John J. Coombe
337 Union Avenue
Bellmawr, New Jersey 08031
856-931-2798
Cell 856-857-5687
EXPERIENCE:
08/14 - PRESENT SARGENT & LUNDY, WILMINGTON. DE.
PROJECT DESIGNER
Mechanical Piping verifier and checker for various nuclear and fossil
piping systems.
02/14 – 07/14 Retired
03/74 – 02/14 CB&I / SHAW GROUP / STONE & WEBSTER ENGINEERING CORP.
MOORESTOWN, N.J.
10/09 – 02/14 GRAND GULF NUCLEAR STATION UNIT 1 –
ENTERGY OPERATIONS, INC
PIPING DESIGN LEAD & SENIOR DESIGN CHECKER , responsible for
major equipment removal and installation, new piping design and pipe
supports installation. Checking responsibilities was using Design Review to
check interferences for equipment removal and installation, piping, pipe
supports installation and assisted construction during installation.
07/07 – 10/09 MERCER BET PROJECT PSEG
PIPING DESIGN LEAD & CHECKER; responsible for piping design
group designing & checking 60,000 of pipe footage. My responsibilities
also included using Design Review checking for piping, pipe supports
interferences and assisted construction during installation.
11/04 – 07/07 MONTOUR FGD PROJECT
DESIGN COORDINATOR; responsible piping design group designing &
checking 80,000 ft. of metallic & fiberglass pipe, checking for
interferences using Design Review, coordination between all design
disciplines, and design decisions for the good of the job & construction.
02/04 – 11/04 INDIAN RIVER GENERATING STATION
BRP COAL TEST BURN FOR UNITS 1, 2 & 3 PROJECT
LEAD DESIGN & SENIOR DESIGNER; responsible design &
installation of LP and HP steam Systems.
04/03 – 02/04 CONTECTIV ATLANTIC GEN. COMBUSTION TURBINE
H.P. WATER INJECTION SYS.
LEAD DESIGN & SENIOR DESIGNER; responsible for design and
checking of Combustion Turbine H.P. Water Injection Sys.
11/01 – 04/03 FPL ENERGY MARCUS HOOK PROJECT
LEAD DESIGN & SENIOR DESIGNER; responsible design and
checking of high energy and turbine related piping systems on and off
piping racks.
2/01 – 11/01 BOILER UPGRADE AT COASTAL EAGLE POINT REFINERY
PIPING DESIGN LEAD & SENIOR DESIGNER; responsible for piping
design group and assist construction during piping & pipe supports
installation.
8/88 – 2/01 PUBLIC SERVICE ELECTRIC & GAS COMPANY
LEAD DESIGN & SENIOR DESIGNER; responsible for design and
installation support on several piping, instrument, and control projects as
follows:
SALEM UNITS I & II
• MSR Low Pressure Tube Bundle and Head Replacement
• Emergency Safety Service Water System to CFCU Units
• Low Pressure Feedwater Heaters Replacement
• Small Bore Piping Replacement”
• Redesign of the Post-Accident pass panel.
• Steam Generator Feedwater Flow Nozzle Replacement
• Generator Feedwater Flow Nozzle Replacement
• Steam Flow Sensing Line Modification
• RHR Mid-Loop Modification
HOPE CREEK
• Extraction Steam Pipe Replacement
• Radwaste Pumps Seal Water Flow Regulators
2/87 – 4/80 SENIOR PIPING DESIGNER on following projects:
• B.L. ENGLAND STATION – UNITS 1, 2 AND 3
• ATLANTIC ELECTRIC COMPANY
• BENNING STATION, POTOMAC ELECTRIC POWER COMPANY
• HATFIELD STATION, UNITS 1, 2 AND 3
• ALLEGHENY POWER SERVICE CORPORATION
• OYSTER CREEK NUCLEAR GENERATING STATION
• GENERAL PUBLIC UTILITIES NUCLEAR CORPORATION
2/87 – 4/80 PIPING DESIGNER on following projects:
• RIVER BEND STATION – UNIT 1
• GULF STATES UTILITIES COMPANY
• NINE MILE POINT NUCLEAR STATION – UNIT 2
NIAGARA MOHAWK POWER CORPORATION
8/67 – 3/74 WESTINGHOUSE ELECTRIC CORPORATION, LESTER, PA
• LAYOUT DRAFTSMAN,
CAD SKILLS Micro Station, Auto Cad, & Smart Plant Review
EDUCATION: Camden County College , Engineering Graphics and Mathematics,
Auto-CAD I and II & Micro Station
Camden County Vocational and Technical School – Design Drafting
REFERENCES: Will be provided upon request.

More Related Content

What's hot

Russell bruce cv 2016.
Russell bruce cv 2016.Russell bruce cv 2016.
Russell bruce cv 2016.
Russell Bruce
 
MCS Presentation
MCS PresentationMCS Presentation
MCS Presentation
ArranEwan
 
Mark c resume installation
Mark c resume installationMark c resume installation
Mark c resume installation
Mark Hensley
 
Cross country pipeline construction steps visual guide
Cross country pipeline construction steps visual guideCross country pipeline construction steps visual guide
Cross country pipeline construction steps visual guide
Chukwuma Anyanwu, PMP, CCP
 
Pipeline construction steps for beginners
Pipeline construction steps for beginnersPipeline construction steps for beginners
Pipeline construction steps for beginners
Chukwuma Anyanwu, PMP, CCP
 
Quality aspects in Cross Country Pipeline construction
Quality aspects in Cross Country Pipeline constructionQuality aspects in Cross Country Pipeline construction
Quality aspects in Cross Country Pipeline construction
Suresh Zanwar
 
Keep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater TreatmentKeep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater Treatment
Communications Branding
 
Cv english
Cv englishCv english
Applying the energy institute and prci paper gmc
Applying the energy institute and prci paper  gmcApplying the energy institute and prci paper  gmc
Applying the energy institute and prci paper gmc
dieselpub
 
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)James Herrmann
 
Aoil profile 2016
Aoil  profile  2016 Aoil  profile  2016
Aoil profile 2016
Abhay Ocean India ltd.
 
DOSH PTI Presentation for FPSO BERTAM LMBV (1)
DOSH PTI Presentation for FPSO BERTAM LMBV (1)DOSH PTI Presentation for FPSO BERTAM LMBV (1)
DOSH PTI Presentation for FPSO BERTAM LMBV (1)Mohd Zaini Baharum
 
EXECUTED PROJECTS AT AIN ENGINEERING
EXECUTED PROJECTS AT AIN ENGINEERINGEXECUTED PROJECTS AT AIN ENGINEERING
EXECUTED PROJECTS AT AIN ENGINEERINGHafiz Ayaz
 
Let it Flow! Culvert Design 101 – Basic Hydraulics, Culvert Location & End Tr...
Let it Flow! Culvert Design 101 – Basic Hydraulics, Culvert Location & End Tr...Let it Flow! Culvert Design 101 – Basic Hydraulics, Culvert Location & End Tr...
Let it Flow! Culvert Design 101 – Basic Hydraulics, Culvert Location & End Tr...
Communications Branding
 
Leisa Boos Resume 2016doc
Leisa Boos  Resume 2016docLeisa Boos  Resume 2016doc
Leisa Boos Resume 2016docLeisa B
 

What's hot (18)

nial resume(2)
nial resume(2)nial resume(2)
nial resume(2)
 
Russell bruce cv 2016.
Russell bruce cv 2016.Russell bruce cv 2016.
Russell bruce cv 2016.
 
MCS Presentation
MCS PresentationMCS Presentation
MCS Presentation
 
Mark c resume installation
Mark c resume installationMark c resume installation
Mark c resume installation
 
Cross country pipeline construction steps visual guide
Cross country pipeline construction steps visual guideCross country pipeline construction steps visual guide
Cross country pipeline construction steps visual guide
 
DPE 42inch Synopsis Rev A
DPE 42inch Synopsis Rev  ADPE 42inch Synopsis Rev  A
DPE 42inch Synopsis Rev A
 
Pipeline construction steps for beginners
Pipeline construction steps for beginnersPipeline construction steps for beginners
Pipeline construction steps for beginners
 
Quality aspects in Cross Country Pipeline construction
Quality aspects in Cross Country Pipeline constructionQuality aspects in Cross Country Pipeline construction
Quality aspects in Cross Country Pipeline construction
 
Keep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater TreatmentKeep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater Treatment
 
Riaz Cv
Riaz CvRiaz Cv
Riaz Cv
 
Cv english
Cv englishCv english
Cv english
 
Applying the energy institute and prci paper gmc
Applying the energy institute and prci paper  gmcApplying the energy institute and prci paper  gmc
Applying the energy institute and prci paper gmc
 
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
Resume and Project History - Jim Herrmann (Rev. 05-11-2016)
 
Aoil profile 2016
Aoil  profile  2016 Aoil  profile  2016
Aoil profile 2016
 
DOSH PTI Presentation for FPSO BERTAM LMBV (1)
DOSH PTI Presentation for FPSO BERTAM LMBV (1)DOSH PTI Presentation for FPSO BERTAM LMBV (1)
DOSH PTI Presentation for FPSO BERTAM LMBV (1)
 
EXECUTED PROJECTS AT AIN ENGINEERING
EXECUTED PROJECTS AT AIN ENGINEERINGEXECUTED PROJECTS AT AIN ENGINEERING
EXECUTED PROJECTS AT AIN ENGINEERING
 
Let it Flow! Culvert Design 101 – Basic Hydraulics, Culvert Location & End Tr...
Let it Flow! Culvert Design 101 – Basic Hydraulics, Culvert Location & End Tr...Let it Flow! Culvert Design 101 – Basic Hydraulics, Culvert Location & End Tr...
Let it Flow! Culvert Design 101 – Basic Hydraulics, Culvert Location & End Tr...
 
Leisa Boos Resume 2016doc
Leisa Boos  Resume 2016docLeisa Boos  Resume 2016doc
Leisa Boos Resume 2016doc
 

Viewers also liked

Simon Shearer Resume Updated Non WorleyParsons
Simon Shearer Resume Updated Non WorleyParsonsSimon Shearer Resume Updated Non WorleyParsons
Simon Shearer Resume Updated Non WorleyParsonsSimon Shearer
 
Marshall, Craig R_Resume_2015-07-21
Marshall, Craig R_Resume_2015-07-21Marshall, Craig R_Resume_2015-07-21
Marshall, Craig R_Resume_2015-07-21Craig Marshall
 
Tim Rathsam Work History
Tim Rathsam Work HistoryTim Rathsam Work History
Tim Rathsam Work HistoryTim Rathsam
 
LarrySmock Resume 3_24_2015
LarrySmock Resume 3_24_2015LarrySmock Resume 3_24_2015
LarrySmock Resume 3_24_2015Larry Smock
 
Jackson-GM0415 Personal
Jackson-GM0415 PersonalJackson-GM0415 Personal
Jackson-GM0415 PersonalGary Jackson
 
ENeilsenresume- Dec2015PE
ENeilsenresume- Dec2015PEENeilsenresume- Dec2015PE
ENeilsenresume- Dec2015PEErik NEILSEN
 
Rebecca Ibach's Resume.doc
Rebecca Ibach's Resume.docRebecca Ibach's Resume.doc
Rebecca Ibach's Resume.docRebecca Ibach
 
Appel resume (august 2014)
Appel resume (august 2014)Appel resume (august 2014)
Appel resume (august 2014)
radiofreecaro
 

Viewers also liked (9)

resume
resumeresume
resume
 
Simon Shearer Resume Updated Non WorleyParsons
Simon Shearer Resume Updated Non WorleyParsonsSimon Shearer Resume Updated Non WorleyParsons
Simon Shearer Resume Updated Non WorleyParsons
 
Marshall, Craig R_Resume_2015-07-21
Marshall, Craig R_Resume_2015-07-21Marshall, Craig R_Resume_2015-07-21
Marshall, Craig R_Resume_2015-07-21
 
Tim Rathsam Work History
Tim Rathsam Work HistoryTim Rathsam Work History
Tim Rathsam Work History
 
LarrySmock Resume 3_24_2015
LarrySmock Resume 3_24_2015LarrySmock Resume 3_24_2015
LarrySmock Resume 3_24_2015
 
Jackson-GM0415 Personal
Jackson-GM0415 PersonalJackson-GM0415 Personal
Jackson-GM0415 Personal
 
ENeilsenresume- Dec2015PE
ENeilsenresume- Dec2015PEENeilsenresume- Dec2015PE
ENeilsenresume- Dec2015PE
 
Rebecca Ibach's Resume.doc
Rebecca Ibach's Resume.docRebecca Ibach's Resume.doc
Rebecca Ibach's Resume.doc
 
Appel resume (august 2014)
Appel resume (august 2014)Appel resume (august 2014)
Appel resume (august 2014)
 

Similar to JC RESUME 08-08-15

Resume Frank Bianca
Resume  Frank Bianca Resume  Frank Bianca
Resume Frank Bianca Fank Bianca
 
Slipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway DriveSlipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway Drive
Fairfax County
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitaeSunil Singh
 
Attleboro Luther's Reservoir Dam & Pump Station Rehabilitation
Attleboro Luther's Reservoir Dam & Pump Station RehabilitationAttleboro Luther's Reservoir Dam & Pump Station Rehabilitation
Attleboro Luther's Reservoir Dam & Pump Station Rehabilitation
ThomasSexton8
 
ResumeofKennethThompson09242015(LOCAL)
ResumeofKennethThompson09242015(LOCAL)ResumeofKennethThompson09242015(LOCAL)
ResumeofKennethThompson09242015(LOCAL)Kenneth Thompson
 
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementLong Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
Fairfax County
 
Cv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas TulabotCv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas Tulabot
Jefferson Tomas Tulabot
 
Merrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation ProjectMerrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation Project
Fairfax County
 
EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16Edward Ruebling
 
Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1
Fairfax County
 
building services in a building
building services in a buildingbuilding services in a building
building services in a building
Barsha
 
Boilerplate Resume PDM_15027
Boilerplate Resume PDM_15027Boilerplate Resume PDM_15027
Boilerplate Resume PDM_15027Pat McEvoy
 

Similar to JC RESUME 08-08-15 (20)

Resume Frank Bianca
Resume  Frank Bianca Resume  Frank Bianca
Resume Frank Bianca
 
Slipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway DriveSlipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway Drive
 
Jason Abendroth Resume_10_2015
Jason Abendroth Resume_10_2015Jason Abendroth Resume_10_2015
Jason Abendroth Resume_10_2015
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
 
Attleboro Luther's Reservoir Dam & Pump Station Rehabilitation
Attleboro Luther's Reservoir Dam & Pump Station RehabilitationAttleboro Luther's Reservoir Dam & Pump Station Rehabilitation
Attleboro Luther's Reservoir Dam & Pump Station Rehabilitation
 
CV - AGK LinkedIn
CV - AGK LinkedInCV - AGK LinkedIn
CV - AGK LinkedIn
 
ResumeofKennethThompson09242015(LOCAL)
ResumeofKennethThompson09242015(LOCAL)ResumeofKennethThompson09242015(LOCAL)
ResumeofKennethThompson09242015(LOCAL)
 
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementLong Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
 
Dariush.resume
Dariush.resumeDariush.resume
Dariush.resume
 
Resup2016
Resup2016Resup2016
Resup2016
 
Cv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas TulabotCv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas Tulabot
 
Merrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation ProjectMerrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation Project
 
EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16
 
Sanitary Pump Station Rehabilitation
Sanitary Pump Station RehabilitationSanitary Pump Station Rehabilitation
Sanitary Pump Station Rehabilitation
 
Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1
 
building services in a building
building services in a buildingbuilding services in a building
building services in a building
 
Richard Martinez #1 PDF
Richard Martinez #1 PDFRichard Martinez #1 PDF
Richard Martinez #1 PDF
 
Boilerplate Resume PDM_15027
Boilerplate Resume PDM_15027Boilerplate Resume PDM_15027
Boilerplate Resume PDM_15027
 
Lakeshore boulevard relief sewer presentation
Lakeshore boulevard relief sewer presentationLakeshore boulevard relief sewer presentation
Lakeshore boulevard relief sewer presentation
 
ECS Food For Thought_ presentation Final2
ECS Food For Thought_ presentation Final2ECS Food For Thought_ presentation Final2
ECS Food For Thought_ presentation Final2
 

JC RESUME 08-08-15

  • 1. John J. Coombe 337 Union Avenue Bellmawr, New Jersey 08031 856-931-2798 Cell 856-857-5687 EXPERIENCE: 08/14 - PRESENT SARGENT & LUNDY, WILMINGTON. DE. PROJECT DESIGNER Mechanical Piping verifier and checker for various nuclear and fossil piping systems. 02/14 – 07/14 Retired 03/74 – 02/14 CB&I / SHAW GROUP / STONE & WEBSTER ENGINEERING CORP. MOORESTOWN, N.J. 10/09 – 02/14 GRAND GULF NUCLEAR STATION UNIT 1 – ENTERGY OPERATIONS, INC PIPING DESIGN LEAD & SENIOR DESIGN CHECKER , responsible for major equipment removal and installation, new piping design and pipe supports installation. Checking responsibilities was using Design Review to check interferences for equipment removal and installation, piping, pipe supports installation and assisted construction during installation. 07/07 – 10/09 MERCER BET PROJECT PSEG PIPING DESIGN LEAD & CHECKER; responsible for piping design group designing & checking 60,000 of pipe footage. My responsibilities also included using Design Review checking for piping, pipe supports interferences and assisted construction during installation. 11/04 – 07/07 MONTOUR FGD PROJECT DESIGN COORDINATOR; responsible piping design group designing & checking 80,000 ft. of metallic & fiberglass pipe, checking for interferences using Design Review, coordination between all design disciplines, and design decisions for the good of the job & construction. 02/04 – 11/04 INDIAN RIVER GENERATING STATION BRP COAL TEST BURN FOR UNITS 1, 2 & 3 PROJECT LEAD DESIGN & SENIOR DESIGNER; responsible design & installation of LP and HP steam Systems.
  • 2. 04/03 – 02/04 CONTECTIV ATLANTIC GEN. COMBUSTION TURBINE H.P. WATER INJECTION SYS. LEAD DESIGN & SENIOR DESIGNER; responsible for design and checking of Combustion Turbine H.P. Water Injection Sys. 11/01 – 04/03 FPL ENERGY MARCUS HOOK PROJECT LEAD DESIGN & SENIOR DESIGNER; responsible design and checking of high energy and turbine related piping systems on and off piping racks. 2/01 – 11/01 BOILER UPGRADE AT COASTAL EAGLE POINT REFINERY PIPING DESIGN LEAD & SENIOR DESIGNER; responsible for piping design group and assist construction during piping & pipe supports installation. 8/88 – 2/01 PUBLIC SERVICE ELECTRIC & GAS COMPANY LEAD DESIGN & SENIOR DESIGNER; responsible for design and installation support on several piping, instrument, and control projects as follows: SALEM UNITS I & II • MSR Low Pressure Tube Bundle and Head Replacement • Emergency Safety Service Water System to CFCU Units • Low Pressure Feedwater Heaters Replacement • Small Bore Piping Replacement” • Redesign of the Post-Accident pass panel. • Steam Generator Feedwater Flow Nozzle Replacement • Generator Feedwater Flow Nozzle Replacement • Steam Flow Sensing Line Modification • RHR Mid-Loop Modification HOPE CREEK • Extraction Steam Pipe Replacement • Radwaste Pumps Seal Water Flow Regulators 2/87 – 4/80 SENIOR PIPING DESIGNER on following projects: • B.L. ENGLAND STATION – UNITS 1, 2 AND 3 • ATLANTIC ELECTRIC COMPANY
  • 3. • BENNING STATION, POTOMAC ELECTRIC POWER COMPANY • HATFIELD STATION, UNITS 1, 2 AND 3 • ALLEGHENY POWER SERVICE CORPORATION • OYSTER CREEK NUCLEAR GENERATING STATION • GENERAL PUBLIC UTILITIES NUCLEAR CORPORATION 2/87 – 4/80 PIPING DESIGNER on following projects: • RIVER BEND STATION – UNIT 1 • GULF STATES UTILITIES COMPANY • NINE MILE POINT NUCLEAR STATION – UNIT 2 NIAGARA MOHAWK POWER CORPORATION 8/67 – 3/74 WESTINGHOUSE ELECTRIC CORPORATION, LESTER, PA • LAYOUT DRAFTSMAN, CAD SKILLS Micro Station, Auto Cad, & Smart Plant Review EDUCATION: Camden County College , Engineering Graphics and Mathematics, Auto-CAD I and II & Micro Station Camden County Vocational and Technical School – Design Drafting REFERENCES: Will be provided upon request.