Heating and
ground thawing
HeatWork’s heating and
thawing concept
Winter has traditionally been a time of waiting and even lay-offs in the building and con-
struction industry. HeatWork systems provide a competitive advantage; operations
can continue all year round, whatever the weather. Stoppages and staff lay-offs are avo-
ided. HeatWork makes your company a winner in competition with other operators.
Advantages Utilising HeatWork systems           on industry. User-friendly and effective        areas in order to carry out effective and
and our heating and thawing concept gives       machines with low operating costs have          high-quality work all year round. In addition
your company a competitive advantage            set a new standard for heating in buildings     to thawing, frost prevention and curing
among other operators in the market.            and thawing of ground frost in cold clima-      operations, HeatWork systems can be
Your projects continue forward whilst           tes. HeatWork is the future!                    used to heat spaces and buildings under
others wait for the frost to thaw.                                                              construction or restoration.
HeatWork concepts have been extremely           Applications The target user groups are
well-received in the building and constructi-   those that require frost-free materials or


Examples of use:
Thawing of ground areas:              Frost-free:                     Heating/drying of:                  Pre-heating of:
• Water and sewage systems            •Floor coverings                •Workman’s cabins                   •Areas for cast concrete
• Cable channels/trenches             •Sand and levelling             •Storage/construction halls         •Formwork and casting frames
• Sumps, basements and                 materials                      •Buildings                          •Curing of concrete and
 floor areas                          •Backfill                       •Damp affected areas                 hollow-beam elements
• Roofs and coverings                 •Pipe trenches                  •Workman’s shelters
• Removal of ice and snow             •Points/switches
                                      •Floating stages



How the HeatWork system works:
Flexible heating hoses are laid out on          HW heat-transporting liquid circulates          The moisture in the material is heated
the area to be thawed, cured or protec-         in a closed system and radiates heat            and thawing begins rapidly and effectively
ted from frost. Rigging/dismantling takes       directly into the ground. The liquid is adju-   down into the ground (30-40 cm per 24
approx 1 hour for an area of 200 m2.            sted to the desired temperature, 0-100°C.       hour period, depending on ground conditi-
                                                                                                ons).
The machines are equipped with the              The hoses are then covered with reflecti-
world’s leading boiler and burner techno-       ve HW Insulation Mats for maximum heat          The machines work unmanned until the
logy. Boilers up to 105kW and burners up        transfer to prevent heat loss.                  job is completed. A GSM control unit will
to 119 kW capacity.                                                                             alert operators in case of any problems.


                                                                                                  HW Insulation Mats with
                                                                                                  heat reflecting foil

                                                                                                  HW Hose
                                                                                                  Ground level
                                                                                                  Heating power

                                                                                                  Frozen ground

Thaw effect: 30-40 cm depth per 24 hours.
Cable trench:




                                          Effective



        Safe and effective digging near cables and pipes




Concrete pouring:   House construction.




                                                           Environmentally
Why HeatWork?
Reliability                                    Profitable                                      Flexibility
Based on leading technological develop-        HeatWork’s extended areas of use and            HeatWork has worked closely within the
ments and quality-controlled components        improved heating and thawing effect com-        market to develop and manufacture machi-
from leading manufacturers, HeatWork’s         pared to other methods will increase your       nes with different spesifications and capaci-
patented heating and thawing concept is        profitability.                                  ties tailored to your needs.
the leader in the market.
                                               Year-round operations Winter is no longer       Varied use The machines can be used at
GSM A GSM control unit allows the machi-       regarded as “waiting time” – stable pro-        several stages of building and construction
ne to work unmanned – the unit alerts ope-     gress is possible in all seasons and lay-offs   projects; from thawing of frost, frost pre-
rators should any problems occur.              and project suspensions are avoided.            vention to curing of concrete and heating of
CE-certified All our models are CE-certified   Advantages for construction                     halls and buildings etc.
and designed for the European market.          project tenders By using HeatWork sys-          Area Depending on the type of machine and
Service The machines have few, easily          tems you can offer a guaranteed project         additional equipment, areas from 10 to 800
accessible service points. Proximity to the    progress plan and provide quality controlled    m2 can be covered for thawing.
market, service personnel and 24-hour ser-     results – thus reducing the risk of guaran-     Trailer/container The machines are sup-
vice hotline provides customers with major     tee claims.                                     plied on a CE-certified trailer for effective
advantages.                                    Lower operational costs With low operati-       transport and use, or in containers for
                                               onal costs, such as fuel consumption, the       more arduous conditions.
                                               cost per thawed square metre is extremely
                                               low.




Frost-free backfill material: Thawed in just 24 hours.
                                                                                                                  Profitable




Laying of block paving: Approx. 70 cm frost.



                                                                                    Environmentally
Efficiency                                      User-friendly                                Environment
HeatWork has developed and patented a 3-        Our machines are developed with ease of      The reduction of noise and pollution is an
section hose reel with several short hose       operation, ergonomics and effective design   ongoing challenge for the building and con-
lengths. This means that the return tempe-      in mind.                                     struction industry. HeatWork’s heating and
rature of the heated liquid is maintained,                                                   thawing concept is the market’s most effec-
leading to more rapid thawing. The heating      Simple rigging/dismantling It takes          tive and environmentally-friendly alternative
efficiency is 92% - the highest ratio in the    approx 1 hour to rig the machine for an      with the lowest CO2 emissions per m2.
industry.                                       area of 200 m2. The machine itself weighs
                                                just under 2000 kg and can be towed by a     Sealed system HeatWork’s sealed heat
Minimal heat loss Our machines provide          car or van.                                  liquid system is environmentally-friendly.
maximum heat transfer, with just 5% heat        Operation The machine can work unman-        Direct heat The hoses are laid directly on
loss when used in combination with HW           ned for approx 3.5 days. An integrated       the ground. The hoses are covered and the
Insulating Mats and tarpaulins.                 GSM unit alerts operators in case of any     heat is radiated into the ground with just
Thawing effect The large pump capacity          problems.                                    5% heat loss, which in turn leads to low die-
and short hose lengths provide rapid circu-     Smart solutions The rear door functions      sel consumption.
lation of liquid and a high return temperatu-   as an overhead awning when open, offering    Working environment and conditions
re. For example: an area of 200 m2 can be       protection from the weather . Lighting is    By using radiator fans connected to a
thawed at a rate of 30-40 cm per 24 hour        also integrated into the door. The machine   HeatWork system to heat a building, the
period.                                         runs from a standard electrical supply       interior climate and working environment is
HW Insulation Mats Our specially-develo-        (220V) or via an integrated generator.       improved. The low-noise fans do not emit
ped mats with a 3-layer reflective aluminium                                                 odors or moisture and distribute the heat
coating minimize heat loss and are highly                                                    evenly.
effective, both in terms of thaw rate and
cost savings.




Thawing of building materials: Flexible and effective.


                                                                                    Flexible




Thawing in connection with manhole repairs:                           IKEA Haparanda, Finland. 2 metre frost.




                                          User-friendly
Delivered
                         350 or 630 with
                                     meter
                               hose
HW 1800                                           HW 3600                                              HW 6000
Simple and cost effective                         Rapid thawing and                                    The machine for larger
operation                                         flexible use                                         tasks, robust and effective
HW 1800 has a simpler user panel                  The HW 3600 is the most advanced of                  The HW 6000 is the ultimate combi-
and a whole reel and retains the capa-            its type for effective thawing and hea-              machine that can be utilised from the
city and functionality of the previous            ting. Three hose circuits offer flexible             ground work stage all the way to finis-
model. The ideal machine for those                use and one 1800 litre pump optimise                 hing processes. The HW 6000 offers
requiring simplicity of use.                      the thawing process and minimise thaw                the maximum utilisation of every kW.
                                                  time. The machine has a large capacity               The machine has the largest capacity
                                                  for thawing larger areas and for hea-                on the market and is suitable for those
                                                  ting buildings, halls etc. when used with            requiring thawing, curing and heating
                                                  extra equipment.                                     functions during several stages of a
                                                                                                       construction project.
                                                  The containerised version can be lifted              The containerised version can be lifted
                                                  by crane into inaccessible locations.                by crane into inaccessible locations.




Specifications                                    Specifications                                       Specifications
Pump capacity:   1800 litres per hour             Pump capacity:   3600 litres per hour                Pump capacity:   6000 litres per hour
Power rating:    70 kW, single stage burner       Power rating:    90 kW, single-stage burner          Power rating:    105 kW, 2-stage burner
Hose circuits:   1-2                              Hose circuits:   3                                   Hose circuits:   3
Weight:          1570-1950 kg incl VTV/diesel     Weight:          2000 kg incl VTV/diesel             Weight:          2200 kg incl VTV/diesel
Supplied with:   Trailer                          Supplied with:   Trailer/container                   Supplied with:   Trailer/container

Additional equipment:                             Additional equipment:                                Additional equipment:
• 4,8 kW watercooled and                          • 4,8 kW watercooled and                             • 4,8 kW watercooled and
  reliable generator                                reliable generator                                   reliable generator
• GSM control unit                                • GSM control unit                                   • GSM control unit


General for all machines:
Galvanised steel frame with channels for
fork lift trucks. Other components: stainless            HW 3600 and HW 6000 can also be supplied in a container:
steel and powder-coated materials.
Trailer: Double-axle galvanised trailer with
adjustable machine platform. Monocoque
fibreglass cowling with four lockable hatches.
Length: 4.5 m
Width: 1.95 m
Height: 2.2 m
Tyres: All-season tyres
Diesel tank: 275 litres
Fluid temperature: Adjustable from 0 to 100°C
Thaw rate: 30-40 cm per 24 hour period
(dependent on ground conditions)                                                                           Spesifikasjoner
                                                          Steel container with channels for                Height:       1.54 m
Fuel consumption: 3.5 litres per hour (average)           lifting with fork lift truck from all four       Width:        1.45 m
Working pressure: 0–6 bar                                 sides. Lifting system. Three lockable            Length:       2.20 m
(In normal use: 3–5 bar)                                  doors. Supplied without generator.               Total weight: Up to 2300 kg
Extra equipment:

                 HW Insulation Mats
                 - specially developed and unique insulation covering
                 for building and construction
                 The three-layer reflective aluminium coating that provides       Material: 2-layer sealed polymer cell foam
                 unique heat reflection from radiating heat from the              Aluminium coating: 3 reflective layers
                 ground means that this type of insulation can be used for        Insulation index:   R= 6.32
                 several applications.                                            Width/Length:       2 x 12 m
                                                                                  Area per mat:       24 m2
                                                                                  Weight per mat: 9 kg
                                                                                  Supplied folded in packs of 2.


                 HW Tarpaulins - strong and durable tarpaulin for all purposes
                 The extremely strong tarpaulin optimises the thawing             Material:           PVC fabric, 620 g/m2
                 process when used with HeatWorks heating and thawing             Moisture:           Moisture and water repellent
                 concepts and HW Insulation mats.                                 Width/Length:       2,5x12 m & 5x7 m
                                                                                  Area per mat:       30 m2 & 35 m2
                                                                                  Weight:             20,5 kg & 22,8 kg




                 HW Hose Insulation - reduce heat loss for improved results!
                 HW hose insulation is specially designed to prevent heat         Material:           NBR/PVC foam
                 loss from the HeatWork machine hoses as well as hoses            Length per piece: 2 m
                 from fans and reels. Supplied in two dimensions (1’’ and         Packs:              20
                 5/8’’).                                                          Total weight per pack: 4 kg




                 HW Xtra Reel - simple extension of the thaw area
                 The HW Xtra Reel extends the thaw area by simply con-            Height:                110 cm
                 necting to a HW 3600 or HW 6000. With a 630 m hose,              Length:                 90 cm
                 simple operation and rapid rigging, the maximum capaci-          Width:                 110 cm
                 ty of the machine is utilised. Feed hoses are supplied sepa-     Volume:                1.1 m3 ex-works
                 rately in 5, 10 or 25 metre lengths.                             Total weight:          420 kg
                                                                                  Transport:             Fork lift channels.
                                                                                  Fitted with lifting lugs for shackles.



                 HW Fan - ensure a sound interior climate
                 HW Fans comply with strict interior climate                                   35 kW             10 kW
                 requirements; heating takes place without               Height:                970 cm           710 cm
                 adding moisture or odours. The low-noise fans           Length:               1005 cm           620 cm
                 distribute the heat throughout the building, room       Width:                 540 cm           460 cm
                 or hall.                                                Weight:               41 kg21 kg
                 Using fans connected to a HeatWork system               Material:             Sheet steel       Sheet steel
HW Vifte 35 kW                                                           Power rating:         35 kW10 kW
                 avoids fuel spills inside a building. Supplied in 10
                 kW and 35 kW capacities. Feed hoses are sup-            Air flow:             3900 m3/h         1100 m3/h
                                                                         Assembly:             Fitted to stand    Fitted to stand*
                 plied separately in 5, 10 or 25 metre lengths.
                                                                         Electrical circuit:   10A 10A
                 *(can also be roof/ceiling mounted)
Some of our many satisfied customers:

                                                              Lillehammer
                                                               Kommune
  “ HeatWork made it pos-
  sible for us to thaw large                   “ We needed a new, flexible system for tha-
                                                                                       the
                                                                                      ease
  areas using minimal fuel.                     wing of ground frost that could incr
  The HeatWork machines                         efficiency of municipal works during the win-
                                                                                      ept also
  were central tools that                       ter. We chose HeatWork. The conc                                    “ Our investment in
 enabled us to honor our                        offers considerable environmen     tal advanta-                                             the
                                                                                                                    HeatWork conc
                                                                                       fuel of                                         ept has pro-
 deadlines when construc-                       ges - HeatWork uses a third of the                                 vided us with co
 ting the new REC Scancell                      our previous system     and reduces noise and                      projects that w
                                                                                                                                       ntinuance on
                                                                                         opera-                                      e previously
 factory in Nar vik.””                          emissions in connection with thawing                               postponed durin
                                                 tions. This is especially important to us as                      We now have
                                                                                                                                      g the winter.
                                                                                      n and in                                     all of our staf f
 Thoralf Storli                                  we often work in the centre of tow                               working at full
                                                                                                                                   operational
 Construction Manager NCC.                       urban areas”                                                     capacity and
 As many as 6 HeatWork                                                                                                            avoid lay-offs
                                                                                                                  The increased                   .
 machines in use at one time.                    Terje Larssen                                                                    activity has
                                                                                       lity                      resulted in grea
                                                 Senior engineer, Lillehammer municipa                                              ter turnover
                                                                                                                 and has proved
                                                                                                                                    to be a very
                                                                                                                 profitable inve
                                                                                                                                 stment”
                                                                                                                 Anders Gustav
                                                                                                                                sson
                                                                                                                 Ramudden En
                                                                                                                              treprenad AB.
                                                                                                                 Owner of 37 He
                                                                                                                                atWork machin
                                    months. We envisage the                                                                                   es
     “ It is too late to make the
     investment when the win-       purchase of 3 HeatWork
     ter has arrived and you        machines within the next
     need the machine there         couple of years ”
     and then! By planning acti-
                                    Jan Tranby, Tranby AS
     vities, you can maintain       Landscaper
      safety and security           Owner of 2 HeatWork
      throughout the winter         machines

                                                                                      “ After purchasing           ced production are sol-
                                                                                      HeatWork systems, our        ved. With this type of
                                                                                                                            nal reliability and
                                                                                      pattern of operations has operatio
                                                                                      totally changed. We no       efficiency it is easy for us
                                                                                      longer ask ourselves         to offer customers a
                                                                                      what we will be doing        quality guarantee.




                                                                                                                                                       1000x.10.2010
                                                                                                                                    months
     “ After testing HeatWork dismantling. Th                                         during the winter season In the coming
     concepts and a competin                         e concept                        – our employees and          HeatWork will repre-
                                 g has simplified our operati-                                                     sent a guarantee of
    system, we decided to                                                             plant machines are wor-
                                    ons and led to lower op                                                                          tion.” ”
    invest in HeatWork ma
                             chi- rating costs, as we are
                                                             e-                        king at full capacity using 100% produc
    nes. Large thawing cap
                             aci- dependent on frost-free                              3 HeatWork machines.         Roger Moe

                                                                                                                                                       HeatWork
   ty was the deciding factor                                                          Our previous concerns        Harstad Maskin og Anlegg AS
                                , materials”
   in addition to the fact tha                                                         about the ongoing over-      Owner of 3 HeatWork
                               t
   HeatWork machines are           Trond Hulleberg,                                    heads of plant that is idle machines.
  easy to handle – especi          Genera                                              and employees in redu-
                              al- Hul l Manager
  ly in regard to rigging an          leberg & Bø AS
                              d



                                                                                                     Producer:




                                                                                                     Teknologiveien 5, N-8502 Narvik, NORWAY
                                                                                                     Phone: (+47) 76 96 58 90
                                                                                                     post@heatwork.com
                                                                                                     www.heatwork.com

                                                                                                     Patentnr. 32 33 89

More Related Content

What's hot

Introduction To Lamco Forest Products, Engineered Wood
Introduction To Lamco Forest Products, Engineered WoodIntroduction To Lamco Forest Products, Engineered Wood
Introduction To Lamco Forest Products, Engineered WoodMelanie Cauchon
 
Bs powerpoint slides
Bs powerpoint slidesBs powerpoint slides
Bs powerpoint slideslohwenjun
 
Isotex Corporation Pvt Ltd, Ahmedabad, Thermic Fluid Heaters
Isotex Corporation Pvt Ltd, Ahmedabad, Thermic Fluid HeatersIsotex Corporation Pvt Ltd, Ahmedabad, Thermic Fluid Heaters
Isotex Corporation Pvt Ltd, Ahmedabad, Thermic Fluid HeatersIndiaMART InterMESH Limited
 
Matt Heaters by Tristar Engineering & Chemical Co. Maharashtra
Matt Heaters by Tristar Engineering & Chemical Co. MaharashtraMatt Heaters by Tristar Engineering & Chemical Co. Maharashtra
Matt Heaters by Tristar Engineering & Chemical Co. MaharashtraIndiaMART InterMESH Limited
 
FIRE NORMS AND INDIAN HABITAT CENTRE CASE STUDY
FIRE NORMS AND INDIAN HABITAT CENTRE CASE STUDYFIRE NORMS AND INDIAN HABITAT CENTRE CASE STUDY
FIRE NORMS AND INDIAN HABITAT CENTRE CASE STUDYNamrata Jindal
 
Fire and safety equipment madh
Fire and safety equipment madhFire and safety equipment madh
Fire and safety equipment madhDeepak Thapa
 
Thermojet - Apresentação de serviços - Livro 6/10
Thermojet - Apresentação de serviços - Livro 6/10Thermojet - Apresentação de serviços - Livro 6/10
Thermojet - Apresentação de serviços - Livro 6/10R2S Apresentações
 
Double Duct Heat Pumps 2012
Double Duct Heat Pumps 2012Double Duct Heat Pumps 2012
Double Duct Heat Pumps 2012dgeisert
 
Fire Protection Systems Unit-I
Fire Protection Systems Unit-IFire Protection Systems Unit-I
Fire Protection Systems Unit-IGAURAV. H .TANDON
 
Double Duct Interior Mount Heat Pump
Double Duct Interior Mount Heat PumpDouble Duct Interior Mount Heat Pump
Double Duct Interior Mount Heat Pumpdgeisert
 
Delta 24 v & 48v Low Voltage IBC Heater Jacket - Spec Sheet
Delta 24 v & 48v Low Voltage IBC Heater Jacket - Spec SheetDelta 24 v & 48v Low Voltage IBC Heater Jacket - Spec Sheet
Delta 24 v & 48v Low Voltage IBC Heater Jacket - Spec SheetThorne & Derrick UK
 

What's hot (19)

Introduction To Lamco Forest Products, Engineered Wood
Introduction To Lamco Forest Products, Engineered WoodIntroduction To Lamco Forest Products, Engineered Wood
Introduction To Lamco Forest Products, Engineered Wood
 
Fire fighting
Fire fightingFire fighting
Fire fighting
 
fire fighting System
fire fighting Systemfire fighting System
fire fighting System
 
Bs powerpoint slides
Bs powerpoint slidesBs powerpoint slides
Bs powerpoint slides
 
Ovens and Furnaces
Ovens and Furnaces Ovens and Furnaces
Ovens and Furnaces
 
Agnee e catalouge oven.
Agnee e catalouge oven.Agnee e catalouge oven.
Agnee e catalouge oven.
 
Isotex Corporation Pvt Ltd, Ahmedabad, Thermic Fluid Heaters
Isotex Corporation Pvt Ltd, Ahmedabad, Thermic Fluid HeatersIsotex Corporation Pvt Ltd, Ahmedabad, Thermic Fluid Heaters
Isotex Corporation Pvt Ltd, Ahmedabad, Thermic Fluid Heaters
 
HZI_Grate
HZI_GrateHZI_Grate
HZI_Grate
 
Matt Heaters by Tristar Engineering & Chemical Co. Maharashtra
Matt Heaters by Tristar Engineering & Chemical Co. MaharashtraMatt Heaters by Tristar Engineering & Chemical Co. Maharashtra
Matt Heaters by Tristar Engineering & Chemical Co. Maharashtra
 
Agnee e catalouge furnace
Agnee e catalouge furnaceAgnee e catalouge furnace
Agnee e catalouge furnace
 
FIRE NORMS AND INDIAN HABITAT CENTRE CASE STUDY
FIRE NORMS AND INDIAN HABITAT CENTRE CASE STUDYFIRE NORMS AND INDIAN HABITAT CENTRE CASE STUDY
FIRE NORMS AND INDIAN HABITAT CENTRE CASE STUDY
 
Sowbal Intro new PPT-EME (2A-1
Sowbal  Intro  new  PPT-EME (2A-1Sowbal  Intro  new  PPT-EME (2A-1
Sowbal Intro new PPT-EME (2A-1
 
Fire and safety equipment madh
Fire and safety equipment madhFire and safety equipment madh
Fire and safety equipment madh
 
SEMINAR for Ventilation with heat recovery 2020
SEMINAR for Ventilation with heat recovery 2020SEMINAR for Ventilation with heat recovery 2020
SEMINAR for Ventilation with heat recovery 2020
 
Thermojet - Apresentação de serviços - Livro 6/10
Thermojet - Apresentação de serviços - Livro 6/10Thermojet - Apresentação de serviços - Livro 6/10
Thermojet - Apresentação de serviços - Livro 6/10
 
Double Duct Heat Pumps 2012
Double Duct Heat Pumps 2012Double Duct Heat Pumps 2012
Double Duct Heat Pumps 2012
 
Fire Protection Systems Unit-I
Fire Protection Systems Unit-IFire Protection Systems Unit-I
Fire Protection Systems Unit-I
 
Double Duct Interior Mount Heat Pump
Double Duct Interior Mount Heat PumpDouble Duct Interior Mount Heat Pump
Double Duct Interior Mount Heat Pump
 
Delta 24 v & 48v Low Voltage IBC Heater Jacket - Spec Sheet
Delta 24 v & 48v Low Voltage IBC Heater Jacket - Spec SheetDelta 24 v & 48v Low Voltage IBC Heater Jacket - Spec Sheet
Delta 24 v & 48v Low Voltage IBC Heater Jacket - Spec Sheet
 

Viewers also liked

Heatwork catalogue suomi (fi)
Heatwork catalogue suomi (fi)Heatwork catalogue suomi (fi)
Heatwork catalogue suomi (fi)Heatwork
 
HW 1800 (no)
HW 1800 (no)HW 1800 (no)
HW 1800 (no)Heatwork
 
Hw winter insulation (se)
Hw winter insulation (se)Hw winter insulation (se)
Hw winter insulation (se)Heatwork
 
HW 1800 (fi)
HW 1800 (fi)HW 1800 (fi)
HW 1800 (fi)Heatwork
 
Heatwork katalog norsk (no)
Heatwork katalog norsk (no)Heatwork katalog norsk (no)
Heatwork katalog norsk (no)Heatwork
 
Heatwork katalog svensk (se)
Heatwork katalog svensk (se)Heatwork katalog svensk (se)
Heatwork katalog svensk (se)Heatwork
 
HW 1800 (se)
HW 1800 (se)HW 1800 (se)
HW 1800 (se)Heatwork
 
HW Winter-Insulation (no)
HW Winter-Insulation (no)HW Winter-Insulation (no)
HW Winter-Insulation (no)Heatwork
 
Heatwork catalogue (RU)
Heatwork catalogue (RU)Heatwork catalogue (RU)
Heatwork catalogue (RU)Heatwork
 
Dongfeng truck t375 price list
Dongfeng truck t375 price listDongfeng truck t375 price list
Dongfeng truck t375 price listChinatruck
 
Incubating Innovative Investments
Incubating Innovative InvestmentsIncubating Innovative Investments
Incubating Innovative Investmentst4 Marketing Ltd.
 
Clasificacion 2º cross la manguilla la pobla de vallbona
Clasificacion 2º cross la manguilla la pobla de vallbonaClasificacion 2º cross la manguilla la pobla de vallbona
Clasificacion 2º cross la manguilla la pobla de vallbonaAjuntament La Pobla de Vallbona
 

Viewers also liked (19)

Heatwork catalogue suomi (fi)
Heatwork catalogue suomi (fi)Heatwork catalogue suomi (fi)
Heatwork catalogue suomi (fi)
 
HW 1800 (no)
HW 1800 (no)HW 1800 (no)
HW 1800 (no)
 
Hw winter insulation (se)
Hw winter insulation (se)Hw winter insulation (se)
Hw winter insulation (se)
 
HW 1800 (fi)
HW 1800 (fi)HW 1800 (fi)
HW 1800 (fi)
 
Heatwork katalog norsk (no)
Heatwork katalog norsk (no)Heatwork katalog norsk (no)
Heatwork katalog norsk (no)
 
Heatwork katalog svensk (se)
Heatwork katalog svensk (se)Heatwork katalog svensk (se)
Heatwork katalog svensk (se)
 
HW 1800 (se)
HW 1800 (se)HW 1800 (se)
HW 1800 (se)
 
HW Winter-Insulation (no)
HW Winter-Insulation (no)HW Winter-Insulation (no)
HW Winter-Insulation (no)
 
Heatwork catalogue (RU)
Heatwork catalogue (RU)Heatwork catalogue (RU)
Heatwork catalogue (RU)
 
Dongfeng truck t375 price list
Dongfeng truck t375 price listDongfeng truck t375 price list
Dongfeng truck t375 price list
 
Hawk Property
Hawk PropertyHawk Property
Hawk Property
 
Incubating Innovative Investments
Incubating Innovative InvestmentsIncubating Innovative Investments
Incubating Innovative Investments
 
Lead Generation Forumla
Lead Generation ForumlaLead Generation Forumla
Lead Generation Forumla
 
Lead Generation Forumla
Lead Generation ForumlaLead Generation Forumla
Lead Generation Forumla
 
Auto-Enrolment
Auto-EnrolmentAuto-Enrolment
Auto-Enrolment
 
Festes patronals de Sant Sebastià 2011
Festes patronals de Sant Sebastià 2011Festes patronals de Sant Sebastià 2011
Festes patronals de Sant Sebastià 2011
 
Guia escoles esportives la pobla de vallbona 2013-14
Guia escoles esportives la pobla de vallbona 2013-14Guia escoles esportives la pobla de vallbona 2013-14
Guia escoles esportives la pobla de vallbona 2013-14
 
Bases la dipu te beca 2014 la pobla de vallbona
Bases la dipu te beca 2014 la pobla de vallbonaBases la dipu te beca 2014 la pobla de vallbona
Bases la dipu te beca 2014 la pobla de vallbona
 
Clasificacion 2º cross la manguilla la pobla de vallbona
Clasificacion 2º cross la manguilla la pobla de vallbonaClasificacion 2º cross la manguilla la pobla de vallbona
Clasificacion 2º cross la manguilla la pobla de vallbona
 

Similar to Heatwork catalogue english

Refratechnik | Energy Saving Series
Refratechnik | Energy Saving SeriesRefratechnik | Energy Saving Series
Refratechnik | Energy Saving SeriesRefratechnik Group
 
160425_ITM_Image_brochure_eng
160425_ITM_Image_brochure_eng160425_ITM_Image_brochure_eng
160425_ITM_Image_brochure_engDaniel Ruell
 
EASY DRY (ED) Refractory Concrete Technology
EASY DRY (ED) Refractory Concrete TechnologyEASY DRY (ED) Refractory Concrete Technology
EASY DRY (ED) Refractory Concrete TechnologyRefratechnik Group
 
Take it Easy! Easy Dry (ED) Refractory Concrete Technology
Take it Easy! Easy Dry (ED) Refractory Concrete TechnologyTake it Easy! Easy Dry (ED) Refractory Concrete Technology
Take it Easy! Easy Dry (ED) Refractory Concrete TechnologyRefratechnik Group
 
Thermon Trace Heating Cables - Commercial Capabilities Brochure
Thermon Trace Heating Cables - Commercial Capabilities BrochureThermon Trace Heating Cables - Commercial Capabilities Brochure
Thermon Trace Heating Cables - Commercial Capabilities BrochureThorne & Derrick UK
 
Commercial trace heating_-_capabilities_brochure
Commercial trace heating_-_capabilities_brochureCommercial trace heating_-_capabilities_brochure
Commercial trace heating_-_capabilities_brochureThorne & Derrick UK
 
Heat Pipes (Better One)
Heat Pipes (Better One)Heat Pipes (Better One)
Heat Pipes (Better One)Abin Krishna
 
C5193 Case Study - Tube Inside Diameter Welding Control Cabs
C5193 Case Study - Tube Inside Diameter Welding Control CabsC5193 Case Study - Tube Inside Diameter Welding Control Cabs
C5193 Case Study - Tube Inside Diameter Welding Control CabsChristian Senior
 
Comparison between Systems
Comparison between SystemsComparison between Systems
Comparison between SystemsVictor Ashkenazy
 
Low Voltage Ultra Ibc Heating Jacket Spec Sheet
Low Voltage Ultra Ibc Heating Jacket Spec SheetLow Voltage Ultra Ibc Heating Jacket Spec Sheet
Low Voltage Ultra Ibc Heating Jacket Spec SheetThorne & Derrick UK
 
Aberdeen Presentation
Aberdeen PresentationAberdeen Presentation
Aberdeen PresentationGeorge Duncan
 
Daewoo Enertec Catalogue
Daewoo Enertec CatalogueDaewoo Enertec Catalogue
Daewoo Enertec Cataloguedaewooenerpia
 
Daewoo Enertec Catalogue
Daewoo Enertec CatalogueDaewoo Enertec Catalogue
Daewoo Enertec Cataloguedaewooenerpia
 
PCES Company Brochure 7 12 16
PCES Company Brochure 7 12 16PCES Company Brochure 7 12 16
PCES Company Brochure 7 12 16Douglas Doolen
 
Daewoo Enertec Catalogue
Daewoo Enertec CatalogueDaewoo Enertec Catalogue
Daewoo Enertec Cataloguedaewooenerpia
 

Similar to Heatwork catalogue english (20)

SA Equip - SA Flexiheat SAPH15 400CEA ATEX Heaters
SA Equip - SA Flexiheat SAPH15 400CEA ATEX HeatersSA Equip - SA Flexiheat SAPH15 400CEA ATEX Heaters
SA Equip - SA Flexiheat SAPH15 400CEA ATEX Heaters
 
geoKOAX
geoKOAXgeoKOAX
geoKOAX
 
Refratechnik | Energy Saving Series
Refratechnik | Energy Saving SeriesRefratechnik | Energy Saving Series
Refratechnik | Energy Saving Series
 
160425_ITM_Image_brochure_eng
160425_ITM_Image_brochure_eng160425_ITM_Image_brochure_eng
160425_ITM_Image_brochure_eng
 
HiPeR Leaflet.PDF
HiPeR Leaflet.PDFHiPeR Leaflet.PDF
HiPeR Leaflet.PDF
 
EASY DRY (ED) Refractory Concrete Technology
EASY DRY (ED) Refractory Concrete TechnologyEASY DRY (ED) Refractory Concrete Technology
EASY DRY (ED) Refractory Concrete Technology
 
Take it Easy! Easy Dry (ED) Refractory Concrete Technology
Take it Easy! Easy Dry (ED) Refractory Concrete TechnologyTake it Easy! Easy Dry (ED) Refractory Concrete Technology
Take it Easy! Easy Dry (ED) Refractory Concrete Technology
 
Agnee E-catalouge Oven.
Agnee E-catalouge Oven.Agnee E-catalouge Oven.
Agnee E-catalouge Oven.
 
Thermon Trace Heating Cables - Commercial Capabilities Brochure
Thermon Trace Heating Cables - Commercial Capabilities BrochureThermon Trace Heating Cables - Commercial Capabilities Brochure
Thermon Trace Heating Cables - Commercial Capabilities Brochure
 
Commercial trace heating_-_capabilities_brochure
Commercial trace heating_-_capabilities_brochureCommercial trace heating_-_capabilities_brochure
Commercial trace heating_-_capabilities_brochure
 
Heat Pipes (Better One)
Heat Pipes (Better One)Heat Pipes (Better One)
Heat Pipes (Better One)
 
Phe brochure lr
Phe brochure lrPhe brochure lr
Phe brochure lr
 
C5193 Case Study - Tube Inside Diameter Welding Control Cabs
C5193 Case Study - Tube Inside Diameter Welding Control CabsC5193 Case Study - Tube Inside Diameter Welding Control Cabs
C5193 Case Study - Tube Inside Diameter Welding Control Cabs
 
Comparison between Systems
Comparison between SystemsComparison between Systems
Comparison between Systems
 
Low Voltage Ultra Ibc Heating Jacket Spec Sheet
Low Voltage Ultra Ibc Heating Jacket Spec SheetLow Voltage Ultra Ibc Heating Jacket Spec Sheet
Low Voltage Ultra Ibc Heating Jacket Spec Sheet
 
Aberdeen Presentation
Aberdeen PresentationAberdeen Presentation
Aberdeen Presentation
 
Daewoo Enertec Catalogue
Daewoo Enertec CatalogueDaewoo Enertec Catalogue
Daewoo Enertec Catalogue
 
Daewoo Enertec Catalogue
Daewoo Enertec CatalogueDaewoo Enertec Catalogue
Daewoo Enertec Catalogue
 
PCES Company Brochure 7 12 16
PCES Company Brochure 7 12 16PCES Company Brochure 7 12 16
PCES Company Brochure 7 12 16
 
Daewoo Enertec Catalogue
Daewoo Enertec CatalogueDaewoo Enertec Catalogue
Daewoo Enertec Catalogue
 

More from Heatwork

Ice Guard System (FI)
Ice Guard System (FI)Ice Guard System (FI)
Ice Guard System (FI)Heatwork
 
Ice Guard System (SE)
Ice Guard System (SE)Ice Guard System (SE)
Ice Guard System (SE)Heatwork
 
Catalogue_DE
Catalogue_DECatalogue_DE
Catalogue_DEHeatwork
 
HW 3600 (no)
HW 3600 (no)HW 3600 (no)
HW 3600 (no)Heatwork
 
Heatwork Catalogue (de)
Heatwork Catalogue (de)Heatwork Catalogue (de)
Heatwork Catalogue (de)Heatwork
 
Tillegsutstyr
TillegsutstyrTillegsutstyr
TillegsutstyrHeatwork
 
Heatwork HW 1800
Heatwork HW 1800Heatwork HW 1800
Heatwork HW 1800Heatwork
 
Heatwork HW 3600
Heatwork HW 3600Heatwork HW 3600
Heatwork HW 3600Heatwork
 

More from Heatwork (8)

Ice Guard System (FI)
Ice Guard System (FI)Ice Guard System (FI)
Ice Guard System (FI)
 
Ice Guard System (SE)
Ice Guard System (SE)Ice Guard System (SE)
Ice Guard System (SE)
 
Catalogue_DE
Catalogue_DECatalogue_DE
Catalogue_DE
 
HW 3600 (no)
HW 3600 (no)HW 3600 (no)
HW 3600 (no)
 
Heatwork Catalogue (de)
Heatwork Catalogue (de)Heatwork Catalogue (de)
Heatwork Catalogue (de)
 
Tillegsutstyr
TillegsutstyrTillegsutstyr
Tillegsutstyr
 
Heatwork HW 1800
Heatwork HW 1800Heatwork HW 1800
Heatwork HW 1800
 
Heatwork HW 3600
Heatwork HW 3600Heatwork HW 3600
Heatwork HW 3600
 

Heatwork catalogue english

  • 2. HeatWork’s heating and thawing concept Winter has traditionally been a time of waiting and even lay-offs in the building and con- struction industry. HeatWork systems provide a competitive advantage; operations can continue all year round, whatever the weather. Stoppages and staff lay-offs are avo- ided. HeatWork makes your company a winner in competition with other operators. Advantages Utilising HeatWork systems on industry. User-friendly and effective areas in order to carry out effective and and our heating and thawing concept gives machines with low operating costs have high-quality work all year round. In addition your company a competitive advantage set a new standard for heating in buildings to thawing, frost prevention and curing among other operators in the market. and thawing of ground frost in cold clima- operations, HeatWork systems can be Your projects continue forward whilst tes. HeatWork is the future! used to heat spaces and buildings under others wait for the frost to thaw. construction or restoration. HeatWork concepts have been extremely Applications The target user groups are well-received in the building and constructi- those that require frost-free materials or Examples of use: Thawing of ground areas: Frost-free: Heating/drying of: Pre-heating of: • Water and sewage systems •Floor coverings •Workman’s cabins •Areas for cast concrete • Cable channels/trenches •Sand and levelling •Storage/construction halls •Formwork and casting frames • Sumps, basements and materials •Buildings •Curing of concrete and floor areas •Backfill •Damp affected areas hollow-beam elements • Roofs and coverings •Pipe trenches •Workman’s shelters • Removal of ice and snow •Points/switches •Floating stages How the HeatWork system works: Flexible heating hoses are laid out on HW heat-transporting liquid circulates The moisture in the material is heated the area to be thawed, cured or protec- in a closed system and radiates heat and thawing begins rapidly and effectively ted from frost. Rigging/dismantling takes directly into the ground. The liquid is adju- down into the ground (30-40 cm per 24 approx 1 hour for an area of 200 m2. sted to the desired temperature, 0-100°C. hour period, depending on ground conditi- ons). The machines are equipped with the The hoses are then covered with reflecti- world’s leading boiler and burner techno- ve HW Insulation Mats for maximum heat The machines work unmanned until the logy. Boilers up to 105kW and burners up transfer to prevent heat loss. job is completed. A GSM control unit will to 119 kW capacity. alert operators in case of any problems. HW Insulation Mats with heat reflecting foil HW Hose Ground level Heating power Frozen ground Thaw effect: 30-40 cm depth per 24 hours.
  • 3. Cable trench: Effective Safe and effective digging near cables and pipes Concrete pouring: House construction. Environmentally
  • 4. Why HeatWork? Reliability Profitable Flexibility Based on leading technological develop- HeatWork’s extended areas of use and HeatWork has worked closely within the ments and quality-controlled components improved heating and thawing effect com- market to develop and manufacture machi- from leading manufacturers, HeatWork’s pared to other methods will increase your nes with different spesifications and capaci- patented heating and thawing concept is profitability. ties tailored to your needs. the leader in the market. Year-round operations Winter is no longer Varied use The machines can be used at GSM A GSM control unit allows the machi- regarded as “waiting time” – stable pro- several stages of building and construction ne to work unmanned – the unit alerts ope- gress is possible in all seasons and lay-offs projects; from thawing of frost, frost pre- rators should any problems occur. and project suspensions are avoided. vention to curing of concrete and heating of CE-certified All our models are CE-certified Advantages for construction halls and buildings etc. and designed for the European market. project tenders By using HeatWork sys- Area Depending on the type of machine and Service The machines have few, easily tems you can offer a guaranteed project additional equipment, areas from 10 to 800 accessible service points. Proximity to the progress plan and provide quality controlled m2 can be covered for thawing. market, service personnel and 24-hour ser- results – thus reducing the risk of guaran- Trailer/container The machines are sup- vice hotline provides customers with major tee claims. plied on a CE-certified trailer for effective advantages. Lower operational costs With low operati- transport and use, or in containers for onal costs, such as fuel consumption, the more arduous conditions. cost per thawed square metre is extremely low. Frost-free backfill material: Thawed in just 24 hours. Profitable Laying of block paving: Approx. 70 cm frost. Environmentally
  • 5. Efficiency User-friendly Environment HeatWork has developed and patented a 3- Our machines are developed with ease of The reduction of noise and pollution is an section hose reel with several short hose operation, ergonomics and effective design ongoing challenge for the building and con- lengths. This means that the return tempe- in mind. struction industry. HeatWork’s heating and rature of the heated liquid is maintained, thawing concept is the market’s most effec- leading to more rapid thawing. The heating Simple rigging/dismantling It takes tive and environmentally-friendly alternative efficiency is 92% - the highest ratio in the approx 1 hour to rig the machine for an with the lowest CO2 emissions per m2. industry. area of 200 m2. The machine itself weighs just under 2000 kg and can be towed by a Sealed system HeatWork’s sealed heat Minimal heat loss Our machines provide car or van. liquid system is environmentally-friendly. maximum heat transfer, with just 5% heat Operation The machine can work unman- Direct heat The hoses are laid directly on loss when used in combination with HW ned for approx 3.5 days. An integrated the ground. The hoses are covered and the Insulating Mats and tarpaulins. GSM unit alerts operators in case of any heat is radiated into the ground with just Thawing effect The large pump capacity problems. 5% heat loss, which in turn leads to low die- and short hose lengths provide rapid circu- Smart solutions The rear door functions sel consumption. lation of liquid and a high return temperatu- as an overhead awning when open, offering Working environment and conditions re. For example: an area of 200 m2 can be protection from the weather . Lighting is By using radiator fans connected to a thawed at a rate of 30-40 cm per 24 hour also integrated into the door. The machine HeatWork system to heat a building, the period. runs from a standard electrical supply interior climate and working environment is HW Insulation Mats Our specially-develo- (220V) or via an integrated generator. improved. The low-noise fans do not emit ped mats with a 3-layer reflective aluminium odors or moisture and distribute the heat coating minimize heat loss and are highly evenly. effective, both in terms of thaw rate and cost savings. Thawing of building materials: Flexible and effective. Flexible Thawing in connection with manhole repairs: IKEA Haparanda, Finland. 2 metre frost. User-friendly
  • 6. Delivered 350 or 630 with meter hose HW 1800 HW 3600 HW 6000 Simple and cost effective Rapid thawing and The machine for larger operation flexible use tasks, robust and effective HW 1800 has a simpler user panel The HW 3600 is the most advanced of The HW 6000 is the ultimate combi- and a whole reel and retains the capa- its type for effective thawing and hea- machine that can be utilised from the city and functionality of the previous ting. Three hose circuits offer flexible ground work stage all the way to finis- model. The ideal machine for those use and one 1800 litre pump optimise hing processes. The HW 6000 offers requiring simplicity of use. the thawing process and minimise thaw the maximum utilisation of every kW. time. The machine has a large capacity The machine has the largest capacity for thawing larger areas and for hea- on the market and is suitable for those ting buildings, halls etc. when used with requiring thawing, curing and heating extra equipment. functions during several stages of a construction project. The containerised version can be lifted The containerised version can be lifted by crane into inaccessible locations. by crane into inaccessible locations. Specifications Specifications Specifications Pump capacity: 1800 litres per hour Pump capacity: 3600 litres per hour Pump capacity: 6000 litres per hour Power rating: 70 kW, single stage burner Power rating: 90 kW, single-stage burner Power rating: 105 kW, 2-stage burner Hose circuits: 1-2 Hose circuits: 3 Hose circuits: 3 Weight: 1570-1950 kg incl VTV/diesel Weight: 2000 kg incl VTV/diesel Weight: 2200 kg incl VTV/diesel Supplied with: Trailer Supplied with: Trailer/container Supplied with: Trailer/container Additional equipment: Additional equipment: Additional equipment: • 4,8 kW watercooled and • 4,8 kW watercooled and • 4,8 kW watercooled and reliable generator reliable generator reliable generator • GSM control unit • GSM control unit • GSM control unit General for all machines: Galvanised steel frame with channels for fork lift trucks. Other components: stainless HW 3600 and HW 6000 can also be supplied in a container: steel and powder-coated materials. Trailer: Double-axle galvanised trailer with adjustable machine platform. Monocoque fibreglass cowling with four lockable hatches. Length: 4.5 m Width: 1.95 m Height: 2.2 m Tyres: All-season tyres Diesel tank: 275 litres Fluid temperature: Adjustable from 0 to 100°C Thaw rate: 30-40 cm per 24 hour period (dependent on ground conditions) Spesifikasjoner Steel container with channels for Height: 1.54 m Fuel consumption: 3.5 litres per hour (average) lifting with fork lift truck from all four Width: 1.45 m Working pressure: 0–6 bar sides. Lifting system. Three lockable Length: 2.20 m (In normal use: 3–5 bar) doors. Supplied without generator. Total weight: Up to 2300 kg
  • 7. Extra equipment: HW Insulation Mats - specially developed and unique insulation covering for building and construction The three-layer reflective aluminium coating that provides Material: 2-layer sealed polymer cell foam unique heat reflection from radiating heat from the Aluminium coating: 3 reflective layers ground means that this type of insulation can be used for Insulation index: R= 6.32 several applications. Width/Length: 2 x 12 m Area per mat: 24 m2 Weight per mat: 9 kg Supplied folded in packs of 2. HW Tarpaulins - strong and durable tarpaulin for all purposes The extremely strong tarpaulin optimises the thawing Material: PVC fabric, 620 g/m2 process when used with HeatWorks heating and thawing Moisture: Moisture and water repellent concepts and HW Insulation mats. Width/Length: 2,5x12 m & 5x7 m Area per mat: 30 m2 & 35 m2 Weight: 20,5 kg & 22,8 kg HW Hose Insulation - reduce heat loss for improved results! HW hose insulation is specially designed to prevent heat Material: NBR/PVC foam loss from the HeatWork machine hoses as well as hoses Length per piece: 2 m from fans and reels. Supplied in two dimensions (1’’ and Packs: 20 5/8’’). Total weight per pack: 4 kg HW Xtra Reel - simple extension of the thaw area The HW Xtra Reel extends the thaw area by simply con- Height: 110 cm necting to a HW 3600 or HW 6000. With a 630 m hose, Length: 90 cm simple operation and rapid rigging, the maximum capaci- Width: 110 cm ty of the machine is utilised. Feed hoses are supplied sepa- Volume: 1.1 m3 ex-works rately in 5, 10 or 25 metre lengths. Total weight: 420 kg Transport: Fork lift channels. Fitted with lifting lugs for shackles. HW Fan - ensure a sound interior climate HW Fans comply with strict interior climate 35 kW 10 kW requirements; heating takes place without Height: 970 cm 710 cm adding moisture or odours. The low-noise fans Length: 1005 cm 620 cm distribute the heat throughout the building, room Width: 540 cm 460 cm or hall. Weight: 41 kg21 kg Using fans connected to a HeatWork system Material: Sheet steel Sheet steel HW Vifte 35 kW Power rating: 35 kW10 kW avoids fuel spills inside a building. Supplied in 10 kW and 35 kW capacities. Feed hoses are sup- Air flow: 3900 m3/h 1100 m3/h Assembly: Fitted to stand Fitted to stand* plied separately in 5, 10 or 25 metre lengths. Electrical circuit: 10A 10A *(can also be roof/ceiling mounted)
  • 8. Some of our many satisfied customers: Lillehammer Kommune “ HeatWork made it pos- sible for us to thaw large “ We needed a new, flexible system for tha- the ease areas using minimal fuel. wing of ground frost that could incr The HeatWork machines efficiency of municipal works during the win- ept also were central tools that ter. We chose HeatWork. The conc “ Our investment in enabled us to honor our offers considerable environmen tal advanta- the HeatWork conc fuel of ept has pro- deadlines when construc- ges - HeatWork uses a third of the vided us with co ting the new REC Scancell our previous system and reduces noise and projects that w ntinuance on opera- e previously factory in Nar vik.”” emissions in connection with thawing postponed durin tions. This is especially important to us as We now have g the winter. n and in all of our staf f Thoralf Storli we often work in the centre of tow working at full operational Construction Manager NCC. urban areas” capacity and As many as 6 HeatWork avoid lay-offs The increased . machines in use at one time. Terje Larssen activity has lity resulted in grea Senior engineer, Lillehammer municipa ter turnover and has proved to be a very profitable inve stment” Anders Gustav sson Ramudden En treprenad AB. Owner of 37 He atWork machin months. We envisage the es “ It is too late to make the investment when the win- purchase of 3 HeatWork ter has arrived and you machines within the next need the machine there couple of years ” and then! By planning acti- Jan Tranby, Tranby AS vities, you can maintain Landscaper safety and security Owner of 2 HeatWork throughout the winter machines “ After purchasing ced production are sol- HeatWork systems, our ved. With this type of nal reliability and pattern of operations has operatio totally changed. We no efficiency it is easy for us longer ask ourselves to offer customers a what we will be doing quality guarantee. 1000x.10.2010 months “ After testing HeatWork dismantling. Th during the winter season In the coming concepts and a competin e concept – our employees and HeatWork will repre- g has simplified our operati- sent a guarantee of system, we decided to plant machines are wor- ons and led to lower op tion.” ” invest in HeatWork ma chi- rating costs, as we are e- king at full capacity using 100% produc nes. Large thawing cap aci- dependent on frost-free 3 HeatWork machines. Roger Moe HeatWork ty was the deciding factor Our previous concerns Harstad Maskin og Anlegg AS , materials” in addition to the fact tha about the ongoing over- Owner of 3 HeatWork t HeatWork machines are Trond Hulleberg, heads of plant that is idle machines. easy to handle – especi Genera and employees in redu- al- Hul l Manager ly in regard to rigging an leberg & Bø AS d Producer: Teknologiveien 5, N-8502 Narvik, NORWAY Phone: (+47) 76 96 58 90 post@heatwork.com www.heatwork.com Patentnr. 32 33 89