Unit / Section: Area:
Activity:
Unit: Date of JSA 30/05/2022
JSA Team
Step #
Probability
(H, M, L)
Assiging priority
Residual hazard
(H, M, L)
Project L
Project/EHS
Project/Services
Project
Project
Project
Project
Project/Services
Project
Project
Project
Project
Project
Project
Project
2 H Project L
15-Persons shall wear safety harnesses for height work
1
1-May result in exposing people and/or potential to
harm or danger
2-Presence of non – certified personnel at
radiography site
3-Radiation Leak
4-Accidental Entry of unauthorized personnel
7-Communication Method during working
H
Site Preparation and
checking the Workplace
1-A written notice should be sent to Shift Manager/ERT/EHS/Service Department 24 hours in
advance
2-The Radiographer supervisor responsible for this activity has to check the PPEs of his staff to
ensure that all required items are available and properly used.
3-Authorized work permit for RT holders shall ensure obtaining and maintaining valid work
permits.
4-SBM to ensure that no person other than Radiographers is at site.Moreover,04 Nos SBM to
required around the barrication of Boiler
5-Suspend any ongoing work at radiography site or barricade area
6-Check the Isotope Storage Box for no radiation leak.
7- Check the safe radiation level and barricade the area; installing radiation warning lights &
alert sign
8-Cnergyico will provide the walki-talki to Radiographer ,if any emergency occur in the area to
stop the RT activity and source to shift the designated Box
9-Warning lights before starting the activity
10-All members of the radiographic teams to be in possession of personnel dosimeters and a
calibrated radiation survey meters at all times
11-Source should be attended at all times. Area to be cleared of all personnel before and during
exposure of the source and barricaded (Restricted area).
12-Warning signs to be located.
Equipment Tag
Special PPEs & Equipments
Required
JSA Score
Safety Helmet, Safety Shoes, Coverall, Gloves, Safety goggles
Boiler A
Potential Hazard
Basic Job Steps Control Measures
Transportation of sealed
sources.
Radiation accident to public.
1-Transport the source in the proper designed box and source box must be locked, source must
be used or handled by trained,and authorized Personnel
2-Same vehicle to use for source transfered at workplace .
3-Vehicle must not stop at any public place and never left unattended.
4-Diesel Vehicle to utilize for transportation of source inside plant and valid licence for driving
13-Only skilled and certified Radiographers are authorized to perform this work
14-Persons working in elevated positions shall be provided with safe, inspected and certified
scaffoldings platform.
Department : Project
Radiography
Job Safety Analysis
Unit / Section: Area:
Activity:
Unit: Date of JSA 30/05/2022
JSA Team
Step #
Probability
(H, M, L)
Assiging priority
Residual hazard
(H, M, L)
1
1-May result in exposing people and/or potential to
harm or danger
2-Presence of non – certified personnel at
radiography site
3-Radiation Leak
4-Accidental Entry of unauthorized personnel
7-Communication Method during working
H
Site Preparation and
checking the Workplace
1-A written notice should be sent to Shift Manager/ERT/EHS/Service Department 24 hours in
advance
Equipment Tag
Special PPEs & Equipments
Required
JSA Score
Safety Helmet, Safety Shoes, Coverall, Gloves, Safety goggles
Boiler A
Potential Hazard
Basic Job Steps Control Measures
Department : Project
Radiography
Job Safety Analysis
3 H Project L
EHS & ERT
Name & Signature
Approving signature
Name & Signature Name & Signature
Radiography
1-Slip trip and fall
2-Health damage
3-Ionizing Radiation
1-An exposed source must be returned to its safe container immediately on the request of
operating personnel, or in the event of a fire, or other emergency,or falling
2-For radiography, the source shall be monitored both during exposure and retraction to ensure
accurate location into collimator and safe
return to projector.
3-Area to be barricaded for the protection of radiation is aprroximately 07 Metre.
4-Calibration and certified radiation survey meter to require at site
5-Radiation warning symbol, Danger Board, Flashing Light and warning sign provided at the
barricades.
6-Direct reading dosimeter for radiographer dose monitoring.
7-TLD/Film badge must be available with radiographer.
Maximum personnel exposure limits 2000 mR/year
8-Standby person to restrict movement of authorized personnel.
9-On completion of work, remove all barriers, signs and blinking lights and check equipment
lists and leaving job site tidy.
Area owner Executer

More Related Content

Similar to JSA of Radiography for Boiler A - Copy.pdf

JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdf
JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdfJHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdf
JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdf
Haroon AbdulRahim
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdf
JESUSBASILIOANTONIO
 
DPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxDPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptx
AamirAbbas75
 
Sydney Gateway Rail Duplication Induction v1.4
Sydney Gateway Rail Duplication Induction v1.4Sydney Gateway Rail Duplication Induction v1.4
Sydney Gateway Rail Duplication Induction v1.4
Garry Pepper
 
Sydney gateway rail duplication induction v1.4
Sydney gateway rail duplication induction v1.4Sydney gateway rail duplication induction v1.4
Sydney gateway rail duplication induction v1.4
Garry Pepper
 
Hse alert 47 all clear safe to work -11.12.18
Hse alert 47 all clear safe to work -11.12.18Hse alert 47 all clear safe to work -11.12.18
Hse alert 47 all clear safe to work -11.12.18
Dwarika Bhushan Sharma
 
Site_Safety_Induction on Health, Safety and Environment .pdf
Site_Safety_Induction on Health, Safety and Environment .pdfSite_Safety_Induction on Health, Safety and Environment .pdf
Site_Safety_Induction on Health, Safety and Environment .pdf
ObijiakuIjeoma
 
New media risk
New media riskNew media risk
New media riskgusmcc09
 
Fire Suppression System Risk assessment file
Fire Suppression System Risk assessment fileFire Suppression System Risk assessment file
Fire Suppression System Risk assessment file
chopriroti
 
HSE Risk Register.docx
HSE Risk Register.docxHSE Risk Register.docx
HSE Risk Register.docx
almamunmolla96
 
Job Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docJob Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..doc
Atif767782
 
Iipp haz com-ppe-fp-evac-p65-bp
Iipp haz com-ppe-fp-evac-p65-bpIipp haz com-ppe-fp-evac-p65-bp
Iipp haz com-ppe-fp-evac-p65-bp
KJP Consulting
 
25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx
Dwarika Bhushan Sharma
 
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.dogani
Risk assessment for soil investigation at towers 5,6,7,8  rev01  a.doganiRisk assessment for soil investigation at towers 5,6,7,8  rev01  a.dogani
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.dogani
Arber Dogani
 
25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates
Dwarika Bhushan Sharma
 
Safety in Radiography.pdf
Safety in Radiography.pdfSafety in Radiography.pdf
Safety in Radiography.pdf
raj kumar singh
 
HSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputHSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh Rajput
Gaurav Singh Rajput
 

Similar to JSA of Radiography for Boiler A - Copy.pdf (20)

JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdf
JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdfJHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdf
JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdf
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdf
 
DPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptxDPL-SP - Safety Induction Presentation 00.pptx
DPL-SP - Safety Induction Presentation 00.pptx
 
CONFINED SPACES
CONFINED SPACESCONFINED SPACES
CONFINED SPACES
 
Sydney Gateway Rail Duplication Induction v1.4
Sydney Gateway Rail Duplication Induction v1.4Sydney Gateway Rail Duplication Induction v1.4
Sydney Gateway Rail Duplication Induction v1.4
 
Sydney gateway rail duplication induction v1.4
Sydney gateway rail duplication induction v1.4Sydney gateway rail duplication induction v1.4
Sydney gateway rail duplication induction v1.4
 
Hse alert 47 all clear safe to work -11.12.18
Hse alert 47 all clear safe to work -11.12.18Hse alert 47 all clear safe to work -11.12.18
Hse alert 47 all clear safe to work -11.12.18
 
SITE INDUCTION Version 2
SITE INDUCTION Version 2SITE INDUCTION Version 2
SITE INDUCTION Version 2
 
Site_Safety_Induction on Health, Safety and Environment .pdf
Site_Safety_Induction on Health, Safety and Environment .pdfSite_Safety_Induction on Health, Safety and Environment .pdf
Site_Safety_Induction on Health, Safety and Environment .pdf
 
New media risk
New media riskNew media risk
New media risk
 
Fire Suppression System Risk assessment file
Fire Suppression System Risk assessment fileFire Suppression System Risk assessment file
Fire Suppression System Risk assessment file
 
HSE Risk Register.docx
HSE Risk Register.docxHSE Risk Register.docx
HSE Risk Register.docx
 
Job Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docJob Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..doc
 
Iipp haz com-ppe-fp-evac-p65-bp
Iipp haz com-ppe-fp-evac-p65-bpIipp haz com-ppe-fp-evac-p65-bp
Iipp haz com-ppe-fp-evac-p65-bp
 
25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx25 Demolition of existing concrete structures Risk Assessment Templates.docx
25 Demolition of existing concrete structures Risk Assessment Templates.docx
 
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.dogani
Risk assessment for soil investigation at towers 5,6,7,8  rev01  a.doganiRisk assessment for soil investigation at towers 5,6,7,8  rev01  a.dogani
Risk assessment for soil investigation at towers 5,6,7,8 rev01 a.dogani
 
25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates25 demolition of existing concrete structures risk assessment templates
25 demolition of existing concrete structures risk assessment templates
 
Safety in Radiography.pdf
Safety in Radiography.pdfSafety in Radiography.pdf
Safety in Radiography.pdf
 
VolkerFitzpatrick
VolkerFitzpatrickVolkerFitzpatrick
VolkerFitzpatrick
 
HSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh RajputHSE Risk Register | Gaurav Singh Rajput
HSE Risk Register | Gaurav Singh Rajput
 

Recently uploaded

Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
zwunae
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
An Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering TechniquesAn Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering Techniques
ambekarshweta25
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABSDESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
itech2017
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
Kamal Acharya
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 

Recently uploaded (20)

Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
一比一原版(UMich毕业证)密歇根大学|安娜堡分校毕业证成绩单专业办理
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
An Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering TechniquesAn Approach to Detecting Writing Styles Based on Clustering Techniques
An Approach to Detecting Writing Styles Based on Clustering Techniques
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABSDESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
DESIGN AND ANALYSIS OF A CAR SHOWROOM USING E TABS
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
Online aptitude test management system project report.pdf
Online aptitude test management system project report.pdfOnline aptitude test management system project report.pdf
Online aptitude test management system project report.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 

JSA of Radiography for Boiler A - Copy.pdf

  • 1. Unit / Section: Area: Activity: Unit: Date of JSA 30/05/2022 JSA Team Step # Probability (H, M, L) Assiging priority Residual hazard (H, M, L) Project L Project/EHS Project/Services Project Project Project Project Project/Services Project Project Project Project Project Project Project 2 H Project L 15-Persons shall wear safety harnesses for height work 1 1-May result in exposing people and/or potential to harm or danger 2-Presence of non – certified personnel at radiography site 3-Radiation Leak 4-Accidental Entry of unauthorized personnel 7-Communication Method during working H Site Preparation and checking the Workplace 1-A written notice should be sent to Shift Manager/ERT/EHS/Service Department 24 hours in advance 2-The Radiographer supervisor responsible for this activity has to check the PPEs of his staff to ensure that all required items are available and properly used. 3-Authorized work permit for RT holders shall ensure obtaining and maintaining valid work permits. 4-SBM to ensure that no person other than Radiographers is at site.Moreover,04 Nos SBM to required around the barrication of Boiler 5-Suspend any ongoing work at radiography site or barricade area 6-Check the Isotope Storage Box for no radiation leak. 7- Check the safe radiation level and barricade the area; installing radiation warning lights & alert sign 8-Cnergyico will provide the walki-talki to Radiographer ,if any emergency occur in the area to stop the RT activity and source to shift the designated Box 9-Warning lights before starting the activity 10-All members of the radiographic teams to be in possession of personnel dosimeters and a calibrated radiation survey meters at all times 11-Source should be attended at all times. Area to be cleared of all personnel before and during exposure of the source and barricaded (Restricted area). 12-Warning signs to be located. Equipment Tag Special PPEs & Equipments Required JSA Score Safety Helmet, Safety Shoes, Coverall, Gloves, Safety goggles Boiler A Potential Hazard Basic Job Steps Control Measures Transportation of sealed sources. Radiation accident to public. 1-Transport the source in the proper designed box and source box must be locked, source must be used or handled by trained,and authorized Personnel 2-Same vehicle to use for source transfered at workplace . 3-Vehicle must not stop at any public place and never left unattended. 4-Diesel Vehicle to utilize for transportation of source inside plant and valid licence for driving 13-Only skilled and certified Radiographers are authorized to perform this work 14-Persons working in elevated positions shall be provided with safe, inspected and certified scaffoldings platform. Department : Project Radiography Job Safety Analysis
  • 2. Unit / Section: Area: Activity: Unit: Date of JSA 30/05/2022 JSA Team Step # Probability (H, M, L) Assiging priority Residual hazard (H, M, L) 1 1-May result in exposing people and/or potential to harm or danger 2-Presence of non – certified personnel at radiography site 3-Radiation Leak 4-Accidental Entry of unauthorized personnel 7-Communication Method during working H Site Preparation and checking the Workplace 1-A written notice should be sent to Shift Manager/ERT/EHS/Service Department 24 hours in advance Equipment Tag Special PPEs & Equipments Required JSA Score Safety Helmet, Safety Shoes, Coverall, Gloves, Safety goggles Boiler A Potential Hazard Basic Job Steps Control Measures Department : Project Radiography Job Safety Analysis 3 H Project L EHS & ERT Name & Signature Approving signature Name & Signature Name & Signature Radiography 1-Slip trip and fall 2-Health damage 3-Ionizing Radiation 1-An exposed source must be returned to its safe container immediately on the request of operating personnel, or in the event of a fire, or other emergency,or falling 2-For radiography, the source shall be monitored both during exposure and retraction to ensure accurate location into collimator and safe return to projector. 3-Area to be barricaded for the protection of radiation is aprroximately 07 Metre. 4-Calibration and certified radiation survey meter to require at site 5-Radiation warning symbol, Danger Board, Flashing Light and warning sign provided at the barricades. 6-Direct reading dosimeter for radiographer dose monitoring. 7-TLD/Film badge must be available with radiographer. Maximum personnel exposure limits 2000 mR/year 8-Standby person to restrict movement of authorized personnel. 9-On completion of work, remove all barriers, signs and blinking lights and check equipment lists and leaving job site tidy. Area owner Executer