Grifols’ North Fractionation Facility
FOYA Winner – Project Execution
Dieter Fassnacht
2
Agenda
Introduction to Grifols
North Fractionation Facility Project
- Key Goals and Accomplishments
Highlights in Project Execution
- Drive Development of Key Technologies
- Perform Detailed Feasibility Studies
- Design Competition to Find A&E Partner
- Establish & Maintain Strong Project Team
- Control Project with Devoted Steering Committee
- Modular Construction
- Functional Testing During Construction
- Leveraging Construction & Commissioning for IOQ
- Engineering Test Runs with Plasma
Other Highlights
- Reduced Risk to Product Quality
- Manufacturing Efficiencies
- Facility Integration
3
Grifols Overview
2 TESTING POOLING3 FRACTIONATION4 PURIFICATION5 FILLING61 COLLECTION
Plasma Fractionation Technology
Grifols is the world’s third largest producer of plasma derived medicines.
We are dedicated to developing innovative healthcare products and services while maintaining the
highest ethical standards for patients and employees across the globe.
The company has 12,000 employees worldwide committed to serving patients affected by life-threatening
conditions.
Manufacturing sites producing plasma-derived pharmaceuticals are located in Parets del Vallès, Spain
(close to Barcelona), Clayton, NC and Los Angeles.
Recent Acquisitions
2011: Grifols acquires Talecris Biotherapeutics for $ 3.4 billion
2014: Grifols acquires Novartis Diagnostics Unit for $ 1.7 billion
4
North Fractionation Facility (NFF)
Key Figures
Location: Clayton, NC, US
Size: 150,000 sq. ft.
Project Cost: $ 342.6 million
Construction Duration: 24 month
Status: Awaiting FDA PAI
5
Provide high-throughput manufacturing facility with minimal risk to product quality
- World’s largest batch size of 9,000 L and annual capacity of up to 6 MML
- Maximized closed processing and incorporated high level of automation
Maximize yields while maintaining product quality
- Optimized processing methods and decreased physical losses
Lower long-term operational costs
- Minimized clean room production space with no cold processing rooms.
- Reduced labor costs due to scale, automation and improved technology
Deliver the facility in an aggressive timeframe and under budget
North Fractionation Facility (NFF)
Project Goals & Achievements
Project Justification
Increase companies fractionation capacity to fulfill patient demands
6
Drive Development of Key Technologies
Centrifugation (GEA Westfalia)
Precipitation
• 1995: Precipitation optimization studies
• Long-term data collection and statistical evaluation to
optimize process
• 2008: Confirmation at 1,000 L manufacturing scale
Bottle & Bag thawing and opening
• 1998: Collaboration between Bayer and Westfalia to
develop unique centrifuge for fractionation
• 2000: First BSH-30 centrifuge tested
• 2004: Second generation machine tested
• 2007: Third generation machine tested
• 2013: FDA licensure of BSH-30 centrifuge
• In-house equipment innovation by Grifols Engineering
7
Perform Detailed Feasibility Studies
New Fractionation Facility
Site (Evaluation of Utilities, Infrastructure and Building Location)
• 2003: Infrastructure Feasibility Report
• 2008: NFF Site Feasibility Study
• 2006: Fractionation Strategy
• 2008: Report on New Fractionation
Stakeholder Approval
- Manufacturing
- Engineering
- Technology
- Quality
- Regulatory Affairs
Ready to Launch
Capital Project
Table of Content
- Executive Summary
- Process Design
- Manufacturing Plant Concepts
- Building Description
- Utilities and Infrastructure Requirements
- Development Strategy and Technology Base
- Regulatory Outlook
- Project Timeline
- Project Cost Estimate
- Open Issues and Risks
8
Design Competition to Find A&E Partner
Bid Process for Conceptual Engineering
included Design Competition to
Pre-Screening
• Three A&E firms were identified to be suitable partners
based on comprehensive survey of existing large scale
bioscience facilities and EPCV experience
• challenge Feasibility Study
• develop new concepts and ideas
• assess teams, collaboration and creativity
Valuable Results included:
- Building location, orientation and size
- Vertical integration / logistics
- Creative concepts around unique
process steps
Team selected Fluor as Partner for the Project
9
Establish and Maintain Strong Project Team
Collaboration with A&E firm to form
“one” team
Staffing
• Grifols Team maintained continuity from Conceptual
Engineering through Validation.
• Project Team also included from “day one” dedicated
resources from
• Plant Engineering incl. Maintenance
Supervisor and Technicians*
• Production Manager and Supervisor
• Technology (R&D)
• Quality
• Validation
Senior Management committed in Project
Charter to
“support the right resources at right time”“maintain critical team members and sufficient
overall staffing”
• Grifols and Fluor formed fully integrated
team.
• Team worked out of Greenville, SC.
• Grifols key team visited Greenville every
two weeks.
* As presented at 20th ISPE CASA Life Sciences Technology Show
by Brent Noel and Detlef Kehm
10
Control Project with Devoted Steering Committee
Steering Committee
- CEO
- CFO
- SVP Manufacturing (Site Head)
- SVP R&D
- SVP Corporate Compliance
Principals Meeting
- SVP Manufacturing (Site Head) - Program Director
- VP Engineering - Project Director
- VP Manufacturing - Finance Director
- VP R&D - Supply Chain Director
- VP Quality - Fluor Senior Management
- VP Regulatory Affairs - MIV Management
- VP Finance
NFF Team Leaders
Meets Monthly
11
Modular Construction*
* As presented at INTERPHEX™ 2013 by Detlef Kehm, “Large Scale
Process Modules First in Place Technology”
Benefits for On Site Super Skid Fabrication
• Controlled conditions in fabrication shop leads to higher quality and
safer environment
• Reduced congestion and coordination in the building
• Increased productivity due to high quality of specialty workforce
• Simultaneous construction of Building including Infrastructure and
Process Modules enabling schedule compression by 4 months.
• Large “off shore” pool of resources can be utilized concurrently
• Standardization leads to assembly line approach
12
Functionality Testing during Construction
Construction approach
• One of seven Centrifuge Piping skids was accelerated
to provide early functionality testing. This skid would
also be the last one to be installed in NFF
building to maximize testing duration
• Test Stand installed to provide structure for centrifuge
and all utilities to enable testing.
Benefits
• Significant software modifications occurred during four
months testing period while facility was still in
construction leveling future resource demands.
• Only minor piping modifications confirmed thorough
skid design.
Objective
• Obtain head-start for functional testing and debugging
of most complicated process equipment of project
• Also allowing possible last minute piping changes
to other skids .
13
Leveraging Construction & Commissioning for IOQ
Commissioning Approach
MIV (Main Instrumentation Vendor) Approach
Selection of MIV partner for entire project allowed single point of contact to perform RV (receipt
verification) of instruments which included 3rd party quality inspection prior to shipment to site or
fabricators
• Utilize validated database and formal protocols (FAT, commissioning) to allow leveraging for IOQ.
• Commission equipment according to same system boundaries as IOQ
• Use formal Project Change Control to bridge changes between verification and qualification
Asset Database
• Validated database was used to populate asset attributes during construction including receipt
and installation verification
• Bulk upload into site maintenance system (Maximo) upon completion of individual systems
Commissioning
IV protocols
OV protocols
Qualification
IQ protocols
OQ protocols
upload data, calibration done, project changes closed
draft procedures, testing with product, changes closed
14
Engineering Test Runs with Plasma
Benefits of Testing with Plasma
• Final tweaking of parameters specifically to optimize
separation temperatures could only be executed with
plasma.
• Many OQ test cases used product instead of a water /
ethanol surrogate increasing confidence in successful
process validation
Plasma Industry’s Challenge for Product Testing
• Released plasma cannot be used for test runs due to high
costs of almost $1 MM per batch and resulting lack of final
product in the market
• Pathogen Safety prohibits use of untested, released plasma
Securing Plasma for Test Runs
• Over 60,000 Liters of tested plasma (not for production
use) was secured over five years to enable testing of
NFF process.
15
Other Highlights: Reduced Risk to Product Quality
• Validated a closed process to eliminate
contamination riskand reduce the
cleanroom space
• Collaborated with Grifols Engineering to
develop a robotic bottle opening system to
eliminate potential plasma contact with
operators (Installation of plasma bag
opening system is in progress)
• Employed automation systems reducing
human error and increase process
reliability
16
Other Highlights: Manufacturing Efficiencies
• Effected a 100% increase in site output to
6 MML plasma per year
• Automation and equipment functionality
lowered labor per liter fractionated by 40%
• Increased process yield between 8 and
15% by leveraging Grifols advanced
understanding of processing human
plasma
• Achieved a 31% reduction in energy per
liter with closed process in ambient space
• Reduced chemical costs by $1 million
annually by employing bulk chemical
storage and distribution
17
Other Highlights: Facility Integration
• Produced modern sustainable facility that
eliminates harsh cold work environments,
while achieving excellent functional
arrangements resulting in a minimization of
material movement
• Contained manufacturing operations on a
single level.
• Minimized cleanroom footprint to 12% of
gross space
• Directing vertical transfer between levels
produced simplified horizontal flow paths
• Applied broad use of windows and natural
light
18
Thank you ISPE for Recognizing
our Effort and Accomplishments!

More Related Content

What's hot

377218-GMP-TRAINING-STERILE-FACILITY
377218-GMP-TRAINING-STERILE-FACILITY377218-GMP-TRAINING-STERILE-FACILITY
377218-GMP-TRAINING-STERILE-FACILITYGOVIND YuvRaju
 
Incorporating The ASME BPE Guidelines For CIP For Biopharma Equipments
Incorporating The ASME  BPE Guidelines For CIP For Biopharma EquipmentsIncorporating The ASME  BPE Guidelines For CIP For Biopharma Equipments
Incorporating The ASME BPE Guidelines For CIP For Biopharma EquipmentsVishal Wagh
 
PC Duracaps(r) CI Corrosion Inhibitor Brochure 2016
PC Duracaps(r) CI  Corrosion Inhibitor Brochure 2016PC Duracaps(r) CI  Corrosion Inhibitor Brochure 2016
PC Duracaps(r) CI Corrosion Inhibitor Brochure 2016Muzaffar Khan
 
Quality System Expectations : Single-Use Materials
Quality System Expectations : Single-Use MaterialsQuality System Expectations : Single-Use Materials
Quality System Expectations : Single-Use Materialsgueste42f6b5
 
Fast-track solutions to address challenges with Host Cell Proteins in early d...
Fast-track solutions to address challenges with Host Cell Proteins in early d...Fast-track solutions to address challenges with Host Cell Proteins in early d...
Fast-track solutions to address challenges with Host Cell Proteins in early d...Merck Life Sciences
 
Colder Products Company-Aseptic Connections for Single Use Applications
Colder Products Company-Aseptic Connections for Single Use ApplicationsColder Products Company-Aseptic Connections for Single Use Applications
Colder Products Company-Aseptic Connections for Single Use ApplicationsLynzee Perdaris
 
Media fill process and validation
Media fill process and validationMedia fill process and validation
Media fill process and validationpaideeksha
 
Validation of water supply system
Validation of water supply systemValidation of water supply system
Validation of water supply systemceutics1315
 
Download-manuals-water quality-wq-manuals-gwvolume7operationmanualwaterquali...
 Download-manuals-water quality-wq-manuals-gwvolume7operationmanualwaterquali... Download-manuals-water quality-wq-manuals-gwvolume7operationmanualwaterquali...
Download-manuals-water quality-wq-manuals-gwvolume7operationmanualwaterquali...hydrologyproject2
 
Update on-pda-tr22-revisions-for-aseptic-process-simulations
Update on-pda-tr22-revisions-for-aseptic-process-simulationsUpdate on-pda-tr22-revisions-for-aseptic-process-simulations
Update on-pda-tr22-revisions-for-aseptic-process-simulationsHainer Martínez Cabrera
 
Media fill validation ppt (1)
Media fill validation ppt (1)Media fill validation ppt (1)
Media fill validation ppt (1)ShraddhaParmar15
 
Implementing and Managing Pre-use Post-sterilization Integrity Testing (PUPSIT)
Implementing and Managing Pre-use Post-sterilization Integrity Testing (PUPSIT)Implementing and Managing Pre-use Post-sterilization Integrity Testing (PUPSIT)
Implementing and Managing Pre-use Post-sterilization Integrity Testing (PUPSIT)MilliporeSigma
 
Qualification Of Autoclave
Qualification Of AutoclaveQualification Of Autoclave
Qualification Of Autoclave8669290285
 
Yaletech catalog 예일테크 카달로그
Yaletech catalog 예일테크 카달로그Yaletech catalog 예일테크 카달로그
Yaletech catalog 예일테크 카달로그Dudals Rla
 
Single Use System 2008 Interphex
Single Use System  2008 InterphexSingle Use System  2008 Interphex
Single Use System 2008 Interphexmadhmad
 
Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
 Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya... Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...hydrologyproject001
 
Cleaning validation
Cleaning validationCleaning validation
Cleaning validationFasika Alemu
 

What's hot (19)

377218-GMP-TRAINING-STERILE-FACILITY
377218-GMP-TRAINING-STERILE-FACILITY377218-GMP-TRAINING-STERILE-FACILITY
377218-GMP-TRAINING-STERILE-FACILITY
 
Incorporating The ASME BPE Guidelines For CIP For Biopharma Equipments
Incorporating The ASME  BPE Guidelines For CIP For Biopharma EquipmentsIncorporating The ASME  BPE Guidelines For CIP For Biopharma Equipments
Incorporating The ASME BPE Guidelines For CIP For Biopharma Equipments
 
PC Duracaps(r) CI Corrosion Inhibitor Brochure 2016
PC Duracaps(r) CI  Corrosion Inhibitor Brochure 2016PC Duracaps(r) CI  Corrosion Inhibitor Brochure 2016
PC Duracaps(r) CI Corrosion Inhibitor Brochure 2016
 
Quality System Expectations : Single-Use Materials
Quality System Expectations : Single-Use MaterialsQuality System Expectations : Single-Use Materials
Quality System Expectations : Single-Use Materials
 
Fast-track solutions to address challenges with Host Cell Proteins in early d...
Fast-track solutions to address challenges with Host Cell Proteins in early d...Fast-track solutions to address challenges with Host Cell Proteins in early d...
Fast-track solutions to address challenges with Host Cell Proteins in early d...
 
Colder Products Company-Aseptic Connections for Single Use Applications
Colder Products Company-Aseptic Connections for Single Use ApplicationsColder Products Company-Aseptic Connections for Single Use Applications
Colder Products Company-Aseptic Connections for Single Use Applications
 
Media fill process and validation
Media fill process and validationMedia fill process and validation
Media fill process and validation
 
Validation of water supply system
Validation of water supply systemValidation of water supply system
Validation of water supply system
 
Download-manuals-water quality-wq-manuals-gwvolume7operationmanualwaterquali...
 Download-manuals-water quality-wq-manuals-gwvolume7operationmanualwaterquali... Download-manuals-water quality-wq-manuals-gwvolume7operationmanualwaterquali...
Download-manuals-water quality-wq-manuals-gwvolume7operationmanualwaterquali...
 
Update on-pda-tr22-revisions-for-aseptic-process-simulations
Update on-pda-tr22-revisions-for-aseptic-process-simulationsUpdate on-pda-tr22-revisions-for-aseptic-process-simulations
Update on-pda-tr22-revisions-for-aseptic-process-simulations
 
Media fill validation ppt (1)
Media fill validation ppt (1)Media fill validation ppt (1)
Media fill validation ppt (1)
 
Filter validation
Filter validationFilter validation
Filter validation
 
Implementing and Managing Pre-use Post-sterilization Integrity Testing (PUPSIT)
Implementing and Managing Pre-use Post-sterilization Integrity Testing (PUPSIT)Implementing and Managing Pre-use Post-sterilization Integrity Testing (PUPSIT)
Implementing and Managing Pre-use Post-sterilization Integrity Testing (PUPSIT)
 
Qualification Of Autoclave
Qualification Of AutoclaveQualification Of Autoclave
Qualification Of Autoclave
 
Aseptic Processing & Media Fill
Aseptic Processing & Media FillAseptic Processing & Media Fill
Aseptic Processing & Media Fill
 
Yaletech catalog 예일테크 카달로그
Yaletech catalog 예일테크 카달로그Yaletech catalog 예일테크 카달로그
Yaletech catalog 예일테크 카달로그
 
Single Use System 2008 Interphex
Single Use System  2008 InterphexSingle Use System  2008 Interphex
Single Use System 2008 Interphex
 
Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
 Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya... Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
Download-manuals-surface water-manual-sw-volume7operationmanualwaterqualitya...
 
Cleaning validation
Cleaning validationCleaning validation
Cleaning validation
 

Viewers also liked

Viewers also liked (12)

Who blood products
Who blood productsWho blood products
Who blood products
 
Recommendations for the production, control & regulation of human plasma for ...
Recommendations for the production, control & regulation of human plasma for ...Recommendations for the production, control & regulation of human plasma for ...
Recommendations for the production, control & regulation of human plasma for ...
 
Calculo de Tanques septicos
Calculo de Tanques septicosCalculo de Tanques septicos
Calculo de Tanques septicos
 
Mobile app GUI
Mobile app GUIMobile app GUI
Mobile app GUI
 
Calculo de Letrinas
Calculo de LetrinasCalculo de Letrinas
Calculo de Letrinas
 
Papiers collés 5 a editado
Papiers collés 5 a editadoPapiers collés 5 a editado
Papiers collés 5 a editado
 
Investigacion de un accidente
Investigacion de un accidenteInvestigacion de un accidente
Investigacion de un accidente
 
How to Frame Your Tweets
How to Frame Your TweetsHow to Frame Your Tweets
How to Frame Your Tweets
 
Investigacion de un accidente
Investigacion de un accidenteInvestigacion de un accidente
Investigacion de un accidente
 
Bioplasma World Asia 2016 - Hong Kong
Bioplasma World Asia 2016 - Hong KongBioplasma World Asia 2016 - Hong Kong
Bioplasma World Asia 2016 - Hong Kong
 
Bauhinia case study
Bauhinia case studyBauhinia case study
Bauhinia case study
 
Blood components
Blood componentsBlood components
Blood components
 

Similar to ISPE updated

RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARSAQIB MANIAR
 
Pilot plant scale up.
Pilot plant scale up.Pilot plant scale up.
Pilot plant scale up.VikramMadane1
 
RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARSAQIB MANIAR
 
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...yusuf699644
 
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015Worksoft
 
Donald_L_Loocke_Resume_TEr3
Donald_L_Loocke_Resume_TEr3Donald_L_Loocke_Resume_TEr3
Donald_L_Loocke_Resume_TEr3dloocke
 
lean manufacturing
 lean manufacturing lean manufacturing
lean manufacturingTonny Danny
 
Pilot Plant Scale up Technique Ppt.pdf
Pilot Plant Scale up Technique Ppt.pdfPilot Plant Scale up Technique Ppt.pdf
Pilot Plant Scale up Technique Ppt.pdfSatyendraMishra77
 
Case Studies in Pharmaceutical Project Management.
Case Studies in Pharmaceutical Project Management.Case Studies in Pharmaceutical Project Management.
Case Studies in Pharmaceutical Project Management.Anthony Grenier
 
andrusyszyn_paul_m_resume_v01
andrusyszyn_paul_m_resume_v01andrusyszyn_paul_m_resume_v01
andrusyszyn_paul_m_resume_v01Paul Andrusyszyn
 
Implementation of End-to-End Disposable Single Use Systems for Rapid Fermenta...
Implementation of End-to-End Disposable Single Use Systems for Rapid Fermenta...Implementation of End-to-End Disposable Single Use Systems for Rapid Fermenta...
Implementation of End-to-End Disposable Single Use Systems for Rapid Fermenta...KBI Biopharma
 
Time is of the Essence: Creating a New Synergy Between Single-Use Adopters an...
Time is of the Essence: Creating a New Synergy Between Single-Use Adopters an...Time is of the Essence: Creating a New Synergy Between Single-Use Adopters an...
Time is of the Essence: Creating a New Synergy Between Single-Use Adopters an...Merck Life Sciences
 
Fmq lqos introduction npi rev 2
Fmq  lqos introduction npi rev 2Fmq  lqos introduction npi rev 2
Fmq lqos introduction npi rev 2amitsonuksms
 
Introduction to pilot plant and scale up technology
Introduction to pilot plant and scale up technologyIntroduction to pilot plant and scale up technology
Introduction to pilot plant and scale up technologyvasantipatil5
 

Similar to ISPE updated (20)

RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIAR
 
Pilot plant scale up.
Pilot plant scale up.Pilot plant scale up.
Pilot plant scale up.
 
James Resume
James ResumeJames Resume
James Resume
 
RESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIARRESUME - NAJMUL SAQIB MANIAR
RESUME - NAJMUL SAQIB MANIAR
 
API 610 pumps .pdf
API 610 pumps .pdfAPI 610 pumps .pdf
API 610 pumps .pdf
 
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
dokumen.tips_installation-of-api-610-centrifugal-pumps-to-achieve-a-8-api-686...
 
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
 
Richard clark cv
Richard clark cvRichard clark cv
Richard clark cv
 
Donald_L_Loocke_Resume_TEr3
Donald_L_Loocke_Resume_TEr3Donald_L_Loocke_Resume_TEr3
Donald_L_Loocke_Resume_TEr3
 
Medaht Cv
Medaht CvMedaht Cv
Medaht Cv
 
Training technology transfer training
Training technology transfer trainingTraining technology transfer training
Training technology transfer training
 
lean manufacturing
 lean manufacturing lean manufacturing
lean manufacturing
 
An approach to production scheduling optimization, A Case of an Oil Lubricati...
An approach to production scheduling optimization, A Case of an Oil Lubricati...An approach to production scheduling optimization, A Case of an Oil Lubricati...
An approach to production scheduling optimization, A Case of an Oil Lubricati...
 
Pilot Plant Scale up Technique Ppt.pdf
Pilot Plant Scale up Technique Ppt.pdfPilot Plant Scale up Technique Ppt.pdf
Pilot Plant Scale up Technique Ppt.pdf
 
Case Studies in Pharmaceutical Project Management.
Case Studies in Pharmaceutical Project Management.Case Studies in Pharmaceutical Project Management.
Case Studies in Pharmaceutical Project Management.
 
andrusyszyn_paul_m_resume_v01
andrusyszyn_paul_m_resume_v01andrusyszyn_paul_m_resume_v01
andrusyszyn_paul_m_resume_v01
 
Implementation of End-to-End Disposable Single Use Systems for Rapid Fermenta...
Implementation of End-to-End Disposable Single Use Systems for Rapid Fermenta...Implementation of End-to-End Disposable Single Use Systems for Rapid Fermenta...
Implementation of End-to-End Disposable Single Use Systems for Rapid Fermenta...
 
Time is of the Essence: Creating a New Synergy Between Single-Use Adopters an...
Time is of the Essence: Creating a New Synergy Between Single-Use Adopters an...Time is of the Essence: Creating a New Synergy Between Single-Use Adopters an...
Time is of the Essence: Creating a New Synergy Between Single-Use Adopters an...
 
Fmq lqos introduction npi rev 2
Fmq  lqos introduction npi rev 2Fmq  lqos introduction npi rev 2
Fmq lqos introduction npi rev 2
 
Introduction to pilot plant and scale up technology
Introduction to pilot plant and scale up technologyIntroduction to pilot plant and scale up technology
Introduction to pilot plant and scale up technology
 

ISPE updated

  • 1. 1 Grifols’ North Fractionation Facility FOYA Winner – Project Execution Dieter Fassnacht
  • 2. 2 Agenda Introduction to Grifols North Fractionation Facility Project - Key Goals and Accomplishments Highlights in Project Execution - Drive Development of Key Technologies - Perform Detailed Feasibility Studies - Design Competition to Find A&E Partner - Establish & Maintain Strong Project Team - Control Project with Devoted Steering Committee - Modular Construction - Functional Testing During Construction - Leveraging Construction & Commissioning for IOQ - Engineering Test Runs with Plasma Other Highlights - Reduced Risk to Product Quality - Manufacturing Efficiencies - Facility Integration
  • 3. 3 Grifols Overview 2 TESTING POOLING3 FRACTIONATION4 PURIFICATION5 FILLING61 COLLECTION Plasma Fractionation Technology Grifols is the world’s third largest producer of plasma derived medicines. We are dedicated to developing innovative healthcare products and services while maintaining the highest ethical standards for patients and employees across the globe. The company has 12,000 employees worldwide committed to serving patients affected by life-threatening conditions. Manufacturing sites producing plasma-derived pharmaceuticals are located in Parets del Vallès, Spain (close to Barcelona), Clayton, NC and Los Angeles. Recent Acquisitions 2011: Grifols acquires Talecris Biotherapeutics for $ 3.4 billion 2014: Grifols acquires Novartis Diagnostics Unit for $ 1.7 billion
  • 4. 4 North Fractionation Facility (NFF) Key Figures Location: Clayton, NC, US Size: 150,000 sq. ft. Project Cost: $ 342.6 million Construction Duration: 24 month Status: Awaiting FDA PAI
  • 5. 5 Provide high-throughput manufacturing facility with minimal risk to product quality - World’s largest batch size of 9,000 L and annual capacity of up to 6 MML - Maximized closed processing and incorporated high level of automation Maximize yields while maintaining product quality - Optimized processing methods and decreased physical losses Lower long-term operational costs - Minimized clean room production space with no cold processing rooms. - Reduced labor costs due to scale, automation and improved technology Deliver the facility in an aggressive timeframe and under budget North Fractionation Facility (NFF) Project Goals & Achievements Project Justification Increase companies fractionation capacity to fulfill patient demands
  • 6. 6 Drive Development of Key Technologies Centrifugation (GEA Westfalia) Precipitation • 1995: Precipitation optimization studies • Long-term data collection and statistical evaluation to optimize process • 2008: Confirmation at 1,000 L manufacturing scale Bottle & Bag thawing and opening • 1998: Collaboration between Bayer and Westfalia to develop unique centrifuge for fractionation • 2000: First BSH-30 centrifuge tested • 2004: Second generation machine tested • 2007: Third generation machine tested • 2013: FDA licensure of BSH-30 centrifuge • In-house equipment innovation by Grifols Engineering
  • 7. 7 Perform Detailed Feasibility Studies New Fractionation Facility Site (Evaluation of Utilities, Infrastructure and Building Location) • 2003: Infrastructure Feasibility Report • 2008: NFF Site Feasibility Study • 2006: Fractionation Strategy • 2008: Report on New Fractionation Stakeholder Approval - Manufacturing - Engineering - Technology - Quality - Regulatory Affairs Ready to Launch Capital Project Table of Content - Executive Summary - Process Design - Manufacturing Plant Concepts - Building Description - Utilities and Infrastructure Requirements - Development Strategy and Technology Base - Regulatory Outlook - Project Timeline - Project Cost Estimate - Open Issues and Risks
  • 8. 8 Design Competition to Find A&E Partner Bid Process for Conceptual Engineering included Design Competition to Pre-Screening • Three A&E firms were identified to be suitable partners based on comprehensive survey of existing large scale bioscience facilities and EPCV experience • challenge Feasibility Study • develop new concepts and ideas • assess teams, collaboration and creativity Valuable Results included: - Building location, orientation and size - Vertical integration / logistics - Creative concepts around unique process steps Team selected Fluor as Partner for the Project
  • 9. 9 Establish and Maintain Strong Project Team Collaboration with A&E firm to form “one” team Staffing • Grifols Team maintained continuity from Conceptual Engineering through Validation. • Project Team also included from “day one” dedicated resources from • Plant Engineering incl. Maintenance Supervisor and Technicians* • Production Manager and Supervisor • Technology (R&D) • Quality • Validation Senior Management committed in Project Charter to “support the right resources at right time”“maintain critical team members and sufficient overall staffing” • Grifols and Fluor formed fully integrated team. • Team worked out of Greenville, SC. • Grifols key team visited Greenville every two weeks. * As presented at 20th ISPE CASA Life Sciences Technology Show by Brent Noel and Detlef Kehm
  • 10. 10 Control Project with Devoted Steering Committee Steering Committee - CEO - CFO - SVP Manufacturing (Site Head) - SVP R&D - SVP Corporate Compliance Principals Meeting - SVP Manufacturing (Site Head) - Program Director - VP Engineering - Project Director - VP Manufacturing - Finance Director - VP R&D - Supply Chain Director - VP Quality - Fluor Senior Management - VP Regulatory Affairs - MIV Management - VP Finance NFF Team Leaders Meets Monthly
  • 11. 11 Modular Construction* * As presented at INTERPHEX™ 2013 by Detlef Kehm, “Large Scale Process Modules First in Place Technology” Benefits for On Site Super Skid Fabrication • Controlled conditions in fabrication shop leads to higher quality and safer environment • Reduced congestion and coordination in the building • Increased productivity due to high quality of specialty workforce • Simultaneous construction of Building including Infrastructure and Process Modules enabling schedule compression by 4 months. • Large “off shore” pool of resources can be utilized concurrently • Standardization leads to assembly line approach
  • 12. 12 Functionality Testing during Construction Construction approach • One of seven Centrifuge Piping skids was accelerated to provide early functionality testing. This skid would also be the last one to be installed in NFF building to maximize testing duration • Test Stand installed to provide structure for centrifuge and all utilities to enable testing. Benefits • Significant software modifications occurred during four months testing period while facility was still in construction leveling future resource demands. • Only minor piping modifications confirmed thorough skid design. Objective • Obtain head-start for functional testing and debugging of most complicated process equipment of project • Also allowing possible last minute piping changes to other skids .
  • 13. 13 Leveraging Construction & Commissioning for IOQ Commissioning Approach MIV (Main Instrumentation Vendor) Approach Selection of MIV partner for entire project allowed single point of contact to perform RV (receipt verification) of instruments which included 3rd party quality inspection prior to shipment to site or fabricators • Utilize validated database and formal protocols (FAT, commissioning) to allow leveraging for IOQ. • Commission equipment according to same system boundaries as IOQ • Use formal Project Change Control to bridge changes between verification and qualification Asset Database • Validated database was used to populate asset attributes during construction including receipt and installation verification • Bulk upload into site maintenance system (Maximo) upon completion of individual systems Commissioning IV protocols OV protocols Qualification IQ protocols OQ protocols upload data, calibration done, project changes closed draft procedures, testing with product, changes closed
  • 14. 14 Engineering Test Runs with Plasma Benefits of Testing with Plasma • Final tweaking of parameters specifically to optimize separation temperatures could only be executed with plasma. • Many OQ test cases used product instead of a water / ethanol surrogate increasing confidence in successful process validation Plasma Industry’s Challenge for Product Testing • Released plasma cannot be used for test runs due to high costs of almost $1 MM per batch and resulting lack of final product in the market • Pathogen Safety prohibits use of untested, released plasma Securing Plasma for Test Runs • Over 60,000 Liters of tested plasma (not for production use) was secured over five years to enable testing of NFF process.
  • 15. 15 Other Highlights: Reduced Risk to Product Quality • Validated a closed process to eliminate contamination riskand reduce the cleanroom space • Collaborated with Grifols Engineering to develop a robotic bottle opening system to eliminate potential plasma contact with operators (Installation of plasma bag opening system is in progress) • Employed automation systems reducing human error and increase process reliability
  • 16. 16 Other Highlights: Manufacturing Efficiencies • Effected a 100% increase in site output to 6 MML plasma per year • Automation and equipment functionality lowered labor per liter fractionated by 40% • Increased process yield between 8 and 15% by leveraging Grifols advanced understanding of processing human plasma • Achieved a 31% reduction in energy per liter with closed process in ambient space • Reduced chemical costs by $1 million annually by employing bulk chemical storage and distribution
  • 17. 17 Other Highlights: Facility Integration • Produced modern sustainable facility that eliminates harsh cold work environments, while achieving excellent functional arrangements resulting in a minimization of material movement • Contained manufacturing operations on a single level. • Minimized cleanroom footprint to 12% of gross space • Directing vertical transfer between levels produced simplified horizontal flow paths • Applied broad use of windows and natural light
  • 18. 18 Thank you ISPE for Recognizing our Effort and Accomplishments!