This document provides an assignment brief for a site visit report on the construction of 96 terrace houses and related infrastructure in Sekyen 2A, Antara Gapi, Hulu Selangor, Selangor. Students are required to submit a report by 26 November 2015 that describes the construction process of pad footings based on their site visit. The report should include an introduction of the site, technical observations on how pad footings are constructed and the materials involved, photos and descriptions, and learning outcomes/conclusion. Marks will be given for the introduction, content, photos, and conclusion sections.