As customers needs are evolving at an astronomical pace, businesses need to reinvent themselves in order to stay relevant. At the heart of this unavoidable reinvention lies Information Technology (IT).
However, if IT will be worth the ‘hype’, there needs to be a seamless handshake between the different IT roles such as; BA, UI/UX Designer, Coder, QA, PM and DevOps, involved in creating value.
In this webinar, you’ll learn:
〉 ITIL 4 Overview
〉 Differences between ITIL V3 and ITIL 4,
〉 ITIL 4 elements (Service value system, Service value chain, Guiding principles, ITIL Practices and Four Dimensions)
〉 The link between IT, Agile, Business Analysis
〉 How the different roles interrelate
〉 Using ITIL 4 Service Value Chain Activities to design a new app
ITIL, formally an acronym for Information Technology Infrastructure Library, is a set of practices for IT service management (ITSM) that focuses on aligning IT services with the needs of business. In its current form (known as ITIL V3),
Difference between ITIL v3 and ITIL 4 | ITIL® Foundation Training | EdurekaEdureka!
YouTube Link: https://www.youtube.com/watch?v=OqTtb0r-4QY
** ITIL® Foundation Certification Training: https://www.edureka.co/itil-foundation-sp **
This Edureka video on 'ITIL® v3 vs ITIL 4' will demystify the differences between the two versions of ITIL which are ITIL v3 released in 2011 and ITIL 4 released in 2019. This video will give you a brief overview of how ITIL v3 differs from ITIL 4 and what all have been updated.
Below are the topics covered in this tutorial:
What is the ITIL® v3 Framework?
What is ITIL® 4 Framework?
ITIL v3 vs ITIL 4
Follow us to never miss an update in the future.
YouTube: https://www.youtube.com/user/edurekaIN
Instagram: https://www.instagram.com/edureka_learning/
Facebook: https://www.facebook.com/edurekaIN/
Twitter: https://twitter.com/edurekain
LinkedIn: https://www.linkedin.com/company/edureka
Castbox: https://castbox.fm/networks/505?country=in
Mario Vivas, CEO, River Horse
ITIL4 is out and everyone is eager to learn about the updates this release introduces. This session will summarize the key changes that ITIL4 presents with a focus on the more operational processes that organizations deliver on a day to day basis (Incident, Problem, Change and so on). The ServiceNow platform has a powerful set of baseline features and optional plugin functions that can help an organization align with the recommendations of ITIL4.
Please join us and Mario to learn about how you can start applying ITIL4 concepts in your ServiceNow implementations!
ITIL, formally an acronym for Information Technology Infrastructure Library, is a set of practices for IT service management (ITSM) that focuses on aligning IT services with the needs of business. In its current form (known as ITIL V3),
Difference between ITIL v3 and ITIL 4 | ITIL® Foundation Training | EdurekaEdureka!
YouTube Link: https://www.youtube.com/watch?v=OqTtb0r-4QY
** ITIL® Foundation Certification Training: https://www.edureka.co/itil-foundation-sp **
This Edureka video on 'ITIL® v3 vs ITIL 4' will demystify the differences between the two versions of ITIL which are ITIL v3 released in 2011 and ITIL 4 released in 2019. This video will give you a brief overview of how ITIL v3 differs from ITIL 4 and what all have been updated.
Below are the topics covered in this tutorial:
What is the ITIL® v3 Framework?
What is ITIL® 4 Framework?
ITIL v3 vs ITIL 4
Follow us to never miss an update in the future.
YouTube: https://www.youtube.com/user/edurekaIN
Instagram: https://www.instagram.com/edureka_learning/
Facebook: https://www.facebook.com/edurekaIN/
Twitter: https://twitter.com/edurekain
LinkedIn: https://www.linkedin.com/company/edureka
Castbox: https://castbox.fm/networks/505?country=in
Mario Vivas, CEO, River Horse
ITIL4 is out and everyone is eager to learn about the updates this release introduces. This session will summarize the key changes that ITIL4 presents with a focus on the more operational processes that organizations deliver on a day to day basis (Incident, Problem, Change and so on). The ServiceNow platform has a powerful set of baseline features and optional plugin functions that can help an organization align with the recommendations of ITIL4.
Please join us and Mario to learn about how you can start applying ITIL4 concepts in your ServiceNow implementations!
Philip Hearsum - Introducing ITIL 4 - AID2019ALVAO
Philip Hearsum je přesvědčeným zastáncem ITSM obecně a ITILu obzvlášť. Už v době, kdy působil na rozličných pozicích v komerční a státní správě, se aktivně podílel na přípravě ITILu 2011. Od roku 2013 pracuje pro AXELOS, kde má na starosti celý ITIL.
Patří tak k hlavním architektům připravované verze ITIL 4.
IT Service Management Tutorial | What Is ITSM? | ITIL Foundation Training | S...Simplilearn
This presentation on 'IT Service Management' will take you through everything you need to know about the concept of IT service management. ITSM is the practice of delivering IT services and supporting internal customers with the help of people, processes and technology. The video will also cover concepts like what is ITIL, what is ITSM, key concepts of ITSM and the ITIL service lifecycle.
What are the course objectives?
ITIL® 4 is the latest release of the ITIL framework, designed to provide a more practical viewpoint to the ITIL lifecycle with best practices from other complementary platforms such as Agile, DevOps and Lean. The objective of this course is to provide a foundational level of understanding of the ITIL 4 framework, key elements, concepts and terminologies associated with ITIL service lifecycle, and how it has evolved to adopt modern technologies and operational processes. The course covers all necessary concepts in the service management framework to support candidates studying for the ITIL 4 Foundation Certification Exam.
What skills will you learn?
Upon completion of this ITIL Certification training you will learn:
- Concepts, key principles and process models required to pass the ITIL 4 Foundation exam.
- How ITIL principles can help an individual understand and apply IT service management in their organization.
- How to improve customer experience and ITSM efficiency with the help of ITIL tools and techniques.
- The purposes and key terms of 15 ITIL practices.
- Industry best practices for deploying IT services.
Below are the topics explained in this ITIL presentation:
1. What is ITIL?
2. Why ITIL?
3. ITIL Service Lifecyclehttps://www.simplilearn.com/it-service-management/itil-foundation-training
An overview of The Open Group IT4IT Reference Architecture. It is a vendor and product-agnostic value chain-based operating model for managing the business of IT. While providing guidance on the design, procurement and implementation of the functionality needed to run IT, it also enables the systematic tracking of the state of IT services across the service life-cycle using four value streams - Strategy to Portfolio, Request to Fulfill, Requirement to Deploy, and Detect to Correct.
Download presentation from http://opengroup.co.za/presentations
Defining Services for a Service CatalogAxios Systems
To view this complimentary webcast in full, visit: http://forms.axiossystems.com/LP=289
Faced with continued cost pressures, as well as growing business unit demand for new services and higher service levels, IT is about to make transformation. IT is having to align their services with the needs of the business, develop standardized process and improve overall internal customer satisfaction. Arguably the most important tool to deliver these demands is the Service Catalog.
ITIL History
ITIL Transition from V3 to V4
Key Concept of ITSM
ITIL Dimensions and Principles
Service Value System (SVS)
ITIL Practices
ITIL Certification Schema
History of IT Service Management Practices and StandardsRob Akershoek
Evolution of IT service management practices and standards from Top Gun 1 (around 1990) to Top Gun Maverick (2022)
How did the IT management evolve since 1990? When were key standards and practices introduced?
The IT management market has significantly evolved over the last few years e.g. introducing DevOps, Continuous Delivery, Agile Development, SRE and IT4IT. Managing this new multi-vendor ecosystem consisting of cloud, containers and micro-services.
Managing this new digital reality requires you to combine various practices into one integrated Digital Operating Model, to optimize end-to-end IT value streams.
Itil 4 "management practices as sets of organizational resources designed for performing work or accomplishing an objective"
The mindmap includes links to posts where the practice is explained in more detail.
ITIL® is a registered trademark of AXELOS Limited.
https://www.axelos.com/
General management practices
Strategy management
Portfolio management
Architecture management
Service financial management
Workforce and talent management
Continual improvement
Measurement and reporting
Risk management
Information security management
Knowledge management
Organizational change management
Project management
Relationship management
Supplier management
Service management practices
Business analysis
Service catalogue management
Service design
Service level management
Availability management
Capacity and performance management
Service continuity management
Monitoring and event management
Service desk
Incident management
Service request management
Problem management
Release management
Change enablement
Service validation and testing
Service configuration management
IT asset management
Technical management practices
Deployment management
Infrastructure and platform management
Software development and management
Last year in May, where we could do what we liked and Covid19 was not even a word, the itSMF organized an event to review ITIL4 and how it positioned itself in the agile service management world. For those who joined, I said that all the information shared was based on the ITIL4 foundation input. Since then, a lot has happened. Also in the world of ITIL4. Axelos released 4 more specialist and strategist titles and 35 practice titles.
It gave the possibility to revisit the initial understanding, challenge it and extending it to the level I am at today. I also said that when time is right, I would share my insights.
So if you want that in depth review of how Axelos has reinvented ITIL and how for me, this evolution of ITIL is as disruptive as the market we are in today, mark in your agenda : 26th of November from 17:30 until 19:00
What can you expect from this indepth session on ITIL4? We will start off with a short recap of the foundation, so even people not really familiar with the basic ins and outs can follow the session.
After that introduction, the 4 core volumes added as part of the managing professional will be reviewed and connected to the ITIL4 operating model. We will investigate how each of the volumes adds tools and guidance, allowing a service driven organisation to become the best version of itself.
Personally it has been a discovery journey which took and still takes time to grasp the potential. I hope that by the end of the session, some of the insights might be of use in your own service management evolution journey.
Eddy Peters
Request to Fulfill Presentation (IT4IT)Rob Akershoek
The Request to Fulfill (R2F) value stream presentation. R2F is one of the four value streams of the IT4IT Reference Architecture of The Open Group.
How to manage your IT organization as a professional IT shop? Provide a self service portal for end-users and IT staff to order IT services and IT resources. Automate the entire process from request to actual deployment and provisioning.
Don Casson, CEO and Jeff Benedict, ITSM Practice Manager share best practices you can use to clearly define and communicate - who is the Customer and what are the Services? They also share how a service catalog taxonomy framework helps you organize and manage this as ONE team. You may download or playback the recording here: http://bit.ly/1BWnEkX #servicecatalog #servicenow #itsm
ITIL 4 service value chain data flows (input and outputs)Rob Akershoek
High level overview of the Service value chain activities and information flows (input/outputs) based upon ITIL 4 from AXELOS (ITIL 4 Foundation).
Mapping of the ITIL value chain activities to the IT4IT value streams as defined by The Open Group IT4IT Standard.
Integrating ITSM Frameworks, Standards and Processes - ITSM Academy WebinarITSM Academy, Inc.
To successfully achieve IT Service Management (ITSM) best practices, organizations need to adopt multiple ITSM frameworks and standards.
This presentation describes when and how to integrate the most widely used ITSM frameworks and standards, such as ITIL®, COBIT, ISO/IEC 20000 and Microsoft Operations Framework (MOF).
The how, why and what of ITIL® certificationsLora Beros
The ITIL® path is long and challenging, but you have to start somewhere. In this on-demand presentation, TrainSignal instructor Lowell Amos discusses the benefits of obtaining an ITIL® certification. Where do you start? Why should you bother? How can this certification transform your career? Let Lowell guide you through the first ladder of the ITIL® climb to success.
Philip Hearsum - Introducing ITIL 4 - AID2019ALVAO
Philip Hearsum je přesvědčeným zastáncem ITSM obecně a ITILu obzvlášť. Už v době, kdy působil na rozličných pozicích v komerční a státní správě, se aktivně podílel na přípravě ITILu 2011. Od roku 2013 pracuje pro AXELOS, kde má na starosti celý ITIL.
Patří tak k hlavním architektům připravované verze ITIL 4.
IT Service Management Tutorial | What Is ITSM? | ITIL Foundation Training | S...Simplilearn
This presentation on 'IT Service Management' will take you through everything you need to know about the concept of IT service management. ITSM is the practice of delivering IT services and supporting internal customers with the help of people, processes and technology. The video will also cover concepts like what is ITIL, what is ITSM, key concepts of ITSM and the ITIL service lifecycle.
What are the course objectives?
ITIL® 4 is the latest release of the ITIL framework, designed to provide a more practical viewpoint to the ITIL lifecycle with best practices from other complementary platforms such as Agile, DevOps and Lean. The objective of this course is to provide a foundational level of understanding of the ITIL 4 framework, key elements, concepts and terminologies associated with ITIL service lifecycle, and how it has evolved to adopt modern technologies and operational processes. The course covers all necessary concepts in the service management framework to support candidates studying for the ITIL 4 Foundation Certification Exam.
What skills will you learn?
Upon completion of this ITIL Certification training you will learn:
- Concepts, key principles and process models required to pass the ITIL 4 Foundation exam.
- How ITIL principles can help an individual understand and apply IT service management in their organization.
- How to improve customer experience and ITSM efficiency with the help of ITIL tools and techniques.
- The purposes and key terms of 15 ITIL practices.
- Industry best practices for deploying IT services.
Below are the topics explained in this ITIL presentation:
1. What is ITIL?
2. Why ITIL?
3. ITIL Service Lifecyclehttps://www.simplilearn.com/it-service-management/itil-foundation-training
An overview of The Open Group IT4IT Reference Architecture. It is a vendor and product-agnostic value chain-based operating model for managing the business of IT. While providing guidance on the design, procurement and implementation of the functionality needed to run IT, it also enables the systematic tracking of the state of IT services across the service life-cycle using four value streams - Strategy to Portfolio, Request to Fulfill, Requirement to Deploy, and Detect to Correct.
Download presentation from http://opengroup.co.za/presentations
Defining Services for a Service CatalogAxios Systems
To view this complimentary webcast in full, visit: http://forms.axiossystems.com/LP=289
Faced with continued cost pressures, as well as growing business unit demand for new services and higher service levels, IT is about to make transformation. IT is having to align their services with the needs of the business, develop standardized process and improve overall internal customer satisfaction. Arguably the most important tool to deliver these demands is the Service Catalog.
ITIL History
ITIL Transition from V3 to V4
Key Concept of ITSM
ITIL Dimensions and Principles
Service Value System (SVS)
ITIL Practices
ITIL Certification Schema
History of IT Service Management Practices and StandardsRob Akershoek
Evolution of IT service management practices and standards from Top Gun 1 (around 1990) to Top Gun Maverick (2022)
How did the IT management evolve since 1990? When were key standards and practices introduced?
The IT management market has significantly evolved over the last few years e.g. introducing DevOps, Continuous Delivery, Agile Development, SRE and IT4IT. Managing this new multi-vendor ecosystem consisting of cloud, containers and micro-services.
Managing this new digital reality requires you to combine various practices into one integrated Digital Operating Model, to optimize end-to-end IT value streams.
Itil 4 "management practices as sets of organizational resources designed for performing work or accomplishing an objective"
The mindmap includes links to posts where the practice is explained in more detail.
ITIL® is a registered trademark of AXELOS Limited.
https://www.axelos.com/
General management practices
Strategy management
Portfolio management
Architecture management
Service financial management
Workforce and talent management
Continual improvement
Measurement and reporting
Risk management
Information security management
Knowledge management
Organizational change management
Project management
Relationship management
Supplier management
Service management practices
Business analysis
Service catalogue management
Service design
Service level management
Availability management
Capacity and performance management
Service continuity management
Monitoring and event management
Service desk
Incident management
Service request management
Problem management
Release management
Change enablement
Service validation and testing
Service configuration management
IT asset management
Technical management practices
Deployment management
Infrastructure and platform management
Software development and management
Last year in May, where we could do what we liked and Covid19 was not even a word, the itSMF organized an event to review ITIL4 and how it positioned itself in the agile service management world. For those who joined, I said that all the information shared was based on the ITIL4 foundation input. Since then, a lot has happened. Also in the world of ITIL4. Axelos released 4 more specialist and strategist titles and 35 practice titles.
It gave the possibility to revisit the initial understanding, challenge it and extending it to the level I am at today. I also said that when time is right, I would share my insights.
So if you want that in depth review of how Axelos has reinvented ITIL and how for me, this evolution of ITIL is as disruptive as the market we are in today, mark in your agenda : 26th of November from 17:30 until 19:00
What can you expect from this indepth session on ITIL4? We will start off with a short recap of the foundation, so even people not really familiar with the basic ins and outs can follow the session.
After that introduction, the 4 core volumes added as part of the managing professional will be reviewed and connected to the ITIL4 operating model. We will investigate how each of the volumes adds tools and guidance, allowing a service driven organisation to become the best version of itself.
Personally it has been a discovery journey which took and still takes time to grasp the potential. I hope that by the end of the session, some of the insights might be of use in your own service management evolution journey.
Eddy Peters
Request to Fulfill Presentation (IT4IT)Rob Akershoek
The Request to Fulfill (R2F) value stream presentation. R2F is one of the four value streams of the IT4IT Reference Architecture of The Open Group.
How to manage your IT organization as a professional IT shop? Provide a self service portal for end-users and IT staff to order IT services and IT resources. Automate the entire process from request to actual deployment and provisioning.
Don Casson, CEO and Jeff Benedict, ITSM Practice Manager share best practices you can use to clearly define and communicate - who is the Customer and what are the Services? They also share how a service catalog taxonomy framework helps you organize and manage this as ONE team. You may download or playback the recording here: http://bit.ly/1BWnEkX #servicecatalog #servicenow #itsm
ITIL 4 service value chain data flows (input and outputs)Rob Akershoek
High level overview of the Service value chain activities and information flows (input/outputs) based upon ITIL 4 from AXELOS (ITIL 4 Foundation).
Mapping of the ITIL value chain activities to the IT4IT value streams as defined by The Open Group IT4IT Standard.
Integrating ITSM Frameworks, Standards and Processes - ITSM Academy WebinarITSM Academy, Inc.
To successfully achieve IT Service Management (ITSM) best practices, organizations need to adopt multiple ITSM frameworks and standards.
This presentation describes when and how to integrate the most widely used ITSM frameworks and standards, such as ITIL®, COBIT, ISO/IEC 20000 and Microsoft Operations Framework (MOF).
The how, why and what of ITIL® certificationsLora Beros
The ITIL® path is long and challenging, but you have to start somewhere. In this on-demand presentation, TrainSignal instructor Lowell Amos discusses the benefits of obtaining an ITIL® certification. Where do you start? Why should you bother? How can this certification transform your career? Let Lowell guide you through the first ladder of the ITIL® climb to success.
Beverly Weed-Schertzer explains how ITIL, the most widely used IT service management framework, supports business objectives, enables changes, adds value to service risk management, and optimizes customer experience while being economical. Additionally, this explores the various trends in the domain and serves as a one-stop guide for all aspiring professionals looking to build a career in this discipline.
ITIL® 4 will be hitting shelves in February 2019, but how is it different from ITIL V3? We joined forces with AXELOS in this webinar to break down what's changing with ITIL 4, how this can benefit you and your organisation, and how you can book onto a course.
The tweedledee and tweedledum of portfolio management 2021Svetlana Sidenko
The BRM role clarity is not a new topic. Everyone who has ever been involved with a BRM in one way or another, understands that often the role boundaries fall into a grey zone. However, in each organization the role clarity, or lack of it, manifests itself in different ways and it depends on whether the BRM is positioned strategically or tactically, on organizational culture, industry, size of the organization, and many other factors. Join to hear the success and challenges of BRM and Service Owners in the Harvard Business School and how they team up to optimize the business value. In today’s reality of volatile, uncertain, complex and ambiguous (VUCA) environments and the age of accelerated digital transformation where service organizations invariably struggle to keep up with the velocity of demand, it has become even more imperative that the roles of the BRM and Service Owner, both connective tissues between various parts of the organization with its partners, be lock stepped in the maximization of value and co-creation of transformation.
What Every Project Manager Should Know About ItilDaniel Cayouette
This presentation will provide a high-level view of ITIL and will identify where the ITIL Service Lifecycle Framework and the PMBOK Guide complement each other.
Understanding of ITIL will help the IT project manager over the lifecycle of their projects, from defining a better project charter focused on IT services to a smoother transition to operations and an increased satisfaction of all stakeholders.
The role of an IT PMO as the Voice of IT and its role with Service Level Management will also be discussed as a key enabler to align IT to the business.
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Ramesh Iyer
In today's fast-changing business world, Companies that adapt and embrace new ideas often need help to keep up with the competition. However, fostering a culture of innovation takes much work. It takes vision, leadership and willingness to take risks in the right proportion. Sachin Dev Duggal, co-founder of Builder.ai, has perfected the art of this balance, creating a company culture where creativity and growth are nurtured at each stage.
State of ICS and IoT Cyber Threat Landscape Report 2024 previewPrayukth K V
The IoT and OT threat landscape report has been prepared by the Threat Research Team at Sectrio using data from Sectrio, cyber threat intelligence farming facilities spread across over 85 cities around the world. In addition, Sectrio also runs AI-based advanced threat and payload engagement facilities that serve as sinks to attract and engage sophisticated threat actors, and newer malware including new variants and latent threats that are at an earlier stage of development.
The latest edition of the OT/ICS and IoT security Threat Landscape Report 2024 also covers:
State of global ICS asset and network exposure
Sectoral targets and attacks as well as the cost of ransom
Global APT activity, AI usage, actor and tactic profiles, and implications
Rise in volumes of AI-powered cyberattacks
Major cyber events in 2024
Malware and malicious payload trends
Cyberattack types and targets
Vulnerability exploit attempts on CVEs
Attacks on counties – USA
Expansion of bot farms – how, where, and why
In-depth analysis of the cyber threat landscape across North America, South America, Europe, APAC, and the Middle East
Why are attacks on smart factories rising?
Cyber risk predictions
Axis of attacks – Europe
Systemic attacks in the Middle East
Download the full report from here:
https://sectrio.com/resources/ot-threat-landscape-reports/sectrio-releases-ot-ics-and-iot-security-threat-landscape-report-2024/
Essentials of Automations: Optimizing FME Workflows with ParametersSafe Software
Are you looking to streamline your workflows and boost your projects’ efficiency? Do you find yourself searching for ways to add flexibility and control over your FME workflows? If so, you’re in the right place.
Join us for an insightful dive into the world of FME parameters, a critical element in optimizing workflow efficiency. This webinar marks the beginning of our three-part “Essentials of Automation” series. This first webinar is designed to equip you with the knowledge and skills to utilize parameters effectively: enhancing the flexibility, maintainability, and user control of your FME projects.
Here’s what you’ll gain:
- Essentials of FME Parameters: Understand the pivotal role of parameters, including Reader/Writer, Transformer, User, and FME Flow categories. Discover how they are the key to unlocking automation and optimization within your workflows.
- Practical Applications in FME Form: Delve into key user parameter types including choice, connections, and file URLs. Allow users to control how a workflow runs, making your workflows more reusable. Learn to import values and deliver the best user experience for your workflows while enhancing accuracy.
- Optimization Strategies in FME Flow: Explore the creation and strategic deployment of parameters in FME Flow, including the use of deployment and geometry parameters, to maximize workflow efficiency.
- Pro Tips for Success: Gain insights on parameterizing connections and leveraging new features like Conditional Visibility for clarity and simplicity.
We’ll wrap up with a glimpse into future webinars, followed by a Q&A session to address your specific questions surrounding this topic.
Don’t miss this opportunity to elevate your FME expertise and drive your projects to new heights of efficiency.
"Impact of front-end architecture on development cost", Viktor TurskyiFwdays
I have heard many times that architecture is not important for the front-end. Also, many times I have seen how developers implement features on the front-end just following the standard rules for a framework and think that this is enough to successfully launch the project, and then the project fails. How to prevent this and what approach to choose? I have launched dozens of complex projects and during the talk we will analyze which approaches have worked for me and which have not.
Key Trends Shaping the Future of Infrastructure.pdfCheryl Hung
Keynote at DIGIT West Expo, Glasgow on 29 May 2024.
Cheryl Hung, ochery.com
Sr Director, Infrastructure Ecosystem, Arm.
The key trends across hardware, cloud and open-source; exploring how these areas are likely to mature and develop over the short and long-term, and then considering how organisations can position themselves to adapt and thrive.
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Tobias Schneck
As AI technology is pushing into IT I was wondering myself, as an “infrastructure container kubernetes guy”, how get this fancy AI technology get managed from an infrastructure operational view? Is it possible to apply our lovely cloud native principals as well? What benefit’s both technologies could bring to each other?
Let me take this questions and provide you a short journey through existing deployment models and use cases for AI software. On practical examples, we discuss what cloud/on-premise strategy we may need for applying it to our own infrastructure to get it to work from an enterprise perspective. I want to give an overview about infrastructure requirements and technologies, what could be beneficial or limiting your AI use cases in an enterprise environment. An interactive Demo will give you some insides, what approaches I got already working for real.
DevOps and Testing slides at DASA ConnectKari Kakkonen
My and Rik Marselis slides at 30.5.2024 DASA Connect conference. We discuss about what is testing, then what is agile testing and finally what is Testing in DevOps. Finally we had lovely workshop with the participants trying to find out different ways to think about quality and testing in different parts of the DevOps infinity loop.
The Art of the Pitch: WordPress Relationships and SalesLaura Byrne
Clients don’t know what they don’t know. What web solutions are right for them? How does WordPress come into the picture? How do you make sure you understand scope and timeline? What do you do if sometime changes?
All these questions and more will be explored as we talk about matching clients’ needs with what your agency offers without pulling teeth or pulling your hair out. Practical tips, and strategies for successful relationship building that leads to closing the deal.
Epistemic Interaction - tuning interfaces to provide information for AI supportAlan Dix
Paper presented at SYNERGY workshop at AVI 2024, Genoa, Italy. 3rd June 2024
https://alandix.com/academic/papers/synergy2024-epistemic/
As machine learning integrates deeper into human-computer interactions, the concept of epistemic interaction emerges, aiming to refine these interactions to enhance system adaptability. This approach encourages minor, intentional adjustments in user behaviour to enrich the data available for system learning. This paper introduces epistemic interaction within the context of human-system communication, illustrating how deliberate interaction design can improve system understanding and adaptation. Through concrete examples, we demonstrate the potential of epistemic interaction to significantly advance human-computer interaction by leveraging intuitive human communication strategies to inform system design and functionality, offering a novel pathway for enriching user-system engagements.
UiPath Test Automation using UiPath Test Suite series, part 4DianaGray10
Welcome to UiPath Test Automation using UiPath Test Suite series part 4. In this session, we will cover Test Manager overview along with SAP heatmap.
The UiPath Test Manager overview with SAP heatmap webinar offers a concise yet comprehensive exploration of the role of a Test Manager within SAP environments, coupled with the utilization of heatmaps for effective testing strategies.
Participants will gain insights into the responsibilities, challenges, and best practices associated with test management in SAP projects. Additionally, the webinar delves into the significance of heatmaps as a visual aid for identifying testing priorities, areas of risk, and resource allocation within SAP landscapes. Through this session, attendees can expect to enhance their understanding of test management principles while learning practical approaches to optimize testing processes in SAP environments using heatmap visualization techniques
What will you get from this session?
1. Insights into SAP testing best practices
2. Heatmap utilization for testing
3. Optimization of testing processes
4. Demo
Topics covered:
Execution from the test manager
Orchestrator execution result
Defect reporting
SAP heatmap example with demo
Speaker:
Deepak Rai, Automation Practice Lead, Boundaryless Group and UiPath MVP
6. Internet Penetration Rate
Global = 58.8%
Africa = 39.3%
Nigeria = 61.2%
Technology Adoption
SaaS Industry
Market Size = $623 billion by 2023
Number = Over 11,000
Business 100% on SaaS = 38%
7. History
First ITIL book published, Service Level
Management, then Help Desk
(incorporating the concepts of Incident
Management), Contingency Planning,
and Change Management.
The updated version of the framework released,
comprising of 26 processes and four functions
across five lifecycle stages of Service Strategy,
Service Design, Service Transition, Service
Operation and Continual Service Improvement.
AXELOS, a joint venture between the Cabinet Office
and Capita plc. founded, to become the custodians of
ITIL, taking responsibility for developing the
framework to equip organizations with the knowledge
and skills to face today’s business challenges.
Version 3 released.
Version 2 released.
First ITIL exams were offered by EXIN.
Problem Management, Configuration
Management and Cost Management for IT
Services published.
Software Control & Distribution published.
Availability Management published.
ITIL 4
12. The ITIL guiding principles
12
• The ITIL guiding principles are not independent
• You need to think about all of them, each time you need to
• Make a decision
• Prioritise work
• Review improvement opportunities
• Resolve a conflict
• …
• Sometimes you will decide that only one or two principles
apply
• But you need to consider all of them
14. The Value Stream for a New Service
• High level value stream for a new service
1. Understand and document service requirements
2. Decide whether to invest in the new service
3. Design & architect the new service to meet customer requirements
4. Build, configure, or buy service components
5. Deploy service components
6. Release service to customers and users
14
3
1
2
4
5
6
15. Demand: Business Pain/Problem creating Opportunity
TTP to productivity for early career
professionals and career builders is always
too long leading to low performance or
ultimate loss on investment
16. The Service Value chain
16
The purpose of the engage value chain
activity is to provide a good
understanding of stakeholder needs,
continual engagement with all
stakeholders, transparency and good
relationships with all stakeholders
17. Service Value Chain Activity - ENGAGE
• What are the pain or opportunities?
• Who are affected?
• What metrics for the pain?
• How big is the pain/opportunity?
• Why does the pain/opportunity exist?
• How is it solved today?
For example:
Questions Key Roles
Principles Practices
Business Analysis
Service level Management
Relationship Management
20. The Service Value chain
20
The purpose of the plan value chain
activity is to ensure a shared
understanding of the vision, current
status and improvement direction for
all four dimensions and all products
and services across the organization
21. Service Value Chain Activity - PLAN
• What is the organization’s mv2
s?
• What are the current statuses of Value
Streams, Organization & People,
Information & Technology, Partners &
Suppliers, Existing Products and
Services?
For example:
Questions Key Roles
Principles Practices
Strategy Management
Portfolio Management
Workforce & Talent Management
23. The Service Value chain
23
The purpose of the design and
transition value chain activity is to
ensure that products and services
continually meet stakeholder
expectations for quality, costs and time
to market
24. Service Value Chain Activity – DESIGN & TRANSITION
• What will be the Minimum Viable &
Usable Product?
• How do we develop the product or
service to deliver value incrementally to
the customers (shortest possible time)?
• How do we move from A to B?
For example:
Questions Key Roles
Principles Practices
Capacity & Performance Management
Architecture Management
Service Design
27. The Service Value chain
27
The purpose of the obtain/build value
chain activity is to ensure that service
components are available when and
where they are needed, and meet
agreed specifications
28. Service Value Chain Activity – OBTAIN/BUILD
• Do we make or buy?
• Considerations can include:
• Time?
• Cost?
• Skills?
• etc
For example:
Questions Key Roles
Principles Practices
Software Development & Management
Service Validation & Testing
Deployment Management
32. The Service Value chain
32
The purpose of the deliver and
support value chain activity is to
ensure that services are delivered
and supported according to agreed
specifications and stakeholders’
expectations
33. Service Value Chain Activity – DELIVER & SUPPORT
• Is the service being delivered as
promised or agreed?
• How responsive are the support teams
to customers’ issues?
• How do we monitor and report service
metrics?
For example:
Questions Key Roles
Principles Practices
Service Desk
Incident Management
Service Requests Management
35. The Service Value chain
35
The purpose of the improve value
chain activity is to ensure continual
improvement of products, services and
practices across all value chain
activities and the four dimensions of
service management
36. Service Value Chain Activity – IMPROVE
• What gaps exist between the planned
targets and the actual performance
across:
• Products
• Services
• Practices
For example:
Questions Key Roles
Principles Practices
Continual Improvement
Measurement & Reporting
Knowledge Management
37. THE SERVICE VALUE CHAIN
• Organizations create service value streams to carry out specific tasks, or respond to particular
situations
• Service value streams are specific combinations of activities and practices, and each one is
designed for a particular scenario
• Each value stream is a different combination of value chain activities and practices
• Inputs and outputs must be understood as specific to particular value streams
ENGAGE ACTIVITY
Step A1 Step A2 Step A3
DELIVER & SUPPORT ACTIVITY
Step A4 Step A5
Step B1 Step B2 Step B3 Step B4
ValuestreamAValuestreamB
ToENGAGEToOBTAIN/BUILD
37
38. 1
2
3
4
5
Practices
Service Desk
Request Management
Service Level Management
Service Catalogue Management
0
Practices
Service Desk
Request Management
IT Asset Management
Capacity & Performance Management
Practices
Supplier Management
IT Asset Management
Capacity & Performance Management
Request Management
39. ITIL in 60 Seconds
Global
recognition
Huge active
community
Enabler for
delivery of
high quality
services
Makes
organizations
more effective
and efficient
Helps
achieve $ms
in ROI
Adopted by
world-leading
brands, e.g.
HP, IBM
Built on 30
years of
experience
42. Useful links & resources
• Looking to get started with ITIL 4?
Find out more the world’s most widely adopted ITSM framework at
https://bit.ly/2TSEqQk
• Looking for ITIL 4 Practices?
Find them, and more, on MyITIL at https://bit.ly/2TSEqQk
• Looking to develop skills relevant to a digital and fast-paced organization?
Find out how ITIL 4 can help at https://bit.ly/2VdkRU4