Integrate Reading & Writing
Basic
1-4
Building
1-4
Contents
• Overview
• Key Features
• Student Book
• Workbook
• Student Digital Materials
• Teacher’s Materials
Overview
Integrate is a multi-level reading and writing series for beginner to intermediate
learners of English. The series features reading passages in a variety of formats on
high-interest topics linked to common academic standards. Throughout the series,
learners gain familiarity with reading skills, reinforced through writing tasks. Reading
comprehension is progressively developed in tandem with fluency. Throughout the
series, students gradually expand their vocabulary through exposure to high-
frequency focus words related to the unit topics. Engaging videos and augmented
reality (AR) content enrich the learning experience and provide opportunities for
developing digital literacy and 21st-century skills.
Complimentary Downloads
www.compasspub.com
A2 A2+
A1+ A2Basic :
Building :
Key Features
• Progressive reading and writing skills transference
• Integrated IT content
• Clear unit objectives linked to academic standards
• Contemporary passage formats covering fiction and
nonfiction
• Comprehension and fluency building
• Free downloadable materials for further practice
Student Book
As the series progresses, interconnected reading passages
help learners to expand their knowledge of the subjects
Intro Page
A clear overview summarizes
what students will do throughout
the unit.
Officially recognized academic
standards and objectives give a
clear purpose to each unit.
A big, captivating, impactful image
helps stimulate the students’ minds
and get them thinking about the
topic of the unit.
Unit Structure
Students cognize the academic
objective with warm-up questions.
Learn the meaning of new vocabulary.
Teacher’s notes describe the purpose of
each activity and are neatly tucked
away at the bottom of each page.
Key grammatical structures from the
reading passage highlight authentic,
practical use.
The academic question in each unit
helps students to approach the reading
passage in a more purposeful way.
Unit Structure
Lesson A - Intro
Background knowledge is provided
to help activate the students’
schemas.
Reading passages are formatted in
realistic ways to provide context and
meaning.
Infographics with captions provide
visual support, additional
information, and context.
The academic objective in context is
reviewed immediately after the
reading.
Unit Structure
Lesson A – Passage
Comprehension questions
ensure understanding.
Students use a graphic organizer
to practice a reading skill and
summarize information from the
passage.
Unit Structure
Lesson A – Post Reading
Warm-up questions help
students recall information
from Lesson A to activate
prior knowledge.
The vocabulary review requires
students to demonstrate their
knowledge of the meaning and use
of each word.
Unit Structure
Lesson B – Intro
Activities get students to recall the
background of the reading
and specify information about the
passage format. Students also learn
two bonus words from context.
Lesson B passages develop reading
speed and fluency through a variety
of activities, and progress is tracked
in the back of the book.
Unit Structure
Lesson B – Passage
Record reading time for each passage
and find out your WPM score
A graphic organizer gives students
practice with a writing skill.
The reading and writing skills
practiced in each unit are transferred
to develop a writing plan. This
bridges the classroom and home by
linking the student book with the
practice.
Unit Structure
Lesson B – Skill Transference
Engaging IT content teaches students
modern literacy. Questions ask
students to make inferences before
viewing the IT content.
After viewing the IT content,
students discuss the questions with a
partner and write their answers on
the page.
Unit Structure
Lesson B – Integrate It
Augmented Reality
QR Videos
A self-assessment checklist helps
students and teachers to track
learning.
Unit Structure
Self-Assessment
Review Units
The review units utilize project based
learning and allow students to
produce tangible outcomes and
demonstrate linguistic competency
and development.
The detachable project templates
can be customized and used to
create a portfolio.
Pull-Out Practice Book
40pages | 2 pages per lesson
The practice book provides students
ample opportunity to use vocabulary
and grammar structures from the unit.
The vocabulary practice
activities strengthen
students’ vocabulary
acquisition, comprehension,
and fluency.
Improve vocabulary
retention, reading
comprehension & fluency
Practice Book
The grammar activities
bolster the
students’ knowledge and
ability to use the structure.
The writing plan links the
student book with the
practice book and the
classroom with the home.
Students practice the skills
they have learned
throughout the unit and use
them to summarize the unit
contents.
Practice Book
Vocabulary wordlist provided at
the back of Practice Book for
students to complete and review
the words they have learnt
throughout the each unit.
Practice Book – Word List
Teacher’s Guide Answer Key provides teachers in-depth information of
each unit to enable meaningful evaluation on students’ performance
Teacher’s Guide Answer Key
Explains objectives for each section and
page. Also includes level tips, answers,
sample answers and practical guide
included.
Grading Rubric provides clear explanation on
assessment criteria and links with student self
assessment in SB to align student and teacher
evaluation.
Student Digital Materials – Class Booster
Fun games and activities to
motivate learning outside
the classroom. Teachers can
also track each students
activity and receive reports.
Teachers need to sign up
for teacher’s account at
www.classbooster.net and
share their email address
with their students to
receive progress report.
New Features of Class Booster – Unlock Games and Watch Videos
Watch the avatars grow as students collect
stars by reviewing the units on Class Booster
?
Unlock three games as the avatar grows.
Look for the
Game icon!
Collect coins to play the games
Collect stars to grow your avatar
Tap on “video” to link directly to the video content
Classroom Digital Materials – Teacher’s Class Kit
Compass’ newest teaching tool,
Teacher’s Class Kit is an
interactive ebook that allows
teachers to show the student
book content in classrooms.
Features
• Embedded video and audio
links
• Easy navigation tools
• Accessible through the
Compass homepage with an
access code
• One-time teacher registration
for one-year access
Thank You!
For information on this product
or other ELT materials, connect with us!
facebook.com/compasspublishing
@CompassELT
info@compasspub.com
compasspublishing
slideshare.net/CompassPublishing
youtube.com/compasspublishing

Integrate: Reading and Writing Walkthrough

  • 1.
    Integrate Reading &Writing Basic 1-4 Building 1-4
  • 2.
    Contents • Overview • KeyFeatures • Student Book • Workbook • Student Digital Materials • Teacher’s Materials
  • 3.
    Overview Integrate is amulti-level reading and writing series for beginner to intermediate learners of English. The series features reading passages in a variety of formats on high-interest topics linked to common academic standards. Throughout the series, learners gain familiarity with reading skills, reinforced through writing tasks. Reading comprehension is progressively developed in tandem with fluency. Throughout the series, students gradually expand their vocabulary through exposure to high- frequency focus words related to the unit topics. Engaging videos and augmented reality (AR) content enrich the learning experience and provide opportunities for developing digital literacy and 21st-century skills. Complimentary Downloads www.compasspub.com A2 A2+ A1+ A2Basic : Building :
  • 4.
    Key Features • Progressivereading and writing skills transference • Integrated IT content • Clear unit objectives linked to academic standards • Contemporary passage formats covering fiction and nonfiction • Comprehension and fluency building • Free downloadable materials for further practice
  • 5.
    Student Book As theseries progresses, interconnected reading passages help learners to expand their knowledge of the subjects
  • 6.
    Intro Page A clearoverview summarizes what students will do throughout the unit. Officially recognized academic standards and objectives give a clear purpose to each unit. A big, captivating, impactful image helps stimulate the students’ minds and get them thinking about the topic of the unit. Unit Structure
  • 7.
    Students cognize theacademic objective with warm-up questions. Learn the meaning of new vocabulary. Teacher’s notes describe the purpose of each activity and are neatly tucked away at the bottom of each page. Key grammatical structures from the reading passage highlight authentic, practical use. The academic question in each unit helps students to approach the reading passage in a more purposeful way. Unit Structure Lesson A - Intro
  • 8.
    Background knowledge isprovided to help activate the students’ schemas. Reading passages are formatted in realistic ways to provide context and meaning. Infographics with captions provide visual support, additional information, and context. The academic objective in context is reviewed immediately after the reading. Unit Structure Lesson A – Passage
  • 9.
    Comprehension questions ensure understanding. Studentsuse a graphic organizer to practice a reading skill and summarize information from the passage. Unit Structure Lesson A – Post Reading
  • 10.
    Warm-up questions help studentsrecall information from Lesson A to activate prior knowledge. The vocabulary review requires students to demonstrate their knowledge of the meaning and use of each word. Unit Structure Lesson B – Intro
  • 11.
    Activities get studentsto recall the background of the reading and specify information about the passage format. Students also learn two bonus words from context. Lesson B passages develop reading speed and fluency through a variety of activities, and progress is tracked in the back of the book. Unit Structure Lesson B – Passage Record reading time for each passage and find out your WPM score
  • 12.
    A graphic organizergives students practice with a writing skill. The reading and writing skills practiced in each unit are transferred to develop a writing plan. This bridges the classroom and home by linking the student book with the practice. Unit Structure Lesson B – Skill Transference
  • 13.
    Engaging IT contentteaches students modern literacy. Questions ask students to make inferences before viewing the IT content. After viewing the IT content, students discuss the questions with a partner and write their answers on the page. Unit Structure Lesson B – Integrate It Augmented Reality QR Videos
  • 14.
    A self-assessment checklisthelps students and teachers to track learning. Unit Structure Self-Assessment Review Units The review units utilize project based learning and allow students to produce tangible outcomes and demonstrate linguistic competency and development. The detachable project templates can be customized and used to create a portfolio.
  • 15.
    Pull-Out Practice Book 40pages| 2 pages per lesson The practice book provides students ample opportunity to use vocabulary and grammar structures from the unit.
  • 16.
    The vocabulary practice activitiesstrengthen students’ vocabulary acquisition, comprehension, and fluency. Improve vocabulary retention, reading comprehension & fluency Practice Book
  • 17.
    The grammar activities bolsterthe students’ knowledge and ability to use the structure. The writing plan links the student book with the practice book and the classroom with the home. Students practice the skills they have learned throughout the unit and use them to summarize the unit contents. Practice Book
  • 18.
    Vocabulary wordlist providedat the back of Practice Book for students to complete and review the words they have learnt throughout the each unit. Practice Book – Word List
  • 19.
    Teacher’s Guide AnswerKey provides teachers in-depth information of each unit to enable meaningful evaluation on students’ performance Teacher’s Guide Answer Key Explains objectives for each section and page. Also includes level tips, answers, sample answers and practical guide included. Grading Rubric provides clear explanation on assessment criteria and links with student self assessment in SB to align student and teacher evaluation.
  • 20.
    Student Digital Materials– Class Booster Fun games and activities to motivate learning outside the classroom. Teachers can also track each students activity and receive reports. Teachers need to sign up for teacher’s account at www.classbooster.net and share their email address with their students to receive progress report. New Features of Class Booster – Unlock Games and Watch Videos Watch the avatars grow as students collect stars by reviewing the units on Class Booster ? Unlock three games as the avatar grows. Look for the Game icon! Collect coins to play the games Collect stars to grow your avatar Tap on “video” to link directly to the video content
  • 21.
    Classroom Digital Materials– Teacher’s Class Kit Compass’ newest teaching tool, Teacher’s Class Kit is an interactive ebook that allows teachers to show the student book content in classrooms. Features • Embedded video and audio links • Easy navigation tools • Accessible through the Compass homepage with an access code • One-time teacher registration for one-year access
  • 22.
    Thank You! For informationon this product or other ELT materials, connect with us! facebook.com/compasspublishing @CompassELT info@compasspub.com compasspublishing slideshare.net/CompassPublishing youtube.com/compasspublishing