY, CALIFORNIA Operating Company: KDC Systems Client / Owner: Orange County Water District General Contractor: J.F. Shea Architect / Engineer: Camp Dresser & McKee Inc. Control System(s): Emerson Delta V Allen Bradley Phoenix Instrumentation: Endress + Hauser Rosemount Krohne I/O Points: 8,000 PHOTO CREDIT: LARNY MACK
  • 2.
    Owens Lake DustMitigation Phase VII INYO COUNTY, CALIFORNIA Operating Company: KDC Systems Client / Owner: Los Angeles Department of Water and Power General Contractor: Barnard Construction Company Architect / Engineer: CDM Control System(s): GE iFix Allen Bradley Instrumentation: Siemens Foxboro Krohne I/O Points: 3,000
  • 3.
    Petco Distribution Center Operating Company: MIRA LOMA, CALIFORNIA KDC Systems Client / Owner: Petco General Contractor: Advanced Material Handling Architect / Engineer: KDC Systems Control System(s): Allen Bradley SLC 500 Equipment Type(s): Case Conveyor Sortation Conveyor Services Provided: Engineering and Design CAD Procurement of Equipment Specification of Equipment Control Panel Fabrication Field Wiring I/O Points: 448
  • 4.
    Safeway Yogurt Operating Company: CITY OF COMMERCE, CALIFORNIA KDC Systems Client / Owner: Safeway General Contractor: Equipment Systems Architect / Engineer: KDC Systems Control System(s): Allen Bradley SLC 500 Equipment Type(s): Case Conveyor Industrial Robot Palletizer Automated Guided Vehicles Services Provided: Engineering and Design CAD Procurement of Equipment Specification of Equipment Control Panel Fabrication Field Wiring I/O Points: 416
  • 5.
    Air Treatment Facility NCOS-North Central Outfall Sewer LOS ANGELES, CALIFORNIA Operating Company: KDC Systems Client / Owner: City of Los Angeles General Contractor: Steve P. Rados Architect / Engineer: Black & Veatch Control System(s): Siemens PLC Siemens OIT Instrumentation: Endress + Hauser Foxboro Rosemount I/O Points: 200
  • 6.
    Cal State FullertonTrigeneration Plant FULLERTON, CALIFORNIA Operating Company: KDC Systems Client / Owner: Cal State Fullerton General Contractor: C.W. Driver Architect / Engineer: AECOM Control System(s): Andover TAC Allen Bradley Matrikon OPC Siemens Instrumentation: Siemens Rosemount I/O Points: 985
  • 7.
    Cal State FullertonStudent Housing Phase III FULLERTON, CALIFORNIA Operating Company: KDC Systems Client / Owner: Cal State Fullerton General Contractor: PCL Contractors Architect / Engineer: Steinberg Architects Control System(s): Andover TAC Allen Bradley ABB Instrumentation: Andover Rosemount I/O Points: 4,250
  • 8.
    Children’s Hospital LosAngeles LOS ANGELES, CALIFORNIA Operating Company: KDC Systems Client / Owner: Children’s Hospital Los Angeles General Contractor: Rudolph & Sletten Architect / Engineer: Zimmer Gunsul Frasca Control System(s): Johnson Controls Instrumentation: Johnson Controls I/O Points: 7,000
  • 9.
    San Gabriel DamButterfly Valve Actuator Rehabilitation ANGELES NATIONAL FOREST, CALIFORNIA Operating Company: KDC Systems Client / Owner: City of Los Angeles General Contractor: Wood Group Architect / Engineer: KDC Systems Control System(s): Allen Bradley Compact Logix PLC I/O Points: 108