SlideShare a Scribd company logo
the company you want to do business with
The Benefits of Ferris Independent Suspension
The overview
There are seven key points (sweet spots) to
consider when assessing Ferris’ independent
suspension.
They are summarised in the following slides
and covered in detail later in this course.
The Seven Sweet Spots
1 Productivity
• You can mow for longer, legally
The Seven Sweet Spots
1 Productivity
2 Accuracy
• All the steering wheels are on the ground, all the time
The Seven Sweet Spots
1 Productivity
2 Accuracy
3 Safety
• All the braking wheels are on the ground, all the time
The Seven Sweet Spots
1 Productivity
2 Accuracy
3 Safety
4 Cutting Quality
• The cutting deck floats level with the ground at all
times
The Seven Sweet Spots
1 Productivity
2 Accuracy
3 Safety
4 Cutting Quality
5 Reliability
• A new 4-year warranty on independent suspension
parts
The Seven Sweet Spots
1 Productivity
2 Accuracy
3 Safety
4 Cutting Quality
5 Reliability
6 Unique
• Only available from Ferris
The Seven Sweet Spots
1 Productivity
2 Accuracy
3 Safety
4 Cutting Quality
5 Reliability
6 Unique
7 Chassis life
• Suspension reduces chassis stress
The Seven Sweet Spots
Productivity
The Health & Safety Executive (HSE) stipulates
how long a machine can be used each day
based on how much vibration it generates.
Two vibration measurements affect mowers:
• Whole Body Vibration (WBV)
• Hand Arm Vibration (HAV)
Lower vibration, longer hours
Independent suspension dramatically reduces
Whole Body Vibration.
By reducing vibration, Ferris ride-on mowers
can legally be used for longer than many
other mowers.
Lower vibration, longer hours
Local Authorities are especially conscious of
HSE recommendations. It is cheaper and more
responsible to follow HSE recommendations
than face litigation from injured staff.
Lower vibration, longer hours
The HSE publish calculators that specify how
long a machine can be used based on its
vibration.
Proving the point
Whole Body Vibration calculator
• www.hse.gov.uk/vibration/wbv/calculator.htm
Proving the point
Hand Arm Vibration calculator
• www.hse.gov.uk/vibration/hav/vibrationcalc.htm
Proving the point
The results to focus on are:
• Exposure Action Value (EAV)
• Exposure Limit Value (ELV)
These numbers illustrate the amount of
vibration an operator has been subjected to
during a day’s work.
Proving the point
Exposure Action Value (EAV)
• If a mower exceeds this value during a day the owner is
advised to show they have assessed the risk to the
operator and taken necessary precautions.
A mower with independent suspension
vibrates less so it can be used longer before
reaching the EAV.
Proving the point
Exposure Limit Value (ELV)
• The operator must stop using a machine once this
value has been reached.
A mower with independent suspension
vibrates less so it can be used longer before
reaching the ELV.
Proving the point
Productivity summary
Independent
suspension
Less vibration
Longer
working hours
Higher
productivity
Reduced costs
Accuracy
Independent suspension keeps the drive
wheels on the ground.
Wheels on the ground can steer the mower.
Wheels in the air can’t.
Better steering, more accuracy
Safety
Independent suspension keeps the braking
wheels on the ground. This can become
critical when loading and unloading mowers.
Wheels on the ground can stop the mower.
Wheels in the air can’t.
Effective braking, enhanced safety
Cutting quality
The cutting deck floats with the wheels not
the mower’s main chassis.
As the wheels follow the terrain, so does the
cutting deck.
Floating deck, better cut
Reliability
All new Ferris ride-on mowers have a 4-year
warranty on the independent suspension
parts.
This covers the lifetime of most Local
Authority contracts.
This is in addition to standard warranty.
4-year warranty
Unique
Ferris is the only manufacturer to offer all-
wheel independent suspension.
If you want the advantages independent
suspension brings, there’s only one option.
Only with Ferris
Chassis life
All-round independent suspension extends
the working life of a mower by reducing three
types of chassis stress:
• Torsional stress from uneven ground
• Jolts from holes, bumps and kerbs
• Vibration from general use
Less vibration, longer life

More Related Content

Similar to IPU: The benefits of Ferris independent suspension

Tyre Protector - Permanent Puncture Prevention
Tyre Protector - Permanent Puncture PreventionTyre Protector - Permanent Puncture Prevention
Tyre Protector - Permanent Puncture Prevention
Geoff24
 
Rex and Link-Belt Spherical Roller Bearing Units Rexnord
Rex and Link-Belt Spherical Roller Bearing Units RexnordRex and Link-Belt Spherical Roller Bearing Units Rexnord
Rex and Link-Belt Spherical Roller Bearing Units Rexnord
Arve
 
Monitoring plain bearings with ultrasound
Monitoring plain bearings with ultrasoundMonitoring plain bearings with ultrasound
Monitoring plain bearings with ultrasound
Barrak Al Fares
 
Bearings and lubrications
Bearings and lubricationsBearings and lubrications
Bearings and lubrications
Muhammad Nadeem
 
Gear Fundamentals & _Failure Analysis.pdf
Gear Fundamentals & _Failure Analysis.pdfGear Fundamentals & _Failure Analysis.pdf
Gear Fundamentals & _Failure Analysis.pdf
Ziad Salem
 
2016_03_SF Product Presentation
2016_03_SF Product Presentation2016_03_SF Product Presentation
2016_03_SF Product PresentationGary Ballinger
 
A1.pdf
A1.pdfA1.pdf
BRAKES PPT.........................................
BRAKES PPT.........................................BRAKES PPT.........................................
BRAKES PPT.........................................
ayushambadare99
 
Alignment.pptx
Alignment.pptxAlignment.pptx
Alignment.pptx
syedmuhammedarifain
 
suspension system.ppt
suspension system.pptsuspension system.ppt
suspension system.ppt
RAMESHKUMARB6
 
Wind turbine grease sampling and analysis
Wind turbine grease sampling and analysisWind turbine grease sampling and analysis
Wind turbine grease sampling and analysis
Rich Wurzbach
 
universal joint
universal jointuniversal joint
universal joint
akmalzuhri96
 
Gen iii aluminumnewarcnocontrols
Gen iii aluminumnewarcnocontrolsGen iii aluminumnewarcnocontrols
Gen iii aluminumnewarcnocontrols
Don Neubauer
 
Internship.pptx
Internship.pptxInternship.pptx
Internship.pptx
EphremAbabiya1
 
Mech disc brakes ppt
Mech disc brakes  pptMech disc brakes  ppt
Mech disc brakes ppt
rockboy1999
 
Unit 3 : Wheels,Tyre and Braking System
Unit 3 : Wheels,Tyre and Braking SystemUnit 3 : Wheels,Tyre and Braking System
Unit 3 : Wheels,Tyre and Braking System
Vishal Niphade
 
Wheel Safety, Inspection, & Maintenance
Wheel Safety, Inspection, & MaintenanceWheel Safety, Inspection, & Maintenance
Wheel Safety, Inspection, & Maintenance
OTR Wheel Engineering, Inc.
 
Principles Of Lubrication
Principles Of LubricationPrinciples Of Lubrication

Similar to IPU: The benefits of Ferris independent suspension (20)

Tyre Protector - Permanent Puncture Prevention
Tyre Protector - Permanent Puncture PreventionTyre Protector - Permanent Puncture Prevention
Tyre Protector - Permanent Puncture Prevention
 
Rex and Link-Belt Spherical Roller Bearing Units Rexnord
Rex and Link-Belt Spherical Roller Bearing Units RexnordRex and Link-Belt Spherical Roller Bearing Units Rexnord
Rex and Link-Belt Spherical Roller Bearing Units Rexnord
 
Monitoring plain bearings with ultrasound
Monitoring plain bearings with ultrasoundMonitoring plain bearings with ultrasound
Monitoring plain bearings with ultrasound
 
Important alignment
Important alignmentImportant alignment
Important alignment
 
Bearings and lubrications
Bearings and lubricationsBearings and lubrications
Bearings and lubrications
 
Tyre Secure PPT
Tyre Secure PPTTyre Secure PPT
Tyre Secure PPT
 
Gear Fundamentals & _Failure Analysis.pdf
Gear Fundamentals & _Failure Analysis.pdfGear Fundamentals & _Failure Analysis.pdf
Gear Fundamentals & _Failure Analysis.pdf
 
2016_03_SF Product Presentation
2016_03_SF Product Presentation2016_03_SF Product Presentation
2016_03_SF Product Presentation
 
A1.pdf
A1.pdfA1.pdf
A1.pdf
 
BRAKES PPT.........................................
BRAKES PPT.........................................BRAKES PPT.........................................
BRAKES PPT.........................................
 
Alignment.pptx
Alignment.pptxAlignment.pptx
Alignment.pptx
 
suspension system.ppt
suspension system.pptsuspension system.ppt
suspension system.ppt
 
Wind turbine grease sampling and analysis
Wind turbine grease sampling and analysisWind turbine grease sampling and analysis
Wind turbine grease sampling and analysis
 
universal joint
universal jointuniversal joint
universal joint
 
Gen iii aluminumnewarcnocontrols
Gen iii aluminumnewarcnocontrolsGen iii aluminumnewarcnocontrols
Gen iii aluminumnewarcnocontrols
 
Internship.pptx
Internship.pptxInternship.pptx
Internship.pptx
 
Mech disc brakes ppt
Mech disc brakes  pptMech disc brakes  ppt
Mech disc brakes ppt
 
Unit 3 : Wheels,Tyre and Braking System
Unit 3 : Wheels,Tyre and Braking SystemUnit 3 : Wheels,Tyre and Braking System
Unit 3 : Wheels,Tyre and Braking System
 
Wheel Safety, Inspection, & Maintenance
Wheel Safety, Inspection, & MaintenanceWheel Safety, Inspection, & Maintenance
Wheel Safety, Inspection, & Maintenance
 
Principles Of Lubrication
Principles Of LubricationPrinciples Of Lubrication
Principles Of Lubrication
 

Recently uploaded

Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
Jayaprasanna4
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 

Recently uploaded (20)

Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
ethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.pptethical hacking-mobile hacking methods.ppt
ethical hacking-mobile hacking methods.ppt
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 

IPU: The benefits of Ferris independent suspension

  • 1. the company you want to do business with The Benefits of Ferris Independent Suspension
  • 3. There are seven key points (sweet spots) to consider when assessing Ferris’ independent suspension. They are summarised in the following slides and covered in detail later in this course. The Seven Sweet Spots
  • 4. 1 Productivity • You can mow for longer, legally The Seven Sweet Spots
  • 5. 1 Productivity 2 Accuracy • All the steering wheels are on the ground, all the time The Seven Sweet Spots
  • 6. 1 Productivity 2 Accuracy 3 Safety • All the braking wheels are on the ground, all the time The Seven Sweet Spots
  • 7. 1 Productivity 2 Accuracy 3 Safety 4 Cutting Quality • The cutting deck floats level with the ground at all times The Seven Sweet Spots
  • 8. 1 Productivity 2 Accuracy 3 Safety 4 Cutting Quality 5 Reliability • A new 4-year warranty on independent suspension parts The Seven Sweet Spots
  • 9. 1 Productivity 2 Accuracy 3 Safety 4 Cutting Quality 5 Reliability 6 Unique • Only available from Ferris The Seven Sweet Spots
  • 10. 1 Productivity 2 Accuracy 3 Safety 4 Cutting Quality 5 Reliability 6 Unique 7 Chassis life • Suspension reduces chassis stress The Seven Sweet Spots
  • 12. The Health & Safety Executive (HSE) stipulates how long a machine can be used each day based on how much vibration it generates. Two vibration measurements affect mowers: • Whole Body Vibration (WBV) • Hand Arm Vibration (HAV) Lower vibration, longer hours
  • 13. Independent suspension dramatically reduces Whole Body Vibration. By reducing vibration, Ferris ride-on mowers can legally be used for longer than many other mowers. Lower vibration, longer hours
  • 14. Local Authorities are especially conscious of HSE recommendations. It is cheaper and more responsible to follow HSE recommendations than face litigation from injured staff. Lower vibration, longer hours
  • 15. The HSE publish calculators that specify how long a machine can be used based on its vibration. Proving the point
  • 16. Whole Body Vibration calculator • www.hse.gov.uk/vibration/wbv/calculator.htm Proving the point
  • 17. Hand Arm Vibration calculator • www.hse.gov.uk/vibration/hav/vibrationcalc.htm Proving the point
  • 18. The results to focus on are: • Exposure Action Value (EAV) • Exposure Limit Value (ELV) These numbers illustrate the amount of vibration an operator has been subjected to during a day’s work. Proving the point
  • 19. Exposure Action Value (EAV) • If a mower exceeds this value during a day the owner is advised to show they have assessed the risk to the operator and taken necessary precautions. A mower with independent suspension vibrates less so it can be used longer before reaching the EAV. Proving the point
  • 20. Exposure Limit Value (ELV) • The operator must stop using a machine once this value has been reached. A mower with independent suspension vibrates less so it can be used longer before reaching the ELV. Proving the point
  • 23. Independent suspension keeps the drive wheels on the ground. Wheels on the ground can steer the mower. Wheels in the air can’t. Better steering, more accuracy
  • 25. Independent suspension keeps the braking wheels on the ground. This can become critical when loading and unloading mowers. Wheels on the ground can stop the mower. Wheels in the air can’t. Effective braking, enhanced safety
  • 27. The cutting deck floats with the wheels not the mower’s main chassis. As the wheels follow the terrain, so does the cutting deck. Floating deck, better cut
  • 29. All new Ferris ride-on mowers have a 4-year warranty on the independent suspension parts. This covers the lifetime of most Local Authority contracts. This is in addition to standard warranty. 4-year warranty
  • 31. Ferris is the only manufacturer to offer all- wheel independent suspension. If you want the advantages independent suspension brings, there’s only one option. Only with Ferris
  • 33. All-round independent suspension extends the working life of a mower by reducing three types of chassis stress: • Torsional stress from uneven ground • Jolts from holes, bumps and kerbs • Vibration from general use Less vibration, longer life