RESUME
Diploma in Mechanical Engineering Professional
R.RAGUPATHI, D.M.E
#2/116 J.J Nagar,
BHEL Ancillary, Ranipet,
Vellore Dist - 632 406.
Tamil Nadu, INDIA.
Cell: +919787173446
E-mail: raghupathi.mech@gmail.com
Seeking a challenging position in a progressive organization and prove to be an asset for its effective
functioning and be a team player for the achievement of organization’s goals.
ACADEMIC PROFILE:
Qualification Institution Percentage Year of Passing
D.M.E (Diploma in
Mechanical Engg)
Shree Sitheswarar polytechnic
College ,Arcot.
75 2009
HSC(Maths)
S.R.K BHEL Higher Secondary school
Ranipet.
62 2007
SSLC
S.R.K BHEL Higher Secondary school
Ranipet.
75 2005
EXPERIENCE DETAILS:
PRESENT EXPERIENCE:
Company Name : M/s.Indira Industries,Ranipet,Tamilnadu
ISO 9001:2000 Company by DNV
A Joint Venture of G+H Montage Gmbh Germany
.
Indira Industries is an ISO 9001: 2000 Company having Collaboration with M/s. G+H
SCHALLSCHUTZ GmbH, Germany. Indira Industries manufactures Industrial Noise control system
like Air Intake system, exhaust system, silencers, Dampers (specialized in Diverter and Guillotine
damper) and Acoustical Enclosures for Gas Turbine Applications for all types of turbine makes like
GE, Siemens, Alstom, Ansaldo Caldaie, etc.
Designation: ENGINEER
Department: QA&QC.
Duration : 14th
March 2011 to Till date.
OBJECTIVE:
Job Profile:.
 INWARD INSPECTION
 INPROCESS INSPECTION `
 NDT CHECK
 SURFACE PREPARATION & PAINTING
 PACKING INSPECTION
 DOCUMENTATION
 INTERNAL QUALITY AUDIT FOR (ISO 9001:2008)
I am working with the following prestigious customers:
 M/s.GE Energy Products France,
• For Inlet ducts turbine model is 6000B, 9000E, 6FA
 M/s.GE Oil & Gas Italy,
• For Inlet duct & Exhaust turbine model is MS5001, 6001
 M/s.GE Aero Energy products,
• For Exhaust system Farras project turbine model is 7FA.
 M/s.BHEL-Hyd,
• For Enclosures project of Rayalseema, Santalidth.
 M/s.BHEL-Hwr,
• For Exhaust system project of Libya.
 M/s.Integral Coach Factory,
• For Side,Roof,End walls and underframes to LHB Coaches & Export Coaches to
Srilankan Railways.
I am working in following Products:
 Gas Turbine power plant accessories
 Combined Cycle Power Plant accessories
 Exhaust systems excludes dampers
 Inlet ducts for Gas turbines
 Plenum
 Air intake system parts.
 Enclosures for heavy duty machines, compressors.
 Silencers and silencer panels.
 Dampers
 Railway Coaches For ICF and RITES.
Roles and Responsibilities:
 Continuous monitoring and review of contracts with inter-departments.
 To raise/clarify the technical /deviation from Customer to Inter departments
 Update the project status and send to customer on regular basis
 Solving Technical Problems during Production, Trial assembly, Erection and attending
customer complaints.
 Co-ordination with Client / Third party agency
 Collection of Dues. Resolving and communicate the customer feedback/complaints.
 Internal audit for all departments (ISO 9001:2008)
PREVIOUS EXPERIENCE RECORD:
 M/S BHARAT HEAVY ELECTRICALS LTD, - RANIPET.
Designation: Apprentice Trainee
Department: Quality Control.
Duration: 01st
March 2010 to 28th
February 2011
Projects handled:
 RO-DM plant for Thermal power plant, GSPC-PIPAVAV - 2x350 MW.
 BECL Thermal Power plant,GSPC-2X250MW
 UKAI – 6 Thermal Power Plant, GSECL – 1X500 MW.
 SIKKA Thermal Power Plant, GSECL – 2X250 MW.
 GANDHI NAGAR R&M Thermal Power plant, GSECL – 2X120 MW
 OPG, Kutch, Thermal power plant – 2X150 MW.
SITE VISIT
Visited RO-DM Plant (Karnataka Power Corporation Limited) in Bellary Thermal
Power Station (1 X 500 MW), North Chennai(2 X 600MW), and Vallur.(3X500MW)
INDUSTRIAL EXPOSURE:
 Under gone INPLANT TRANING for one week at Greaves Cotton Ltd. in Ranipet -
Manufactures of IC Engines.
 Under gone INDUSTRIAL visit at Same Deutz Fahr Ltd in Ranipet – Complete
Tractor Manufacture.
 Under gone INDUSTRIAL visit at Integral Coach Factory (ICF) at Chennai – Rail
Wagons Manufactures.
SELF STRENGTH:
 Well organized, Disciplined and Independent.
 Flexible and able to adapt quickly to a changing and fast paced environment.
 A Team player with good interpersonal communication skills.
 Very good leadership Qualities.
 Willing to face any challenges.
PROJECT:
 PROJECT 1 : Done a project entitled “SOLAR CYCLE” during D.M.E. (Main
Project)
EXTRA CUIRRICULAR ACTIVITIES :
 National Cadet Crops – Grade B, Rank-CDT.
 Volunteer of National Service Scheme and organized two camps.
 Internal Quality Auditor Training Class attended at TQM Chennai.
 ASNT Level –II(NDT)
SPORTS:
 Cricket.
 Foot ball.
SOFT SKILLS:
 Operating system - Windows 98 ,2000,XP/Vista
 Drafting software - AutoCAD 2010, CADWorx.
 Modeling software - Pro-E. wildfire 2.0
HOBBIES:
 Pencil Drawing.
 Coin Collection's.
 Swimming.
Name : R.Ragupathi
Father Name : Mr.K.Rajaram (Late)
Date of Birth : 03rd
July 1990
Permanent Address : #2/116,J.J Nagar,
Malimedu,Ranipet,
Vellore - 632 406.
Marital Status : Single
Sex : Male
Nationality : Indian
Languages known : English - Speak, Read, Write
Tamil - Speak, Read, Write
DECLARATION
I hereby declare that all the above mentioned information is correct to best of my knowledge and
responsibility for the correctness of the mentioned particular..
PERSONAL PROFILE:
Place: Ranipet Yours faithfully,
Date: 24.01.2015 ( R.RAGUPATHI)
Place: Ranipet Yours faithfully,
Date: 24.01.2015 ( R.RAGUPATHI)

IQA RESUME

  • 1.
    RESUME Diploma in MechanicalEngineering Professional R.RAGUPATHI, D.M.E #2/116 J.J Nagar, BHEL Ancillary, Ranipet, Vellore Dist - 632 406. Tamil Nadu, INDIA. Cell: +919787173446 E-mail: raghupathi.mech@gmail.com Seeking a challenging position in a progressive organization and prove to be an asset for its effective functioning and be a team player for the achievement of organization’s goals. ACADEMIC PROFILE: Qualification Institution Percentage Year of Passing D.M.E (Diploma in Mechanical Engg) Shree Sitheswarar polytechnic College ,Arcot. 75 2009 HSC(Maths) S.R.K BHEL Higher Secondary school Ranipet. 62 2007 SSLC S.R.K BHEL Higher Secondary school Ranipet. 75 2005 EXPERIENCE DETAILS: PRESENT EXPERIENCE: Company Name : M/s.Indira Industries,Ranipet,Tamilnadu ISO 9001:2000 Company by DNV A Joint Venture of G+H Montage Gmbh Germany . Indira Industries is an ISO 9001: 2000 Company having Collaboration with M/s. G+H SCHALLSCHUTZ GmbH, Germany. Indira Industries manufactures Industrial Noise control system like Air Intake system, exhaust system, silencers, Dampers (specialized in Diverter and Guillotine damper) and Acoustical Enclosures for Gas Turbine Applications for all types of turbine makes like GE, Siemens, Alstom, Ansaldo Caldaie, etc. Designation: ENGINEER Department: QA&QC. Duration : 14th March 2011 to Till date. OBJECTIVE:
  • 2.
    Job Profile:.  INWARDINSPECTION  INPROCESS INSPECTION `  NDT CHECK  SURFACE PREPARATION & PAINTING  PACKING INSPECTION  DOCUMENTATION  INTERNAL QUALITY AUDIT FOR (ISO 9001:2008) I am working with the following prestigious customers:  M/s.GE Energy Products France, • For Inlet ducts turbine model is 6000B, 9000E, 6FA  M/s.GE Oil & Gas Italy, • For Inlet duct & Exhaust turbine model is MS5001, 6001  M/s.GE Aero Energy products, • For Exhaust system Farras project turbine model is 7FA.  M/s.BHEL-Hyd, • For Enclosures project of Rayalseema, Santalidth.  M/s.BHEL-Hwr, • For Exhaust system project of Libya.  M/s.Integral Coach Factory, • For Side,Roof,End walls and underframes to LHB Coaches & Export Coaches to Srilankan Railways. I am working in following Products:  Gas Turbine power plant accessories  Combined Cycle Power Plant accessories  Exhaust systems excludes dampers  Inlet ducts for Gas turbines  Plenum  Air intake system parts.  Enclosures for heavy duty machines, compressors.  Silencers and silencer panels.  Dampers  Railway Coaches For ICF and RITES. Roles and Responsibilities:  Continuous monitoring and review of contracts with inter-departments.  To raise/clarify the technical /deviation from Customer to Inter departments  Update the project status and send to customer on regular basis  Solving Technical Problems during Production, Trial assembly, Erection and attending customer complaints.  Co-ordination with Client / Third party agency  Collection of Dues. Resolving and communicate the customer feedback/complaints.
  • 3.
     Internal auditfor all departments (ISO 9001:2008) PREVIOUS EXPERIENCE RECORD:  M/S BHARAT HEAVY ELECTRICALS LTD, - RANIPET. Designation: Apprentice Trainee Department: Quality Control. Duration: 01st March 2010 to 28th February 2011 Projects handled:  RO-DM plant for Thermal power plant, GSPC-PIPAVAV - 2x350 MW.  BECL Thermal Power plant,GSPC-2X250MW  UKAI – 6 Thermal Power Plant, GSECL – 1X500 MW.  SIKKA Thermal Power Plant, GSECL – 2X250 MW.  GANDHI NAGAR R&M Thermal Power plant, GSECL – 2X120 MW  OPG, Kutch, Thermal power plant – 2X150 MW. SITE VISIT Visited RO-DM Plant (Karnataka Power Corporation Limited) in Bellary Thermal Power Station (1 X 500 MW), North Chennai(2 X 600MW), and Vallur.(3X500MW) INDUSTRIAL EXPOSURE:  Under gone INPLANT TRANING for one week at Greaves Cotton Ltd. in Ranipet - Manufactures of IC Engines.  Under gone INDUSTRIAL visit at Same Deutz Fahr Ltd in Ranipet – Complete Tractor Manufacture.  Under gone INDUSTRIAL visit at Integral Coach Factory (ICF) at Chennai – Rail Wagons Manufactures. SELF STRENGTH:  Well organized, Disciplined and Independent.  Flexible and able to adapt quickly to a changing and fast paced environment.  A Team player with good interpersonal communication skills.  Very good leadership Qualities.  Willing to face any challenges. PROJECT:
  • 4.
     PROJECT 1: Done a project entitled “SOLAR CYCLE” during D.M.E. (Main Project) EXTRA CUIRRICULAR ACTIVITIES :  National Cadet Crops – Grade B, Rank-CDT.  Volunteer of National Service Scheme and organized two camps.  Internal Quality Auditor Training Class attended at TQM Chennai.  ASNT Level –II(NDT) SPORTS:  Cricket.  Foot ball. SOFT SKILLS:  Operating system - Windows 98 ,2000,XP/Vista  Drafting software - AutoCAD 2010, CADWorx.  Modeling software - Pro-E. wildfire 2.0 HOBBIES:  Pencil Drawing.  Coin Collection's.  Swimming. Name : R.Ragupathi Father Name : Mr.K.Rajaram (Late) Date of Birth : 03rd July 1990 Permanent Address : #2/116,J.J Nagar, Malimedu,Ranipet, Vellore - 632 406. Marital Status : Single Sex : Male Nationality : Indian Languages known : English - Speak, Read, Write Tamil - Speak, Read, Write DECLARATION I hereby declare that all the above mentioned information is correct to best of my knowledge and responsibility for the correctness of the mentioned particular.. PERSONAL PROFILE:
  • 5.
    Place: Ranipet Yoursfaithfully, Date: 24.01.2015 ( R.RAGUPATHI)
  • 6.
    Place: Ranipet Yoursfaithfully, Date: 24.01.2015 ( R.RAGUPATHI)