Introduction to The Diel Group
March 2009


Prepared for:




R eal Wo r ld M an ag em en t C o n su lt in g




Copyright © 2009 by The Diel Group, Inc.
Agenda



         •   Background: The Diel Group
              – Our Business Model
              – Our Offerings
              – Our Expertise

         •   Selected Biographies

         •   Next Steps




                                          Page 1
Background: The Diel Group
Our Organization

The Diel Group forms the hub of a network of internal and external resources from which we
assemble teams to execute approaches we tailor specifically to meet your needs

   Members of our core team work with you to define and complete the engagement
     Our core team is made up of highly-experienced industry and consulting veterans
     We fill a role similar to that of an independent film producer – to qualify and define the opportunity,
     assemble a team with the particular skills required, and oversee delivery
     The Diel Group maintains a broad network of resources from which to build our teams and provides
     the methodologies and tools required for the project
     Like independent film producers, we believe that this model better enables us to cost effectively
     deliver the high-quality, tailored work demanded by our clients
   Once the project is defined, we draw upon our network to form the full project team
     Partner/principal-level independent consultants
     Managers and staff members drawn from your firm
     A network of smaller professional services firms
     Teams and individuals from selected large consulting
     and professional services firms
     Financial services software development firms with
     on- and off-shore capabilities
     Financial and compliance system and service vendors
     Where appropriate, we also will support the recruiting and use of contract staff
   The Diel Group remains responsible for the quality and timeliness of the team s work

    Films were mass produced in large film factories and exhibited in studio-owned theater chains… In contrast to the major studios, the
    independent producers made hand-crafted quality films. Independents understood that masterpieces were best made by individual artists,
    not studio committees. Without the studio restrictions the independents were free to break new ground with such films as Snow White and
    the Seven Dwarves, Gone With the Wind, Fantasia, City Light, and Citizen Kane.

      From the Hollywood Renegades Archive, www.cobbles.com/simpp_archive

                                                                                                                                             Page 3
Our Value Proposition

Our structure recalls an earlier paradigm: professional services firms with capabilities and
business models more closely aligned with their clients needs and interests

   The integrated teams we form are composed of experienced, highly skilled experts
      We forgo the pyramid structure of larger firms to staff projects with industry and consulting veterans
      who can meaningfully contribute to the project s success
      You can avoid the expense, delays and frustrations imposed when your staff has to “educate” the
      consulting team – on our teams the experts do the work
      Experience enables our teams to create innovative, forward-looking recommendations tailored to
      your specific needs and capabilities
   Our core team members have extensive backgrounds in industry and consulting roles
      We re experienced at implementing projects in real-world corporate settings; we won t propose
     solutions that can t be approved or implemented
      Our teams quickly establish credibility and team with your staff and clients
      Deliverables are structured to add value, not to fit the limited skills of junior staff
      We recognize and plan for the organizational steps required to advance a project
   Our multidisciplinary teams leverage strategic, technical and operational expertise
      Because the tough problems span functional boundaries, our teams include the cross-functional
     expertise needed to integrate strategic, technical and business recommendations – we re not
     constrained by our firm s internal organizational considerations
      As projects move through conceptual, design, planning and implementation phases, the same team
     has the skills required to continue delivering value
   By controlling overhead, we are able to deliver exceptional value




                                                                                                          Page 4
Our Approach

Our approach is designed to efficiently move from analysis through planning into
implementation of a solution expressly tailored to your needs

    We draw upon our extensive project experience to create a customized approach for each
    project, one that is tailored to meet your specific objectives and constraints
       In creating a tailored approach, our leads leverage their real-world experience in creating and
       executing complex workplans for a wide variety of engagement topics and structures
       The selection of resources from internal and external sources to form the project team is done in
       consultation with you, not presented as a fait accompli
       Before the kickoff, we work with you to create and syndicate the structured workplan that will be
       used to define, manage and report on your project
       Our project management skills ensure disciplined execution of the project workplan
    Our action bias is reflected throughout our project plans, tools and teams
       We work with you to structure deliverables that are useful within your business context – we aren t
      constrained by pre-defined templates or the need to deliver PowerPoint decks to keep junior staff
      employed
       We take into account the reality of your business setting – including the requirement to gain
      approvals and budgeting, and your organization s execution capabilities
       Our recommendations are delivered in interactive senior-level working sessions
       Senior consultants remain available on an as-needed basis to update recommendations, plans,
      business models, etc. as you act upon our recommendations
    Diel Group engagements are performed by joint DGI / network / client teams
       By providing a team with seasoned leadership, we provide an effective way to leverage your
       internal expertise and staff to reduce costs while increasing project impact
       We have the skills and experience to lead all project phases from initial investigations through post-
       implementation reviews


                                                                                                             Page 5
Our Service Offerings

We focus on high impact engagements, leveraging our expertise across diverse disciplines
to design and execute customized engagement approaches that meet your specific needs

    The Diel Group specializes in traditional management consulting engagements
       Significant projects that have the potential for strategic impact
       Situations where your requirements and challenges are unique, not suited to cookie-cutter project
       plans or off-the-shelf solutions
       Projects that call for participation from, and interaction with, multiple disciplines within your firm;
       these often include several of the following:
         – Front-office Executives                           – Marketing and Sales
         – Operations                                       – Technology
         – Legal                                            – Compliance
         – Risk Management                                  – Transaction Execution
       Extended efforts that require significant program management expertise during both planning and
       execution phases
    Illustrative qualifications include:
        Re-engineering the organization, processes and systems of a securities clearing firm
        Definition of the role, organization and processes for a regional CIO of a global bank
        Analysis of operational and compliance risks for a large investment firm
        Assisting in the remediation of compliance issues in response to regulatory dictates
        Business strategy development, including business case preparation and implementation planning
        for systems, procedures and organization
        Structuring and operating program management offices for multiple complex initiatives
        Supporting the design and creation of new business units and product offerings
        Merger planning and post-merger integration at the business-unit level




                                                                                                                Page 6
Our Expertise

Each of our core team members has significant hands-on experience working in multiple
financial industry segments, dealing with diverse topics, and using varied toolsets
                                                                 Business Strategy
                                                    Corporate strategy development and execution
                                                         Alliance planning and development
                                                          Business unit strategic planning
                                                            Electronic commerce strategy
                                                                  Electronic markets




                                                                                                                   Operational Effectiveness
           Information Technology




                                    IT architecture
                                                                   Risk management               Cost reduction
                                    ROI improvement
                                                                Compliance management     Process reengineering
                                    Organizational design
                                                                 Program management   Performance improvement
                                    Technology alignment
                                                                  Change management     Organizational Advisory
                                    Process improvement
                                                                   Merger integration           Operational risk
                                    Systems selection
                                                                   Communications                   Compliance
                                    Technology risk
                                                                      E-Discovery                           STP
                                    e-Procurement




                                                                    Channels strategy
                                                                  Competitive analysis
                                                                New product development
                                                                Market entry and extension
                                                            Customer relationship management

                                                            Product and Market Strategy
                                                                                                                                               Page 7
Our Real World Experience

Our consultants have worked with many of the leading firms in financial services, and the
professional services firms that support them, both as consultants and as employees…




                                                                                      Page 8
Selected Biographies




                 Page 9
Ronald Diel, President
 Summary of experience:
  •   Mr. Diel, the founder and President of the Diel Group, has extensive experience in compliance, business strategy, financial systems,
      operations and organizational management in the banking, securities, asset management, and investment banking industries. He has been
      responsible for developing and implementing compliance, organizational, technology and business strategies and policies at major financial
      firms based on his line, consulting and legal experience.

 Selected project / engagement experience:
  •   Structured and initiated a firm-wide review of operational risks and processes for a large privately-held asset management firm. Designed
      procedures, tools and project plans, and led the analysis of the trading floor and account maintenance department; advising an internal team
      that will complete the analysis and procedural redesign of the entire firm.
  •   Led a team of over fifty consultants in the analysis and remediation of more than 12,000 customer files to achieve AML compliance at the
      private bank subsidiary of a major global bank, thereby meeting a FRB deadline imposed by a Memorandum of Understanding.
  •   Directed an engagement to assist a money-center bank in realigning a large team of bank-supervised temporaries, streamlining procedures,
      and reviewing the technology platforms being used to meet a FRB-mandated deadline for remediation of KYCs at their private banking unit.
  •   Oversaw the capture, analysis and redesign of new client KYC processes for the corporate banking division of a money-center bank to
      expedite the account opening process and reduce demands on front-office staff while achieving increased compliance levels.
  •   Assisted a client in reviewing and preparing over 10,000 KYC files for scanning into an on-line database.
  •   Responsible for identifying and developing a high-profile Software Asset Management service offering that is being marketed to leading enterprises
      in financial services, pharmacology, health care, communications, government and other sectors. Oversaw the definition of the service, development
      of a go-to-market strategy and materials, and the creation of our delivery capability.
  •   Oversaw the development of detailed operational, technology and policy recommendations to strengthen the compliance posture of a leading mutual
      fund and investment management firm. Reviewed current practices in light of recent changes in the structure and business activities of the firm,
      applicable regulatory requirements, and current examiner practices to identify and prioritize gaps, developed actionable recommendations and led a
      firm-wide prioritization process.
  •   Performed AML compliance reviews for delivery to the regulatory authorities overseeing the high-volume transaction processing banks affiliated with
      a leading financial services company.
  •   Oversaw the development of an enterprise AML surveillance architecture and implementation methodology for a major consulting firm; secured
      vendor alliances and developed marketing strategies and materials.
  •   Directed engagements to redesign and implement recommendations for AML organizations, procedures, training and technology at multiple
      financial services firms, including both KYC and surveillance functions.
  •   Led an engagement to review remediated KYC files and recommend changes in the client s review and remediation checklists and processes.
  •   Assisted a leading prime broker in revising their KYC risk rating policies, procedures and requirements for selected classes of high-risk clients.
  •   In conjunction with legal, compliance and operations staff, assisted in the formulation of policies, procedures and control activities for a new
      hedge fund being created by one of the leading global investment banks.




                                                                                                                                                   Page 10
Ronald Diel, President (continued)
 Selected project / engagement experience (continued):
  •   Led an effort that defined the roles, responsibilities and operating procedures for the Americas Regional CIO of a global bank, including
      regulatory, risk and operations oversight functions. Based on these definitions developed the organizational structure, job definitions and
      management agenda for the group along with regional KPIs and management reports.
  •   Directed the analysis, redesign and planning stages of a total transformation of a securities processing firm including the analysis and
      redesign of operations, technology, and staffing; effectively built the client team required to implement the redesigned environment.
  •   Senior team member in the development of a technology strategy and systems architecture for a major investment banking firm; responsible
      for detailed technical and strategic reviews of all significant technology projects in preparation for their presentation to the firm s executive
      committee.
  •   Development of a multi-channel deployment strategy to enable a large mutual funds firm to exploit a state-of-the-art investment analysis tool
      as a means for increasing assets under management; included preparing specific recommendations for the operational, marketing and
      financial changes required to implement the strategy.
  •   Selection of a technology platform for delivery of advisory services to affluent clients of a major mutual funds complex, including
      documentation of the business unit strategy, development of operations improvement plans and an economic analyses in support of the
      selection process.
  •   For a major investment management firm oversaw the design and outsourced development of an asset allocation product based on the
      Black-Litterman Model to be provided to high net worth clients through third-party banks; oversaw the rearchitecting of the quantitative
      investment model used in managing money for their institutional clients and mutual funds.
  •   Organizational transformation of the procurement function for a bulge bracket securities firm, including the redesign of their global
      organization and procedures to significantly increase effectiveness and to expedite deployment of an e-procurement infrastructure.
  •   Operationalizing an international electronic payments startup, including the development of organization structures, business procedures,
      technical infrastructure and relationships with key vendors and customers.
  •   Responsible for the overall technology environment of the asset management division of a bulge bracket securities firm, including the
      trading floor, portfolio and fund accounting, analytics and market data, compliance, marketing and telecommunications.
  •   Managed the design and implementation of multiple investment analysis systems including portfolio allocation and balancing, asset
      securitization models, and multi-factor equities models.
  •   Led requirements analysis and design of regulatory reporting and compliance monitoring systems and procedures at major investment
      management and securities firms.
  •   Managed the SEC-directed compliance review of the investment management group at a major investment banking firm as well as other
      internally-sponsored compliance reviews of financial firms.
  •   Responsible for infrastructure components (including market data, floor support, database administration and systems administration) for
      the rollout of distributed trading systems to over five hundred equity and derivatives traders at the largest broker/dealer in New York.
      Oversaw market data vendor analysis and relationships.
  •   Created and operated the program office for the development of a state of the art treasury workstation to be deployed to major corporate
      clients and financial institutions by a leading global bank.



                                                                                                                                                Page 11
Ronald Diel, President (continued)
 Selected project / engagement experience (continued):
  •   Formulation of business unit and alliance strategies to enable a global bank to expand U.S. check processing and related cash
      management services from a regional to a national basis, and program management of full implementation of the resulting plans.
  •   Senior manager in the team responsible for planning, overseeing and executing the expedited movement of more than fifty traders and their
      associated systems and feeds onto an existing trading floor in connection with the consolidation of trading floors following the acquisition of
      a foreign investment banking firm by a bulge bracket firm.
  •   Advised a global bank in the creation and operation of a program management office to oversee the technical, operational and governance
      changes required to comply with the Interagency White Paper issued by the Federal Reserve, the SEC and the OCC. Oversaw collection
      of regulatory, compliance and internal control requirements for the program.
  •   Directed the development, implementation and support of a thorough project process program adopted for all technology areas at a major
      securities firm, including the formation and operation of an internal project management / process consulting group.
  •   Researched regulatory issues, drafted required applications and coordinated the filing of documentation used to obtain regulatory approval
      for the acquisition of a large regional bank by a major North American Bank.
  •   Year 2000 program management initiatives at a leading European bank and a major U.S. insurance company, including the analysis and
      prioritization of their Y2K project portfolios; subsequently advised on implementation of structured project management processes for a
      major unit for one client, and the design of the global year-end transition management program / network for the other.
  •   Performed due diligence reviews of technology, staffing, and operations at several financial service vendors for potential acquirers.
  •   Managed the design, implementation, and support of PC-based and distributed portfolio accounting systems.
  •   Directed the design, development, and initial deployment in Russia of an ATM/POS network based on stored-value smart cards.

 Prior work experience:
  •   Previously, Mr. Diel was the Managing Director responsible for leading the Global Compliance practice within BearingPoint s Finance, Risk
      and Compliance Group. Prior to joining BearingPoint, he was a vice president in A.T. Kearney s Financial Institutions Group, where he led
      the firm's North American securities practice and was a founding member of their e-FIG group. Previously, he was a vice president in the
      Technology Strategy and Equity Trading Systems Groups at Merrill Lynch. He was also the Chief Technology Officer as a vice president at
      Goldman Sachs Asset Management. Mr. Diel also practiced banking and securities law as an associate at Sullivan & Cromwell.

 Education:
  •   Mr. Diel received a B.S. in Mathematics from the University of Wisconsin.      He earned his MBA at the University of Colorado and was
      awarded his J.D. from the University of Wisconsin.




                                                                                                                                              Page 12
Next Steps…
Next Steps



             •   Discussion




                              Page 14
The Diel Group is an innovative management consulting firm focusing on the financial services industry.
Our business model is derived from the one used by independent producers in the film industry.
Members of our core team act as the producers, working with our clients to identify and qualify
appropriate opportunities. As these opportunities develop, we tap into our large network of independent
experienced resources to involve project managers (directors), methodologists (writers), and subject
matter experts to create a tailored approach (script) that meets your needs. Once the approach is
approved, we use our network of resources to identify and secure the experienced team members (the
cast) who will be best able to complete your project. Each project team is a hand-picked, one-time
group assembled specifically for the project they will be doing.
Since we don t have a dedicated staff of employees, we are under no pressure to try to force fit
(miscast) resources onto a project, but are instead free to select the best fit. This enables us to create
teams that are highly experienced in the subject matter of the project and the practices in your business
area. Because the project staff members, including our producer-leads, do not have the same firm-
building responsibilities as senior members of larger firms, they won t disappear once the project has
been sold or spend their days on internal conference calls. The Diel Group, through our assigned
producer, remains responsible for the quality and timeliness of the team s work, actively working with
you to ensure we are meeting your needs. In short, you will have the undivided attention of the full
project team.
You will also benefit from our business model which does not incent us to build a project team pyramid
with numerous junior resources who conduct inefficient interviews that annoy your team (“what is a
preferred stock?”) and create PowerPoint slides because that fits their skill set rather than because the
presentations are required.
We find that our model meets the needs of increasingly sophisticated financial service clients who have
learned from experience that the success of a project team depends upon the capabilities of the team
presented, not on the imprimatur of the firm presenting them.
Additional information about The Diel Group is available upon request, at the address below.

                                        The Diel Group, Inc
                                    160 Riverside Blvd, Suite 8S
                                        New York, NY 10069
                                           (212) 419-4300

Introduction to The Diel Group

  • 1.
    Introduction to TheDiel Group March 2009 Prepared for: R eal Wo r ld M an ag em en t C o n su lt in g Copyright © 2009 by The Diel Group, Inc.
  • 2.
    Agenda • Background: The Diel Group – Our Business Model – Our Offerings – Our Expertise • Selected Biographies • Next Steps Page 1
  • 3.
  • 4.
    Our Organization The DielGroup forms the hub of a network of internal and external resources from which we assemble teams to execute approaches we tailor specifically to meet your needs Members of our core team work with you to define and complete the engagement Our core team is made up of highly-experienced industry and consulting veterans We fill a role similar to that of an independent film producer – to qualify and define the opportunity, assemble a team with the particular skills required, and oversee delivery The Diel Group maintains a broad network of resources from which to build our teams and provides the methodologies and tools required for the project Like independent film producers, we believe that this model better enables us to cost effectively deliver the high-quality, tailored work demanded by our clients Once the project is defined, we draw upon our network to form the full project team Partner/principal-level independent consultants Managers and staff members drawn from your firm A network of smaller professional services firms Teams and individuals from selected large consulting and professional services firms Financial services software development firms with on- and off-shore capabilities Financial and compliance system and service vendors Where appropriate, we also will support the recruiting and use of contract staff The Diel Group remains responsible for the quality and timeliness of the team s work Films were mass produced in large film factories and exhibited in studio-owned theater chains… In contrast to the major studios, the independent producers made hand-crafted quality films. Independents understood that masterpieces were best made by individual artists, not studio committees. Without the studio restrictions the independents were free to break new ground with such films as Snow White and the Seven Dwarves, Gone With the Wind, Fantasia, City Light, and Citizen Kane. From the Hollywood Renegades Archive, www.cobbles.com/simpp_archive Page 3
  • 5.
    Our Value Proposition Ourstructure recalls an earlier paradigm: professional services firms with capabilities and business models more closely aligned with their clients needs and interests The integrated teams we form are composed of experienced, highly skilled experts We forgo the pyramid structure of larger firms to staff projects with industry and consulting veterans who can meaningfully contribute to the project s success You can avoid the expense, delays and frustrations imposed when your staff has to “educate” the consulting team – on our teams the experts do the work Experience enables our teams to create innovative, forward-looking recommendations tailored to your specific needs and capabilities Our core team members have extensive backgrounds in industry and consulting roles We re experienced at implementing projects in real-world corporate settings; we won t propose solutions that can t be approved or implemented Our teams quickly establish credibility and team with your staff and clients Deliverables are structured to add value, not to fit the limited skills of junior staff We recognize and plan for the organizational steps required to advance a project Our multidisciplinary teams leverage strategic, technical and operational expertise Because the tough problems span functional boundaries, our teams include the cross-functional expertise needed to integrate strategic, technical and business recommendations – we re not constrained by our firm s internal organizational considerations As projects move through conceptual, design, planning and implementation phases, the same team has the skills required to continue delivering value By controlling overhead, we are able to deliver exceptional value Page 4
  • 6.
    Our Approach Our approachis designed to efficiently move from analysis through planning into implementation of a solution expressly tailored to your needs We draw upon our extensive project experience to create a customized approach for each project, one that is tailored to meet your specific objectives and constraints In creating a tailored approach, our leads leverage their real-world experience in creating and executing complex workplans for a wide variety of engagement topics and structures The selection of resources from internal and external sources to form the project team is done in consultation with you, not presented as a fait accompli Before the kickoff, we work with you to create and syndicate the structured workplan that will be used to define, manage and report on your project Our project management skills ensure disciplined execution of the project workplan Our action bias is reflected throughout our project plans, tools and teams We work with you to structure deliverables that are useful within your business context – we aren t constrained by pre-defined templates or the need to deliver PowerPoint decks to keep junior staff employed We take into account the reality of your business setting – including the requirement to gain approvals and budgeting, and your organization s execution capabilities Our recommendations are delivered in interactive senior-level working sessions Senior consultants remain available on an as-needed basis to update recommendations, plans, business models, etc. as you act upon our recommendations Diel Group engagements are performed by joint DGI / network / client teams By providing a team with seasoned leadership, we provide an effective way to leverage your internal expertise and staff to reduce costs while increasing project impact We have the skills and experience to lead all project phases from initial investigations through post- implementation reviews Page 5
  • 7.
    Our Service Offerings Wefocus on high impact engagements, leveraging our expertise across diverse disciplines to design and execute customized engagement approaches that meet your specific needs The Diel Group specializes in traditional management consulting engagements Significant projects that have the potential for strategic impact Situations where your requirements and challenges are unique, not suited to cookie-cutter project plans or off-the-shelf solutions Projects that call for participation from, and interaction with, multiple disciplines within your firm; these often include several of the following: – Front-office Executives – Marketing and Sales – Operations – Technology – Legal – Compliance – Risk Management – Transaction Execution Extended efforts that require significant program management expertise during both planning and execution phases Illustrative qualifications include: Re-engineering the organization, processes and systems of a securities clearing firm Definition of the role, organization and processes for a regional CIO of a global bank Analysis of operational and compliance risks for a large investment firm Assisting in the remediation of compliance issues in response to regulatory dictates Business strategy development, including business case preparation and implementation planning for systems, procedures and organization Structuring and operating program management offices for multiple complex initiatives Supporting the design and creation of new business units and product offerings Merger planning and post-merger integration at the business-unit level Page 6
  • 8.
    Our Expertise Each ofour core team members has significant hands-on experience working in multiple financial industry segments, dealing with diverse topics, and using varied toolsets Business Strategy Corporate strategy development and execution Alliance planning and development Business unit strategic planning Electronic commerce strategy Electronic markets Operational Effectiveness Information Technology IT architecture Risk management Cost reduction ROI improvement Compliance management Process reengineering Organizational design Program management Performance improvement Technology alignment Change management Organizational Advisory Process improvement Merger integration Operational risk Systems selection Communications Compliance Technology risk E-Discovery STP e-Procurement Channels strategy Competitive analysis New product development Market entry and extension Customer relationship management Product and Market Strategy Page 7
  • 9.
    Our Real WorldExperience Our consultants have worked with many of the leading firms in financial services, and the professional services firms that support them, both as consultants and as employees… Page 8
  • 10.
  • 11.
    Ronald Diel, President Summary of experience: • Mr. Diel, the founder and President of the Diel Group, has extensive experience in compliance, business strategy, financial systems, operations and organizational management in the banking, securities, asset management, and investment banking industries. He has been responsible for developing and implementing compliance, organizational, technology and business strategies and policies at major financial firms based on his line, consulting and legal experience. Selected project / engagement experience: • Structured and initiated a firm-wide review of operational risks and processes for a large privately-held asset management firm. Designed procedures, tools and project plans, and led the analysis of the trading floor and account maintenance department; advising an internal team that will complete the analysis and procedural redesign of the entire firm. • Led a team of over fifty consultants in the analysis and remediation of more than 12,000 customer files to achieve AML compliance at the private bank subsidiary of a major global bank, thereby meeting a FRB deadline imposed by a Memorandum of Understanding. • Directed an engagement to assist a money-center bank in realigning a large team of bank-supervised temporaries, streamlining procedures, and reviewing the technology platforms being used to meet a FRB-mandated deadline for remediation of KYCs at their private banking unit. • Oversaw the capture, analysis and redesign of new client KYC processes for the corporate banking division of a money-center bank to expedite the account opening process and reduce demands on front-office staff while achieving increased compliance levels. • Assisted a client in reviewing and preparing over 10,000 KYC files for scanning into an on-line database. • Responsible for identifying and developing a high-profile Software Asset Management service offering that is being marketed to leading enterprises in financial services, pharmacology, health care, communications, government and other sectors. Oversaw the definition of the service, development of a go-to-market strategy and materials, and the creation of our delivery capability. • Oversaw the development of detailed operational, technology and policy recommendations to strengthen the compliance posture of a leading mutual fund and investment management firm. Reviewed current practices in light of recent changes in the structure and business activities of the firm, applicable regulatory requirements, and current examiner practices to identify and prioritize gaps, developed actionable recommendations and led a firm-wide prioritization process. • Performed AML compliance reviews for delivery to the regulatory authorities overseeing the high-volume transaction processing banks affiliated with a leading financial services company. • Oversaw the development of an enterprise AML surveillance architecture and implementation methodology for a major consulting firm; secured vendor alliances and developed marketing strategies and materials. • Directed engagements to redesign and implement recommendations for AML organizations, procedures, training and technology at multiple financial services firms, including both KYC and surveillance functions. • Led an engagement to review remediated KYC files and recommend changes in the client s review and remediation checklists and processes. • Assisted a leading prime broker in revising their KYC risk rating policies, procedures and requirements for selected classes of high-risk clients. • In conjunction with legal, compliance and operations staff, assisted in the formulation of policies, procedures and control activities for a new hedge fund being created by one of the leading global investment banks. Page 10
  • 12.
    Ronald Diel, President(continued) Selected project / engagement experience (continued): • Led an effort that defined the roles, responsibilities and operating procedures for the Americas Regional CIO of a global bank, including regulatory, risk and operations oversight functions. Based on these definitions developed the organizational structure, job definitions and management agenda for the group along with regional KPIs and management reports. • Directed the analysis, redesign and planning stages of a total transformation of a securities processing firm including the analysis and redesign of operations, technology, and staffing; effectively built the client team required to implement the redesigned environment. • Senior team member in the development of a technology strategy and systems architecture for a major investment banking firm; responsible for detailed technical and strategic reviews of all significant technology projects in preparation for their presentation to the firm s executive committee. • Development of a multi-channel deployment strategy to enable a large mutual funds firm to exploit a state-of-the-art investment analysis tool as a means for increasing assets under management; included preparing specific recommendations for the operational, marketing and financial changes required to implement the strategy. • Selection of a technology platform for delivery of advisory services to affluent clients of a major mutual funds complex, including documentation of the business unit strategy, development of operations improvement plans and an economic analyses in support of the selection process. • For a major investment management firm oversaw the design and outsourced development of an asset allocation product based on the Black-Litterman Model to be provided to high net worth clients through third-party banks; oversaw the rearchitecting of the quantitative investment model used in managing money for their institutional clients and mutual funds. • Organizational transformation of the procurement function for a bulge bracket securities firm, including the redesign of their global organization and procedures to significantly increase effectiveness and to expedite deployment of an e-procurement infrastructure. • Operationalizing an international electronic payments startup, including the development of organization structures, business procedures, technical infrastructure and relationships with key vendors and customers. • Responsible for the overall technology environment of the asset management division of a bulge bracket securities firm, including the trading floor, portfolio and fund accounting, analytics and market data, compliance, marketing and telecommunications. • Managed the design and implementation of multiple investment analysis systems including portfolio allocation and balancing, asset securitization models, and multi-factor equities models. • Led requirements analysis and design of regulatory reporting and compliance monitoring systems and procedures at major investment management and securities firms. • Managed the SEC-directed compliance review of the investment management group at a major investment banking firm as well as other internally-sponsored compliance reviews of financial firms. • Responsible for infrastructure components (including market data, floor support, database administration and systems administration) for the rollout of distributed trading systems to over five hundred equity and derivatives traders at the largest broker/dealer in New York. Oversaw market data vendor analysis and relationships. • Created and operated the program office for the development of a state of the art treasury workstation to be deployed to major corporate clients and financial institutions by a leading global bank. Page 11
  • 13.
    Ronald Diel, President(continued) Selected project / engagement experience (continued): • Formulation of business unit and alliance strategies to enable a global bank to expand U.S. check processing and related cash management services from a regional to a national basis, and program management of full implementation of the resulting plans. • Senior manager in the team responsible for planning, overseeing and executing the expedited movement of more than fifty traders and their associated systems and feeds onto an existing trading floor in connection with the consolidation of trading floors following the acquisition of a foreign investment banking firm by a bulge bracket firm. • Advised a global bank in the creation and operation of a program management office to oversee the technical, operational and governance changes required to comply with the Interagency White Paper issued by the Federal Reserve, the SEC and the OCC. Oversaw collection of regulatory, compliance and internal control requirements for the program. • Directed the development, implementation and support of a thorough project process program adopted for all technology areas at a major securities firm, including the formation and operation of an internal project management / process consulting group. • Researched regulatory issues, drafted required applications and coordinated the filing of documentation used to obtain regulatory approval for the acquisition of a large regional bank by a major North American Bank. • Year 2000 program management initiatives at a leading European bank and a major U.S. insurance company, including the analysis and prioritization of their Y2K project portfolios; subsequently advised on implementation of structured project management processes for a major unit for one client, and the design of the global year-end transition management program / network for the other. • Performed due diligence reviews of technology, staffing, and operations at several financial service vendors for potential acquirers. • Managed the design, implementation, and support of PC-based and distributed portfolio accounting systems. • Directed the design, development, and initial deployment in Russia of an ATM/POS network based on stored-value smart cards. Prior work experience: • Previously, Mr. Diel was the Managing Director responsible for leading the Global Compliance practice within BearingPoint s Finance, Risk and Compliance Group. Prior to joining BearingPoint, he was a vice president in A.T. Kearney s Financial Institutions Group, where he led the firm's North American securities practice and was a founding member of their e-FIG group. Previously, he was a vice president in the Technology Strategy and Equity Trading Systems Groups at Merrill Lynch. He was also the Chief Technology Officer as a vice president at Goldman Sachs Asset Management. Mr. Diel also practiced banking and securities law as an associate at Sullivan & Cromwell. Education: • Mr. Diel received a B.S. in Mathematics from the University of Wisconsin. He earned his MBA at the University of Colorado and was awarded his J.D. from the University of Wisconsin. Page 12
  • 14.
  • 15.
    Next Steps • Discussion Page 14
  • 16.
    The Diel Groupis an innovative management consulting firm focusing on the financial services industry. Our business model is derived from the one used by independent producers in the film industry. Members of our core team act as the producers, working with our clients to identify and qualify appropriate opportunities. As these opportunities develop, we tap into our large network of independent experienced resources to involve project managers (directors), methodologists (writers), and subject matter experts to create a tailored approach (script) that meets your needs. Once the approach is approved, we use our network of resources to identify and secure the experienced team members (the cast) who will be best able to complete your project. Each project team is a hand-picked, one-time group assembled specifically for the project they will be doing. Since we don t have a dedicated staff of employees, we are under no pressure to try to force fit (miscast) resources onto a project, but are instead free to select the best fit. This enables us to create teams that are highly experienced in the subject matter of the project and the practices in your business area. Because the project staff members, including our producer-leads, do not have the same firm- building responsibilities as senior members of larger firms, they won t disappear once the project has been sold or spend their days on internal conference calls. The Diel Group, through our assigned producer, remains responsible for the quality and timeliness of the team s work, actively working with you to ensure we are meeting your needs. In short, you will have the undivided attention of the full project team. You will also benefit from our business model which does not incent us to build a project team pyramid with numerous junior resources who conduct inefficient interviews that annoy your team (“what is a preferred stock?”) and create PowerPoint slides because that fits their skill set rather than because the presentations are required. We find that our model meets the needs of increasingly sophisticated financial service clients who have learned from experience that the success of a project team depends upon the capabilities of the team presented, not on the imprimatur of the firm presenting them. Additional information about The Diel Group is available upon request, at the address below. The Diel Group, Inc 160 Riverside Blvd, Suite 8S New York, NY 10069 (212) 419-4300