SlideShare a Scribd company logo
1 of 12
Download to read offline
An update from
IT@arts
The IT@arts team has been making a lot of changes. We wanted to take the time to explain
to you what’s happening and why, and how the changes will support your work.
Everything we’re doing is focused on the staff and student experience i.e. we’re trying to
improve things for you.
We know things haven’t always been smooth, and thank you for bearing with us through 
any disruptions you’ve experienced. Our goal is for the changes we are putting in place to
address some of the fundamental issues and build a framework that’s fit for the future.
All the changes we’re looking to make, we will continue to fully discuss with you, our
customer. Any changes that are decided on will only be introduced once they have been
accepted by yourselves.
What have we been up to?
1.  Student expectations: Students will judge us on our ability
to provide the latest equipment and IT services.
2.  Security and resilience: Our current back up plans and
on-site storage facilities leave us very exposed . We’ve
been lucky so far, but we need to protect ourselves from
risks of system failure.
3.  Data storage: The amount of data we are storing has risen
by a staggering 3,140% since 2006. Secure, cloud-based
services now give us the option to shop for flexible
solutions, but it’s still costly and we need to cut waste and
inefficiency by being better at managing data.
4.  Rapid innovation: We need to take advantage of
innovations in technology and build an environment that
enables us to adapt to future evolutionary change.
5.  Consistency: We can make things simpler and cheaper by
creating a backbone of common administrative systems.
6.  Regulations: We’re at risk of large fines if we don’t comply
with regulations, such as data protection and copyright.
Six reasons why we need to transform IT
2.5TB 81TB
2600TB
The exponential rise in UAL data storage
2006
 2012
 2018 (projected)
1 Terabyte = 1,000,000,000,000 bytes and stores the equivalent of 500 2 hour movies
162TB
best-case
worst-case
Overall strategy
Our priority is to deliver and maintain day-to-day services and at the same time rebuild the underlying
structures so we can establish a framework that’s fit for the future. It’s a case of rewiring the house while
the lights are on…
stabilise simplify grow
Following a period of underinvestment, our
current IT infrastructure is both unstable and
prone to failures. As well as carrying out
repairs, we are urgently taking measures to
update services, storage and server
facilities to improve stability and security.
We can save money and time, and even
generate income by simplifying and
integrating the way our IT systems work.
With your help, we would like to reduce the
number of IT technologies, applications and
suppliers we use.
Our aim is to support UAL’s strategy for
growth. We can achieve this by building a
system that has solid common foundations,
but has the in-built flexibility to keep pace
with unpredictable future demands and
enable teams to experiment.
Priorities
Desktop
Transformation
Architecture
 Information
Management
Infrastructure
Website
 MyArts and
Intranet
Online Portfolio
Review Tool
Virtual Learning
Environment
Hardware
 Software
licensing
Printing
 IT Service Desk
Priorities
Infrastructure
and Storage
We currently manage three
equipment rooms on site. To
create more data storage and a
more flexible, secure and resilient
service, we are moving to an
outsourced infrastructure service.
The switch over is planned for the
end of the year. A backup storage
solution for the whole university
will be in place by the end of May.
Information
Management
We need to establish how we
organise information, how we
protect it, and how we ‘retire it’.
We’re in the process of writing the
core policies and will need to
communicate some basic do’s
and don’ts in advance of an audit
in the summer.
Desktop
transformation
We’re halfway through a five year
programme to upgrade the
systems that manage our
computers and the software you
use. We'll also be upgrading
operating systems so you can
use the latest applications.
A programme of software asset
management is being
implemented to support a
standard deployment of
applications wherever possible,
whilst remaining flexible to the
needs of individual courses and
keeping pace with the latest
technologies to deliver a world-
class supported service.
You shouldn’t notice too much
changing except for a significantly
better service. The benefits are
that you will be able to access the
UAL network anytime, anyplace,
from any device.
Architecture
At the moment, our systems are a
bit like a complex spaghetti of
connections. This makes them
unreliable and costly to maintain
and develop. It also means that
data can’t be easily shared.
Our first task is to understand
how the “spaghetti” of
connections is currently working.
Ultimately, we want to design a
system that will make it easy to
access shared and report
information, across the
organisation.
Priorities
Hardware
This year, we’ll be spending
£1.4 million on replacing some of
UAL’s 2,800 Macs and 4,200
PCs. This is part of an rolling
hardware replacement
programme ensuring you have
access to the latest hardware.
Software
licensing
We’re conducting a review to
make sure we’ve got the right
number and range of licences to
meet users’ needs, and we’re
complying with licence
agreements.
Printing
We’re working to develop a
common print solution for all UAL
staff and students. The new
system will be in place by the end
of the year.
Priorities
IT Service
Desk
A new Service Management
team has been set up to
consolidate the support service
provided across the University.
The IT Service Desk will field
the first line of enquiries and 11
support engineers, who will
provide on-site services across
the organisation. The aim is to
go live with the reorganised
service on 1st August.
Projects we’re involved in
Online
Portfolio
Review Tool
This enables applicants to
upload their portfolio and course
leaders to review their
submission. The system was
used in January for 20 courses.
Work is underway to develop a
system that will cater for all
30,000 applicants.
Website
A more flexible, ‘mobile first’
website has been designed to
promote the UAL brand as well
as reflect the personalities of
the individual colleges. Designs
have been signed off and we’re
on track to launch on
September 17th.
Virtual
Learning
Environment
All course related information –
timetables, reading lists, course
notes, assignments – will be
moved from the current
‘Blackboard’ environment to a
new application called Moodle.
This will be the home of all
Virtual Learning applications
and will integrate with all other
systems. Courses are in the
process of being created – our
target is for all courses to be live
on Moodle by September 2013.
MyArts and
Intranet
Replacing the current MyArts, a
new homepage will become the
single point of access for all
online applications.
Sitting behind MyArts, a
redesigned intranet will give
content publishers more flexible
page templates and users more
personalised information.
What’s coming up
MyArts and intranet relaunch
July 31: New portal (MyArts) page launched, plus phase 1 of the intranet
Website relaunch
September 17: New website
launch
New data storage solution in place
By December: Users should experience no change,
other than a faster more reliable service.
Centralised IT Service Desk goes live
August 1: New service desk goes live. From
now on call 9898 for all IT queries
June: Phased switch over to centralised IT
Service Desk begins
New policies communicated
July: New policies introduced to tighten the way
information is managed across all sites, and to ensure
we are compliant with regulations. 
IT Strategy
June: IT Strategy presented to the board
May June July August September October November December
Online Portfolio Review Tool options
By July 31: Complete project to understand
requirements and next steps for the Online
Portfolio Review Tool 
Moodle launch
October: All Virtual Learning Experience programmes
now 
Information Commissioner audit
August / September: Following an incident last year,
the Information Commissioner is coming in to check
what policies and practices we have in place to
protect personal data. 
July - Sept: Next phase of desktop refreshments take
place 
Desktop refresh
CRM
July 31: Delivering scoping for QL integration
alongside minor improvements to functionality.
May: OpenDays management
system launched
July – Sept: Annual Summer moves 
Summer moves
Unified Printing Policy
July 31: supplier selection
Aug/Sept: LCF / CCW implementation
Oct/Nov: LCC / CSM implementation
Aug/Dec: Printing Policy implementation
How we can help
The changes we've been making to our team structures are nearing completion and we now have three new
heads of department in place.
Phil Swain
Associate Director of
Service Management
The Service Management team is
responsible for providing joined
up support for day-to-day queries 
and issues. Talk to Phil if you'd 
like to discuss levels of service 
or support. 
Helen Davies
Associate Director of
Portfolio Management
The Portfolio Management team is
responsible for co-ordinating
improvement projects. Talk to
Helen if you want to start a new
project with IT requirements.
Gareth Bedford
Associate Director of
Strategy & Architecture
The Strategy and Architecture team
is responsible for shaping the
overall design and planning for the
future. Talk to Gareth If you would
like to discuss ideas or ask
questions about technology used 
at UAL.
John Brown
Director of IT
How you can help us
Complete security details on the password 
self service site
Log your call with the IT Service Desk when you have a
problem (visit it.arts.ac.uk or call 9898)
Look out for policies coming out shortly 
Some of the changes we're working on won't have any impact on you (other than an improved service).
For other changes, we will be asking you and your teams to make small changes in the way you work.
Here are some immediate things you can help us with:
New changes in regulation means
that we could risk fines of up to 2%
of our revenues if we break certain
conventions. A first step has been
to put common policies together; a
next step is to communicate them.
The IT support team receives about
5,000 calls a year about forgotten
passwords. That takes up vast
amounts of time and costs
approximately £125,000 a year.
You can save everyone time and
money by logging security details
online, so when you forget, you can
find the answer yourself.
Thank you for reading. We'll be back in touch in a few weeks with more information
about how we can protect all at UAL from IT-related risks, such as viruses, security
and regulation breaches.

More Related Content

Viewers also liked

Social media explained2 [recovered]
Social media explained2 [recovered]Social media explained2 [recovered]
Social media explained2 [recovered]Todd Hampton
 
CRM PROJECT DONE ON RURAL MARKETING - SURVEY
CRM PROJECT DONE ON RURAL MARKETING - SURVEYCRM PROJECT DONE ON RURAL MARKETING - SURVEY
CRM PROJECT DONE ON RURAL MARKETING - SURVEYKarishma Sharma
 
Telemedicine in India Design Research
Telemedicine in India Design Research Telemedicine in India Design Research
Telemedicine in India Design Research Manisha S
 
Research project on Mont blanc
Research project on Mont blancResearch project on Mont blanc
Research project on Mont blancKarishma Sharma
 
Bajaj Automotives pvt ltd (532977)
Bajaj Automotives pvt ltd (532977)Bajaj Automotives pvt ltd (532977)
Bajaj Automotives pvt ltd (532977)Karishma Sharma
 
Exemple powerpoint
Exemple powerpointExemple powerpoint
Exemple powerpointrosseta7
 

Viewers also liked (9)

Social media explained2 [recovered]
Social media explained2 [recovered]Social media explained2 [recovered]
Social media explained2 [recovered]
 
Digi pr process
Digi pr processDigi pr process
Digi pr process
 
CRM PROJECT DONE ON RURAL MARKETING - SURVEY
CRM PROJECT DONE ON RURAL MARKETING - SURVEYCRM PROJECT DONE ON RURAL MARKETING - SURVEY
CRM PROJECT DONE ON RURAL MARKETING - SURVEY
 
Adarsh housing society
Adarsh housing societyAdarsh housing society
Adarsh housing society
 
Telemedicine in India Design Research
Telemedicine in India Design Research Telemedicine in India Design Research
Telemedicine in India Design Research
 
Research project on Mont blanc
Research project on Mont blancResearch project on Mont blanc
Research project on Mont blanc
 
Purchase organisation
Purchase organisationPurchase organisation
Purchase organisation
 
Bajaj Automotives pvt ltd (532977)
Bajaj Automotives pvt ltd (532977)Bajaj Automotives pvt ltd (532977)
Bajaj Automotives pvt ltd (532977)
 
Exemple powerpoint
Exemple powerpointExemple powerpoint
Exemple powerpoint
 

Similar to It%40arts update may2013_v6.2

Washoe County School District IT infrastructure and security audit
Washoe County School District IT infrastructure and security auditWashoe County School District IT infrastructure and security audit
Washoe County School District IT infrastructure and security auditThis Is Reno
 
CPIN 269 Final Documentation
CPIN 269 Final DocumentationCPIN 269 Final Documentation
CPIN 269 Final DocumentationJennifer Cordes
 
360 IT Infra Mng&Support by Business Goals
360 IT Infra Mng&Support by Business Goals360 IT Infra Mng&Support by Business Goals
360 IT Infra Mng&Support by Business GoalsAlexandru Golosoiu
 
Temperfied 360 Infrastrucure Management & Support -- By Business Goals - web-...
Temperfied 360 Infrastrucure Management & Support -- By Business Goals - web-...Temperfied 360 Infrastrucure Management & Support -- By Business Goals - web-...
Temperfied 360 Infrastrucure Management & Support -- By Business Goals - web-...Calin DAMIAN TANASE (open to invites)
 
Adopting cloud in the local market
Adopting cloud in the local marketAdopting cloud in the local market
Adopting cloud in the local marketaziznkh
 
Piti Prasertsuksean-CV 201501
Piti Prasertsuksean-CV 201501Piti Prasertsuksean-CV 201501
Piti Prasertsuksean-CV 201501petemail2k
 
Replace this Line with the Title of Your Paper.docx
Replace this Line with the Title of Your Paper.docxReplace this Line with the Title of Your Paper.docx
Replace this Line with the Title of Your Paper.docxdebishakespeare
 
Cisco Domain Ten solution overview
Cisco Domain Ten solution overviewCisco Domain Ten solution overview
Cisco Domain Ten solution overviewCharles Malkiel
 
quick_guide_to_IT_reform_at_AAUA
quick_guide_to_IT_reform_at_AAUAquick_guide_to_IT_reform_at_AAUA
quick_guide_to_IT_reform_at_AAUAAdewale Adegoroye
 
Matt Amjad Portfolio (1)
Matt Amjad Portfolio (1)Matt Amjad Portfolio (1)
Matt Amjad Portfolio (1)Mateen Amjad
 
Assignment 1 Your Mobile Ordering Project team needs to provide a s
Assignment 1 Your Mobile Ordering Project team needs to provide a sAssignment 1 Your Mobile Ordering Project team needs to provide a s
Assignment 1 Your Mobile Ordering Project team needs to provide a sdesteinbrook
 
IT Department Roadmap | National Management Olympiad Season 4
IT Department Roadmap | National Management Olympiad Season 4IT Department Roadmap | National Management Olympiad Season 4
IT Department Roadmap | National Management Olympiad Season 4National Management Olympiad
 
Annual%20report%20layout_v42web-2
Annual%20report%20layout_v42web-2Annual%20report%20layout_v42web-2
Annual%20report%20layout_v42web-2Marcee Davis
 
ITP-1 – Project CharterGroup 3 - The Project Management Masters .docx
ITP-1 – Project CharterGroup 3 - The Project Management Masters .docxITP-1 – Project CharterGroup 3 - The Project Management Masters .docx
ITP-1 – Project CharterGroup 3 - The Project Management Masters .docxpriestmanmable
 

Similar to It%40arts update may2013_v6.2 (20)

Washoe County School District IT infrastructure and security audit
Washoe County School District IT infrastructure and security auditWashoe County School District IT infrastructure and security audit
Washoe County School District IT infrastructure and security audit
 
SFC 2019
SFC 2019SFC 2019
SFC 2019
 
CPIN 269 Final Documentation
CPIN 269 Final DocumentationCPIN 269 Final Documentation
CPIN 269 Final Documentation
 
360 IT Infra Mng&Support by Business Goals
360 IT Infra Mng&Support by Business Goals360 IT Infra Mng&Support by Business Goals
360 IT Infra Mng&Support by Business Goals
 
Temperfied 360 Infrastrucure Management & Support -- By Business Goals - web-...
Temperfied 360 Infrastrucure Management & Support -- By Business Goals - web-...Temperfied 360 Infrastrucure Management & Support -- By Business Goals - web-...
Temperfied 360 Infrastrucure Management & Support -- By Business Goals - web-...
 
Adopting cloud in the local market
Adopting cloud in the local marketAdopting cloud in the local market
Adopting cloud in the local market
 
0101InSite
0101InSite0101InSite
0101InSite
 
Piti Prasertsuksean-CV 201501
Piti Prasertsuksean-CV 201501Piti Prasertsuksean-CV 201501
Piti Prasertsuksean-CV 201501
 
2015 siguccs itsm panel
2015 siguccs itsm panel2015 siguccs itsm panel
2015 siguccs itsm panel
 
Billing project
Billing projectBilling project
Billing project
 
Replace this Line with the Title of Your Paper.docx
Replace this Line with the Title of Your Paper.docxReplace this Line with the Title of Your Paper.docx
Replace this Line with the Title of Your Paper.docx
 
Resume
ResumeResume
Resume
 
Cisco Domain Ten solution overview
Cisco Domain Ten solution overviewCisco Domain Ten solution overview
Cisco Domain Ten solution overview
 
quick_guide_to_IT_reform_at_AAUA
quick_guide_to_IT_reform_at_AAUAquick_guide_to_IT_reform_at_AAUA
quick_guide_to_IT_reform_at_AAUA
 
Matt Amjad Portfolio (1)
Matt Amjad Portfolio (1)Matt Amjad Portfolio (1)
Matt Amjad Portfolio (1)
 
Assignment 1 Your Mobile Ordering Project team needs to provide a s
Assignment 1 Your Mobile Ordering Project team needs to provide a sAssignment 1 Your Mobile Ordering Project team needs to provide a s
Assignment 1 Your Mobile Ordering Project team needs to provide a s
 
Mayor Farm Manager
Mayor Farm ManagerMayor Farm Manager
Mayor Farm Manager
 
IT Department Roadmap | National Management Olympiad Season 4
IT Department Roadmap | National Management Olympiad Season 4IT Department Roadmap | National Management Olympiad Season 4
IT Department Roadmap | National Management Olympiad Season 4
 
Annual%20report%20layout_v42web-2
Annual%20report%20layout_v42web-2Annual%20report%20layout_v42web-2
Annual%20report%20layout_v42web-2
 
ITP-1 – Project CharterGroup 3 - The Project Management Masters .docx
ITP-1 – Project CharterGroup 3 - The Project Management Masters .docxITP-1 – Project CharterGroup 3 - The Project Management Masters .docx
ITP-1 – Project CharterGroup 3 - The Project Management Masters .docx
 

Recently uploaded

Science&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfScience&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfjimielynbastida
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxnull - The Open Security Community
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Unlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsUnlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsPrecisely
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Wonjun Hwang
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsHyundai Motor Group
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphNeo4j
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Bluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfBluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfngoud9212
 

Recently uploaded (20)

Science&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfScience&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdf
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Unlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsUnlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power Systems
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter RoadsSnow Chain-Integrated Tire for a Safe Drive on Winter Roads
Snow Chain-Integrated Tire for a Safe Drive on Winter Roads
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge GraphSIEMENS: RAPUNZEL – A Tale About Knowledge Graph
SIEMENS: RAPUNZEL – A Tale About Knowledge Graph
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Bluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdfBluetooth Controlled Car with Arduino.pdf
Bluetooth Controlled Car with Arduino.pdf
 

It%40arts update may2013_v6.2

  • 2. The IT@arts team has been making a lot of changes. We wanted to take the time to explain to you what’s happening and why, and how the changes will support your work. Everything we’re doing is focused on the staff and student experience i.e. we’re trying to improve things for you. We know things haven’t always been smooth, and thank you for bearing with us through any disruptions you’ve experienced. Our goal is for the changes we are putting in place to address some of the fundamental issues and build a framework that’s fit for the future. All the changes we’re looking to make, we will continue to fully discuss with you, our customer. Any changes that are decided on will only be introduced once they have been accepted by yourselves. What have we been up to?
  • 3. 1.  Student expectations: Students will judge us on our ability to provide the latest equipment and IT services. 2.  Security and resilience: Our current back up plans and on-site storage facilities leave us very exposed . We’ve been lucky so far, but we need to protect ourselves from risks of system failure. 3.  Data storage: The amount of data we are storing has risen by a staggering 3,140% since 2006. Secure, cloud-based services now give us the option to shop for flexible solutions, but it’s still costly and we need to cut waste and inefficiency by being better at managing data. 4.  Rapid innovation: We need to take advantage of innovations in technology and build an environment that enables us to adapt to future evolutionary change. 5.  Consistency: We can make things simpler and cheaper by creating a backbone of common administrative systems. 6.  Regulations: We’re at risk of large fines if we don’t comply with regulations, such as data protection and copyright. Six reasons why we need to transform IT 2.5TB 81TB 2600TB The exponential rise in UAL data storage 2006 2012 2018 (projected) 1 Terabyte = 1,000,000,000,000 bytes and stores the equivalent of 500 2 hour movies 162TB best-case worst-case
  • 4. Overall strategy Our priority is to deliver and maintain day-to-day services and at the same time rebuild the underlying structures so we can establish a framework that’s fit for the future. It’s a case of rewiring the house while the lights are on… stabilise simplify grow Following a period of underinvestment, our current IT infrastructure is both unstable and prone to failures. As well as carrying out repairs, we are urgently taking measures to update services, storage and server facilities to improve stability and security. We can save money and time, and even generate income by simplifying and integrating the way our IT systems work. With your help, we would like to reduce the number of IT technologies, applications and suppliers we use. Our aim is to support UAL’s strategy for growth. We can achieve this by building a system that has solid common foundations, but has the in-built flexibility to keep pace with unpredictable future demands and enable teams to experiment.
  • 5. Priorities Desktop Transformation Architecture Information Management Infrastructure Website MyArts and Intranet Online Portfolio Review Tool Virtual Learning Environment Hardware Software licensing Printing IT Service Desk
  • 6. Priorities Infrastructure and Storage We currently manage three equipment rooms on site. To create more data storage and a more flexible, secure and resilient service, we are moving to an outsourced infrastructure service. The switch over is planned for the end of the year. A backup storage solution for the whole university will be in place by the end of May. Information Management We need to establish how we organise information, how we protect it, and how we ‘retire it’. We’re in the process of writing the core policies and will need to communicate some basic do’s and don’ts in advance of an audit in the summer. Desktop transformation We’re halfway through a five year programme to upgrade the systems that manage our computers and the software you use. We'll also be upgrading operating systems so you can use the latest applications. A programme of software asset management is being implemented to support a standard deployment of applications wherever possible, whilst remaining flexible to the needs of individual courses and keeping pace with the latest technologies to deliver a world- class supported service. You shouldn’t notice too much changing except for a significantly better service. The benefits are that you will be able to access the UAL network anytime, anyplace, from any device. Architecture At the moment, our systems are a bit like a complex spaghetti of connections. This makes them unreliable and costly to maintain and develop. It also means that data can’t be easily shared. Our first task is to understand how the “spaghetti” of connections is currently working. Ultimately, we want to design a system that will make it easy to access shared and report information, across the organisation.
  • 7. Priorities Hardware This year, we’ll be spending £1.4 million on replacing some of UAL’s 2,800 Macs and 4,200 PCs. This is part of an rolling hardware replacement programme ensuring you have access to the latest hardware. Software licensing We’re conducting a review to make sure we’ve got the right number and range of licences to meet users’ needs, and we’re complying with licence agreements. Printing We’re working to develop a common print solution for all UAL staff and students. The new system will be in place by the end of the year.
  • 8. Priorities IT Service Desk A new Service Management team has been set up to consolidate the support service provided across the University. The IT Service Desk will field the first line of enquiries and 11 support engineers, who will provide on-site services across the organisation. The aim is to go live with the reorganised service on 1st August.
  • 9. Projects we’re involved in Online Portfolio Review Tool This enables applicants to upload their portfolio and course leaders to review their submission. The system was used in January for 20 courses. Work is underway to develop a system that will cater for all 30,000 applicants. Website A more flexible, ‘mobile first’ website has been designed to promote the UAL brand as well as reflect the personalities of the individual colleges. Designs have been signed off and we’re on track to launch on September 17th. Virtual Learning Environment All course related information – timetables, reading lists, course notes, assignments – will be moved from the current ‘Blackboard’ environment to a new application called Moodle. This will be the home of all Virtual Learning applications and will integrate with all other systems. Courses are in the process of being created – our target is for all courses to be live on Moodle by September 2013. MyArts and Intranet Replacing the current MyArts, a new homepage will become the single point of access for all online applications. Sitting behind MyArts, a redesigned intranet will give content publishers more flexible page templates and users more personalised information.
  • 10. What’s coming up MyArts and intranet relaunch July 31: New portal (MyArts) page launched, plus phase 1 of the intranet Website relaunch September 17: New website launch New data storage solution in place By December: Users should experience no change, other than a faster more reliable service. Centralised IT Service Desk goes live August 1: New service desk goes live. From now on call 9898 for all IT queries June: Phased switch over to centralised IT Service Desk begins New policies communicated July: New policies introduced to tighten the way information is managed across all sites, and to ensure we are compliant with regulations. IT Strategy June: IT Strategy presented to the board May June July August September October November December Online Portfolio Review Tool options By July 31: Complete project to understand requirements and next steps for the Online Portfolio Review Tool Moodle launch October: All Virtual Learning Experience programmes now Information Commissioner audit August / September: Following an incident last year, the Information Commissioner is coming in to check what policies and practices we have in place to protect personal data. July - Sept: Next phase of desktop refreshments take place Desktop refresh CRM July 31: Delivering scoping for QL integration alongside minor improvements to functionality. May: OpenDays management system launched July – Sept: Annual Summer moves Summer moves Unified Printing Policy July 31: supplier selection Aug/Sept: LCF / CCW implementation Oct/Nov: LCC / CSM implementation Aug/Dec: Printing Policy implementation
  • 11. How we can help The changes we've been making to our team structures are nearing completion and we now have three new heads of department in place. Phil Swain Associate Director of Service Management The Service Management team is responsible for providing joined up support for day-to-day queries and issues. Talk to Phil if you'd like to discuss levels of service or support. Helen Davies Associate Director of Portfolio Management The Portfolio Management team is responsible for co-ordinating improvement projects. Talk to Helen if you want to start a new project with IT requirements. Gareth Bedford Associate Director of Strategy & Architecture The Strategy and Architecture team is responsible for shaping the overall design and planning for the future. Talk to Gareth If you would like to discuss ideas or ask questions about technology used at UAL. John Brown Director of IT
  • 12. How you can help us Complete security details on the password self service site Log your call with the IT Service Desk when you have a problem (visit it.arts.ac.uk or call 9898) Look out for policies coming out shortly Some of the changes we're working on won't have any impact on you (other than an improved service). For other changes, we will be asking you and your teams to make small changes in the way you work. Here are some immediate things you can help us with: New changes in regulation means that we could risk fines of up to 2% of our revenues if we break certain conventions. A first step has been to put common policies together; a next step is to communicate them. The IT support team receives about 5,000 calls a year about forgotten passwords. That takes up vast amounts of time and costs approximately £125,000 a year. You can save everyone time and money by logging security details online, so when you forget, you can find the answer yourself. Thank you for reading. We'll be back in touch in a few weeks with more information about how we can protect all at UAL from IT-related risks, such as viruses, security and regulation breaches.