1. Software project planning involves decomposing the project into smaller problems, estimating the size and effort required, and creating schedules and plans for quality, risks, and monitoring.
2. Size estimation is important for project planning and can be done through direct methods like lines of code or indirect methods like function points. The results from different sizing methods are combined statistically.
3. Estimation involves decomposing the software into problem functions, estimating each individually, and combining them to estimate the overall project using historical productivity metrics.