SlideShare a Scribd company logo
1 of 3
Page|1
CURRICULUM VITAE
NAME: Isaac Isaac Akpan
Position: Rigging/Lifting Foreman.
Fork Lift Operator
Nationality: Nigerian
Address: No. 4 Assan Anieatang Str. D.O.B: 23/01/1980
Eket, Mobile : +2348036768223,+234808219676
AkwaIbom
Email address :isaacakpan77@gmail.com
Qualifications/
Training
Higher National Diploma 2006
Electrical Electronics Engineering,
Rivers State Polythecnic
Ordinary National Diploma 2002
Electrical Electronics Engineering
The Polythecnic Calabar,
Cross River State
National Youth Service Corps 2007
Ihite Uboma L.G.A
Imo State
Works Department
National Technical Certificate Examination,1997
Federal Craft Certificate,
Federal Ministry Of Labour And Trade Test (3&2)
Goverment Technical Collage,
Ikot Ada Idem, Ibiono Ibom L.G.A
Akwa Ibom State.
LEEA Rigging and Lifting. Stage 1
OPITO Offshore Survival (Current).
DPR (offshore permit)
Fork Lift Operator Certification, 28.08.2014
Exxon Mobil Technical Training Centre,
Eket, Akwa Ibom State
Subsea7 P.A.S.S Training
Manual Handling Training
12th August 2010
Exxon Mobil Producing Nigeria Unltd
Nigeria Joint Venture Development Projects
2009 Safety Leadership And Hazard Recognition Workshop
European Management & Marine Corporation
Aberdeen, Uk
Termination of Steel Wire Ropes Resin Pouring Socket method
Page|2
European Management & Marine Corporation
Aberdeen, Uk
1 day In-Service Examination of Manual Lifting Equipments
A précis ofmy Personality, Abilities and Strengths
I started my Rigging career in October 2006, I have worked in various offshore locations in my
country all in offshore construction companies on Hook up maintenance and other major projects. I
am able to work in any environment that requires my skills. I enjoy working with others am able to
carry out instructions and also contribute. Am a good motivator and in my status as a foreman can
motivate others to safely and efficiently carry out their task. I am prepared to share my knowledge
and also learn new skills so long it is safe.
Summary of Key Skills & Experience
 Excellent communication and
interpersonal skills
 Calm and well organized under pressure
maintaining a strong customer focus
 Ability to work and meet the set client
deadlines safely
 Willing to undergo training to enhance
career and self development
 Able to work well as a team player and
on own initiative
 Adapts quickly to changing environments
and policy procedures

Career History
Nov. 14 - Present:
Sept 2014 – Oct.
2015:
Jan2013 – August
2014 :
April 2012 –
Dec2012 :
Broron Oil and Gas Nigeria Limited
Rigging/lifting foreman - Inim West Project in Nigeria on Exxonmobil Field.
Removal of SBM- Chain and lifting and transfering of project materials
Subsea 7 Nigeria Limited
Rigging/Lifting Foreman & Fork Lift Operator–Erha North Phase 2 project
in Nigeria on Exxon Mobil F.P.S.O. facility. Working under a supervisor and a
general foreman and also leading a group of riggers, planning and Installation of
various spools of sizes, carrying out heavy lifts and Installation of items such as:
F.lli Righini Pull- in system, Tuta, Methanol and Chemical injection skids, HPU
units, extension platforms, risers, valves and various sized pipework. Involved in
both topside and subsea tie-ins. Also transferring of materials using fork lift
Subsea7 Nigeria Limited
Rigging/ Lifting Foreman – Emergency Trunk Line Projects, taking charge of
installation of various spools, Shut down valves, riser guards and also heavy lifts
on Asabo, EKpe and Idoho Platforms for Exxon Mobil Nigeria.
Subsea7 Nigeria Limited
Rigger- OCIP satellite field developments project on Exxon Mobil
Platforms,(oyot, Abanng and Itut), carrying out rigging activities like installation
of valves, deck extensions, risers and various pipe spools before and during shut
down and general housekeeping.
Page|3
April2011– March
2012:
Oct2009 –March
2010:
Acergy / Globestar Nigeria Limited.
Rigger – 4th LP Compressor Installation Project E.A.P Carrying out rigging
activities, Installation of 240 tonnes Compressor and Turbine, various sizes of
pipe spools ans valves.
Acergy/ Globestar Nigeria Limited.
Rigger- EPC 4A Projects. Upgrade of Iyak and Mfem external platforms, carry
out rigging and lifting activities and also Installation of Platform extensions.
Referees.
Victor Guerin,
Hook Up Offshore Manager
Email: victor.guerin@subsea7.com
Subsea7
ERHA North Phase2
James Blacklock
Rigging Supervisor
Subsea7
Ibanga Brownson
Nolib Company
(+234) 08029178186

More Related Content

Viewers also liked

Hema rapidskillz certificate
Hema rapidskillz certificateHema rapidskillz certificate
Hema rapidskillz certificateHema Shekar
 
อุปกรณ์คอม
อุปกรณ์คอมอุปกรณ์คอม
อุปกรณ์คอมkunntumm
 
Bravery#2
Bravery#2Bravery#2
Bravery#2Shiro28
 
Setting the Stage for Dramatically Improving O&G Operations Performance
Setting the Stage for Dramatically Improving O&G Operations PerformanceSetting the Stage for Dramatically Improving O&G Operations Performance
Setting the Stage for Dramatically Improving O&G Operations PerformanceBill Bosler, P.E.
 
Leon Analysis- Kiara Eley
Leon Analysis- Kiara EleyLeon Analysis- Kiara Eley
Leon Analysis- Kiara Eleytbgsmedia1415
 
Agenda 2017
Agenda 2017Agenda 2017
Agenda 2017narjonas
 
Social media en e mail: van conversaties naar conversie
Social media en e mail: van conversaties naar conversieSocial media en e mail: van conversaties naar conversie
Social media en e mail: van conversaties naar conversieAbbey Road Creations
 
найкращі поезії про кохання
найкращі поезії про коханнянайкращі поезії про кохання
найкращі поезії про коханняNastia Dziubak
 
1. data infrastructure keynote october 2010 alain
1. data infrastructure keynote october 2010 alain1. data infrastructure keynote october 2010 alain
1. data infrastructure keynote october 2010 alainDoina Draganescu
 
Yury scherbak development of scientific technical platfroms in a firald of bi...
Yury scherbak development of scientific technical platfroms in a firald of bi...Yury scherbak development of scientific technical platfroms in a firald of bi...
Yury scherbak development of scientific technical platfroms in a firald of bi...igorod
 
Gagnon family collage
Gagnon family collageGagnon family collage
Gagnon family collagegagnonohoh3
 

Viewers also liked (15)

Hema rapidskillz certificate
Hema rapidskillz certificateHema rapidskillz certificate
Hema rapidskillz certificate
 
อุปกรณ์คอม
อุปกรณ์คอมอุปกรณ์คอม
อุปกรณ์คอม
 
SEO Presentation - Read
SEO Presentation - ReadSEO Presentation - Read
SEO Presentation - Read
 
Bravery#2
Bravery#2Bravery#2
Bravery#2
 
DECODE
DECODEDECODE
DECODE
 
Setting the Stage for Dramatically Improving O&G Operations Performance
Setting the Stage for Dramatically Improving O&G Operations PerformanceSetting the Stage for Dramatically Improving O&G Operations Performance
Setting the Stage for Dramatically Improving O&G Operations Performance
 
Leon Analysis- Kiara Eley
Leon Analysis- Kiara EleyLeon Analysis- Kiara Eley
Leon Analysis- Kiara Eley
 
Focus n _29_18_settembre_2014
Focus n _29_18_settembre_2014Focus n _29_18_settembre_2014
Focus n _29_18_settembre_2014
 
Agenda 2017
Agenda 2017Agenda 2017
Agenda 2017
 
Social media en e mail: van conversaties naar conversie
Social media en e mail: van conversaties naar conversieSocial media en e mail: van conversaties naar conversie
Social media en e mail: van conversaties naar conversie
 
найкращі поезії про кохання
найкращі поезії про коханнянайкращі поезії про кохання
найкращі поезії про кохання
 
1. data infrastructure keynote october 2010 alain
1. data infrastructure keynote october 2010 alain1. data infrastructure keynote october 2010 alain
1. data infrastructure keynote october 2010 alain
 
Koko2 gambar
Koko2 gambarKoko2 gambar
Koko2 gambar
 
Yury scherbak development of scientific technical platfroms in a firald of bi...
Yury scherbak development of scientific technical platfroms in a firald of bi...Yury scherbak development of scientific technical platfroms in a firald of bi...
Yury scherbak development of scientific technical platfroms in a firald of bi...
 
Gagnon family collage
Gagnon family collageGagnon family collage
Gagnon family collage
 

Similar to ISAAC AKPAN CV (20)

LITO B.E NEW RESUME new
LITO B.E NEW RESUME newLITO B.E NEW RESUME new
LITO B.E NEW RESUME new
 
CV.PM
CV.PMCV.PM
CV.PM
 
CVJohn Gibson Nov 2015
CVJohn Gibson Nov 2015CVJohn Gibson Nov 2015
CVJohn Gibson Nov 2015
 
Totie Laurel CV
Totie Laurel CVTotie Laurel CV
Totie Laurel CV
 
LourensBamCV
LourensBamCVLourensBamCV
LourensBamCV
 
Emeka Resume
Emeka  ResumeEmeka  Resume
Emeka Resume
 
Professional Resume Rasyid
Professional Resume RasyidProfessional Resume Rasyid
Professional Resume Rasyid
 
Zulfiqar - Cv
Zulfiqar - CvZulfiqar - Cv
Zulfiqar - Cv
 
Melvin Lee CV (Updated)
Melvin Lee CV (Updated)Melvin Lee CV (Updated)
Melvin Lee CV (Updated)
 
Victor umoh cv
Victor umoh cvVictor umoh cv
Victor umoh cv
 
mgt cv 2015 HEO
mgt cv 2015 HEOmgt cv 2015 HEO
mgt cv 2015 HEO
 
CV 2015
CV 2015CV 2015
CV 2015
 
Lugsy 2014 updated c.v. - Copy
Lugsy 2014 updated c.v. - CopyLugsy 2014 updated c.v. - Copy
Lugsy 2014 updated c.v. - Copy
 
AMOD CV CHINA 2017 - Copy
AMOD CV CHINA 2017 - CopyAMOD CV CHINA 2017 - Copy
AMOD CV CHINA 2017 - Copy
 
SBCV2016
SBCV2016SBCV2016
SBCV2016
 
Scott Donaldson CV - Copy - for merge
Scott Donaldson CV - Copy - for mergeScott Donaldson CV - Copy - for merge
Scott Donaldson CV - Copy - for merge
 
Sherif joseph
Sherif josephSherif joseph
Sherif joseph
 
Mark Gorda CV 2015
Mark Gorda CV 2015Mark Gorda CV 2015
Mark Gorda CV 2015
 
scooby cv4
scooby cv4scooby cv4
scooby cv4
 
Bishop's Cv
Bishop's CvBishop's Cv
Bishop's Cv
 

ISAAC AKPAN CV

  • 1. Page|1 CURRICULUM VITAE NAME: Isaac Isaac Akpan Position: Rigging/Lifting Foreman. Fork Lift Operator Nationality: Nigerian Address: No. 4 Assan Anieatang Str. D.O.B: 23/01/1980 Eket, Mobile : +2348036768223,+234808219676 AkwaIbom Email address :isaacakpan77@gmail.com Qualifications/ Training Higher National Diploma 2006 Electrical Electronics Engineering, Rivers State Polythecnic Ordinary National Diploma 2002 Electrical Electronics Engineering The Polythecnic Calabar, Cross River State National Youth Service Corps 2007 Ihite Uboma L.G.A Imo State Works Department National Technical Certificate Examination,1997 Federal Craft Certificate, Federal Ministry Of Labour And Trade Test (3&2) Goverment Technical Collage, Ikot Ada Idem, Ibiono Ibom L.G.A Akwa Ibom State. LEEA Rigging and Lifting. Stage 1 OPITO Offshore Survival (Current). DPR (offshore permit) Fork Lift Operator Certification, 28.08.2014 Exxon Mobil Technical Training Centre, Eket, Akwa Ibom State Subsea7 P.A.S.S Training Manual Handling Training 12th August 2010 Exxon Mobil Producing Nigeria Unltd Nigeria Joint Venture Development Projects 2009 Safety Leadership And Hazard Recognition Workshop European Management & Marine Corporation Aberdeen, Uk Termination of Steel Wire Ropes Resin Pouring Socket method
  • 2. Page|2 European Management & Marine Corporation Aberdeen, Uk 1 day In-Service Examination of Manual Lifting Equipments A précis ofmy Personality, Abilities and Strengths I started my Rigging career in October 2006, I have worked in various offshore locations in my country all in offshore construction companies on Hook up maintenance and other major projects. I am able to work in any environment that requires my skills. I enjoy working with others am able to carry out instructions and also contribute. Am a good motivator and in my status as a foreman can motivate others to safely and efficiently carry out their task. I am prepared to share my knowledge and also learn new skills so long it is safe. Summary of Key Skills & Experience  Excellent communication and interpersonal skills  Calm and well organized under pressure maintaining a strong customer focus  Ability to work and meet the set client deadlines safely  Willing to undergo training to enhance career and self development  Able to work well as a team player and on own initiative  Adapts quickly to changing environments and policy procedures  Career History Nov. 14 - Present: Sept 2014 – Oct. 2015: Jan2013 – August 2014 : April 2012 – Dec2012 : Broron Oil and Gas Nigeria Limited Rigging/lifting foreman - Inim West Project in Nigeria on Exxonmobil Field. Removal of SBM- Chain and lifting and transfering of project materials Subsea 7 Nigeria Limited Rigging/Lifting Foreman & Fork Lift Operator–Erha North Phase 2 project in Nigeria on Exxon Mobil F.P.S.O. facility. Working under a supervisor and a general foreman and also leading a group of riggers, planning and Installation of various spools of sizes, carrying out heavy lifts and Installation of items such as: F.lli Righini Pull- in system, Tuta, Methanol and Chemical injection skids, HPU units, extension platforms, risers, valves and various sized pipework. Involved in both topside and subsea tie-ins. Also transferring of materials using fork lift Subsea7 Nigeria Limited Rigging/ Lifting Foreman – Emergency Trunk Line Projects, taking charge of installation of various spools, Shut down valves, riser guards and also heavy lifts on Asabo, EKpe and Idoho Platforms for Exxon Mobil Nigeria. Subsea7 Nigeria Limited Rigger- OCIP satellite field developments project on Exxon Mobil Platforms,(oyot, Abanng and Itut), carrying out rigging activities like installation of valves, deck extensions, risers and various pipe spools before and during shut down and general housekeeping.
  • 3. Page|3 April2011– March 2012: Oct2009 –March 2010: Acergy / Globestar Nigeria Limited. Rigger – 4th LP Compressor Installation Project E.A.P Carrying out rigging activities, Installation of 240 tonnes Compressor and Turbine, various sizes of pipe spools ans valves. Acergy/ Globestar Nigeria Limited. Rigger- EPC 4A Projects. Upgrade of Iyak and Mfem external platforms, carry out rigging and lifting activities and also Installation of Platform extensions. Referees. Victor Guerin, Hook Up Offshore Manager Email: victor.guerin@subsea7.com Subsea7 ERHA North Phase2 James Blacklock Rigging Supervisor Subsea7 Ibanga Brownson Nolib Company (+234) 08029178186