Consider this a transition point in my various thinking and writings about program management and by extension management of the projects that comprise these programs. It is driven by a simple glaring fact that our industry more often than not “fails” in our delivery of large projects. I will leave the debate on whether failure is the right term to use until another time but it would certainly be safe to say that large projects “underperform” with respect to the baselines upon which final investment decisions are made and projects “sanctioned”. This performance issue has been well documented by others.
This persistent performance challenge drives me to question whether the theoretical foundations of project management theory as it is widely practiced today are sufficient to meet the challenges of large projects. After all, various management approaches have evolved over time to implement any of a number of management theories. Perhaps large projects, and especially large multi-project programs, require a different theoretical foundation than the traditional theories that underpin our management practices currently afford.
I hope you enjoy this short article and I am interested in your thoughts on the subject.
Theory of Management of Large Complex Projects - Chapter 3Bob Prieto
The world of large complex projects is challenging to say the least with a majority of these projects significantly under performing. It is this weak performance regime that underpins the key premise of "Theory of Management of Large Complex Projects" – project management theory as it currently exists and is applied to large complex projects falls short, significantly short, of what these projects require.
I have decided to serialize this book for the benefit of those interested in better understanding and improving project performance. If you are interested in purchasing a copy of the 400 page paperback you may click on http://www.lulu.com/us/en/shop/bob-prieto/theory-of-management-of-large-complex-projects/paperback/product-22342232.html
There is a tendency to think of the essential difference between megaprojects and more traditional sized projects as one of scale. If only it was that simple. A better analogy, and something that we see more clearly in the world of gigaprograms, is that this scaling up
in size has the concomitant effect of “unfolding” unseen dimensions that were likely always there but whose effects were not readily noticeable.
These unseen dimensions:
create new regions of “white space”, that if not aggressively managed, serve as nesting and breeding grounds for new, more systemic type risks
expose a subtle “coupling” across the gigaprogram that at smaller scales was not as significant; this “coupling” is not only direct coupling but importantly indirect
coupling realized through “coupled constraints” or “white space” couplings that previously were not significant
drive us to a level of complexity where the scaling of activities is dramatically outweighed by the scaling of the possible network combinations and effects that
are created.
expose the fragility of many of our assumptions, as longer project development and execution periods that are inherent characteristics of commitment of growing
levels of capital, demonstrate that they are far from static and instead experience “assumption migration”
highlight management dimensions that are less significant on smaller scale projects such as those associated with:
o increased strategic importance (achievement of strategic business objectives or SBOs with their outcomes focus) vs. the output focus of delivering more traditional projects and the emergence of a changed governance regime
o owner, not just project, readiness given the increased level of owner organizational involvement and oversight that gigaprograms attract
o increased importance of multi-party contractual relationships both in the various execution teams and potentially even in the project ownership
structure
expose the need to think about “capital efficiency” in a fuller way than is traditionally experienced on smaller projects where CAPEX or construction
schedule usually suffice as project optimization points.
Theory of Management of Large Complex Projects - Introduction and Chapter 1Bob Prieto
The world of large complex projects is challenging to say the least with a majority of these projects significantly under performing. It is this weak performance regime that underpins the key premise of "Theory of Management of Large Complex Projects" – project management theory as it currently exists and is applied to large complex projects falls short, significantly short, of what these projects require.
I have decided to serialize this book for the benefit of those interested in better understanding and improving project performance. If you are interested in purchasing a copy of the 400 page paperback you may click on http://www.lulu.com/us/en/shop/bob-prieto/theory-of-management-of-large-complex-projects/paperback/product-22342232.html
This is the first installment in this series.
“What a waste of money”
IT Project Failure and how to avoid it
This white paper examines the reasons why IT projects fail. The results of several studies are presented, and the trends for failure rates
examined. A number of reasons for project failure are considered, and recommendations are made as to how project failure may be
avoided.
It’s almost an unwritten rule that IT projects fail - or at least a significant number of them do! IT Projects do not need to fail,
but it seems to have become an acceptable norm. The reasons why they fail have not changed much over the past 15 years,
and neither have the rates of failure. Although there have been many attempts to propose simple guidelines, which, it has
been argued, can change IT project success rates significantly, projects continue to fail.
In the following sections we will consider what is meant by project failure, and then look at the results of studies that provide
figures for IT project failure rates. We will examine the reasons why they fail, and consider ways to avoid project failure.
This paper looks at the special case of decision making under uncertainty. The relationship between uncertainty and complexity is explored as is their joint relationship with large complex projects. The importance of getting these projects well founded from an ability to manage uncertainty is discussed and the aspects of these strong foundations is described
The real question is why is managing projects so hard? The Project Management processes are well defined, well documented, mature, and available to anyone anywhere. But we still seem to think, or at least make the claim that “managing projects” requires some type of special skill, requiring processes not found in these standard approaches.
Impact of correlation on risks in programs and projects Bob Prieto
One of the most under considered elements of cost and schedule risk is the correlation that exists within various WBS elements of a project or across projects comprising a program. Failure to adequately consider correlation between various activities and projects compounds the impact of other factors present in large complex projects.
Theory of Management of Large Complex Projects - Chapter 3Bob Prieto
The world of large complex projects is challenging to say the least with a majority of these projects significantly under performing. It is this weak performance regime that underpins the key premise of "Theory of Management of Large Complex Projects" – project management theory as it currently exists and is applied to large complex projects falls short, significantly short, of what these projects require.
I have decided to serialize this book for the benefit of those interested in better understanding and improving project performance. If you are interested in purchasing a copy of the 400 page paperback you may click on http://www.lulu.com/us/en/shop/bob-prieto/theory-of-management-of-large-complex-projects/paperback/product-22342232.html
There is a tendency to think of the essential difference between megaprojects and more traditional sized projects as one of scale. If only it was that simple. A better analogy, and something that we see more clearly in the world of gigaprograms, is that this scaling up
in size has the concomitant effect of “unfolding” unseen dimensions that were likely always there but whose effects were not readily noticeable.
These unseen dimensions:
create new regions of “white space”, that if not aggressively managed, serve as nesting and breeding grounds for new, more systemic type risks
expose a subtle “coupling” across the gigaprogram that at smaller scales was not as significant; this “coupling” is not only direct coupling but importantly indirect
coupling realized through “coupled constraints” or “white space” couplings that previously were not significant
drive us to a level of complexity where the scaling of activities is dramatically outweighed by the scaling of the possible network combinations and effects that
are created.
expose the fragility of many of our assumptions, as longer project development and execution periods that are inherent characteristics of commitment of growing
levels of capital, demonstrate that they are far from static and instead experience “assumption migration”
highlight management dimensions that are less significant on smaller scale projects such as those associated with:
o increased strategic importance (achievement of strategic business objectives or SBOs with their outcomes focus) vs. the output focus of delivering more traditional projects and the emergence of a changed governance regime
o owner, not just project, readiness given the increased level of owner organizational involvement and oversight that gigaprograms attract
o increased importance of multi-party contractual relationships both in the various execution teams and potentially even in the project ownership
structure
expose the need to think about “capital efficiency” in a fuller way than is traditionally experienced on smaller projects where CAPEX or construction
schedule usually suffice as project optimization points.
Theory of Management of Large Complex Projects - Introduction and Chapter 1Bob Prieto
The world of large complex projects is challenging to say the least with a majority of these projects significantly under performing. It is this weak performance regime that underpins the key premise of "Theory of Management of Large Complex Projects" – project management theory as it currently exists and is applied to large complex projects falls short, significantly short, of what these projects require.
I have decided to serialize this book for the benefit of those interested in better understanding and improving project performance. If you are interested in purchasing a copy of the 400 page paperback you may click on http://www.lulu.com/us/en/shop/bob-prieto/theory-of-management-of-large-complex-projects/paperback/product-22342232.html
This is the first installment in this series.
“What a waste of money”
IT Project Failure and how to avoid it
This white paper examines the reasons why IT projects fail. The results of several studies are presented, and the trends for failure rates
examined. A number of reasons for project failure are considered, and recommendations are made as to how project failure may be
avoided.
It’s almost an unwritten rule that IT projects fail - or at least a significant number of them do! IT Projects do not need to fail,
but it seems to have become an acceptable norm. The reasons why they fail have not changed much over the past 15 years,
and neither have the rates of failure. Although there have been many attempts to propose simple guidelines, which, it has
been argued, can change IT project success rates significantly, projects continue to fail.
In the following sections we will consider what is meant by project failure, and then look at the results of studies that provide
figures for IT project failure rates. We will examine the reasons why they fail, and consider ways to avoid project failure.
This paper looks at the special case of decision making under uncertainty. The relationship between uncertainty and complexity is explored as is their joint relationship with large complex projects. The importance of getting these projects well founded from an ability to manage uncertainty is discussed and the aspects of these strong foundations is described
The real question is why is managing projects so hard? The Project Management processes are well defined, well documented, mature, and available to anyone anywhere. But we still seem to think, or at least make the claim that “managing projects” requires some type of special skill, requiring processes not found in these standard approaches.
Impact of correlation on risks in programs and projects Bob Prieto
One of the most under considered elements of cost and schedule risk is the correlation that exists within various WBS elements of a project or across projects comprising a program. Failure to adequately consider correlation between various activities and projects compounds the impact of other factors present in large complex projects.
The ability to execute virtual projects – projects where the team members seldom or never meet physically – is becoming an increasingly important capability for international organizations. This paper identifies five factors that determine the success or failure of virtual projects, and discusses how to build the capability to execute virtual projects effectively, including those currently thought too small to be viable.
Why Scheduling Mustn't Be Allowed to Become an Extinct ScienceAcumen
This paper discusses why the emerging 14 Point Schedule Assessment, developed by the Defense Contract Management Agency (DCMA), is fast becoming an established standard within the scheduling community across multiple industries.
www.projectacumen.com
@projectacumen
How to Effectively Manage IT Project Risks Bradley Susser
How to Effectively Manage IT Project Risks ...This paper we will provide a brief history on the evolution of Project Management, the most common reasons projects fail, a detailed case study of a well-known project failure, solutions and how to effectively manage and mitigate risks in IT projects, incorporate an opinion from a highly recognized Project Management consulting firm on an evolving risk management approach and then conclude by offering an added opinion which will comprise of how to attain desirable outcomes.
A growing world requires improved and expanded infrastructure. Juxtapose that with the need for massive public investment driven by pandemic created economic weakness and the prospects for significant investment in infrastructure is improved, but as history has taught us not necessarily assured.
We have been through other infrastructure stimulus programs focused on so-called shovel ready projects and have been disappointed. But whether we define them as “shovel ready” or otherwise we need infrastructure projects, especially the largest of them, to be successful.
In this paper we will look at common reasons large scale infrastructure projects fail and importantly suggest some strategies and tactics to improve their success rate.
3 Critical Steps to Project Management Office (PMO) DevelopmentGravesSE
Implementers know that before you make final decisions, you examine the current state and optimize it whenever possible before overlaying new process or new technology. Launching a PMO is no different. This article covers three important steps to position and balance your organization during PMO implementation.
More organizations are recognizing the many benefits that Agile delivers.
As organizations start embracing the approach, there are gaps in understanding about what it is, what it involves and what value it brings.
What is Agile Development is the first in a series of Agile eBooks from Intelliware Development intended to help eliminate those gaps.
Chaos report 2012: here you´ll find the full version of the worldwide report ellaborated by The Standish Group about success and failure of IT projects.
The naturally occurring uncertainties (Aleatory) in cost, schedule, and technical performance can be modeled in a Monte Carlo Simulation tool. The Event Based uncertainties (Epistemic) require capture, modeling of their impacts, defining handling strategies, modeling the effectiveness of these handling efforts, and the residual risks, and their impacts of both the original risk and the residual risk on the program.
Making decisions under uncertainty and under pressure in projectsPECB
The webinar covers:
• The uncertainty that matters
• Psychology of risk
- Utility
- Prospect theory
• Ways to deal with the pressure in projects
Presenter:
This webinar was presented by Gilberto Costa, Project Manager and Risk Analyst responsible for 3 power sub-stations in the rainforest. Currently he is working as a Risk Management consultant and Trainer for several organizations in Portugal.
Link of the recorded session published on YouTube:
The purpose of this article is to conceptualize and identify troubled projects and allow their evaluation and possible recovery, minimizing the impact of the negative effects in the event of a total failure. The word recovery, as used here, has a meaning that is different than usual. It does not mean leading the project to the intended success from the planning phase but to minimize total failure.
The ability to execute virtual projects – projects where the team members seldom or never meet physically – is becoming an increasingly important capability for international organizations. This paper identifies five factors that determine the success or failure of virtual projects, and discusses how to build the capability to execute virtual projects effectively, including those currently thought too small to be viable.
Why Scheduling Mustn't Be Allowed to Become an Extinct ScienceAcumen
This paper discusses why the emerging 14 Point Schedule Assessment, developed by the Defense Contract Management Agency (DCMA), is fast becoming an established standard within the scheduling community across multiple industries.
www.projectacumen.com
@projectacumen
How to Effectively Manage IT Project Risks Bradley Susser
How to Effectively Manage IT Project Risks ...This paper we will provide a brief history on the evolution of Project Management, the most common reasons projects fail, a detailed case study of a well-known project failure, solutions and how to effectively manage and mitigate risks in IT projects, incorporate an opinion from a highly recognized Project Management consulting firm on an evolving risk management approach and then conclude by offering an added opinion which will comprise of how to attain desirable outcomes.
A growing world requires improved and expanded infrastructure. Juxtapose that with the need for massive public investment driven by pandemic created economic weakness and the prospects for significant investment in infrastructure is improved, but as history has taught us not necessarily assured.
We have been through other infrastructure stimulus programs focused on so-called shovel ready projects and have been disappointed. But whether we define them as “shovel ready” or otherwise we need infrastructure projects, especially the largest of them, to be successful.
In this paper we will look at common reasons large scale infrastructure projects fail and importantly suggest some strategies and tactics to improve their success rate.
3 Critical Steps to Project Management Office (PMO) DevelopmentGravesSE
Implementers know that before you make final decisions, you examine the current state and optimize it whenever possible before overlaying new process or new technology. Launching a PMO is no different. This article covers three important steps to position and balance your organization during PMO implementation.
More organizations are recognizing the many benefits that Agile delivers.
As organizations start embracing the approach, there are gaps in understanding about what it is, what it involves and what value it brings.
What is Agile Development is the first in a series of Agile eBooks from Intelliware Development intended to help eliminate those gaps.
Chaos report 2012: here you´ll find the full version of the worldwide report ellaborated by The Standish Group about success and failure of IT projects.
The naturally occurring uncertainties (Aleatory) in cost, schedule, and technical performance can be modeled in a Monte Carlo Simulation tool. The Event Based uncertainties (Epistemic) require capture, modeling of their impacts, defining handling strategies, modeling the effectiveness of these handling efforts, and the residual risks, and their impacts of both the original risk and the residual risk on the program.
Making decisions under uncertainty and under pressure in projectsPECB
The webinar covers:
• The uncertainty that matters
• Psychology of risk
- Utility
- Prospect theory
• Ways to deal with the pressure in projects
Presenter:
This webinar was presented by Gilberto Costa, Project Manager and Risk Analyst responsible for 3 power sub-stations in the rainforest. Currently he is working as a Risk Management consultant and Trainer for several organizations in Portugal.
Link of the recorded session published on YouTube:
The purpose of this article is to conceptualize and identify troubled projects and allow their evaluation and possible recovery, minimizing the impact of the negative effects in the event of a total failure. The word recovery, as used here, has a meaning that is different than usual. It does not mean leading the project to the intended success from the planning phase but to minimize total failure.
Talking points agenda:
Why Project Management rules the world?
Why the demand for project professionals is extremely high?
Change through innovation in the form of project
The evident Question: Why managing projects is so Hard?
Learning objectives:
Through this session you will understand and learn the importance of soft skills rather than methodologies as well as “Balancing Project Management Hard Skills and Soft Skills.”
Is your project a losing battle? We've alI seen IT projects that failed, whether in our own organizations or observed elsewhere (hopefully the latter) One common attribute of failing projects is the Gambler's Paradox, where the gambler - the project manager - continues to gamble in the hope of recouping losses, resulting in even greater losses. We believe that milestone based project management LS superior to traditional project management.
Most traditional methodologies hold that a business case is something that a project manager inherits and that its responsibility sits with a sponsor, project executive or even a governance board of some sort. However the project manager can, and should, play a critical role in assessing and critiquing the business case to guard against project failure..
CHAPTER 2 Strategic Management and Project SelectionMore and m.docxcravennichole326
CHAPTER 2
Strategic Management and Project Selection
More and more, the accomplishment of important tasks and goals in organizations today is being achieved through the use of projects. The phrases we hear and read about daily at our work and in conversations with our colleagues, such as “management by projects” and “project management maturity,” reflect this increasing trend in our society. The explosively rapid adoption of such a powerful tool as project management to help organizations achieve their goals and objectives is certainly awesome. In addition to project management’s great utility when correctly used, however, its utility has also led to many misapplications. As frequently noted by both consultants and industry project experts, there are many projects that:
• fall outside the organization’s stated mission,
• are completely unrelated to the strategy and goals of the organization, or
• have excessive funding levels relative to their expected benefits.
In addition to the growth in the number of organizations adopting project management, there is also accelerating growth in the number of multiple, simultaneous, and often interrelated projects in organizations. Thus, the issue naturally arises as to how one manages all these projects. Are they all really projects? (It has been suggested that perhaps up to 80 percent of all “projects” are not actually projects at all, since they do not include the three project requirements for scope, budget, and due date.) Should we be undertaking all of them? Among those we should implement, what should be their priorities?
It is not unusual these days for organizations to be wrestling with hundreds of new projects. With so many ongoing projects it becomes difficult for smaller projects to get adequate support, or even the attention of senior management. Three particularly common problems in organizations trying to manage multiple projects are:
1. Delays in one project cause delays in other projects because of common resource needs or technological dependencies.
2. The inefficient use of corporate resources results in peaks and valleys of resource utilization.
3. Bottlenecks in resource availability or lack of required technological inputs result in project delays that depend on those scarce resources or technology.
As might be expected, the report card on organizational success with management by projects is not stellar. For example, an early research study (Thomas et al., 2001) found that 30 percent of all projects were canceled midstream, and over half of completed projects were up to 190 percent over budget and 220 percent late. This same study found that the primary motivation of organizations to improve and expand their project management processes was due to major troubled or failed projects, new upcoming mega-projects, or to meet competition or maintain their market share. Those firms that “bought” project management skills from consultants tended to see it as a “commodity.” These fi ...
Agile methodologies in_project_managementPravin Asar
In today's unpredictable markets, companies are feeling the squeeze to achieve more with fewer resources in shorter periods of time. In addition to controlling operational costs, IT is looking to increase the value of information to make the business more profitable. So, necessity to complete and develop projects with changeable requirement ,short period of time ,easily to manage risk , adaptability to changing market requirements has become undeniable main principles for each organization ‘s approach .While traditional methodologies or heavy weight with huge bulk of documentation and long term for planning and designing significantly affects the speed of developing process and customer satisfaction. Hence, using innovative methods for building project are important matter which has introduced in the recent years. Light weight methodologies evolve to meet changing technologies and new demands from users in dynamic business environment.
As a result, agile methodologies and practices emerged as an explicit attempt to more formally embrace higher rates of requirements change.
Agile development methodologies claim to go a step further in overcoming the limitations of traditional one and coping with high speed and high changes on relationships with customers and responsiveness to changes of business processes.
This paper is an evaluation of the agile development methodologies. Furthermore, it includes a discussion about the critical success factors of the agile methodologies, reasons for its failure. A case-study gives a real-world success story.
Project Management Change vs. Risk . pm-workshops.comMike Doherty, PMP
Change and Risk are similar in the sense that they both deal with uncertainty. In other words, they are both unknowns, which may or may not occur, and they can both have negative and positive impacts on a project. So how do we distinguish them?
In the simplest of terms, “risks” can and usually are identified at the beginning of a project, as well as throughout the project, as soon as any potential new risks are identified. However, “change” is unanticipated and, therefore, poses its own unique set of challenges. Whereas a risk, which you identified early in the project cycle, can be addressed through some sort of strategic response (mitigation, transfer, etc.) and monitored through pre-determined triggers, a “change” will occur spontaneously and needs to be addressed as quickly and effectively as possible.
Running head IMPLEMENTATION STRATEGIESIMPLEMENTATION STRATEGIES.docxcowinhelen
Running head: IMPLEMENTATION STRATEGIES
IMPLEMENTATION STRATEGIES 4
Implementation Strategies
Michael Boddie
Application Implementation
CMGT/445
Michael Goyden
December 11, 2017
Introduction
Project communication is very critical to the success of any project. It is also critical to key project management soft-skill. As a project manager, project communication is one deliverable that they are personally responsible for and it was of the largest influence over the failure or project success. There are main elements of project communications examples are project sponsors, customers, project team members, project manager, and project management office.
Project communication plan
The major objectives of a communication plan are; to encourage the use of project management best practices, ensure a consistent, give accurate and timely information about the project, and to promote and gain support for the project management improvements.
Table 1 below shows the target audience
Project stakeholders
Message
Delivery method
Delivery Frequency
Communicator
Project Sponsor
Project plans and status report
Meeting
Report sent via mail to project sponsor
Weekly
Project manager
Project core team
Project plans
Meeting
Weekly
Project manager
Executive management
Project briefing
Oral briefing and presentation of slides
Monthly
Biweekly
Project manager
Programmers
Project briefing
Oral briefing
Daily
Project manager
Users
Project status
Meeting and presentation slides
Weekly
Project manager
Communication message contents
A project plan shoes a guide of project execution and project control. Then document also shows approved scope of the project, the cost, and schedule. Project plans shows the current and future plans. The documents also shows project problems and issues. Project plan also shows planned project deliverables for the next period. The status report, keeps the key project stakeholders informed. It is shows status summary, status budget, status scope, accomplishment, issues, and project team members. Project briefing shows project issues and problems, it also shows goals of project management improvement, and project checklist (Project Management Institute, 2017).
Documentation Required
There are eight essential documents required for this project. First is a project charter. This document formally recognizes the project creation and the formal contract between project sponsors, project stakeholders, and commercial agreement. Project charter documents gathers aspects related to the contracting and the contacted example is the project name, the goals of the project and the needs that the project it serves. Project charter also shows a brief description of the project, feasibility study, the project products i.e. training manuals, supporting, and monitoring post release of the project. A project charter also shows the intermediate products whic ...
Application of system life cycle processes to large complex engineering and c...Bob Prieto
The complexity of megaprojects and programs continues to grow and with it the challenges of delivering ever larger and more complex programs. These large complex programs open the door to many new opportunities but also to increased challenges in delivery and sustainment throughout their lifecycle. Prior articles have described the open nature of this large complex program system and compared its attributes to many we find in the world of relativistic physics. These challenges must be addressed recognizing that they arise from a combination of physical, fiscal and human attributes in a realm of complexity which challenges the very foundations of project management theory.
This paper looks at hard systems aspects as contrasted with the soft system aspects more characteristic of an open system. Its purpose is to adapt a systems engineering framework associated with the hard closed elements of these large complex project systems without losing site of the overall open systems nature of large complex programs.
The systems life cycle process codified in ISO 15288 lends itself to application in large complex engineering and construction programs.
Engineering and construction project startupBob Prieto
This paper looks at engineering and construction project startup for three different project execution approaches. While specific to this industry, project professionals in other industries may find it is a good analog for their own efforts.
The paper underscores that:
• Large complex projects require strong foundations
• A day at the beginning of a project is just as valuable as a day at the end
• Strong project foundations are built during project startup
• Vertical startup is enabled by the use of a dedicated startup team
• Project startup should consider lessons learned on other projects
This paper addresses project startup for three general types of contracts:
• Pure design or engineering contracts typically performed for the Owner
• Design/build contracts performed for the Owner but recognizes that engineering may be undertaken by an engineering subcontractor within the D/B team
• Pure construction contract
I have previously written about the transition that I believe is necessary in project management thinking related to large complex projects. In those writing I describe the shift as analogous to the shift from Newtonian to relativistic physics. Subsequently, I have compared the nature of large complex programs to open systems. Reflecting back, classical project management theory was very much based on closed systems thinking and early applications of systems thinking to projects and engineering was also very much based on closed systems thinking.
This is analogous to the closed systems of Newton and Einstein’s correction of his original General Theory of Relativity through the introduction of the cosmological constant to close a system which he believed behaved mechanistically and not expanding. In hindsight the cosmological constant was not necessary but does suggest some properties of the universe and became relevant in explaining an accelerating expansion of the universe. Subsequently, there was at least one special case where the deterministic nature of a closed system broke down when considering General Relativity suggesting at least some open nature to this system.
Systems nature of large complex projectsBob Prieto
This paper explores the system characteristics and behaviors of large engineering and construction programs with a particular focus on those that would be characterized as complex. It recognizes the interrelated and interacting elements of both programs and projects as they strive to form a complex whole. Large complex programs and projects are not well bounded as classical project management theory as espoused by Taylor, Gantt and Fayol would have us believe but rather behave in both independent and interconnected ways in a dynamic systems environment.
Large complex programs demonstrate the evolutionary nature of all complex systems; uncertainty; and emergence that comes with human actions and interactions. They struggle from insufficient situational awareness, treating the program to be more well-bounded than reality would suggest and using simplified models to understand the complexity inherent in execution. Best practices from project management literature were typically not derived from such environments and, worse, have fallen short on other large complex programs and projects.
In the engineering and construction industry governance needs and requirements exist at
multiple levels. These include:
• Governmental and industry level governance (laws, regulations, codes, standards)
• Enterprise level (encompassing social (stakeholder), political, economic (market,
shareholder, financial institutions), cultural (corporate and national/local),
technological)
• Portfolio and programs
• Project
This paper focuses on the portfolio and program level, collectively referred to as program in
this paper.
Strengthen outcome based capital project deliveryBob Prieto
Over the course of my career I have looked at a number of underperforming mega-projects. In every instance there was a common element of underperformance, the lack of clarity around the strategic business outcomes to be accomplished. Conversely, some of the best performing projects exhibited high clarity of recognized and shared outcomes.
This paper looks at the imperative to continue the shift to outcomes based contracts versus more traditional output based contracting forms. This shift is discussed from the perspective of the engineering and construction industry in the United States but draws upon the experience in other countries and other sectors.
Today’s infrastructure and facilities are “smart”. At least that is our objective as we seek to enhance lifecycle performance and capital efficiency. These “smart” facilities transcend any given sector and bring new challenges to the engineering and construction industry. In some ways our more traditional projects are today outcomes focused or capabilities delivering IT projects with bits of concrete and steel wrapped around them!
This “smart” focus is not limited to just a technology and systems dimension but goes further, demanding an increased and increasing environmental, social and governance (ESG) focus as well. Together “smart” and ESG create a greatly expanded set of interfaces for program and project managers to manage.
Rework in Engineering & Construction ProjectsBob Prieto
This paper is focused on engineering and construction projects which will experience increased emphasis as nations increase their focus on economic stimulus and climate change. It deals narrowly with the inevitable rework these projects often experience and which contributes to the cost and schedule growth we all too often witness. The objective of this paper is to:
• Categorize rework factors into four broad categories – project, human, organizational and complexity
• Identify rework impacts not just on cost and schedule but importantly morale and trust.
• Recognize that strategies exist to reduce the potential for required rework
• Suggest four dozen control points.
In this paper I will attempt to:
• Outline some of the systems of systems challenges that we will likely face.
• Discuss the emergent nature of both the challenges as well as the potential resultant outcomes.
• Draw attention to some of the driving forces acting both on this system of systems as well as the national and sectoral programs that may emerge to respond to this challenge.
• Highlight some of the feedback loops which may exist or emerge from both apparent and hidden coupling.
• Discuss system of system risks, program risks and where our perceptions and appetite for such risks may change over time.
• Outline some particular challenges for program managers as they are engaged in addressing this challenge.
This paper builds on my beliefs that the prevailing theory of project management has failed us with respect to large complex projects. I have written extensively on this including highlighting that the assumptions of Gantt and Fayol fall short at scale and complexity. In this paper I examine the successes that underpin modern project management theory and seek to understand how the resulting approach to project management has failed to deliver comparable successes with regularity. As I explored these questions, I sought to understand the unique characteristics of the Atlas and Polaris missile programs; the subsequent institutionalization of the perceived success factors; and importantly, did perception and reality align. In other words, have we made an incomplete set of assumptions and institutionalized them?
Post Dorian Engineering & Construction in the BahamasBob Prieto
As the task of recovery and rebuilding in the Bahamas post hurricane Dorian begins, it is important to understand that it cannot be business as usual. The increasing frequency and severity of hurricanes, driven by global climate change, cannot be ignored. Building codes will have to be further strengthened and development in coastal areas rethought.
Debating project decisions in an ai enabled environmentBob Prieto
I had the opportunity to watch the first debate between AI powered IBM Debater and a recognized human expert debater. I will not spoil the outcome for those who have not yet watched the debate but I will underscore one key aspect - all learned more about both sides of the position as a result of the debate.
We have seen a construct for the management of large
complex projects laid out in the earlier chapters. In these chapters we will simply lay out some of the main concepts and
considerations for a practitioner. Each of these can be more
extensively developed.
In the world of physics, classical theory breaks down at
scale. Conventional project management theory similarly
seems to break down at scale. The theoretical construct I
have been building to in this book is very much focused on this
project realm where scale and complexity rule.
In developing this theoretical construct I have essentially
considered three simple hypotheses, the first of which is:
Large complex projects are not well served by
conventional project management theory and
practice.
This hypothesis was demonstrated at the outset of this
book and the differential behavior between large and
traditionally scaled projects has been previously noted.
The second hypothesis considered relates to the Theory of
Management as applied to the management of projects. In
simplest terms this hypothesis says:
- The Theory of Project Management does not draw
fully on the richness of the Theory of Management
This hypothesis is demonstrated as we explored the
extensions of the Theory of Management to address chaos and
complexity and the more limited extensions of project
management theory.
The third and final hypothesis we considered focused on
the Theory of Projects, positing:
Large complex projects have significantly different
attributes than the more traditional projects which
comprise the basis for classical project management
theory
This chapter summarizes various aspects of large
projects and provides a foundation to consider what a new
Theory of Project Management for large complex projects may
look like.
In this chapter we will look at a few of the project attributes
that we observe in large complex projects and suggest they
may serve as a basis for a neo-classical Theory of Large
Complex Projects.
Theory of Management of Large Complex Projects - Chapter 7Bob Prieto
The world of large complex projects is challenging to say the least with a majority of these projects significantly under performing. It is this weak performance regime that underpins the key premise of "Theory of Management of Large Complex Projects" – project management theory as it currently exists and is applied to large complex projects falls short, significantly short, of what these projects require.
I have decided to serialize this book for the benefit of those interested in better understanding and improving project performance. If you are interested in purchasing a copy of the 400 page paperback you may click on http://www.lulu.com/us/en/shop/bob-prieto/theory-of-management-of-large-complex-projects/paperback/product-22342232.html
Theory of Management of Large Complex Projects - Chapter 6Bob Prieto
The world of large complex projects is challenging to say the least with a majority of these projects significantly under performing. It is this weak performance regime that underpins the key premise of "Theory of Management of Large Complex Projects" – project management theory as it currently exists and is applied to large complex projects falls short, significantly short, of what these projects require.
I have decided to serialize this book for the benefit of those interested in better understanding and improving project performance. If you are interested in purchasing a copy of the 400 page paperback you may click on http://www.lulu.com/us/en/shop/bob-prieto/theory-of-management-of-large-complex-projects/paperback/product-22342232.html
Theory of Management of Large Complex Projects - Chapter 5Bob Prieto
The world of large complex projects is challenging to say the least with a majority of these projects significantly under performing. It is this weak performance regime that underpins the key premise of "Theory of Management of Large Complex Projects" – project management theory as it currently exists and is applied to large complex projects falls short, significantly short, of what these projects require.
I have decided to serialize this book for the benefit of those interested in better understanding and improving project performance. If you are interested in purchasing a copy of the 400 page paperback you may click on http://www.lulu.com/us/en/shop/bob-prieto/theory-of-management-of-large-complex-projects/paperback/product-22342232.html
Theory of Management of Large Complex Projects - Chapter 4Bob Prieto
The world of large complex projects is challenging to say the least with a majority of these projects significantly under performing. It is this weak performance regime that underpins the key premise of "Theory of Management of Large Complex Projects" – project management theory as it currently exists and is applied to large complex projects falls short, significantly short, of what these projects require.
I have decided to serialize this book for the benefit of those interested in better understanding and improving project performance. If you are interested in purchasing a copy of the 400 page paperback you may click on http://www.lulu.com/us/en/shop/bob-prieto/theory-of-management-of-large-complex-projects/paperback/product-22342232.html
Oprah Winfrey: A Leader in Media, Philanthropy, and Empowerment | CIO Women M...CIOWomenMagazine
This person is none other than Oprah Winfrey, a highly influential figure whose impact extends beyond television. This article will delve into the remarkable life and lasting legacy of Oprah. Her story serves as a reminder of the importance of perseverance, compassion, and firm determination.
Senior Project and Engineering Leader Jim Smith.pdfJim Smith
I am a Project and Engineering Leader with extensive experience as a Business Operations Leader, Technical Project Manager, Engineering Manager and Operations Experience for Domestic and International companies such as Electrolux, Carrier, and Deutz. I have developed new products using Stage Gate development/MS Project/JIRA, for the pro-duction of Medical Equipment, Large Commercial Refrigeration Systems, Appliances, HVAC, and Diesel engines.
My experience includes:
Managed customized engineered refrigeration system projects with high voltage power panels from quote to ship, coordinating actions between electrical engineering, mechanical design and application engineering, purchasing, production, test, quality assurance and field installation. Managed projects $25k to $1M per project; 4-8 per month. (Hussmann refrigeration)
Successfully developed the $15-20M yearly corporate capital strategy for manufacturing, with the Executive Team and key stakeholders. Created project scope and specifications, business case, ROI, managed project plans with key personnel for nine consumer product manufacturing and distribution sites; to support the company’s strategic sales plan.
Over 15 years of experience managing and developing cost improvement projects with key Stakeholders, site Manufacturing Engineers, Mechanical Engineers, Maintenance, and facility support personnel to optimize pro-duction operations, safety, EHS, and new product development. (BioLab, Deutz, Caire)
Experience working as a Technical Manager developing new products with chemical engineers and packaging engineers to enhance and reduce the cost of retail products. I have led the activities of multiple engineering groups with diverse backgrounds.
Great experience managing the product development of products which utilize complex electrical controls, high voltage power panels, product testing, and commissioning.
Created project scope, business case, ROI for multiple capital projects to support electrotechnical assembly and CPG goods. Identified project cost, risk, success criteria, and performed equipment qualifications. (Carrier, Electrolux, Biolab, Price, Hussmann)
Created detailed projects plans using MS Project, Gant charts in excel, and updated new product development in Jira for stakeholders and project team members including critical path.
Great knowledge of ISO9001, NFPA, OSHA regulations.
User level knowledge of MRP/SAP, MS Project, Powerpoint, Visio, Mastercontrol, JIRA, Power BI and Tableau.
I appreciate your consideration, and look forward to discussing this role with you, and how I can lead your company’s growth and profitability. I can be contacted via LinkedIn via phone or E Mail.
Jim Smith
678-993-7195
jimsmith30024@gmail.com
The Team Member and Guest Experience - Lead and Take Care of your restaurant team. They are the people closest to and delivering Hospitality to your paying Guests!
Make the call, and we can assist you.
408-784-7371
Foodservice Consulting + Design
The case study discusses the potential of drone delivery and the challenges that need to be addressed before it becomes widespread.
Key takeaways:
Drone delivery is in its early stages: Amazon's trial in the UK demonstrates the potential for faster deliveries, but it's still limited by regulations and technology.
Regulations are a major hurdle: Safety concerns around drone collisions with airplanes and people have led to restrictions on flight height and location.
Other challenges exist: Who will use drone delivery the most? Is it cost-effective compared to traditional delivery trucks?
Discussion questions:
Managerial challenges: Integrating drones requires planning for new infrastructure, training staff, and navigating regulations. There are also marketing and recruitment considerations specific to this technology.
External forces vary by country: Regulations, consumer acceptance, and infrastructure all differ between countries.
Demographics matter: Younger generations might be more receptive to drone delivery, while older populations might have concerns.
Stakeholders for Amazon: Customers, regulators, aviation authorities, and competitors are all stakeholders. Regulators likely hold the greatest influence as they determine the feasibility of drone delivery.
Artificial intelligence (AI) offers new opportunities to radically reinvent the way we do business. This study explores how CEOs and top decision makers around the world are responding to the transformative potential of AI.