Source: World Economic Forum | ForumBlog.org
1
The Internet of Things
Little by little, all electronic
devices are connecting to the
Internet, offering contextual
relevance and a user-friendly
experience, which lead to higher
adoption rates, connecting
every part of our lives.
businessinsider.com
From activity bands to smart
helmets and from smart clothing
to Google Glass, we will be fully
equipped with interconnected
devices powered by the
Internet.

2

Google Glass

Wearable Devices
3
Augmented Reality
Augmented reality – connecting
the physical and the virtual world
– opens up great opportunities
for user engagement. We will
basically be able to turn the
whole world into a digital
space where we can use the
power of technologies to discover
new digital horizons.

artistopensource.net
The future of technology will be
shaped by machine learning
algorithms that are able to learn
from the data they process
and can be trained to improve
as they process more data,
providing the information you
need when it is needed.

4

robodata.ir

Big Data &
Machine Learning
Algorithms
5
mHealth Technologies
Our mobile phones have turned into
our personal assistants, and with
the proliferation of low-cost mobile
devices in emerging economies,
mHealth technologies can now
improve the lives of millions and
make healthcare more
personalized and efficient.

4medapproved.com
6

The creative dimensions of the
new technological possibilities
are huge, ranging from
architecture to home design to
art and education, as well as
manufacturing and health care.
gizmodo.com

3D Printing
7
Intraday Deliveries
E-commerce players with highend warehouses, fast enterprise
resource planning and supply
chain management systems, and
their own fleet of vehicles will
change the way we buy online
with one-day delivery services.

Amazon
With the increase in the number
of mobile devices, there will be
more and more new payment
methods. Virtual currencies like
bitcoin are the future.

8

Bitcoin

Mobile Payment &
Virtual Currencies
9
Electric Cars
The electric cars of tomorrow will
be fully equipped with
computers, sensors and
wireless connections, allowing
cars to know more about the
driver.
Toyota Prius
The classroom is no longer
simply a mentoring space,
but is now an interactive
and inspirational learning
environment.
The ease of access and
certification offered by online
learning models are key to
making knowledge
accessible to all.

10

eLearning
| www.qnet.net

SOURCE: World Economic Forum
FORUMBLOG.ORG

Top Internet & Technology Trends for 2014

  • 1.
    Source: World EconomicForum | ForumBlog.org
  • 2.
    1 The Internet ofThings Little by little, all electronic devices are connecting to the Internet, offering contextual relevance and a user-friendly experience, which lead to higher adoption rates, connecting every part of our lives. businessinsider.com
  • 3.
    From activity bandsto smart helmets and from smart clothing to Google Glass, we will be fully equipped with interconnected devices powered by the Internet. 2 Google Glass Wearable Devices
  • 4.
    3 Augmented Reality Augmented reality– connecting the physical and the virtual world – opens up great opportunities for user engagement. We will basically be able to turn the whole world into a digital space where we can use the power of technologies to discover new digital horizons. artistopensource.net
  • 5.
    The future oftechnology will be shaped by machine learning algorithms that are able to learn from the data they process and can be trained to improve as they process more data, providing the information you need when it is needed. 4 robodata.ir Big Data & Machine Learning Algorithms
  • 6.
    5 mHealth Technologies Our mobilephones have turned into our personal assistants, and with the proliferation of low-cost mobile devices in emerging economies, mHealth technologies can now improve the lives of millions and make healthcare more personalized and efficient. 4medapproved.com
  • 7.
    6 The creative dimensionsof the new technological possibilities are huge, ranging from architecture to home design to art and education, as well as manufacturing and health care. gizmodo.com 3D Printing
  • 8.
    7 Intraday Deliveries E-commerce playerswith highend warehouses, fast enterprise resource planning and supply chain management systems, and their own fleet of vehicles will change the way we buy online with one-day delivery services. Amazon
  • 9.
    With the increasein the number of mobile devices, there will be more and more new payment methods. Virtual currencies like bitcoin are the future. 8 Bitcoin Mobile Payment & Virtual Currencies
  • 10.
    9 Electric Cars The electriccars of tomorrow will be fully equipped with computers, sensors and wireless connections, allowing cars to know more about the driver. Toyota Prius
  • 11.
    The classroom isno longer simply a mentoring space, but is now an interactive and inspirational learning environment. The ease of access and certification offered by online learning models are key to making knowledge accessible to all. 10 eLearning
  • 12.
    | www.qnet.net SOURCE: WorldEconomic Forum FORUMBLOG.ORG