Guidance for
Centre Internal Verification
Procedures
CIOB Level 3 Certificate in Supervising Construction Works
to Existing Buildings and Structures
CIOB Level 3 Diploma in Construction Site Supervisory Studies
CIOB Level 4 Certificate in Construction Site Management
CIOB Level 4 Diploma in Construction Site Management
CIOB Level 4 Graduate Conversion Certificate
THE CHARTERED INSTITUTE OF BUILDING
AWARDING ORGANSATION
2
Updated:Dec16/Final: 21.04.17
Next Full Annual Policy Review Date: December 2017
CONTENTS
Page
1. The internal verification process 3
2. Requirements for internal verification 3
3. Role of the internal verifier 3
4. Responsibilities of the internal verifier 4
5. Assignments set by the centre 5
6. Providing a verification plan 5
7. Sampling procedures and selection 5
7.1. Interim sampling 6
7.2. Summative sampling 6
8. Recording outcomes 6
9. Role of the assessor 6
10. Appendix 1: Internal Verification flow chart 8
11. Appendix 2: Sample Internal Verification plan 9
12. Appendix 3: Sample Internal Verification Report 10
13. Contact details 13
3
Updated:Dec16/Final: 21.04.17
Next Full Annual Policy Review Date: December 2017
1. THE INTERNAL VERIFICATION PROCESS
The internal verification system forms part of the CIOB Awarding Organisations’
quality assurance procedures and is concerned with management and consistency
of the assessment process within approved centres. The provision of these systems
is necessary to ensure continuous quality management arrangements are present
within centres. Internal verification relies on a number of integrated activities which
should be specified within the centres quality management documentation (required
as part of the Centre Approval Submission). A written internal verification procedure
approved by senior management should be in place along with schedules and
systems. Its implementation is to be monitored by the centre.
In order to ensure the process is delivering the necessary level and rigour of internal
verification, the CIOB will conduct annual inspections. These will be undertaken each
year by an appointed CIOB External Verifier.
2. REQUIREMENTS FOR INTERNAL VERIFICATION
The CIOB Awarding Organisation is committed to ensuring that the standards of its
qualifications are maintained at a national level. The centres provision of an effective
internal verification system is designed to achieve this requirement.
All centres are required to appoint an internal verifier as part of the CIOB quality
assurance process and to maintain managed and auditable records for production
during the external verification inspection.
3. ROLE OF THE INTERNAL VERIFIER
The Internal Verifier is responsible for developing and maintaining a quality
assurance system within the approved centre to ensure learners are assessed fairly
and accurately. The role is required to monitor and regulate the assessment process
and marking arrangements within the approved centre to ensure a consistent
approach. The development of a continuous and rigorous procedure is a key factor
in the management of risk, ensuring that when certification is claimed for a
candidate, it reliably reflects the achievement of national standards.
There are three main aspects of the internal verification role:
• Verifying assessment;
• Developing and supporting assessors;
• Managing quality of course delivery;
The Internal Verifier is appointed by the teaching institution and must ensure that
both assessors and teachers are suitably qualified to assess CIOB courses.
4
Updated:Dec16/Final: 21.04.17
Next Full Annual Policy Review Date: December 2017
Internal verifiers should be competent in the following areas:
• Delivery of the specific course modules;
• Have a comprehensive understanding of assessment and verification methods and
criteria;
• Have suitable industrial experience relating to course provision;
• Teaching qualifications and/or experience as appropriate.
Internal Verifiers and assessors should be ideally educated to level six in a
construction related discipline, such as honours degree or a level six vocational
qualification. The CIOB definition of construction management is the broad discipline
spanning all aspects of building in construction from design to demolition. As a
minimum, internal verifiers must hold a level four qualification in a construction
discipline and have at least three years of recent industry experience. Some
professional qualifications are recognised as comparable to level six and are
accepted as qualifying awards:
 Member or Fellow of the Chartered Institute of Building (CIOB)
 Fellow of the British Institute of Facilities Management (BIFM)
 Member of Fellow of the Royal Institute of Chartered Surveyors (RICS)
 Member or Fellow of the Institute of Civil Engineers (ICE)
 Member or Fellow of the Chartered Institute of Building Services Engineers
(CIBSE)
 Member or Fellow of the Chartered Institute of Civil Engineering Surveyors
(CICES)
 Member or Fellow of the Chartered Institute of Architectural Technologists
(CIAT)
 Member or Fellow of the Institution of Structural Engineers (IStructE)
4. RESPONSIBILITIES OF THE INTERNAL VERIFIER
The Internal Verifier will:
 Ensure that a schedule is in place and operational
 Check the quality of assessment instruments are fit for purpose
 Advise on the interpretation of the subject area
 Coordinate assessment arrangements
 Assure an effective system of recording learner achievement is in place
 Keep records of the verification process
 Liaise with awarding organisation external verifiers
 Provide advice and support to assessors on a regular basis, covering all
assessors and all units
5
Updated:Dec16/Final: 21.04.17
Next Full Annual Policy Review Date: December 2017
 Advise on the appropriateness of assessment evidence with regard to level,
sufficiency, authenticity, validity and consistency
 Use subject specialism to sample assessments to verify assessors’
judgements
 Arrange standardisation meetings
 Check the quality of assessment to ensure that it is consistent, fair and
reliable
 Ensure own assessment decisions are sampled by another internal verifier
when teaching on the qualification
 Monitor and advise on assessment decisions by sampling
 Give qualification team decisions and feedback on sampling
 Ensure appropriate action is taken when necessary
 Take part in the formal stages of an appeal
 Advise the qualification team on any training needs
 Provide feedback on aspects of the assessment system to the programme
team
5. ASSIGNMENTS SET BY THE CENTRE
Assignment briefs set or amended by the centre must be internally verified and
approved by the external verifier before they are distributed to the learners to ensure
they are fit for purpose meeting the required standards and learning outcomes.
6. PROVIDING A VERIFICATION PLAN
It is the internal verifier’s responsibility for developing an internal verification plan.
The plan for internal verification is essential and should cover two aspects:
1. Teaching timetable and allocation of units;
2. Details of students registrations and units being taken and when;
7. SAMPLING PROCEDURES AND SELECTION
When considering the size of the sample at the start of the course, your internal
verification plan should give you a clear indication of what should be appropriate.
Changes can be implemented at any time within the timescale of the plan, but the
sample should reflect an accurate picture of the quality of assessment in the centre.
Students work should be marked in accordance with the marking criteria. The
internal verifier should also ensure that tutor feedback to students is constructive and
assists students to gauge their abilities and progression.
6
Updated:Dec16/Final: 21.04.17
Next Full Annual Policy Review Date: December 2017
7.1. Interim Sampling
This procedure entails a review of the assessment process throughout the course,
including a review of candidates work before decisions have been made on any unit
and looking at course work with one or two completed units. This will also involve
checking the progress review report given to candidates by assessors. This will
enable the internal verifier to determine the quality of general guidance on
assessment and assessment planning.
The internal verification system will allow problems with assessment to be evaluated
at an early stage and identify assessor training or development needs.
A well-constructed sample should ensure that:
 The full range of assessment decisions made is covered
 External verifier or assessors feedback from previous years is taken into
account
 The experience of the assessor/tutor is taken into account
 The sample size is sufficient
7.2. Summative Sampling
This should involve a review of the decision-making process by the assessors and
determine how this was reached. An audit trail is required to ensure the assessor
has checked evidence provided, which should be:
Valid – relevant to standards;
Authentic – produced by the candidate;
Reliable – reflecting level of performance consistently demonstrated by the
candidate;
Sufficient – meets standards in FULL;
It is important that internal verification is conducted as an on-going process applied
throughout the duration of the course and not end-loaded. This ensures that internal
verification is benchmarked consistently throughout the period against student
performance.
8. RECORDING OUTCOMES
Internal verification details should be maintained within a course file for availability at
external verification. Actions should be discussed with the assessors and problems
highlighted. The internal verifier and assessor are required to sign the completed
report. Verification reports should also be discussed by the course team at meetings
with records of meetings being held within the course file. Centres are responsible
7
Updated:Dec16/Final: 21.04.17
Next Full Annual Policy Review Date: December 2017
for ensuring that internal verifier/assessment records are kept for five years after
certification.
9. ROLE OF THE ASSESSOR
The assessor is responsible for all assessed work relating to specified units within
the approved centre. The role is required to conform to the assessment process and
marking arrangements within the approved centre to ensure a consistent approach.
The development of a continuous and rigorous procedure is a key factor in the
management of risk, ensuring that when certification is claimed for a learner, it
reliably reflects the achievement of awarding organisations standards.
The main aspects of an assessment role are:
• Completing assessments within required timescales;
• Ensuring that marking and assessment criteria are in accordance with CIOB
procedures;
• Managing quality of course delivery;
• Ensure consistency of compulsory assignment work.
The assessor is appointed by the teaching institution. Assessors should be
competent in the following areas:
• Delivery of the specific course units
• Have a comprehensive understanding of assessment methods and criteria;
• Have suitable industrial experience relating to course provision;
• Teaching qualifications and/or experience as appropriate.
Assessors may also be internal verifiers, as long as they never internally verify their
own work.
Details of the grading and assessment criteria are contained within separate policy
documentation.
8
Updated:Dec16/Final: 21.04.17
Next Full Annual Policy Review Date: December 2017
10.APPENDIX 1: INTERNAL VERIFICATION FLOWCHART
Stage 1 Internal verifiers check:
Assessor qualifications
Assignment briefs
Stage 2
Stage 3
Make a verification plan
Select a sample
Verify student work
Record outcomes
Feedback to assessor
Assessor comments
Take necessary action
Make recommendations
Feedback to student
9
Updated:Dec16/Final: 21.04.17
Next Full Annual Policy Review Date: December 2017
11. APPENDIX 2: SAMPLE INTERNAL VERIFICATION PLAN
Course Title Awarding
Body
Course Tutor Internal
Verifier
Course Dates
Student 1
Student 2
Student 3
Student 4
Student 5
Student 6
Student 7
Student 8
N.B: If this is a new course or if any of the tutors have not taught on the course
before, it is good practice to internally verify all assessed pieces of work.
10
Updated:Dec16/Final: 21.04.17
Next Full Annual Policy Review Date: December 2017
12. APPENDIX 3: SAMPLE INTERNAL VERIFICATION REPORT
INTERNAL VERIFICATION REPORT ON ASSESSMENT DECISION FOR CIOB
QUALIFICATIONS
Name of Student:
Name of Assessor:
Name of Internal Verifier:
Qualification:
Unit Title: Number:
Type of evidence provided by the Candidate:
Sources of Evidence:
Assignment
Project
Report
Graphs
Video with rationale of methods to completion
Other please state:
11
Updated:Dec16/Final: 21.04.17
Next Full Annual Policy Review Date: December 2017
Assessment Decision:
Is the student evidence:
Valid Yes No
Reliable Yes No
Authentic Yes No
Sufficient Yes No
Does the student evidence show that all the required learning outcomes for knowledge have been
met and that there is sufficient evidence relating to this unit to merit the given grade?
Yes No
Is the assessment decision considered correct? Yes No
Action Points/Feedback to Assessor:
IV Feedback to Student:
Internal Verifier Signature: Date:
Assessor Signature: Date:
I confirm that all action points, as above have now been completed and all the evidence
requirements satisfied
Internal Verifier Signature: Date:
12
Updated:Dec16/Final: 21.04.17
Next Full Annual Policy Review Date: December 2017
Assessor Feedback
Date:
Student Feedback
Date:
Further Action Required:
Date:
During the course of the qualification, sampling from the assessors should cover the following as a
minimum:
 All assessors
 All units
 Work from every assignment
Not all learners are expected to be internally verified during the lifetime of the qualification, but should
any concerns arise then the size of the sample should be increased.
13
Updated:Dec16/Final: 21.04.17
Next Full Annual Policy Review Date: December 2017
13. CONTACT DETAILS
CIOB Awarding Organisation
The Chartered Institute of Building
1 Arlington Square
Downshire Way
Bracknell
Berkshire
RG12 1WA
Tel: +44 (0) 1344 630700
www.ciob.org.uk

More Related Content

Similar to Internal verification policy

NVQ Quality Assurance and Internal Verification Strategy
NVQ Quality Assurance and Internal Verification StrategyNVQ Quality Assurance and Internal Verification Strategy
NVQ Quality Assurance and Internal Verification StrategyThe Pathway Group
 
Quality assuring assessment guidelines for providers, revised 2013
Quality assuring assessment   guidelines for providers, revised 2013Quality assuring assessment   guidelines for providers, revised 2013
Quality assuring assessment guidelines for providers, revised 2013Ibrahim Khleifat
 
Quality assuring assessment guidelines for providers, revised 2013
Quality assuring assessment   guidelines for providers, revised 2013Quality assuring assessment   guidelines for providers, revised 2013
Quality assuring assessment guidelines for providers, revised 2013Ibrahim Khleifat
 
NCA PGR Session 7 May 02 2018
NCA PGR Session 7 May 02 2018NCA PGR Session 7 May 02 2018
NCA PGR Session 7 May 02 2018CHC Connecticut
 
NCA Residency Session 8 April 5 2017
NCA Residency Session 8 April 5 2017NCA Residency Session 8 April 5 2017
NCA Residency Session 8 April 5 2017CHC Connecticut
 
CBA_1_Introduction for social work class.pptx
CBA_1_Introduction for social work class.pptxCBA_1_Introduction for social work class.pptx
CBA_1_Introduction for social work class.pptxlinetnafuna
 
center guidence.pptx
center guidence.pptxcenter guidence.pptx
center guidence.pptxNoorulainKK
 
School Audit Check Points.docx
School Audit Check Points.docxSchool Audit Check Points.docx
School Audit Check Points.docxAnandPalSingh12
 
Internal Audit Training with different .pptx
Internal Audit Training with different .pptxInternal Audit Training with different .pptx
Internal Audit Training with different .pptxBonAlexisGuatato
 
Moderation workshop dietetics april 2017b
Moderation workshop dietetics april 2017bModeration workshop dietetics april 2017b
Moderation workshop dietetics april 2017bRita Ndagire Kizito
 
Template Opening Meeting Slides MSPO 17042024.pptx
Template Opening Meeting Slides MSPO 17042024.pptxTemplate Opening Meeting Slides MSPO 17042024.pptx
Template Opening Meeting Slides MSPO 17042024.pptxJamesJoeJoeseph
 
Bsbpmg505 manage project quality
Bsbpmg505 manage project qualityBsbpmg505 manage project quality
Bsbpmg505 manage project qualityasmits kharel
 
Pmp Certification
Pmp CertificationPmp Certification
Pmp Certificationturnerwife
 
SELF ASSESSMENT REPORT.pptx
SELF ASSESSMENT REPORT.pptxSELF ASSESSMENT REPORT.pptx
SELF ASSESSMENT REPORT.pptxssusera174fe1
 
Internal verification forms
Internal verification formsInternal verification forms
Internal verification formsIbrahim Khleifat
 
Internal audit procedure
Internal audit procedureInternal audit procedure
Internal audit procedurebhavikjariwala
 

Similar to Internal verification policy (20)

NVQ Quality Assurance and Internal Verification Strategy
NVQ Quality Assurance and Internal Verification StrategyNVQ Quality Assurance and Internal Verification Strategy
NVQ Quality Assurance and Internal Verification Strategy
 
Quality assuring assessment guidelines for providers, revised 2013
Quality assuring assessment   guidelines for providers, revised 2013Quality assuring assessment   guidelines for providers, revised 2013
Quality assuring assessment guidelines for providers, revised 2013
 
Quality assuring assessment guidelines for providers, revised 2013
Quality assuring assessment   guidelines for providers, revised 2013Quality assuring assessment   guidelines for providers, revised 2013
Quality assuring assessment guidelines for providers, revised 2013
 
NCA PGR Session 7 May 02 2018
NCA PGR Session 7 May 02 2018NCA PGR Session 7 May 02 2018
NCA PGR Session 7 May 02 2018
 
Atesol cp (1)
Atesol cp (1)Atesol cp (1)
Atesol cp (1)
 
NCA Residency Session 8 April 5 2017
NCA Residency Session 8 April 5 2017NCA Residency Session 8 April 5 2017
NCA Residency Session 8 April 5 2017
 
CBA_1_Introduction for social work class.pptx
CBA_1_Introduction for social work class.pptxCBA_1_Introduction for social work class.pptx
CBA_1_Introduction for social work class.pptx
 
center guidence.pptx
center guidence.pptxcenter guidence.pptx
center guidence.pptx
 
Joint Training & Certification Program for Materials Testers
Joint Training & Certification Program for Materials TestersJoint Training & Certification Program for Materials Testers
Joint Training & Certification Program for Materials Testers
 
Qms iso 9000
Qms iso 9000Qms iso 9000
Qms iso 9000
 
School Audit Check Points.docx
School Audit Check Points.docxSchool Audit Check Points.docx
School Audit Check Points.docx
 
Internal Audit Training with different .pptx
Internal Audit Training with different .pptxInternal Audit Training with different .pptx
Internal Audit Training with different .pptx
 
Moderation workshop dietetics april 2017b
Moderation workshop dietetics april 2017bModeration workshop dietetics april 2017b
Moderation workshop dietetics april 2017b
 
Template Opening Meeting Slides MSPO 17042024.pptx
Template Opening Meeting Slides MSPO 17042024.pptxTemplate Opening Meeting Slides MSPO 17042024.pptx
Template Opening Meeting Slides MSPO 17042024.pptx
 
Bsbpmg505 manage project quality
Bsbpmg505 manage project qualityBsbpmg505 manage project quality
Bsbpmg505 manage project quality
 
Pmp Certification
Pmp CertificationPmp Certification
Pmp Certification
 
Preview
PreviewPreview
Preview
 
SELF ASSESSMENT REPORT.pptx
SELF ASSESSMENT REPORT.pptxSELF ASSESSMENT REPORT.pptx
SELF ASSESSMENT REPORT.pptx
 
Internal verification forms
Internal verification formsInternal verification forms
Internal verification forms
 
Internal audit procedure
Internal audit procedureInternal audit procedure
Internal audit procedure
 

More from Ibrahim Khleifat

Ielts april 7th 2018 ielts listening
Ielts april 7th 2018 ielts listeningIelts april 7th 2018 ielts listening
Ielts april 7th 2018 ielts listeningIbrahim Khleifat
 
Ielts 2018.04.21 listening real excellent real
Ielts 2018.04.21 listening real excellent realIelts 2018.04.21 listening real excellent real
Ielts 2018.04.21 listening real excellent realIbrahim Khleifat
 
Ielts 2017.12.14 listening real excellent
Ielts 2017.12.14 listening real excellentIelts 2017.12.14 listening real excellent
Ielts 2017.12.14 listening real excellentIbrahim Khleifat
 
Ielts 2017.5.13 listening predict section 1
Ielts 2017.5.13 listening predict section 1Ielts 2017.5.13 listening predict section 1
Ielts 2017.5.13 listening predict section 1Ibrahim Khleifat
 
Ielts reading ancient literate signals proto writing in americas 2014
Ielts reading ancient literate signals   proto writing in americas 2014Ielts reading ancient literate signals   proto writing in americas 2014
Ielts reading ancient literate signals proto writing in americas 2014Ibrahim Khleifat
 
Ielts 2018.10.13 reading real uphere
Ielts 2018.10.13 reading real   uphereIelts 2018.10.13 reading real   uphere
Ielts 2018.10.13 reading real uphereIbrahim Khleifat
 
Right and left handedness in humans
Right and left handedness in humansRight and left handedness in humans
Right and left handedness in humansIbrahim Khleifat
 
John franklin the discovery of the slowness
John franklin the discovery of the slownessJohn franklin the discovery of the slowness
John franklin the discovery of the slownessIbrahim Khleifat
 
Certificate in assessing vocational acheivement textbook print
Certificate in assessing vocational acheivement textbook printCertificate in assessing vocational acheivement textbook print
Certificate in assessing vocational acheivement textbook printIbrahim Khleifat
 
Basics of motor control centers
Basics of motor control centersBasics of motor control centers
Basics of motor control centersIbrahim Khleifat
 
Engineering symbology-prints-and-drawings-handbook
Engineering symbology-prints-and-drawings-handbookEngineering symbology-prints-and-drawings-handbook
Engineering symbology-prints-and-drawings-handbookIbrahim Khleifat
 
The e learning-guilds-handbook-on-synchronous-e-learning
The e learning-guilds-handbook-on-synchronous-e-learningThe e learning-guilds-handbook-on-synchronous-e-learning
The e learning-guilds-handbook-on-synchronous-e-learningIbrahim Khleifat
 
Dc earth ground-measurement_ed1
Dc earth ground-measurement_ed1Dc earth ground-measurement_ed1
Dc earth ground-measurement_ed1Ibrahim Khleifat
 
Wireless charger for_low_power_devices_ excellent one same
Wireless charger for_low_power_devices_ excellent one sameWireless charger for_low_power_devices_ excellent one same
Wireless charger for_low_power_devices_ excellent one sameIbrahim Khleifat
 
Wirelesspowertransmission 141102061911-conversion-gate01
Wirelesspowertransmission 141102061911-conversion-gate01Wirelesspowertransmission 141102061911-conversion-gate01
Wirelesspowertransmission 141102061911-conversion-gate01Ibrahim Khleifat
 

More from Ibrahim Khleifat (20)

Ielts april 7th 2018 ielts listening
Ielts april 7th 2018 ielts listeningIelts april 7th 2018 ielts listening
Ielts april 7th 2018 ielts listening
 
Ielts 2018.04.21 listening real excellent real
Ielts 2018.04.21 listening real excellent realIelts 2018.04.21 listening real excellent real
Ielts 2018.04.21 listening real excellent real
 
Ielts 2017.12.14 listening real excellent
Ielts 2017.12.14 listening real excellentIelts 2017.12.14 listening real excellent
Ielts 2017.12.14 listening real excellent
 
Ielts 2017.5.13 listening predict section 1
Ielts 2017.5.13 listening predict section 1Ielts 2017.5.13 listening predict section 1
Ielts 2017.5.13 listening predict section 1
 
Ielts reading ancient literate signals proto writing in americas 2014
Ielts reading ancient literate signals   proto writing in americas 2014Ielts reading ancient literate signals   proto writing in americas 2014
Ielts reading ancient literate signals proto writing in americas 2014
 
Ielts 2018.10.13 reading real uphere
Ielts 2018.10.13 reading real   uphereIelts 2018.10.13 reading real   uphere
Ielts 2018.10.13 reading real uphere
 
Right and left handedness in humans
Right and left handedness in humansRight and left handedness in humans
Right and left handedness in humans
 
John franklin the discovery of the slowness
John franklin the discovery of the slownessJohn franklin the discovery of the slowness
John franklin the discovery of the slowness
 
History of chocolate
History of chocolateHistory of chocolate
History of chocolate
 
Btec prof l4_aqa_issue_4
Btec prof l4_aqa_issue_4Btec prof l4_aqa_issue_4
Btec prof l4_aqa_issue_4
 
Certificate in assessing vocational acheivement textbook print
Certificate in assessing vocational acheivement textbook printCertificate in assessing vocational acheivement textbook print
Certificate in assessing vocational acheivement textbook print
 
Iqa random
Iqa randomIqa random
Iqa random
 
Basics of motor control centers
Basics of motor control centersBasics of motor control centers
Basics of motor control centers
 
Engineering symbology-prints-and-drawings-handbook
Engineering symbology-prints-and-drawings-handbookEngineering symbology-prints-and-drawings-handbook
Engineering symbology-prints-and-drawings-handbook
 
The e learning-guilds-handbook-on-synchronous-e-learning
The e learning-guilds-handbook-on-synchronous-e-learningThe e learning-guilds-handbook-on-synchronous-e-learning
The e learning-guilds-handbook-on-synchronous-e-learning
 
Dc earth ground-measurement_ed1
Dc earth ground-measurement_ed1Dc earth ground-measurement_ed1
Dc earth ground-measurement_ed1
 
Phe brochure lr
Phe brochure lrPhe brochure lr
Phe brochure lr
 
Wireless charger for_low_power_devices_ excellent one same
Wireless charger for_low_power_devices_ excellent one sameWireless charger for_low_power_devices_ excellent one same
Wireless charger for_low_power_devices_ excellent one same
 
Wirelesspowertransmission 141102061911-conversion-gate01
Wirelesspowertransmission 141102061911-conversion-gate01Wirelesspowertransmission 141102061911-conversion-gate01
Wirelesspowertransmission 141102061911-conversion-gate01
 
Wireless energy transfer
Wireless energy transferWireless energy transfer
Wireless energy transfer
 

Recently uploaded

UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 

Recently uploaded (20)

UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 

Internal verification policy

  • 1. Guidance for Centre Internal Verification Procedures CIOB Level 3 Certificate in Supervising Construction Works to Existing Buildings and Structures CIOB Level 3 Diploma in Construction Site Supervisory Studies CIOB Level 4 Certificate in Construction Site Management CIOB Level 4 Diploma in Construction Site Management CIOB Level 4 Graduate Conversion Certificate THE CHARTERED INSTITUTE OF BUILDING AWARDING ORGANSATION
  • 2. 2 Updated:Dec16/Final: 21.04.17 Next Full Annual Policy Review Date: December 2017 CONTENTS Page 1. The internal verification process 3 2. Requirements for internal verification 3 3. Role of the internal verifier 3 4. Responsibilities of the internal verifier 4 5. Assignments set by the centre 5 6. Providing a verification plan 5 7. Sampling procedures and selection 5 7.1. Interim sampling 6 7.2. Summative sampling 6 8. Recording outcomes 6 9. Role of the assessor 6 10. Appendix 1: Internal Verification flow chart 8 11. Appendix 2: Sample Internal Verification plan 9 12. Appendix 3: Sample Internal Verification Report 10 13. Contact details 13
  • 3. 3 Updated:Dec16/Final: 21.04.17 Next Full Annual Policy Review Date: December 2017 1. THE INTERNAL VERIFICATION PROCESS The internal verification system forms part of the CIOB Awarding Organisations’ quality assurance procedures and is concerned with management and consistency of the assessment process within approved centres. The provision of these systems is necessary to ensure continuous quality management arrangements are present within centres. Internal verification relies on a number of integrated activities which should be specified within the centres quality management documentation (required as part of the Centre Approval Submission). A written internal verification procedure approved by senior management should be in place along with schedules and systems. Its implementation is to be monitored by the centre. In order to ensure the process is delivering the necessary level and rigour of internal verification, the CIOB will conduct annual inspections. These will be undertaken each year by an appointed CIOB External Verifier. 2. REQUIREMENTS FOR INTERNAL VERIFICATION The CIOB Awarding Organisation is committed to ensuring that the standards of its qualifications are maintained at a national level. The centres provision of an effective internal verification system is designed to achieve this requirement. All centres are required to appoint an internal verifier as part of the CIOB quality assurance process and to maintain managed and auditable records for production during the external verification inspection. 3. ROLE OF THE INTERNAL VERIFIER The Internal Verifier is responsible for developing and maintaining a quality assurance system within the approved centre to ensure learners are assessed fairly and accurately. The role is required to monitor and regulate the assessment process and marking arrangements within the approved centre to ensure a consistent approach. The development of a continuous and rigorous procedure is a key factor in the management of risk, ensuring that when certification is claimed for a candidate, it reliably reflects the achievement of national standards. There are three main aspects of the internal verification role: • Verifying assessment; • Developing and supporting assessors; • Managing quality of course delivery; The Internal Verifier is appointed by the teaching institution and must ensure that both assessors and teachers are suitably qualified to assess CIOB courses.
  • 4. 4 Updated:Dec16/Final: 21.04.17 Next Full Annual Policy Review Date: December 2017 Internal verifiers should be competent in the following areas: • Delivery of the specific course modules; • Have a comprehensive understanding of assessment and verification methods and criteria; • Have suitable industrial experience relating to course provision; • Teaching qualifications and/or experience as appropriate. Internal Verifiers and assessors should be ideally educated to level six in a construction related discipline, such as honours degree or a level six vocational qualification. The CIOB definition of construction management is the broad discipline spanning all aspects of building in construction from design to demolition. As a minimum, internal verifiers must hold a level four qualification in a construction discipline and have at least three years of recent industry experience. Some professional qualifications are recognised as comparable to level six and are accepted as qualifying awards:  Member or Fellow of the Chartered Institute of Building (CIOB)  Fellow of the British Institute of Facilities Management (BIFM)  Member of Fellow of the Royal Institute of Chartered Surveyors (RICS)  Member or Fellow of the Institute of Civil Engineers (ICE)  Member or Fellow of the Chartered Institute of Building Services Engineers (CIBSE)  Member or Fellow of the Chartered Institute of Civil Engineering Surveyors (CICES)  Member or Fellow of the Chartered Institute of Architectural Technologists (CIAT)  Member or Fellow of the Institution of Structural Engineers (IStructE) 4. RESPONSIBILITIES OF THE INTERNAL VERIFIER The Internal Verifier will:  Ensure that a schedule is in place and operational  Check the quality of assessment instruments are fit for purpose  Advise on the interpretation of the subject area  Coordinate assessment arrangements  Assure an effective system of recording learner achievement is in place  Keep records of the verification process  Liaise with awarding organisation external verifiers  Provide advice and support to assessors on a regular basis, covering all assessors and all units
  • 5. 5 Updated:Dec16/Final: 21.04.17 Next Full Annual Policy Review Date: December 2017  Advise on the appropriateness of assessment evidence with regard to level, sufficiency, authenticity, validity and consistency  Use subject specialism to sample assessments to verify assessors’ judgements  Arrange standardisation meetings  Check the quality of assessment to ensure that it is consistent, fair and reliable  Ensure own assessment decisions are sampled by another internal verifier when teaching on the qualification  Monitor and advise on assessment decisions by sampling  Give qualification team decisions and feedback on sampling  Ensure appropriate action is taken when necessary  Take part in the formal stages of an appeal  Advise the qualification team on any training needs  Provide feedback on aspects of the assessment system to the programme team 5. ASSIGNMENTS SET BY THE CENTRE Assignment briefs set or amended by the centre must be internally verified and approved by the external verifier before they are distributed to the learners to ensure they are fit for purpose meeting the required standards and learning outcomes. 6. PROVIDING A VERIFICATION PLAN It is the internal verifier’s responsibility for developing an internal verification plan. The plan for internal verification is essential and should cover two aspects: 1. Teaching timetable and allocation of units; 2. Details of students registrations and units being taken and when; 7. SAMPLING PROCEDURES AND SELECTION When considering the size of the sample at the start of the course, your internal verification plan should give you a clear indication of what should be appropriate. Changes can be implemented at any time within the timescale of the plan, but the sample should reflect an accurate picture of the quality of assessment in the centre. Students work should be marked in accordance with the marking criteria. The internal verifier should also ensure that tutor feedback to students is constructive and assists students to gauge their abilities and progression.
  • 6. 6 Updated:Dec16/Final: 21.04.17 Next Full Annual Policy Review Date: December 2017 7.1. Interim Sampling This procedure entails a review of the assessment process throughout the course, including a review of candidates work before decisions have been made on any unit and looking at course work with one or two completed units. This will also involve checking the progress review report given to candidates by assessors. This will enable the internal verifier to determine the quality of general guidance on assessment and assessment planning. The internal verification system will allow problems with assessment to be evaluated at an early stage and identify assessor training or development needs. A well-constructed sample should ensure that:  The full range of assessment decisions made is covered  External verifier or assessors feedback from previous years is taken into account  The experience of the assessor/tutor is taken into account  The sample size is sufficient 7.2. Summative Sampling This should involve a review of the decision-making process by the assessors and determine how this was reached. An audit trail is required to ensure the assessor has checked evidence provided, which should be: Valid – relevant to standards; Authentic – produced by the candidate; Reliable – reflecting level of performance consistently demonstrated by the candidate; Sufficient – meets standards in FULL; It is important that internal verification is conducted as an on-going process applied throughout the duration of the course and not end-loaded. This ensures that internal verification is benchmarked consistently throughout the period against student performance. 8. RECORDING OUTCOMES Internal verification details should be maintained within a course file for availability at external verification. Actions should be discussed with the assessors and problems highlighted. The internal verifier and assessor are required to sign the completed report. Verification reports should also be discussed by the course team at meetings with records of meetings being held within the course file. Centres are responsible
  • 7. 7 Updated:Dec16/Final: 21.04.17 Next Full Annual Policy Review Date: December 2017 for ensuring that internal verifier/assessment records are kept for five years after certification. 9. ROLE OF THE ASSESSOR The assessor is responsible for all assessed work relating to specified units within the approved centre. The role is required to conform to the assessment process and marking arrangements within the approved centre to ensure a consistent approach. The development of a continuous and rigorous procedure is a key factor in the management of risk, ensuring that when certification is claimed for a learner, it reliably reflects the achievement of awarding organisations standards. The main aspects of an assessment role are: • Completing assessments within required timescales; • Ensuring that marking and assessment criteria are in accordance with CIOB procedures; • Managing quality of course delivery; • Ensure consistency of compulsory assignment work. The assessor is appointed by the teaching institution. Assessors should be competent in the following areas: • Delivery of the specific course units • Have a comprehensive understanding of assessment methods and criteria; • Have suitable industrial experience relating to course provision; • Teaching qualifications and/or experience as appropriate. Assessors may also be internal verifiers, as long as they never internally verify their own work. Details of the grading and assessment criteria are contained within separate policy documentation.
  • 8. 8 Updated:Dec16/Final: 21.04.17 Next Full Annual Policy Review Date: December 2017 10.APPENDIX 1: INTERNAL VERIFICATION FLOWCHART Stage 1 Internal verifiers check: Assessor qualifications Assignment briefs Stage 2 Stage 3 Make a verification plan Select a sample Verify student work Record outcomes Feedback to assessor Assessor comments Take necessary action Make recommendations Feedback to student
  • 9. 9 Updated:Dec16/Final: 21.04.17 Next Full Annual Policy Review Date: December 2017 11. APPENDIX 2: SAMPLE INTERNAL VERIFICATION PLAN Course Title Awarding Body Course Tutor Internal Verifier Course Dates Student 1 Student 2 Student 3 Student 4 Student 5 Student 6 Student 7 Student 8 N.B: If this is a new course or if any of the tutors have not taught on the course before, it is good practice to internally verify all assessed pieces of work.
  • 10. 10 Updated:Dec16/Final: 21.04.17 Next Full Annual Policy Review Date: December 2017 12. APPENDIX 3: SAMPLE INTERNAL VERIFICATION REPORT INTERNAL VERIFICATION REPORT ON ASSESSMENT DECISION FOR CIOB QUALIFICATIONS Name of Student: Name of Assessor: Name of Internal Verifier: Qualification: Unit Title: Number: Type of evidence provided by the Candidate: Sources of Evidence: Assignment Project Report Graphs Video with rationale of methods to completion Other please state:
  • 11. 11 Updated:Dec16/Final: 21.04.17 Next Full Annual Policy Review Date: December 2017 Assessment Decision: Is the student evidence: Valid Yes No Reliable Yes No Authentic Yes No Sufficient Yes No Does the student evidence show that all the required learning outcomes for knowledge have been met and that there is sufficient evidence relating to this unit to merit the given grade? Yes No Is the assessment decision considered correct? Yes No Action Points/Feedback to Assessor: IV Feedback to Student: Internal Verifier Signature: Date: Assessor Signature: Date: I confirm that all action points, as above have now been completed and all the evidence requirements satisfied Internal Verifier Signature: Date:
  • 12. 12 Updated:Dec16/Final: 21.04.17 Next Full Annual Policy Review Date: December 2017 Assessor Feedback Date: Student Feedback Date: Further Action Required: Date: During the course of the qualification, sampling from the assessors should cover the following as a minimum:  All assessors  All units  Work from every assignment Not all learners are expected to be internally verified during the lifetime of the qualification, but should any concerns arise then the size of the sample should be increased.
  • 13. 13 Updated:Dec16/Final: 21.04.17 Next Full Annual Policy Review Date: December 2017 13. CONTACT DETAILS CIOB Awarding Organisation The Chartered Institute of Building 1 Arlington Square Downshire Way Bracknell Berkshire RG12 1WA Tel: +44 (0) 1344 630700 www.ciob.org.uk