SlideShare a Scribd company logo
Technical Specifications :
SPESIFIKASI MATERIAL
- Double/Single Smooth Surface - Cs Mat 450
- Angle Frame 60x60mm - Steel Base Frame, WF/UNP
-WR 600 - Resin Orthophthalic
- Support Pipe 1” (Galvanized/SS304) - Color Blue
SPESIFIKASI PEKERJAAN
- Ventilasi - Mainhole - Outlet - Inlet
- Drainhole - Overflow - Ladder
Support Pipe 1” (Galvanized)
Support Pipe 1” (SS304)
Struktur Pondasi WF/UNP
Tangki Panel Fiberglass
No Nama Pekerjaan
Dimension
( PxLxT )
Volume UNIT
Lokasi
Pekerjaan
Status
1 Tangki Air Bersih - Diklat Hambalang 11 x 5 x 2 Meter
110M3 1
Sentul - Bogor Finished
2 Tangki Panel Rooftank - Rumah Sakit PMI 3 x 3 x 3 Meter
27M3 2
Bogor Finished
3 Tangki Air Panel - Rumah Sakit Santo Yusuf 5 x 2 x 2 Meter
20M3 1
Bandung Finished
4 Toren Panel Air Bersih - Dinas PU Palu 10 x 5 x 3 Meter
150M3 2
Palu Finished
5 Toren Panel Air Bersih - Dinas PU Mamuju 10 x 5 x 3 Meter
150M3 2
Mamuju Finished
6 Tangki Panel - PT Trisco - Textile Industri 4 x 3 x 3 Meter
36M3 1
Bandung Finished
7 Tangki Panel - PT Prima Lakto Sehat 5 x 5 x 2 Meter
50M3 1
Bandung Finished
8 Tangki Air Rooftank - Rumah Sakit Gigi 2 x 2 x 1 Meter
4M3 1
Bandung Finished
9 Tangki Air Kotak - BCOMP 1 x 1 x 3 Meter
3M3 1
Bandung Finished
10 Tangki Air Kotak - Private Housing 3 x 1 x 2 Meter
6M3 1
Bandung Finished
11
Tangki Reservoir Panel - Badan Intelegen
Negara 12 x 8 x 2 Meter
192M3 1
Jakarta Finished
12 Tangki Panel Rooftank - Hotel Batara 5 x 2 x 2 Meter
20M3 1
Bandung In Progress
13
Tangki Air Panel - Gedung KPPBC TMP
Cirebon 5 x 2 x 2 Meter
20M3 1
Cirebon In Progress
14 Tangki Air Panel - Cibinong 3 x 2 x 1 Meter
6M3 1
Cibinong In Progress
Tangki Air Bersih - Diklat Hambalang 11 x 5 x 2 Meter 110M3
Tangki Panel Rooftank - Rumah Sakit PMI 3 x 3 x 3 Meter 27M3
Tangki Air Panel - Rumah Sakit Santo Yusuf 5 x 2 x 2 Meter 20M3
Toren Panel Air Bersih - Dinas PU Palu 10 x 5 x 3 Meter 150M3
Toren Panel Air Bersih - Dinas PU Mamuju 10 x 5 x 3 Meter 150M3
Tangki Panel - PT Trisco - Textile Industri 4 x 3 x 3 Meter 36M3
Tangki Panel - PT Prima Lakto Sehat 5 x 5 x 2 Meter 50M3
Tangki Air Rooftank - Rumah Sakit Gigi 2 x 2 x 1 Meter 4M3
Tangki Air Kotak - BCOMP 1 x 1 x 3 Meter 3M3
Tangki Air Kotak - BCOMP 2 x 2 x 3 Meter 8M3
Tangki Air Kotak - Private Housing 3 x 1 x 2 Meter 6M3
Tangki Reservoir Panel - Badan Intelegen Negara 12 x 8 x 2 Meter 192M3
Drawing Tangki Panel 50M3
Drawing Tangki Panel 110M3
Drawing Tangki Panel 16M3
Drawing Tangki Panel 1000M3
Contact Us :
Andri Kelana
Mobile Phone : 0877 2200 3360 (WA)
Email : fiberglassbandung@gmail.com

More Related Content

What's hot

Analisa pekerjaan bongkaran
Analisa pekerjaan bongkaranAnalisa pekerjaan bongkaran
Analisa pekerjaan bongkaran
Saeful Fajri
 
209921115 justifikasi-teknis-cco1
209921115 justifikasi-teknis-cco1209921115 justifikasi-teknis-cco1
209921115 justifikasi-teknis-cco1
Dafa Adunt
 
R3 spek khusus butur seal asbuton (24 jan2012) rev. bintek-02a (finalgrt8ju...
R3 spek  khusus  butur seal asbuton (24 jan2012) rev. bintek-02a (finalgrt8ju...R3 spek  khusus  butur seal asbuton (24 jan2012) rev. bintek-02a (finalgrt8ju...
R3 spek khusus butur seal asbuton (24 jan2012) rev. bintek-02a (finalgrt8ju...
Lam Aim
 
3. analisa harga satuan
3. analisa harga satuan3. analisa harga satuan
3. analisa harga satuan
im4m90
 

What's hot (20)

Tangki septik sistem terpisah dengan bidang peresapan
Tangki septik sistem terpisah dengan bidang peresapanTangki septik sistem terpisah dengan bidang peresapan
Tangki septik sistem terpisah dengan bidang peresapan
 
backup-data-jembatan.docx
backup-data-jembatan.docxbackup-data-jembatan.docx
backup-data-jembatan.docx
 
Analisa pekerjaan bongkaran
Analisa pekerjaan bongkaranAnalisa pekerjaan bongkaran
Analisa pekerjaan bongkaran
 
Metode pelaksanaan
Metode pelaksanaanMetode pelaksanaan
Metode pelaksanaan
 
Spesifikasi teknis jembatan
Spesifikasi teknis jembatanSpesifikasi teknis jembatan
Spesifikasi teknis jembatan
 
209921115 justifikasi-teknis-cco1
209921115 justifikasi-teknis-cco1209921115 justifikasi-teknis-cco1
209921115 justifikasi-teknis-cco1
 
Metode Pelaksanaan Pekerjaan Konstruksi PPT file
Metode Pelaksanaan Pekerjaan Konstruksi PPT fileMetode Pelaksanaan Pekerjaan Konstruksi PPT file
Metode Pelaksanaan Pekerjaan Konstruksi PPT file
 
Cara pasang bio septic tank biotech IPAL BioSeven STP WWTP (www.bioseven.info)
Cara pasang bio septic tank biotech IPAL BioSeven STP WWTP (www.bioseven.info)Cara pasang bio septic tank biotech IPAL BioSeven STP WWTP (www.bioseven.info)
Cara pasang bio septic tank biotech IPAL BioSeven STP WWTP (www.bioseven.info)
 
Pedoman Pelaksanaan Konstruksi Sistem Penyediaan Air Minum
Pedoman Pelaksanaan Konstruksi Sistem Penyediaan Air MinumPedoman Pelaksanaan Konstruksi Sistem Penyediaan Air Minum
Pedoman Pelaksanaan Konstruksi Sistem Penyediaan Air Minum
 
Paparan SLF 2018 Pemprov DKI
Paparan SLF 2018 Pemprov DKIPaparan SLF 2018 Pemprov DKI
Paparan SLF 2018 Pemprov DKI
 
Perancangan dan pemasangan sistem sprinkler pada gedung perkantoran
Perancangan dan pemasangan sistem sprinkler pada gedung perkantoranPerancangan dan pemasangan sistem sprinkler pada gedung perkantoran
Perancangan dan pemasangan sistem sprinkler pada gedung perkantoran
 
Pedoman Penyusunan Perencanaan Teknis Pengembangan Sistem Penyediaan Air Minum
Pedoman Penyusunan Perencanaan Teknis Pengembangan Sistem Penyediaan Air MinumPedoman Penyusunan Perencanaan Teknis Pengembangan Sistem Penyediaan Air Minum
Pedoman Penyusunan Perencanaan Teknis Pengembangan Sistem Penyediaan Air Minum
 
Quality Control (Pengetesan Suhu Hotmix Pekerjaan Jalan)
Quality Control (Pengetesan Suhu Hotmix Pekerjaan Jalan)Quality Control (Pengetesan Suhu Hotmix Pekerjaan Jalan)
Quality Control (Pengetesan Suhu Hotmix Pekerjaan Jalan)
 
R3 spek khusus butur seal asbuton (24 jan2012) rev. bintek-02a (finalgrt8ju...
R3 spek  khusus  butur seal asbuton (24 jan2012) rev. bintek-02a (finalgrt8ju...R3 spek  khusus  butur seal asbuton (24 jan2012) rev. bintek-02a (finalgrt8ju...
R3 spek khusus butur seal asbuton (24 jan2012) rev. bintek-02a (finalgrt8ju...
 
Power point tgl 16 12-2014 (2)
Power point tgl 16 12-2014 (2)Power point tgl 16 12-2014 (2)
Power point tgl 16 12-2014 (2)
 
Spesifikasi teknis
Spesifikasi teknisSpesifikasi teknis
Spesifikasi teknis
 
3. analisa harga satuan
3. analisa harga satuan3. analisa harga satuan
3. analisa harga satuan
 
Pedoman Pemeliharaan dan Rehabilitasi Sistem Penyediaan Air Minum
Pedoman Pemeliharaan dan Rehabilitasi Sistem Penyediaan Air MinumPedoman Pemeliharaan dan Rehabilitasi Sistem Penyediaan Air Minum
Pedoman Pemeliharaan dan Rehabilitasi Sistem Penyediaan Air Minum
 
PPT TKP M1-KB3 INSTALASI AIR BERSIH DAN AIR KOTOR BANGUNAN
PPT TKP M1-KB3 INSTALASI AIR BERSIH DAN AIR KOTOR BANGUNANPPT TKP M1-KB3 INSTALASI AIR BERSIH DAN AIR KOTOR BANGUNAN
PPT TKP M1-KB3 INSTALASI AIR BERSIH DAN AIR KOTOR BANGUNAN
 
Tahap Konstruksi SPAL - Pekerjaan Mekanikal dan Elektrikal
Tahap Konstruksi SPAL - Pekerjaan Mekanikal dan ElektrikalTahap Konstruksi SPAL - Pekerjaan Mekanikal dan Elektrikal
Tahap Konstruksi SPAL - Pekerjaan Mekanikal dan Elektrikal
 

Recently uploaded

ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
Kamal Acharya
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Recently uploaded (20)

KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data StreamKIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
KIT-601 Lecture Notes-UNIT-3.pdf Mining Data Stream
 
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdfONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
ONLINE VEHICLE RENTAL SYSTEM PROJECT REPORT.pdf
 
Hall booking system project report .pdf
Hall booking system project report  .pdfHall booking system project report  .pdf
Hall booking system project report .pdf
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering Workshop
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientist
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Natalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in KrakówNatalia Rutkowska - BIM School Course in Kraków
Natalia Rutkowska - BIM School Course in Kraków
 
AI for workflow automation Use cases applications benefits and development.pdf
AI for workflow automation Use cases applications benefits and development.pdfAI for workflow automation Use cases applications benefits and development.pdf
AI for workflow automation Use cases applications benefits and development.pdf
 
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfRESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
 
Electrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission lineElectrostatic field in a coaxial transmission line
Electrostatic field in a coaxial transmission line
 
Peek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdfPeek implant persentation - Copy (1).pdf
Peek implant persentation - Copy (1).pdf
 
A case study of cinema management system project report..pdf
A case study of cinema management system project report..pdfA case study of cinema management system project report..pdf
A case study of cinema management system project report..pdf
 
Online resume builder management system project report.pdf
Online resume builder management system project report.pdfOnline resume builder management system project report.pdf
Online resume builder management system project report.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES  INTRODUCTION UNIT-IENERGY STORAGE DEVICES  INTRODUCTION UNIT-I
ENERGY STORAGE DEVICES INTRODUCTION UNIT-I
 
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and ClusteringKIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
KIT-601 Lecture Notes-UNIT-4.pdf Frequent Itemsets and Clustering
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdfA CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
A CASE STUDY ON ONLINE TICKET BOOKING SYSTEM PROJECT.pdf
 

Katalog Tangki Panel Fiberglass - FRP Water Tank

  • 1.
  • 2. Technical Specifications : SPESIFIKASI MATERIAL - Double/Single Smooth Surface - Cs Mat 450 - Angle Frame 60x60mm - Steel Base Frame, WF/UNP -WR 600 - Resin Orthophthalic - Support Pipe 1” (Galvanized/SS304) - Color Blue SPESIFIKASI PEKERJAAN - Ventilasi - Mainhole - Outlet - Inlet - Drainhole - Overflow - Ladder
  • 3. Support Pipe 1” (Galvanized)
  • 6. Tangki Panel Fiberglass No Nama Pekerjaan Dimension ( PxLxT ) Volume UNIT Lokasi Pekerjaan Status 1 Tangki Air Bersih - Diklat Hambalang 11 x 5 x 2 Meter 110M3 1 Sentul - Bogor Finished 2 Tangki Panel Rooftank - Rumah Sakit PMI 3 x 3 x 3 Meter 27M3 2 Bogor Finished 3 Tangki Air Panel - Rumah Sakit Santo Yusuf 5 x 2 x 2 Meter 20M3 1 Bandung Finished 4 Toren Panel Air Bersih - Dinas PU Palu 10 x 5 x 3 Meter 150M3 2 Palu Finished 5 Toren Panel Air Bersih - Dinas PU Mamuju 10 x 5 x 3 Meter 150M3 2 Mamuju Finished 6 Tangki Panel - PT Trisco - Textile Industri 4 x 3 x 3 Meter 36M3 1 Bandung Finished 7 Tangki Panel - PT Prima Lakto Sehat 5 x 5 x 2 Meter 50M3 1 Bandung Finished 8 Tangki Air Rooftank - Rumah Sakit Gigi 2 x 2 x 1 Meter 4M3 1 Bandung Finished 9 Tangki Air Kotak - BCOMP 1 x 1 x 3 Meter 3M3 1 Bandung Finished 10 Tangki Air Kotak - Private Housing 3 x 1 x 2 Meter 6M3 1 Bandung Finished 11 Tangki Reservoir Panel - Badan Intelegen Negara 12 x 8 x 2 Meter 192M3 1 Jakarta Finished 12 Tangki Panel Rooftank - Hotel Batara 5 x 2 x 2 Meter 20M3 1 Bandung In Progress 13 Tangki Air Panel - Gedung KPPBC TMP Cirebon 5 x 2 x 2 Meter 20M3 1 Cirebon In Progress 14 Tangki Air Panel - Cibinong 3 x 2 x 1 Meter 6M3 1 Cibinong In Progress
  • 7. Tangki Air Bersih - Diklat Hambalang 11 x 5 x 2 Meter 110M3
  • 8. Tangki Panel Rooftank - Rumah Sakit PMI 3 x 3 x 3 Meter 27M3
  • 9. Tangki Air Panel - Rumah Sakit Santo Yusuf 5 x 2 x 2 Meter 20M3
  • 10. Toren Panel Air Bersih - Dinas PU Palu 10 x 5 x 3 Meter 150M3
  • 11. Toren Panel Air Bersih - Dinas PU Mamuju 10 x 5 x 3 Meter 150M3
  • 12. Tangki Panel - PT Trisco - Textile Industri 4 x 3 x 3 Meter 36M3
  • 13. Tangki Panel - PT Prima Lakto Sehat 5 x 5 x 2 Meter 50M3
  • 14. Tangki Air Rooftank - Rumah Sakit Gigi 2 x 2 x 1 Meter 4M3
  • 15. Tangki Air Kotak - BCOMP 1 x 1 x 3 Meter 3M3
  • 16. Tangki Air Kotak - BCOMP 2 x 2 x 3 Meter 8M3
  • 17. Tangki Air Kotak - Private Housing 3 x 1 x 2 Meter 6M3
  • 18. Tangki Reservoir Panel - Badan Intelegen Negara 12 x 8 x 2 Meter 192M3
  • 19.
  • 20.
  • 21.
  • 26. Contact Us : Andri Kelana Mobile Phone : 0877 2200 3360 (WA) Email : fiberglassbandung@gmail.com