SlideShare a Scribd company logo
A PRACTICAL GUIDE
for a successful
intralogistic
system project
How to prepare the project?
How to prepare the consultation process?
How to compare the proposals?
How to organise and implement the project?
A CUSTOMER HANDBOOK
prepared by the Intralogistic Systems Product Group,
European Federation of Materials Handling
© FEM 2015
Diamant Building / 80 Boulevard Auguste Reyers / B - 1030 Brussels / Belgium
Tel: +32 2 706 82 37 / E-mail: info@fem-eur.com
w w w . f e m - e u r . e u
FEM & IS PG Who are we?
FEM is the voice of the European manufacturers of
materials handling, lifting and storage equipment.
m Founded in 1953
m Today, FEM defends the interests of some 1,000 companies,
m Representing around 80% of the European materials handling
industry in value,
m Employing 160,000 people directly and many more indirectly
with distributors, agents and subcontractors.
The Intralogistic Systems Product Group (IS PG) is a
Group within FEM:
m It addresses both single materials handling products and
complete turnkey systems.
m It focuses on automation, control and IT, and integration of several
types of materials handling equipment into one system.
m Members are system integrators and suppliers of complete
systems such as complex baggage transport systems, automated
storage systems, automated dispatching and order picking systems.
The Intralogistic Systems PG aims to provide an international forum
to elaborate on technical and business matters. We proactively
develop technical guidance at European level to define interface
and communication standards as well as consistent technical
language.
For more information:
www.fem-eur.eu
(Intralogistic Systems Product Group)
Intralogistic Systems Product Group
Foreword
This handbook aims to provide advice
to customers on how to ensure successful and fair cooperation
with a system supplier. It gives tips and draws attention to the key
aspects of an efficient intralogistic system that answers current and
future customer needs.
This guide is divided into four parts, which are the four main steps
to designing an intralogistic system, selecting the most appropriate
supplier and implementing it:
1/ How to prepare the project?
2/ How to prepare the consultation process?
3/ How to compare the proposals?
4/ How to organise and implement the project?
Throughthishandbook,FEMISPGmemberswouldliketoencourage
good practice within the intralogistic system industry, for example:
m Design of clear, effective and all-inclusive solutions for
customers;
m Solutions that fully answer customer needs, without deliberate
omissions;
m Respect of confidentiality and work ethics since system
integrators consider their engineering work as their intellectual
property, notably:
/ not forwarding confidential data to a third party,
/ not using competitor data,
/ asking their customers not to divulge their design work.
m Supply of information and advice to customers on existing
standards and regulations (e.g. fire protection, ergonomics, energy
consumption);
m Development of new standards or updating of existing ones at
national or European level.
How to prepare the project?
Before contacting a system integrator or an equipment supplier,
you first need to identify your current needs, but also possible
business expansion or developments in the future.
Step 1:: Clarify your needs
m Define your priorities and success criteria
m Establish the loads (pallets, cases, totes…)
m Define the dimensions and weight of materials to be handled
m Define the capacities, average / peak performances and
functionality (present, progression, security margins…) of your
production process
m Consider the possible evolution scenarios
m Set up the project schedule
Step 2:: Define your investment limits / range
Step 3:: Prepare the relevant data
m The activity history of your company
m The product data file
Step 4:: Anticipate the physical implementation
m Greenfield or existing site
m Target areas
Step 5:: Gather information about standards
and regulations
m Equipment & building
m Electrical equipment
m Ergonomics
How to prepare
the consultation process?
To select a project integrator or an equipment supplier, you should
address the following questions:
Step 1:: What is the freedom of design that you
intend to give to your supplier?
Step 2:: What is the methodology used by your
supplier?
m Does he have operational and formalised procedures? Are they
accessible and auditable? Are they certified?
mDoesheunderstandandreproduceclearlyyourprocessandyourtarget?
m Has he improved your project content after review and discussions?
m Has he informed you about any risk or warning?
m Has he described training and the production launch plan?
m Has he described a project plan? With documented and auditable
procedures?
Step 3:: Define your own project team that would have
m Responsibility for data
m Project management responsibility
m Operational responsibility
Step 4:: Enquire about the project and service
resources of your supplier
m Language
m Opening hours
m Support service
How to compare the proposals?
Once you have received proposals from different project integrators or
equipment suppliers, you need to assess the strengths and weaknesses
of each proposal. This is a crucial step to identifying the project best
suited to your needs.
Step 1:: Compare the performance offered vs. your
performance needs
Step 2:: Study the functionality of the software,
system, maintenance
Step 3:: Look for hidden costs and exclusions
Step 4:: Check whether the solution is evolving:
does it match your own business evolution scenarios?
Step 5:: Ask yourself whether a contractual
simulation is necessary
Step 6:: Ask for feedback and references from
other clients
Once you have selected a project integrator or an equipment
supplier, the implementation of the project needs to be
carefully scheduled to ensure its efficient execution. In
addition, the after-sales service should be properly discussed.
Step 1:: Define roles and responsibilities
between your company and the system
integrator
Your teams
m Project management
m Change management (physical, cultural)
m Migration / move / ramp-up
The integrator
m Capacity to guide / follow you
m Methodology
m Project supervision
m Commitment in terms of means, but also results
Step 2:: Define the working relationship
between your teams and the integrator
m Organise a kick-off meeting between your teams and the
integrator (including sub-contractors) to get all parties on the
same wavelength
m Schedule specification meetings (if a Warehouse
Management System is included in the integrator’s scope
of supply)
Step 3:: Define the work safety aspects
Step 4:: Plan the after-sales services
m Training of users and of the maintenance team
m Own or subcontracted services
m Customer service (language, schedule, answering time)
How to organise
and implement the final project?

More Related Content

Similar to IS-guide-intralogistic-system-project.pdf

Business marketing M.COM 2nd semester bang lore university
Business marketing M.COM 2nd semester bang lore university Business marketing M.COM 2nd semester bang lore university
Business marketing M.COM 2nd semester bang lore university
NawazPashaS
 
Business marketing
Business marketingBusiness marketing
Business marketing
NawazPashaS
 
Cisa domain 3
Cisa domain 3Cisa domain 3
Cisa domain 3
ShivamSharma909
 
CISA Domain 3 - Information Systems Acquisition, Development and Implementation
CISA Domain 3 - Information Systems Acquisition, Development and ImplementationCISA Domain 3 - Information Systems Acquisition, Development and Implementation
CISA Domain 3 - Information Systems Acquisition, Development and Implementation
InfosecTrain
 
A Brief Introduction to Enterprise Architecture
A Brief Introduction to  Enterprise Architecture A Brief Introduction to  Enterprise Architecture
A Brief Introduction to Enterprise Architecture
Daljit Banger
 
EPF-Industrial-and-Logistics-Engineering
EPF-Industrial-and-Logistics-EngineeringEPF-Industrial-and-Logistics-Engineering
EPF-Industrial-and-Logistics-Engineering
Monir Akrad
 
046 INTERGRATING SCM WITH FEM & LEAN CONSTRUCTION
046 INTERGRATING SCM WITH FEM & LEAN CONSTRUCTION 046 INTERGRATING SCM WITH FEM & LEAN CONSTRUCTION
046 INTERGRATING SCM WITH FEM & LEAN CONSTRUCTION
Dr Fereidoun Dejahang
 
Applying some simple system design concepts to aid better planning: SIPOC, Sy...
Applying some simple system design concepts to aid better planning: SIPOC, Sy...Applying some simple system design concepts to aid better planning: SIPOC, Sy...
Applying some simple system design concepts to aid better planning: SIPOC, Sy...
raj takhar
 
Product and operation management chap1 2 3 sumaries
Product and operation management chap1 2 3 sumariesProduct and operation management chap1 2 3 sumaries
Product and operation management chap1 2 3 sumaries
ssuser07ac07
 
Software Training ProgramABC Company has 50,000 employees and wa.docx
Software Training ProgramABC Company has 50,000 employees and wa.docxSoftware Training ProgramABC Company has 50,000 employees and wa.docx
Software Training ProgramABC Company has 50,000 employees and wa.docx
jensgosney
 
Lect 2 project screening & selection
Lect 2 project screening & selection Lect 2 project screening & selection
Lect 2 project screening & selection
Muhammad Bilal
 
Enterprise Architecture - An Introduction
Enterprise Architecture - An Introduction Enterprise Architecture - An Introduction
Enterprise Architecture - An Introduction
Daljit Banger
 
Vendor Management - An Overview (Project File)
Vendor Management - An Overview (Project File)Vendor Management - An Overview (Project File)
Vendor Management - An Overview (Project File)
Jyoti Kumari
 
PLCM MODULE 1-Dr.GMS JSSATEB.pptx
PLCM MODULE 1-Dr.GMS JSSATEB.pptxPLCM MODULE 1-Dr.GMS JSSATEB.pptx
PLCM MODULE 1-Dr.GMS JSSATEB.pptx
swamy62
 
MIS Wk-10.ppt
MIS Wk-10.pptMIS Wk-10.ppt
MIS Wk-10.ppt
NasirMehmood666923
 
Mb0044 production & operation mangement
Mb0044 production & operation mangementMb0044 production & operation mangement
Mb0044 production & operation mangement
Devendra Kachhi
 
Mi0040 technology management
Mi0040  technology managementMi0040  technology management
Mi0040 technology management
smumbahelp
 
B14 1 select options_final
B14 1 select options_finalB14 1 select options_final
B14 1 select options_final
Dir Jan
 
Lecture 5- Technologies Designing Supply Chain.pdf
Lecture 5- Technologies Designing Supply Chain.pdfLecture 5- Technologies Designing Supply Chain.pdf
Lecture 5- Technologies Designing Supply Chain.pdf
juliuscherylann22
 
Technical Architecture.pptx
Technical Architecture.pptxTechnical Architecture.pptx
Technical Architecture.pptx
AubreyAppegu
 

Similar to IS-guide-intralogistic-system-project.pdf (20)

Business marketing M.COM 2nd semester bang lore university
Business marketing M.COM 2nd semester bang lore university Business marketing M.COM 2nd semester bang lore university
Business marketing M.COM 2nd semester bang lore university
 
Business marketing
Business marketingBusiness marketing
Business marketing
 
Cisa domain 3
Cisa domain 3Cisa domain 3
Cisa domain 3
 
CISA Domain 3 - Information Systems Acquisition, Development and Implementation
CISA Domain 3 - Information Systems Acquisition, Development and ImplementationCISA Domain 3 - Information Systems Acquisition, Development and Implementation
CISA Domain 3 - Information Systems Acquisition, Development and Implementation
 
A Brief Introduction to Enterprise Architecture
A Brief Introduction to  Enterprise Architecture A Brief Introduction to  Enterprise Architecture
A Brief Introduction to Enterprise Architecture
 
EPF-Industrial-and-Logistics-Engineering
EPF-Industrial-and-Logistics-EngineeringEPF-Industrial-and-Logistics-Engineering
EPF-Industrial-and-Logistics-Engineering
 
046 INTERGRATING SCM WITH FEM & LEAN CONSTRUCTION
046 INTERGRATING SCM WITH FEM & LEAN CONSTRUCTION 046 INTERGRATING SCM WITH FEM & LEAN CONSTRUCTION
046 INTERGRATING SCM WITH FEM & LEAN CONSTRUCTION
 
Applying some simple system design concepts to aid better planning: SIPOC, Sy...
Applying some simple system design concepts to aid better planning: SIPOC, Sy...Applying some simple system design concepts to aid better planning: SIPOC, Sy...
Applying some simple system design concepts to aid better planning: SIPOC, Sy...
 
Product and operation management chap1 2 3 sumaries
Product and operation management chap1 2 3 sumariesProduct and operation management chap1 2 3 sumaries
Product and operation management chap1 2 3 sumaries
 
Software Training ProgramABC Company has 50,000 employees and wa.docx
Software Training ProgramABC Company has 50,000 employees and wa.docxSoftware Training ProgramABC Company has 50,000 employees and wa.docx
Software Training ProgramABC Company has 50,000 employees and wa.docx
 
Lect 2 project screening & selection
Lect 2 project screening & selection Lect 2 project screening & selection
Lect 2 project screening & selection
 
Enterprise Architecture - An Introduction
Enterprise Architecture - An Introduction Enterprise Architecture - An Introduction
Enterprise Architecture - An Introduction
 
Vendor Management - An Overview (Project File)
Vendor Management - An Overview (Project File)Vendor Management - An Overview (Project File)
Vendor Management - An Overview (Project File)
 
PLCM MODULE 1-Dr.GMS JSSATEB.pptx
PLCM MODULE 1-Dr.GMS JSSATEB.pptxPLCM MODULE 1-Dr.GMS JSSATEB.pptx
PLCM MODULE 1-Dr.GMS JSSATEB.pptx
 
MIS Wk-10.ppt
MIS Wk-10.pptMIS Wk-10.ppt
MIS Wk-10.ppt
 
Mb0044 production & operation mangement
Mb0044 production & operation mangementMb0044 production & operation mangement
Mb0044 production & operation mangement
 
Mi0040 technology management
Mi0040  technology managementMi0040  technology management
Mi0040 technology management
 
B14 1 select options_final
B14 1 select options_finalB14 1 select options_final
B14 1 select options_final
 
Lecture 5- Technologies Designing Supply Chain.pdf
Lecture 5- Technologies Designing Supply Chain.pdfLecture 5- Technologies Designing Supply Chain.pdf
Lecture 5- Technologies Designing Supply Chain.pdf
 
Technical Architecture.pptx
Technical Architecture.pptxTechnical Architecture.pptx
Technical Architecture.pptx
 

Recently uploaded

Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
PKavitha10
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
bijceesjournal
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
Atif Razi
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
RamonNovais6
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
Yasser Mahgoub
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
gowrishankartb2005
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
ElakkiaU
 
Welding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdfWelding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdf
AjmalKhan50578
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
VANDANAMOHANGOUDA
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
bjmsejournal
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
People as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimalaPeople as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimala
riddhimaagrawal986
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
architagupta876
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
LAXMAREDDY22
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
Prakhyath Rai
 
artificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptxartificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptx
GauravCar
 

Recently uploaded (20)

Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1CEC 352 - SATELLITE COMMUNICATION UNIT 1
CEC 352 - SATELLITE COMMUNICATION UNIT 1
 
Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...Comparative analysis between traditional aquaponics and reconstructed aquapon...
Comparative analysis between traditional aquaponics and reconstructed aquapon...
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
 
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURSCompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
CompEx~Manual~1210 (2).pdf COMPEX GAS AND VAPOURS
 
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
2008 BUILDING CONSTRUCTION Illustrated - Ching Chapter 02 The Building.pdf
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
 
Welding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdfWelding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdf
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
 
Design and optimization of ion propulsion drone
Design and optimization of ion propulsion droneDesign and optimization of ion propulsion drone
Design and optimization of ion propulsion drone
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
People as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimalaPeople as resource Grade IX.pdf minimala
People as resource Grade IX.pdf minimala
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
 
artificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptxartificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptx
 

IS-guide-intralogistic-system-project.pdf

  • 1. A PRACTICAL GUIDE for a successful intralogistic system project How to prepare the project? How to prepare the consultation process? How to compare the proposals? How to organise and implement the project? A CUSTOMER HANDBOOK prepared by the Intralogistic Systems Product Group, European Federation of Materials Handling © FEM 2015 Diamant Building / 80 Boulevard Auguste Reyers / B - 1030 Brussels / Belgium Tel: +32 2 706 82 37 / E-mail: info@fem-eur.com w w w . f e m - e u r . e u FEM & IS PG Who are we? FEM is the voice of the European manufacturers of materials handling, lifting and storage equipment. m Founded in 1953 m Today, FEM defends the interests of some 1,000 companies, m Representing around 80% of the European materials handling industry in value, m Employing 160,000 people directly and many more indirectly with distributors, agents and subcontractors. The Intralogistic Systems Product Group (IS PG) is a Group within FEM: m It addresses both single materials handling products and complete turnkey systems. m It focuses on automation, control and IT, and integration of several types of materials handling equipment into one system. m Members are system integrators and suppliers of complete systems such as complex baggage transport systems, automated storage systems, automated dispatching and order picking systems. The Intralogistic Systems PG aims to provide an international forum to elaborate on technical and business matters. We proactively develop technical guidance at European level to define interface and communication standards as well as consistent technical language. For more information: www.fem-eur.eu (Intralogistic Systems Product Group) Intralogistic Systems Product Group Foreword This handbook aims to provide advice to customers on how to ensure successful and fair cooperation with a system supplier. It gives tips and draws attention to the key aspects of an efficient intralogistic system that answers current and future customer needs. This guide is divided into four parts, which are the four main steps to designing an intralogistic system, selecting the most appropriate supplier and implementing it: 1/ How to prepare the project? 2/ How to prepare the consultation process? 3/ How to compare the proposals? 4/ How to organise and implement the project? Throughthishandbook,FEMISPGmemberswouldliketoencourage good practice within the intralogistic system industry, for example: m Design of clear, effective and all-inclusive solutions for customers; m Solutions that fully answer customer needs, without deliberate omissions; m Respect of confidentiality and work ethics since system integrators consider their engineering work as their intellectual property, notably: / not forwarding confidential data to a third party, / not using competitor data, / asking their customers not to divulge their design work. m Supply of information and advice to customers on existing standards and regulations (e.g. fire protection, ergonomics, energy consumption); m Development of new standards or updating of existing ones at national or European level.
  • 2. How to prepare the project? Before contacting a system integrator or an equipment supplier, you first need to identify your current needs, but also possible business expansion or developments in the future. Step 1:: Clarify your needs m Define your priorities and success criteria m Establish the loads (pallets, cases, totes…) m Define the dimensions and weight of materials to be handled m Define the capacities, average / peak performances and functionality (present, progression, security margins…) of your production process m Consider the possible evolution scenarios m Set up the project schedule Step 2:: Define your investment limits / range Step 3:: Prepare the relevant data m The activity history of your company m The product data file Step 4:: Anticipate the physical implementation m Greenfield or existing site m Target areas Step 5:: Gather information about standards and regulations m Equipment & building m Electrical equipment m Ergonomics How to prepare the consultation process? To select a project integrator or an equipment supplier, you should address the following questions: Step 1:: What is the freedom of design that you intend to give to your supplier? Step 2:: What is the methodology used by your supplier? m Does he have operational and formalised procedures? Are they accessible and auditable? Are they certified? mDoesheunderstandandreproduceclearlyyourprocessandyourtarget? m Has he improved your project content after review and discussions? m Has he informed you about any risk or warning? m Has he described training and the production launch plan? m Has he described a project plan? With documented and auditable procedures? Step 3:: Define your own project team that would have m Responsibility for data m Project management responsibility m Operational responsibility Step 4:: Enquire about the project and service resources of your supplier m Language m Opening hours m Support service How to compare the proposals? Once you have received proposals from different project integrators or equipment suppliers, you need to assess the strengths and weaknesses of each proposal. This is a crucial step to identifying the project best suited to your needs. Step 1:: Compare the performance offered vs. your performance needs Step 2:: Study the functionality of the software, system, maintenance Step 3:: Look for hidden costs and exclusions Step 4:: Check whether the solution is evolving: does it match your own business evolution scenarios? Step 5:: Ask yourself whether a contractual simulation is necessary Step 6:: Ask for feedback and references from other clients Once you have selected a project integrator or an equipment supplier, the implementation of the project needs to be carefully scheduled to ensure its efficient execution. In addition, the after-sales service should be properly discussed. Step 1:: Define roles and responsibilities between your company and the system integrator Your teams m Project management m Change management (physical, cultural) m Migration / move / ramp-up The integrator m Capacity to guide / follow you m Methodology m Project supervision m Commitment in terms of means, but also results Step 2:: Define the working relationship between your teams and the integrator m Organise a kick-off meeting between your teams and the integrator (including sub-contractors) to get all parties on the same wavelength m Schedule specification meetings (if a Warehouse Management System is included in the integrator’s scope of supply) Step 3:: Define the work safety aspects Step 4:: Plan the after-sales services m Training of users and of the maintenance team m Own or subcontracted services m Customer service (language, schedule, answering time) How to organise and implement the final project?