SAP for
Engineering,
Construction &
Operations
Industry Briefing
Book
Comments and questions: david.clemens@sap.com
Edition 2
January 2012
Legal disclaimer
All information in this industry briefing book is provided under NDA
The information in this document is confidential and proprietary to SAP and may not be disclosed without the
permission of SAP. This document is not subject to your license agreement or any other service or subscription
agreement with SAP. SAP has no obligation to pursue any course of business outlined in this document or any related
presentation, or to develop or release any functionality mentioned therein. This document, or any related presentation
and SAP's strategy and possible future developments, products and or platforms directions and functionality are all
subject to change and may be changed by SAP at any time for any reason without notice. The information on this
document is not a commitment, promise or legal obligation to deliver any material, code or functionality. This
document is provided without a warranty of any kind, either express or implied, including but not limited to, the implied
warranties of merchantability, fitness for a particular purpose, or non-infringement. This document is for informational
purposes and may not be incorporated into a contract. SAP assumes no responsibility for errors or omissions in this
document, except if such damages were caused by SAP intentionally or grossly negligent.
All forward-looking statements are subject to various risks and uncertainties that could cause actual results to differ
materially from expectations. Readers are cautioned not to place undue reliance on these forward-looking statements,
which speak only as of their dates, and they should not be relied upon in making purchasing decisions.
and
SAP for Engineering,
Construction & Operations
TransformationRun Better
Proof Points Strategy
Solutions
Innovations
Drivers
Take Away
Comments and questions: david.clemens@sap.com
© 2011 SAP AG. All rights reserved. 4
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
What does “Run Better” mean for a
construction company?
Project margin
variance
Labor and equipment
productivity
Days revenue
outstanding
Equipment utilization
Unapproved change order
indicator
Project cash position
Average project margin
Run Better
KPIs
Examples
• Roy Anderson Corp
• Day & Zimmermann
• Hatch
Value potential
© 2011 SAP AG. All rights reserved. 5
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Average Operating
Margin (in %)
Days Sales
Outstanding (in days)
30 best
Large disparity between average and best
16% best
Run Better
KPIs
Examples
• Roy Anderson Corp
• Day & Zimmermann
• Hatch
Value potential
© 2011 SAP AG. All rights reserved. 6
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
The best are leading the way
40%
reduction in
days revenue
outstanding
50%
reduction in time
to create global
customer
invoice
17%
reduced project
cost over-runs
Run Better
KPIs
Examples
• Roy Anderson Corp
• Day & Zimmermann
• Hatch
Value potential
© 2011 SAP AG. All rights reserved. 7
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Roy Anderson Corp is a
leading midsize U.S.
construction company
with 500 employees and
U.S. $650 million in
revenue.
Hindered by nonintegrated
systems and manual
processes, Roy Anderson
needed to eliminate
information silos and allow
easier retrieval of project
data. It wanted to improve
construction project
management through better
analysis of job scope and
cost.
Gained greater visibility across all levels of
the organization
Improved forecasting and gained greater cost
control
Streamlined human resources, project
management, and scheduling processes
17% reduction in project cost overruns
33% reduction in month-end closing
80% reduction in time to create new reports
Run Better
KPIs
Examples
• Roy Anderson Corp
• Day & Zimmermann
• Hatch
Value potential
© 2011 SAP AG. All rights reserved. 8
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Day & Zimmermann (D&Z)
is a top global contractor
serving governments and
commercial customers
with 24,000 employees and
U.S. $2.2 billion in
revenue.
Operating in more than 150
locations worldwide, D&Z
struggled with an array of
point solutions that impeded
collaboration across
business units and made it
difficult to capture and report
cost. The company needed
to consolidate operations
and eliminate cumbersome,
nonscalable legacy systems.
Reduced enterprise complexity by mapping
dozens of business units to a single software
foundation
Eliminated costly legacy systems: 6 legacy
core business systems and 17 different labor
collection systems
Minimized support functions through
centralization and standardization
40% reduction in days sales outstanding
25% reduction in duration of billing-to-cash
cycle
increase in online sales30%
Run Better
KPIs
Examples
• Roy Anderson Corp
• Day & Zimmermann
• Hatch
Value potential
© 2011 SAP AG. All rights reserved. 9
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Hatch is a global
consulting, engineering,
and project and
construction management
company with 8,000
employees.
Based in Ontario, Canada,
Hatch provides solutions and
services to industry sectors
that include mining and
metals, energy, and
infrastructure. The company
implemented the SAP ERP
application to support its goal
of continued worldwide
growth and to standardize
business processes among
11 business units operating
across six continents.
Retirement of legacy systems
Single global instance, with minimal
customization
Eight-month implementation with big-bang
rollout of all core systems
Sandbox system to familiarize employees
with software and accelerate business
readiness
reduction in time to create final global
customer invoices
reduction in time for month-end closing
improvement in capturing global time
sheet information
50%
50%
60%
Run Better
KPIs
Examples
• Roy Anderson Corp
• Day & Zimmermann
• Hatch
Value potential
© 2011 SAP AG. All rights reserved. 10
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Innovation drivers in the EC&O industry
Customers demanding more flexible business models to
support an increasingly complex environment
Innovation
Drivers
Intense
competition
Flexible delivery
models
Materials volatility
Workforce
optimization
Efficient execution
© 2011 SAP AG. All rights reserved. 11
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Intense competition
Firms battle
for work as the
industry
contracts
A buyer’s
market puts
the squeeze
on margins
Emerging
markets present
challenges and
opportunities
Owners
outsource more/
demand full
lifecycle services
Innovation
Drivers
Intense
competition
Flexible delivery
models
Materials volatility
Workforce
optimization
Efficient execution
© 2011 SAP AG. All rights reserved. 12
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Flexible delivery models
Government
spending shifts
demand from
private to public
Drive to access
opportunities in
stronger
geographies
Regulatory
issues
associated with
public projects
create challenges
Innovation
Drivers
Intense
competition
Flexible delivery
models
Materials volatility
Workforce
optimization
Efficient execution
© 2011 SAP AG. All rights reserved. 13
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Materials volatility
Commodity
volatility remains
unpredictable
Building materials
price inflation
remains possible
Ability to
leverage buying
power reduces
cost
Innovation
Drivers
Intense
competition
Flexible delivery
models
Materials volatility
Workforce
optimization
Efficient execution
© 2011 SAP AG. All rights reserved. 14
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Workforce optimization
Talent losses due to
downturn create
challenges after
recovery
Workforce efficiency
and productivity are
essential in a tight
market
Ability to
leverage talent
regardless of
geography
Innovation
Drivers
Intense
competition
Flexible delivery
models
Materials volatility
Workforce
optimization
Efficient execution
© 2011 SAP AG. All rights reserved. 15
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Efficient execution
Tight margins
demand efficient
use of project
resources
Equipment, labor,
and materials
management on
projects
Complex projects
drive complex
business
relationships
Innovation
Drivers
Intense
competition
Flexible delivery
models
Materials volatility
Workforce
optimization
Efficient execution
© 2011 SAP AG. All rights reserved. 16
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Without SAP
Business Challenges
Transformation
Without SAP
SAP’s Value
With SAP
Designer Projects
Subcontractors Owners
Operations
Business
Development
Procurement
IT HRFinance
 Inefficient projects
Poor communication and
collaboration reduce
resource productivity
 Increased risk
Lack of operational and
financial visibility puts
pressure on margins
 Limited systems
Unable to track and manage
full service lifecycle
operations
 Poor skill set allocation
Staffing issues becoming
more common amid
shrinking labor market
© 2011 SAP AG. All rights reserved. 17
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
With SAP
Coordinated and integrated systems and processes
Designer Projects
Subcontractors Owners
 Optimized resources
Maximize productivity and
profitability of project
materials, equipment and
labor
 Increased visibility
Make better, faster
decisions with real-time,
contextual insights
 Integrated portfolio
Drive process efficiency
and business growth
 Aligned skills for the
right project
Effectively attract,
develop, and retain a
talented and productive
workforce
Operations
Business
Development
Procurement
IT HRFinance
Transformation
Without SAP
SAP’s Value
With SAP
© 2011 SAP AG. All rights reserved. 18
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
SAP helps EC&O companies confidently
expand their business
Maximizing resource
productivity and
increasing project
profitability
Bridge the gap
between design and
construction by
bringing in real-time
design information
to assess the
“constructability” of
any given design
SAP unique capability SAP unique capabilitySAP unique capability
Managing and mitigating
operations and financial
risk
Establishing new
revenue streams with
complete lifecycle
services
Ensure on-time, on-
budget delivery and
reduce execution risks
through in-depth
mapping of resources,
material, and
equipment to the
project plan
Deliver applications for
the full facility lifecycle,
from planning and
design, to project
management, to
operations
Transformation
Without SAP
SAP’s Value
With SAP
© 2011 SAP AG. All rights reserved. 19
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
SAP solutions for EC&O
Solutions
 IT
 Finance
 Procurement
 HR
 Business Development
 Operations
SAP delivers comprehensive,
integrated solutions for all
business areas in EC&O
Operations
Business
Development
Procurement
IT HRFinance
© 2011 SAP AG. All rights reserved. 20
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
 Design & Engineering
Enable detailed design and engineering
capabilities including the management and
development of design documents,
engineering descriptions and facility/plant
modeling.
 Project Management
Projects embedded into the Enterprise – making them
easier to manage and reduce risk. Leverage buying
power and manage subcontractors.
 Equipment and Tools Management
Improved availability and tracking of equipment.
Flexible price and account determination. Clear
visibility of TCO and return on assets.
 Operational Workforce Management
Improved utilization, profitability and client satisfaction
by assigning the right people, with the right skills at
the right rates to the right projects.
SAP solutions for operations
Connect engineering‚ project management and execution in one
unified solution
Solutions
Operations
Business
Development
Procurement
IT HRFinance
1 | 2
 IT
 Finance
 Procurement
 HR
 Business Development
 Operations
© 2011 SAP AG. All rights reserved. 21
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
 Commercial Real Estate
End-to-end real estate lifecycle management with full
integration to ERP Financials
 Facility Services and Operations
Improve run-time production and reduce costs with an
integrated maintenance program that enables higher
equipment reliability and improved resource allocation.
Solutions
1 | 2
SAP solutions for operations
Connect engineering‚ project management and execution in one
unified solution
 IT
 Finance
 Procurement
 HR
 Business Development
 Operations
Operations
Business
Development
Procurement
IT HRFinance
© 2011 SAP AG. All rights reserved. 22
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
SAP solutions for business development
Streamline selling processes to accelerate buying decisions
 Building Information Modeling (BIM)
Optimize project planning and delivery (cost estimating,
modeling, planning, quantity tracking, subcontractor
mgt.) while leveraging CAD design data.
 Bid and Proposal Management
Enables EC&O companies to manage potential
opportunities, customer relationships and business
development effectively through improved sales force
productivity with account, contact and opportunity
management as well as handling of contracts and
quotation
Solutions
 IT
 Finance
 Procurement
 HR
 Business Development
 Operations
Operations
Business
Development
Procurement
IT HRFinance
© 2011 SAP AG. All rights reserved. 23
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
SAP solutions for procurement
Close the loop of engineering, procurement and construction in the
project life
 Procurement and Materials Management
Enables end-to-end sourcing and procurement by
connecting spend analysis, on-demand strategic
sourcing and contract management, and operational
procurement.
 Subcontractor Management
Enable core sourcing of multiple levels of suppliers,
partners, and manufacturers to perform altogether in
delivering to projects
Solutions
 IT
 Finance
 Procurement
 HR
 Business Development
 Operations
Operations
Business
Development
Procurement
IT HRFinance
© 2011 SAP AG. All rights reserved. 24
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
SAP solutions for information technology
Improve insight‚ productivity and operations
 Operational Risk Management
Improve EHS performance and ensure operational
continuity by proactively reducing risks, preventing
incidents, and improving operating efficiency.
 Manage Enterprise Risk and Compliance
Continuously monitor key risk indicators and compliance
effectiveness, business processes and IT systems to
align risks and compliance to strategy.
Solutions
 IT
 Finance
 Procurement
 HR
 Business Development
 Operations
Operations
Business
Development
Procurement
IT HRFinance
© 2011 SAP AG. All rights reserved. 25
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
 Manage Financial Performance
Managing financial and operational performance helps
companies for accurate insight into costing, improved
financial planning and forecasting.
 Treasury and Financial Risk Management
Ensure enough cash liquidity to fund business
operations.
 Accounting and Financial Close
Help customers to run their accounting and financial
close processes faster, more accurate, more compliant
and less costly.
SAP solutions for finance
Improve visibility and insight into enterprise risks that affect
business performance
Solutions
 IT
 Finance
 Procurement
 HR
 Business Development
 Operations
Operations
Business
Development
Procurement
IT HRFinance
© 2011 SAP AG. All rights reserved. 26
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
SAP solutions for human resources
Find and develop the best people and talent
 Core HR and Payroll for EC&O
Enables organizations to support and automate
processes that allow them to support the entire
employee lifecycle from hire to retire for a global
workforce.
 Talent Management
Enables organizations to attract, recruit, appraise,
develop and retain the best talent available.
Solutions
 IT
 Finance
 Procurement
 HR
 Business Development
 Operations
Operations
Business
Development
Procurement
IT HRFinance
© 2011 SAP AG. All rights reserved. 27
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Customer centric and innovation driven
SAP’s strategy for EC&O companies
Solution Innovations
Technology Innovations
Delivery Innovations
Innovations
Solutions
Technology
• Mobility
• Business analytics
• In-memory computing
Delivery
• Rapid-deployment
solutions
• Customer co-innovation
• Ecosystem
• Road map
• Recent innovations
Future
• Common area maint.
• Commercial proj. mgmt
© 2011 SAP AG. All rights reserved. 28
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
SAP solution innovations for EC&O
companies
Innovations
Solutions
Technology
• Business analytics
• In-memory computing
Delivery
• Rapid-deployment
solutions
• Customer co-innovation
• Road map
• Recent innovations
Future
• Common area maint.
• Commercial proj. mgmt
• Mobility
• Ecosystem
Operations
Business
Development
Procurement
IT HRFinance
© 2011 SAP AG. All rights reserved. 29
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Selected solution innovations
Available today
Real estate operations
SAP Common Area Maintenance Expense Recovery application
 Automatically settle common area invoices for shopping centers, retail malls, and
office environments
 Fully integrated and highly flexible add-on solution to SAP Real Estate
Management application
 Allows effective control of expense recoveries by automating this process
 Optimize investment planning by receiving full reimbursement for common area
invoices
 Dedicated subcontractor management solution that handles all related data,
processing, and retention
Innovations
Solutions
Technology
• Mobility
• Business analytics
• In-memory computing
Delivery
• Rapid-deployment
solutions
• Customer co-innovation
• Ecosystem
• Road map
• Recent innovations
Future
• Common area maint.
• Commercial proj. mgmt
© 2011 SAP AG. All rights reserved. 30
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Selected solution innovations
SAP Common Area Maintenance Expense Recovery
Innovations
Solutions
Technology
• Mobility
• Business analytics
• In-memory computing
Delivery
• Rapid-deployment
solutions
• Customer co-innovation
• Ecosystem
• Road map
• Recent innovations
Future
• Common area maint.
• Commercial proj. mgmt
Full
Automation
Automated process (as add-on to SAP Real Estate management with full
integration to ERP) to timely calculate common area expenses and pass-
through the correct amounts of common area charges to your tenants.
Optimized
Portfolio
Management
Effective control of expense recoveries in order to secure the sound
performance of your property portfolio. Optimize your investment planning
by receiving full reimbursement for common area invoices.
Full
Integration
SAP Common Area Maintenance Expense Recovery is a seamless and
highly flexible add-on solution to SAP Real Estate Management, with full
integration to SAP ERP and other SAP solutions.
Reduced
TCO
The solution allows a constant cost control and monitoring of all expense
types and provides a correct common area maintenance expense
calculation. It is self contained within SAP, no external interfaces
necessary.
High
Flexibility
New settlement program with the option to manually adjust the results for
current period and adjust expenses during simulation. Ability for customer
specific calculation methods, including the assignment of new distribution
rules.
Resulting in improved transparency on real estate portfolio profitability by
constantly monitoring common areas and related costs
© 2011 SAP AG. All rights reserved. 31
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Selected solution innovations
Road map – commercial project management
Project Work Space
 New user experience
for project managers
 Work space for
comprehensive project-
centric enterprise
solutions
 Enables management
of project-specific
business processes
across systems
Extended Project
Financial Planning and
Forecasting
 Extended functionality
and enhanced usability
for the planning,
forecasting, and
monitoring of projects
 Enhanced front end to
support financial
planning (cost,
revenue, quantities,
cash, and progress) for
projects
Project Issue and
Change Management
 Manage and track
project scope changes
(from initial change
request to the final
change order)
 Enhanced process
support for cost and
revenue planning of
changes and for
updating purchasing
and contract
documents
Innovations
Solutions
Technology
• Mobility
• Business analytics
• In-memory computing
Delivery
• Rapid-deployment
solutions
• Customer co-innovation
• Ecosystem
• Road map
• Recent innovations
Future
• Common area maint.
• Commercial proj mgmt
Project Management
© 2011 SAP AG. All rights reserved. 32
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Finance
Invoice to pay
Customer to cash
Accounting and finance
Treasury and financial risk mgmt.
Travel management
Shared service for financials
Selected solution innovations
Commercial project management
Human capital management
Core HR and payroll
HR operations
Business development, client and opportunity mgmt
Business development and marketing to customer acceptance
Customer lifecycle management
Risk and independence check
Project and engagement
management
Engagement mgmt and
controlling
Engagement fulfillment
Project planning, execution, and
monitoring
Project collaboration and
knowledge management
Business and IT service
management
Contract mgmt and controlling
IT financial mgmt/service centric billing
Product order management
Service request and service order mgmt
Call center operations
IT service desk
Configuration and change management
IT asset management
Innovations
Solutions
Technology
• Mobility
• Business analytics
• In-memory computing
Delivery
• Rapid-deployment
solutions
• Customer co-innovation
• Ecosystem
• Road map
• Recent innovations
Future
• Common area maint.
• Commercial project
mgmt
Sell/business
development
Plan
Build/
deliver
Manage/
operate
Service/
support
Bill and
collect
Project-
centric
operations
© 2011 SAP AG. All rights reserved. 33
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Technology innovations
Business
Analytics
MobilityIn-Memory Computing
Innovations
Solutions
Technology
• Mobility
• Business analytics
• In-memory computing
Delivery
• Rapid-deployment
solutions
• Customer co-innovation
• Ecosystem
• Road map
• Recent innovations
Future
• Common area maint.
• Commercial proj. mgmt
© 2011 SAP AG. All rights reserved. 34
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
SAP in-memory computing for EC&O
Opportunities for the business
Details
 Perform complex workforce
planning simulations in “real”
real time
 Refine complex workforce
models driven by strategic
revenue, full-time equivalent
(FTE), attrition rates, hiring
rates, cost, retirement age, and
so on
 Target revenue and head count
across time by line of business,
location, and role, skill, and
competency
 Reduce cycle time for
profitability analysis and
improve internal accounting and
decision making
 Predict inbound and outbound
cash flows to effectively drive
cash requirements, risk
management, and short-term
borrowing in real time
 Accelerate spend visibility to
identify areas of potential cost
savings
 Accelerate estimation and
budgeting for external
stakeholders
 Real time profitability by owner,
project, and market
 Comprehensive pipeline and
backlog analysis in seconds
 Understand owner requirements
and derive new opportunities
 Highlights areas to focus on and
identify at-risk customers for
improved account management
Finance and Operations Procurement and HR
Business
Development
Innovations
Solutions
Technology
• Mobility
• Business analytics
• In-memory computing
Delivery
• Rapid-deployment
solutions
• Customer co-innovation
• Ecosystem
• Road map
• Recent innovations
Future
• Common area maint.
• Commercial proj. mgmt
© 2011 SAP AG. All rights reserved. 35
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
SAP in-memory computing for EC&O
Finance and operations
Opportunity for the business In-memory-enabled
Innovation/SAP HANA
use cases
Capability enabled by
Financial and cost analysis ‒
Enable real-time analysis of
general ledger and invoice data to
identify cost leakage, reduce
audit costs and invoice delays,
and improve cash position
 Enables real-time analysis and
monitoring at the granular level
Planned standard
solution
Profitability and cost analysis ‒
Address eroding margins by
keeping track of changes in cost
dynamics and price optimization
opportunities
 Analyze large data sets of cost,
revenue, and customer data to
reduce unprofitable projects
Available standard
solution
 Enable real-time visibility to
KPIs
Available standard
solution
Cash and liquidity management ‒
Predict inbound and outbound
cash flows to effectively drive
cash requirements, risk
management, and short-term
borrowing in real time
 Interactive, high-performance
analysis of cash-flow data in
several dimensions
Planned standard
solution
 Access to payment history at
customer, project, and regional
level
Supported by HANA 1.0
SP3
Innovations
Solutions
Technology
• Mobility
• Business analytics
• In-memory computing
Delivery
• Rapid-deployment
solutions
• Customer co-innovation
• Ecosystem
• Road map
• Recent innovations
Future
• Common area maint.
• Commercial proj. mgmt
Back
© 2011 SAP AG. All rights reserved. 36
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
SAP in-memory computing for EC&O
Procurement and HR
Opportunity for the business In-memory-enabled
innovation/SAP HANA
use cases
Capability enabled by
Procurement spend analysis -‒
Accelerate holistic and actionable
spend visibility across the
enterprise to identify areas of
potential cost savings
• Access vast amount of data
across the entire company to
gain visibility into spend and to
identify areas of cost savings
Future or custom-made
Strategic workforce planning ‒
Perform simulations on demand
with insight into workforce
demographics, distribution, skills,
and so on
• Fast, collaborative simulation of
multiple scenarios Available standard
solution
• Refine complex workforce
models driven by strategic
revenue, FTE, attrition rates,
hiring rates, cost, retirement
age, and so on
• Target revenue and head count
across time by LoB, location,
current role, and strategic role
Innovations
Solutions
Technology
• Mobility
• Business analytics
• In-memory computing
Delivery
• Rapid-deployment
solutions
• Customer co-innovation
• Ecosystem
• Road map
• Recent innovations
Future
• Common area maint.
• Commercial proj. mgmt
Back
© 2011 SAP AG. All rights reserved. 37
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
SAP in-memory computing for EC&O
Business development
Opportunity for the business In-memory-enabled
innovation/SAP HANA
use cases
Capability enabled by
Customer 360-degree ‒ Account
intelligence highlights areas to
focus on, and identifies activity-
based outliers and at-risk
customers for improved account
management.
• Account intelligence ‒ a mobile
analytic application with super-fast
access to real-time customer
interactions, operational results,
and customer satisfaction in a
central view.
Planned standard
solution
Real-time sales analysis ‒ Timely
evaluation of sales pipeline to
compare actual vs. projected
backlog enables accurate
forecasting.
• Real-time sales analysis
 Access and analyze vast amounts
of sales data by
customer/project/location in real
time
 Identify where project volume
varies greatly from forecast, so
funds or resources can be
redirected to meet opportunities
Planned standard
solution
Innovations
Solutions
Technology
• Mobility
• Business analytics
• In-memory computing
Delivery
• Rapid-deployment
solutions
• Customer co-innovation
• Ecosystem
• Road map
• Recent innovations
Future
• Common area maint.
• Commercial proj mgmt
Back
© 2011 SAP AG. All rights reserved. 38
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Mobility for EC&O
Opportunities for the business
Business
Development
DetailsDetails DetailsDetails
Project
Operations
Project
Performance
IT
 Provide business
development staff
anywhere, anytime
access to critical
SAP CRM data
using smart phones,
such as iPhones and
Windows Mobile
devices
 Provide full access
to SAP CRM
accounts, contacts,
leads, opportunities,
activities, and
analytics from a
mobile device
 Increase business
development
efficiency
 Gain efficiency by
enabling on-site
project procurement
and materials
management
 Maximize labor and
equipment
productivity by
enabling mobile
equipment
management on-site
 Help ensure safety
and compliance by
enabling on-device
safety observation
reporting and audits
 Increase the
efficiency and
accuracy of
capturing time and
attendance
 Link construction
operations and
financial
performance with
time-relevant
reporting on device
 Increase visibility of
project performance
for project
managers,
engineers, and
superintendents in
the field
 Simplify sharing of
project status by
providing updates on
mobile devices
 Reduce manual and
double entry of
project task input
and updating
 Leverage the
industry’s most
powerful solution for
managing and
securing mobile
data, devices, and
applications.
 Allow mobile workers
to receive and
manage processes
supported by SAP
software on their
mobile device of
choice
 Build your own
mobile applications
to receive a
competitive edge on
a single platform
Innovations
Solutions
Technology
• Mobility
• Business analytics
• In-memory computing
Delivery
• Rapid-deployment
solutions
• Customer co-innovation
• Ecosystem
• Road map
• Recent innovations
Future
• Common area maint.
• Commercial proj. mgmt
© 2011 SAP AG. All rights reserved. 39
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Mobility for EC&O
Project performance use cases
Opportunity for the business Mobility-enabled
innovations/Mobility
use cases
Capability enabled by
Gain efficiency by enabling on-
site project procurement and
materials management
• Mobile purchasing and
purchase requisitions for
projects
Future and custom-
made
• Mobile materials receiving and
materials management for
projects
Maximize labor and equipment
productivity by enabling mobile
equipment management on site
 Mobile equipment management Future and custom-
made
Help ensure safety and
compliance by enabling on-
device safety observation
reporting and audits
 Project safety reporting and
tracking
Future and custom-
made
Increase the efficiency and
accuracy of capturing time and
attendance
• Time and expense entry Future and custom-
made
Innovations
Solutions
Technology
• Mobility
• Business analytics
• In-memory computing
Delivery
• Rapid-deployment
solutions
• Customer co-innovation
• Ecosystem
• Road map
• Recent innovations
Future
• Common area maint.
• Commercial proj. mgmt
Back
© 2011 SAP AG. All rights reserved. 40
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Mobility for EC&O
Project operations use cases
Opportunity for the business Mobility-enabled
innovations/Mobility
use cases
Capability enabled by
Link construction operations and
financial performance with time-
relevant reporting on device
• Mobile analytics for
construction
• Based on mobile SAP
Business Objects
Explorer software
(available) with
customer-specific
analysis
• Future
Increase visibility of project
performance for project
managers, engineers, and
superintendents in the field
Simplify sharing of project status
by providing updates via mobile
device
Reduce manual and double entry
of project task input and updating
Innovations
Solutions
Technology
• Mobility
• Business analytics
• In-memory computing
Delivery
• Rapid-deployment
solutions
• Customer co-innovation
• Ecosystem
• Road map
• Recent innovations
Future
• Common area maint.
• Commercial proj. mgmt
Back
© 2011 SAP AG. All rights reserved. 41
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Mobility for EC&O
Business development use cases
Opportunity for the business Mobility-enabled
innovations/Mobility
use cases
Capability enabled by
Provide business development
staff anywhere, anytime access
to critical SAP Customer
Relationship Management (SAP
CRM) application data using
smart phones, such as iPhones
and Windows Mobile devices
• Sales on device • Based on Sybase
Mobile Sales
application
Provide full access to SAP CRM
accounts, contacts, leads,
opportunities, activities, and
analytics from a mobile device
 Mobile sales analytics • Based on mobile SAP
BusinessObjects
Explorer with customer-
specific analysis
Increase business development
efficiency
Innovations
Solutions
Technology
• Mobility
• Business analytics
• In-memory computing
Delivery
• Rapid-deployment
solutions
• Customer co-innovation
• Ecosystem
• Road map
• Recent innovations
Future
• Common area maint.
• Commercial proj. mgmt
Back
© 2011 SAP AG. All rights reserved. 42
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Mobility for EC&O
Information technology use cases
Opportunity for the business Mobility-enabled
innovations/Mobility
use cases
Capability enabled by
Leverage the industry’s most
powerful solution for managing
and securing mobile data,
devices, and applications.
• Mobile device management • Afaria mobile device
management solution
Allow mobile workers to receive
and manage processes
supported by SAP Business Suite
software on their mobile device of
choice
• Mobile workflow management • Sybase Mobile
Workflow application for
SAP Business Suite
Build your own mobile
applications to receive a
competitive edge on a single
platform
• Mobile platform • Sybase Unwired
Platform
Innovations
Solutions
Technology
• Mobility
• Business analytics
• In-memory computing
Delivery
• Rapid-deployment
solutions
• Customer co-innovation
• Ecosystem
• Road map
• Recent innovations
Future
• Common area maint.
• Commercial proj mgmt
Back
© 2011 SAP AG. All rights reserved. 43
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Business analytics for EC&O
Opportunities for your business
Project Performance
Management
Business Performance
Management
 Analyze margin and margin variance for a
project in execution and investigate the
source of margin variance – multilevel
analysis of revenue, costs, and productivity
for a project
 Analyze cash position and cash-in and cash-
out for a project and investigate various
causes of variance in cash flow
 Analyze materials requirement for a job and
plan material purchasing and delivery as per
execution schedule to ensure just-in-time
availability
 Analyze project execution progress in terms
of schedule and earned value and forecast
project completion
 Analyze resource productivity and equipment
utilization for a project and their impact on
project progress and project costs
 Analyze correlated historical bids, backlog,
and profitability information to optimize the
bid – maximize probability of winning and
profitability
 Analyze profitability indicators for project
portfolios, lines of work, and markets
 Analyze cash position and cash flow for
various jobs and assess cash requirements
for meeting short-term commitments
 Analyze progress of various projects in
execution and assess impact on revenue,
cost, and profitability
 Analyze firm’s performance on safety
standards and its impact on financial risk
and profitability of the firm
DetailsDetails
Innovations
Solutions
Technology
• Mobility
• Business analytics
• In-memory computing
Delivery
• Rapid-deployment
solutions
• Customer co-innovation
• Ecosystem
• Road map
• Recent innovations
Future
• Common area maint.
• Commercial proj mgmt
© 2011 SAP AG. All rights reserved. 44
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Business analytics for EC&O
Project performance management use cases
Opportunity for the business Analytics-Enabled
innovations/Analytics
use cases
Capability enabled
by
Analyze margin and margin variance for a
project in execution and investigate the
source of margin variance – multilevel
analysis of revenue, costs, and productivity
for a project
 Profitability Plan to develop and
release the solution by
Q2/2012
Analyze cash position and cash-in and
cash-out for a project and investigate
various causes of variance in cash flow
 Cash flow
Analyze materials requirement for a job and
plan material purchasing and delivery as
per execution schedule to ensure just-in-
time availability
 Materials planning
Analyze project execution progress in terms
of schedule and earned value and forecast
project completion
 Project delivery
Analyze resource productivity and
equipment utilization for a project and their
impact on project progress and project
costs
 Resource productivity
and utilization
Innovations
Solutions
Technology
• Mobility
• Business analytics
• In-memory computing
Delivery
• Rapid-deployment
solutions
• Customer co-innovation
• Ecosystem
• Road map
• Recent innovations
Future
• Common area maint.
• Commercial proj. mgmt
Back
© 2011 SAP AG. All rights reserved. 45
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Business analytics for EC&O
Business performance management use cases
Opportunity for the business Analytics-Enabled
innovations/Analytics
use cases
Capability enabled
by
Analyze correlated historical bids, backlog,
and profitability information to optimize the
bid – maximize probability of winning and
profitability
 Bid planning and
optimization
Plan to develop and
release the solution by
Q2/2012
Analyze profitability indicators for project
portfolios, lines of work, and markets
 Profitability
Analyze cash position and cash flow for
various jobs and assess cash requirements
for meeting short-term commitments
 Liquidity
Analyze progress of various projects in
execution and assess impact on revenue,
cost, and profitability
 Project delivery
(portfolio)
Analyze firm’s performance on safety
standards and its impact on financial risk
and profitability of the firm
 Risk management
Innovations
Solutions
Technology
• Mobility
• Business analytics
• In-memory computing
Delivery
• Rapid-deployment
solutions
• Customer co-innovation
• Ecosystem
• Road map
• Recent innovations
Future
• Common area maint.
• Commercial proj. mgmt
Back
© 2011 SAP AG. All rights reserved. 46
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Delivery innovations
Innovations
Solutions
Technology
• Mobility
• Business analytics
• In-memory computing
Delivery
• Rapid-deployment
solutions
• Customer co-innovation
• Ecosystem
• Road map
• Recent innovations
Future
• Common area maint.
• Commercial proj. mgmt
© 2011 SAP AG. All rights reserved. 47
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
SAP ERP rapid-deployment solution for operational reporting with SAP HANA
software
Opportunity for the business Solution
Ready-to-run, SAP ERP rapid-deployment solution
for operational reporting with SAP HANA software
is essential reporting software with fixed scope,
predefined services at a predictable price with the
flexibility for future extension.
Shifting from a reactive business model, EC&O
companies can immediately respond to productivity
and profitability changes and proactively detect
project cost overruns and scope change.
Real-time, detailed visibility into project margin
variance and unapproved change orders
Immediate, self-service access to engineer-
procure-construct processes to facilitate on-time
purchasing and materials management
Instantly examine high-volume internal and
external design, build, and estimate/submittal data
 This SAP Rapid Deployment solution
provides a set of models from the business
areas of sales, financial, shipping,
procurement, and master data. The usage
via in-memory technology will ensure good
performance even with high data volumes
(which cannot currently be provided without
in-memory technology). Different clients
can be used to visualize the results.
 Business models and reports including:
 Financial reports
 Sales reports
 Procurement reports
 Master data reports
Rapid-deployment solutions
Innovations
Solutions
Technology
• Mobility
• Business analytics
• In-memory computing
Delivery
• Rapid-deployment
solutions
• Customer co-innovation
• Ecosystem
• Road map
• Recent innovations
Future
• Common area maint.
• Commercial proj. mgmt
© 2011 SAP AG. All rights reserved. 48
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Customer co-innovation
SAP Community Network
This online hub supports customers, partners, consultants, experts, and SAP employees.
Companies can find answers to questions and benefit from the expertise of other community
members as they develop their own products.
the idea place
Just launched – an open online forum for customers and ecosystem partners to connect and
provide feedback on new developments from SAP.
SAP BusinessObjects innovation center
This interactive online forum lets customers sample SAP technology that is in development.
Companies can download prototype software and offer their feedback.
SAP Premier Customer Network
Successful companies that SAP has selected to collaborate and share ideas. Network members
participate in programs designed to cultivate, diversify, and transform ideas into tangible business
improvements.
Innovations
Solutions
Technology
• Mobility
• Business analytics
• In-memory computing
Delivery
• Rapid-deployment
solutions
• Customer co-innovation
• Road map
• Recent innovations
Future
• Common area maint.
• Commercial proj. mgmt
Business analytics for construction
Commercial project management
• Ecosystem
© 2011 SAP AG. All rights reserved. 49
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Ecosystem
Consulting and integration
System integrators for EC&O
Qualified SAP Business All-in-One partner solutions for EC&O
Independent software vendors for building information modeling
For more details, see the SAP Communities site on SAP.com: SAP Communities
Innovations
Solutions
Technology
• Mobility
• Business analytics
• In-memory computing
Delivery
• Rapid-deployment
solutions
• Customer co-innovation
• Ecosystem
• Road map
• Recent innovations
Future
• Common area maint.
• Commercial proj. mgmt
© 2011 SAP AG. All rights reserved. 50
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Key trends driving future innovations
Innovations
Solutions
Technology
• Mobility
• Business analytics
• In-memory computing
Delivery
• Rapid-deployment
solutions
• Customer co-innovation
• Ecosystem
• Road map
• Recent innovations
Future
• Common area maint.
• Commercial proj. mgmt
Business Development
Collaborative Bid & Proposal Capability
Enhance Pipeline and Forecasting Capability
Enable Digital Construction / Building Information Modeling
Project Management
Comprehensive Project-centric Enterprise Solutions
Complete Construction Life-Cycle Solutions
Collaborative Approach to Project Stakeholders
Risk and Performance Management
Reporting / Analytics BAS
Risk-based performance management
Extended Capabilities
Offer new level of project visualization, integrating CAD,
simulation tools, engineering-centric data management applications
© 2011 SAP AG. All rights reserved. 51
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
References and results
Proof Points
High Companies
Larsen & Toubro
© 2011 SAP AG. All rights reserved. 52
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Proof Points
High Companies
Larsen & Toubro
Larsen & Toubro (L&T) is a
diverse technology,
engineering, construction,
and manufacturing company
with 60,000 employees and
$9.8 billion in revenue.
L&T wanted to establish a
single database for its
employees, to improve local as
well as global access to
employee information.
Leveraged cost-effective shared services and
single HR platform
Created common template for rollouts across
all businesses
Retired multiple stand-alone custom-built
systems and paper–based processes
Gained process scalability to support future
growth
Used employee data in different systems,
saving time and improving HR productivity
25% reduction in response time for
HR data analysis requests
30% reduction in HR transaction
processing time
95% reduction in time to generate HR
reports
© 2011 SAP AG. All rights reserved. 53
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Proof Points
High Companies
Larsen & Toubro
The High® Companies, a US
based engineering,
construction and operations
innovator , has 2,400
employees and specializes in
steel fabrication and
precast/prestressed concrete
system projects.
Legacy IT solutions kept track
of production history – but
couldn’t help management
track day-to-day inventory or
accurately forecast completion
of projects. Closer tracking of
materials and labor was
needed in addition to creating
best practices–based job-
costing processes and
implementing postmortem
profitability reporting.
Replaced antiquated IT solutions
Eliminated high volumes of custom reports
Reduced materials waste and loss
Enhanced ability to manage labor allocations
Reduced number of FTEs in accounts
payable
40% reduction in time needed to close
accounting period
25 number of reports needed, reduced
from several hundred
© 2011 SAP AG. All rights reserved. 54
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
SAP solutions help EC&O companies run
better
Strategy Business value
“End to end” processes for multi industry value chains
combining horizontal and industry specific solutions
 Collaborate better: Capture new revenue by enabling
complete lifecycle services
 Adapt better: Increase project profitability with real-time
insight
 Decide better: Align design and construction to maximize
productivity
 Operate better: Manage and mitigate risks to improve
operational results
SAP innovations
enable business
transformation Mobility Business
Analytics
In-Memory
Computing
IT value
Orchestration across on premise, on demand, and on device
providing flexibility, security, and scalability on a single IT
platform
 Easily consumable through implementable steps
 Quick ROI through rapid-deployment solutions
 Secure reliable operations tuned for your business
© 2011 SAP AG. All rights reserved. 55
Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points
Take Away
Completely integrated - SAP offers the only enterprise
platform that provides construction customers with a
solution across the entire value chain and project lifecycle.
Better communication and collaboration - SAP’s
innovations in mobility and real-time analytics enable
construction users to complete all of their daily functions
and tasks for managing their projects in the field.
Operations focused - SAP integrates operational data with
backend data, across all systems, not just financials and
controlling.
1
2
3
Take Away
© 2011 SAP AG. All rights reserved.
SAP, R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign, SAP
BusinessObjects Explorer, StreamWork, and other SAP products and
services mentioned herein as well as their respective logos are trademarks
or registered trademarks of SAP AG in Germany and other countries.
Business Objects and the Business Objects logo, BusinessObjects, Crystal
Reports, Crystal Decisions, Web Intelligence, Xcelsius, and other Business
Objects products and services mentioned herein as well as their respective
logos are trademarks or registered trademarks of Business Objects
Software Ltd. Business Objects is an SAP company.
Sybase and Adaptive Server, iAnywhere, Sybase 365, SQL Anywhere, and
other Sybase products and services mentioned herein as well as their
respective logos are trademarks or registered trademarks of Sybase, Inc.
Sybase is an SAP company.
All other product and service names mentioned are the trademarks of
their respective companies. Data contained in this document serves
informational purposes only. National product specifications may vary.
These materials are subject to change without notice. These materials
are provided by SAP AG and its affiliated companies (“SAP Group”)
for informational purposes only, without representation or warranty of
any kind, and SAP Group shall not be liable for errors or omissions with
respect to the materials. The only warranties for SAP Group products and
services are those that are set forth in the express warranty statements
accompanying such products and services, if any. Nothing herein should be
construed as constituting an additional warranty.

Industry EC & O

  • 1.
    SAP for Engineering, Construction & Operations IndustryBriefing Book Comments and questions: david.clemens@sap.com Edition 2 January 2012
  • 2.
    Legal disclaimer All informationin this industry briefing book is provided under NDA The information in this document is confidential and proprietary to SAP and may not be disclosed without the permission of SAP. This document is not subject to your license agreement or any other service or subscription agreement with SAP. SAP has no obligation to pursue any course of business outlined in this document or any related presentation, or to develop or release any functionality mentioned therein. This document, or any related presentation and SAP's strategy and possible future developments, products and or platforms directions and functionality are all subject to change and may be changed by SAP at any time for any reason without notice. The information on this document is not a commitment, promise or legal obligation to deliver any material, code or functionality. This document is provided without a warranty of any kind, either express or implied, including but not limited to, the implied warranties of merchantability, fitness for a particular purpose, or non-infringement. This document is for informational purposes and may not be incorporated into a contract. SAP assumes no responsibility for errors or omissions in this document, except if such damages were caused by SAP intentionally or grossly negligent. All forward-looking statements are subject to various risks and uncertainties that could cause actual results to differ materially from expectations. Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of their dates, and they should not be relied upon in making purchasing decisions.
  • 3.
    and SAP for Engineering, Construction& Operations TransformationRun Better Proof Points Strategy Solutions Innovations Drivers Take Away Comments and questions: david.clemens@sap.com
  • 4.
    © 2011 SAPAG. All rights reserved. 4 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points What does “Run Better” mean for a construction company? Project margin variance Labor and equipment productivity Days revenue outstanding Equipment utilization Unapproved change order indicator Project cash position Average project margin Run Better KPIs Examples • Roy Anderson Corp • Day & Zimmermann • Hatch Value potential
  • 5.
    © 2011 SAPAG. All rights reserved. 5 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Average Operating Margin (in %) Days Sales Outstanding (in days) 30 best Large disparity between average and best 16% best Run Better KPIs Examples • Roy Anderson Corp • Day & Zimmermann • Hatch Value potential
  • 6.
    © 2011 SAPAG. All rights reserved. 6 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points The best are leading the way 40% reduction in days revenue outstanding 50% reduction in time to create global customer invoice 17% reduced project cost over-runs Run Better KPIs Examples • Roy Anderson Corp • Day & Zimmermann • Hatch Value potential
  • 7.
    © 2011 SAPAG. All rights reserved. 7 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Roy Anderson Corp is a leading midsize U.S. construction company with 500 employees and U.S. $650 million in revenue. Hindered by nonintegrated systems and manual processes, Roy Anderson needed to eliminate information silos and allow easier retrieval of project data. It wanted to improve construction project management through better analysis of job scope and cost. Gained greater visibility across all levels of the organization Improved forecasting and gained greater cost control Streamlined human resources, project management, and scheduling processes 17% reduction in project cost overruns 33% reduction in month-end closing 80% reduction in time to create new reports Run Better KPIs Examples • Roy Anderson Corp • Day & Zimmermann • Hatch Value potential
  • 8.
    © 2011 SAPAG. All rights reserved. 8 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Day & Zimmermann (D&Z) is a top global contractor serving governments and commercial customers with 24,000 employees and U.S. $2.2 billion in revenue. Operating in more than 150 locations worldwide, D&Z struggled with an array of point solutions that impeded collaboration across business units and made it difficult to capture and report cost. The company needed to consolidate operations and eliminate cumbersome, nonscalable legacy systems. Reduced enterprise complexity by mapping dozens of business units to a single software foundation Eliminated costly legacy systems: 6 legacy core business systems and 17 different labor collection systems Minimized support functions through centralization and standardization 40% reduction in days sales outstanding 25% reduction in duration of billing-to-cash cycle increase in online sales30% Run Better KPIs Examples • Roy Anderson Corp • Day & Zimmermann • Hatch Value potential
  • 9.
    © 2011 SAPAG. All rights reserved. 9 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Hatch is a global consulting, engineering, and project and construction management company with 8,000 employees. Based in Ontario, Canada, Hatch provides solutions and services to industry sectors that include mining and metals, energy, and infrastructure. The company implemented the SAP ERP application to support its goal of continued worldwide growth and to standardize business processes among 11 business units operating across six continents. Retirement of legacy systems Single global instance, with minimal customization Eight-month implementation with big-bang rollout of all core systems Sandbox system to familiarize employees with software and accelerate business readiness reduction in time to create final global customer invoices reduction in time for month-end closing improvement in capturing global time sheet information 50% 50% 60% Run Better KPIs Examples • Roy Anderson Corp • Day & Zimmermann • Hatch Value potential
  • 10.
    © 2011 SAPAG. All rights reserved. 10 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Innovation drivers in the EC&O industry Customers demanding more flexible business models to support an increasingly complex environment Innovation Drivers Intense competition Flexible delivery models Materials volatility Workforce optimization Efficient execution
  • 11.
    © 2011 SAPAG. All rights reserved. 11 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Intense competition Firms battle for work as the industry contracts A buyer’s market puts the squeeze on margins Emerging markets present challenges and opportunities Owners outsource more/ demand full lifecycle services Innovation Drivers Intense competition Flexible delivery models Materials volatility Workforce optimization Efficient execution
  • 12.
    © 2011 SAPAG. All rights reserved. 12 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Flexible delivery models Government spending shifts demand from private to public Drive to access opportunities in stronger geographies Regulatory issues associated with public projects create challenges Innovation Drivers Intense competition Flexible delivery models Materials volatility Workforce optimization Efficient execution
  • 13.
    © 2011 SAPAG. All rights reserved. 13 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Materials volatility Commodity volatility remains unpredictable Building materials price inflation remains possible Ability to leverage buying power reduces cost Innovation Drivers Intense competition Flexible delivery models Materials volatility Workforce optimization Efficient execution
  • 14.
    © 2011 SAPAG. All rights reserved. 14 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Workforce optimization Talent losses due to downturn create challenges after recovery Workforce efficiency and productivity are essential in a tight market Ability to leverage talent regardless of geography Innovation Drivers Intense competition Flexible delivery models Materials volatility Workforce optimization Efficient execution
  • 15.
    © 2011 SAPAG. All rights reserved. 15 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Efficient execution Tight margins demand efficient use of project resources Equipment, labor, and materials management on projects Complex projects drive complex business relationships Innovation Drivers Intense competition Flexible delivery models Materials volatility Workforce optimization Efficient execution
  • 16.
    © 2011 SAPAG. All rights reserved. 16 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Without SAP Business Challenges Transformation Without SAP SAP’s Value With SAP Designer Projects Subcontractors Owners Operations Business Development Procurement IT HRFinance  Inefficient projects Poor communication and collaboration reduce resource productivity  Increased risk Lack of operational and financial visibility puts pressure on margins  Limited systems Unable to track and manage full service lifecycle operations  Poor skill set allocation Staffing issues becoming more common amid shrinking labor market
  • 17.
    © 2011 SAPAG. All rights reserved. 17 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points With SAP Coordinated and integrated systems and processes Designer Projects Subcontractors Owners  Optimized resources Maximize productivity and profitability of project materials, equipment and labor  Increased visibility Make better, faster decisions with real-time, contextual insights  Integrated portfolio Drive process efficiency and business growth  Aligned skills for the right project Effectively attract, develop, and retain a talented and productive workforce Operations Business Development Procurement IT HRFinance Transformation Without SAP SAP’s Value With SAP
  • 18.
    © 2011 SAPAG. All rights reserved. 18 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points SAP helps EC&O companies confidently expand their business Maximizing resource productivity and increasing project profitability Bridge the gap between design and construction by bringing in real-time design information to assess the “constructability” of any given design SAP unique capability SAP unique capabilitySAP unique capability Managing and mitigating operations and financial risk Establishing new revenue streams with complete lifecycle services Ensure on-time, on- budget delivery and reduce execution risks through in-depth mapping of resources, material, and equipment to the project plan Deliver applications for the full facility lifecycle, from planning and design, to project management, to operations Transformation Without SAP SAP’s Value With SAP
  • 19.
    © 2011 SAPAG. All rights reserved. 19 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points SAP solutions for EC&O Solutions  IT  Finance  Procurement  HR  Business Development  Operations SAP delivers comprehensive, integrated solutions for all business areas in EC&O Operations Business Development Procurement IT HRFinance
  • 20.
    © 2011 SAPAG. All rights reserved. 20 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points  Design & Engineering Enable detailed design and engineering capabilities including the management and development of design documents, engineering descriptions and facility/plant modeling.  Project Management Projects embedded into the Enterprise – making them easier to manage and reduce risk. Leverage buying power and manage subcontractors.  Equipment and Tools Management Improved availability and tracking of equipment. Flexible price and account determination. Clear visibility of TCO and return on assets.  Operational Workforce Management Improved utilization, profitability and client satisfaction by assigning the right people, with the right skills at the right rates to the right projects. SAP solutions for operations Connect engineering‚ project management and execution in one unified solution Solutions Operations Business Development Procurement IT HRFinance 1 | 2  IT  Finance  Procurement  HR  Business Development  Operations
  • 21.
    © 2011 SAPAG. All rights reserved. 21 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points  Commercial Real Estate End-to-end real estate lifecycle management with full integration to ERP Financials  Facility Services and Operations Improve run-time production and reduce costs with an integrated maintenance program that enables higher equipment reliability and improved resource allocation. Solutions 1 | 2 SAP solutions for operations Connect engineering‚ project management and execution in one unified solution  IT  Finance  Procurement  HR  Business Development  Operations Operations Business Development Procurement IT HRFinance
  • 22.
    © 2011 SAPAG. All rights reserved. 22 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points SAP solutions for business development Streamline selling processes to accelerate buying decisions  Building Information Modeling (BIM) Optimize project planning and delivery (cost estimating, modeling, planning, quantity tracking, subcontractor mgt.) while leveraging CAD design data.  Bid and Proposal Management Enables EC&O companies to manage potential opportunities, customer relationships and business development effectively through improved sales force productivity with account, contact and opportunity management as well as handling of contracts and quotation Solutions  IT  Finance  Procurement  HR  Business Development  Operations Operations Business Development Procurement IT HRFinance
  • 23.
    © 2011 SAPAG. All rights reserved. 23 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points SAP solutions for procurement Close the loop of engineering, procurement and construction in the project life  Procurement and Materials Management Enables end-to-end sourcing and procurement by connecting spend analysis, on-demand strategic sourcing and contract management, and operational procurement.  Subcontractor Management Enable core sourcing of multiple levels of suppliers, partners, and manufacturers to perform altogether in delivering to projects Solutions  IT  Finance  Procurement  HR  Business Development  Operations Operations Business Development Procurement IT HRFinance
  • 24.
    © 2011 SAPAG. All rights reserved. 24 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points SAP solutions for information technology Improve insight‚ productivity and operations  Operational Risk Management Improve EHS performance and ensure operational continuity by proactively reducing risks, preventing incidents, and improving operating efficiency.  Manage Enterprise Risk and Compliance Continuously monitor key risk indicators and compliance effectiveness, business processes and IT systems to align risks and compliance to strategy. Solutions  IT  Finance  Procurement  HR  Business Development  Operations Operations Business Development Procurement IT HRFinance
  • 25.
    © 2011 SAPAG. All rights reserved. 25 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points  Manage Financial Performance Managing financial and operational performance helps companies for accurate insight into costing, improved financial planning and forecasting.  Treasury and Financial Risk Management Ensure enough cash liquidity to fund business operations.  Accounting and Financial Close Help customers to run their accounting and financial close processes faster, more accurate, more compliant and less costly. SAP solutions for finance Improve visibility and insight into enterprise risks that affect business performance Solutions  IT  Finance  Procurement  HR  Business Development  Operations Operations Business Development Procurement IT HRFinance
  • 26.
    © 2011 SAPAG. All rights reserved. 26 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points SAP solutions for human resources Find and develop the best people and talent  Core HR and Payroll for EC&O Enables organizations to support and automate processes that allow them to support the entire employee lifecycle from hire to retire for a global workforce.  Talent Management Enables organizations to attract, recruit, appraise, develop and retain the best talent available. Solutions  IT  Finance  Procurement  HR  Business Development  Operations Operations Business Development Procurement IT HRFinance
  • 27.
    © 2011 SAPAG. All rights reserved. 27 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Customer centric and innovation driven SAP’s strategy for EC&O companies Solution Innovations Technology Innovations Delivery Innovations Innovations Solutions Technology • Mobility • Business analytics • In-memory computing Delivery • Rapid-deployment solutions • Customer co-innovation • Ecosystem • Road map • Recent innovations Future • Common area maint. • Commercial proj. mgmt
  • 28.
    © 2011 SAPAG. All rights reserved. 28 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points SAP solution innovations for EC&O companies Innovations Solutions Technology • Business analytics • In-memory computing Delivery • Rapid-deployment solutions • Customer co-innovation • Road map • Recent innovations Future • Common area maint. • Commercial proj. mgmt • Mobility • Ecosystem Operations Business Development Procurement IT HRFinance
  • 29.
    © 2011 SAPAG. All rights reserved. 29 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Selected solution innovations Available today Real estate operations SAP Common Area Maintenance Expense Recovery application  Automatically settle common area invoices for shopping centers, retail malls, and office environments  Fully integrated and highly flexible add-on solution to SAP Real Estate Management application  Allows effective control of expense recoveries by automating this process  Optimize investment planning by receiving full reimbursement for common area invoices  Dedicated subcontractor management solution that handles all related data, processing, and retention Innovations Solutions Technology • Mobility • Business analytics • In-memory computing Delivery • Rapid-deployment solutions • Customer co-innovation • Ecosystem • Road map • Recent innovations Future • Common area maint. • Commercial proj. mgmt
  • 30.
    © 2011 SAPAG. All rights reserved. 30 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Selected solution innovations SAP Common Area Maintenance Expense Recovery Innovations Solutions Technology • Mobility • Business analytics • In-memory computing Delivery • Rapid-deployment solutions • Customer co-innovation • Ecosystem • Road map • Recent innovations Future • Common area maint. • Commercial proj. mgmt Full Automation Automated process (as add-on to SAP Real Estate management with full integration to ERP) to timely calculate common area expenses and pass- through the correct amounts of common area charges to your tenants. Optimized Portfolio Management Effective control of expense recoveries in order to secure the sound performance of your property portfolio. Optimize your investment planning by receiving full reimbursement for common area invoices. Full Integration SAP Common Area Maintenance Expense Recovery is a seamless and highly flexible add-on solution to SAP Real Estate Management, with full integration to SAP ERP and other SAP solutions. Reduced TCO The solution allows a constant cost control and monitoring of all expense types and provides a correct common area maintenance expense calculation. It is self contained within SAP, no external interfaces necessary. High Flexibility New settlement program with the option to manually adjust the results for current period and adjust expenses during simulation. Ability for customer specific calculation methods, including the assignment of new distribution rules. Resulting in improved transparency on real estate portfolio profitability by constantly monitoring common areas and related costs
  • 31.
    © 2011 SAPAG. All rights reserved. 31 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Selected solution innovations Road map – commercial project management Project Work Space  New user experience for project managers  Work space for comprehensive project- centric enterprise solutions  Enables management of project-specific business processes across systems Extended Project Financial Planning and Forecasting  Extended functionality and enhanced usability for the planning, forecasting, and monitoring of projects  Enhanced front end to support financial planning (cost, revenue, quantities, cash, and progress) for projects Project Issue and Change Management  Manage and track project scope changes (from initial change request to the final change order)  Enhanced process support for cost and revenue planning of changes and for updating purchasing and contract documents Innovations Solutions Technology • Mobility • Business analytics • In-memory computing Delivery • Rapid-deployment solutions • Customer co-innovation • Ecosystem • Road map • Recent innovations Future • Common area maint. • Commercial proj mgmt Project Management
  • 32.
    © 2011 SAPAG. All rights reserved. 32 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Finance Invoice to pay Customer to cash Accounting and finance Treasury and financial risk mgmt. Travel management Shared service for financials Selected solution innovations Commercial project management Human capital management Core HR and payroll HR operations Business development, client and opportunity mgmt Business development and marketing to customer acceptance Customer lifecycle management Risk and independence check Project and engagement management Engagement mgmt and controlling Engagement fulfillment Project planning, execution, and monitoring Project collaboration and knowledge management Business and IT service management Contract mgmt and controlling IT financial mgmt/service centric billing Product order management Service request and service order mgmt Call center operations IT service desk Configuration and change management IT asset management Innovations Solutions Technology • Mobility • Business analytics • In-memory computing Delivery • Rapid-deployment solutions • Customer co-innovation • Ecosystem • Road map • Recent innovations Future • Common area maint. • Commercial project mgmt Sell/business development Plan Build/ deliver Manage/ operate Service/ support Bill and collect Project- centric operations
  • 33.
    © 2011 SAPAG. All rights reserved. 33 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Technology innovations Business Analytics MobilityIn-Memory Computing Innovations Solutions Technology • Mobility • Business analytics • In-memory computing Delivery • Rapid-deployment solutions • Customer co-innovation • Ecosystem • Road map • Recent innovations Future • Common area maint. • Commercial proj. mgmt
  • 34.
    © 2011 SAPAG. All rights reserved. 34 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points SAP in-memory computing for EC&O Opportunities for the business Details  Perform complex workforce planning simulations in “real” real time  Refine complex workforce models driven by strategic revenue, full-time equivalent (FTE), attrition rates, hiring rates, cost, retirement age, and so on  Target revenue and head count across time by line of business, location, and role, skill, and competency  Reduce cycle time for profitability analysis and improve internal accounting and decision making  Predict inbound and outbound cash flows to effectively drive cash requirements, risk management, and short-term borrowing in real time  Accelerate spend visibility to identify areas of potential cost savings  Accelerate estimation and budgeting for external stakeholders  Real time profitability by owner, project, and market  Comprehensive pipeline and backlog analysis in seconds  Understand owner requirements and derive new opportunities  Highlights areas to focus on and identify at-risk customers for improved account management Finance and Operations Procurement and HR Business Development Innovations Solutions Technology • Mobility • Business analytics • In-memory computing Delivery • Rapid-deployment solutions • Customer co-innovation • Ecosystem • Road map • Recent innovations Future • Common area maint. • Commercial proj. mgmt
  • 35.
    © 2011 SAPAG. All rights reserved. 35 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points SAP in-memory computing for EC&O Finance and operations Opportunity for the business In-memory-enabled Innovation/SAP HANA use cases Capability enabled by Financial and cost analysis ‒ Enable real-time analysis of general ledger and invoice data to identify cost leakage, reduce audit costs and invoice delays, and improve cash position  Enables real-time analysis and monitoring at the granular level Planned standard solution Profitability and cost analysis ‒ Address eroding margins by keeping track of changes in cost dynamics and price optimization opportunities  Analyze large data sets of cost, revenue, and customer data to reduce unprofitable projects Available standard solution  Enable real-time visibility to KPIs Available standard solution Cash and liquidity management ‒ Predict inbound and outbound cash flows to effectively drive cash requirements, risk management, and short-term borrowing in real time  Interactive, high-performance analysis of cash-flow data in several dimensions Planned standard solution  Access to payment history at customer, project, and regional level Supported by HANA 1.0 SP3 Innovations Solutions Technology • Mobility • Business analytics • In-memory computing Delivery • Rapid-deployment solutions • Customer co-innovation • Ecosystem • Road map • Recent innovations Future • Common area maint. • Commercial proj. mgmt Back
  • 36.
    © 2011 SAPAG. All rights reserved. 36 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points SAP in-memory computing for EC&O Procurement and HR Opportunity for the business In-memory-enabled innovation/SAP HANA use cases Capability enabled by Procurement spend analysis -‒ Accelerate holistic and actionable spend visibility across the enterprise to identify areas of potential cost savings • Access vast amount of data across the entire company to gain visibility into spend and to identify areas of cost savings Future or custom-made Strategic workforce planning ‒ Perform simulations on demand with insight into workforce demographics, distribution, skills, and so on • Fast, collaborative simulation of multiple scenarios Available standard solution • Refine complex workforce models driven by strategic revenue, FTE, attrition rates, hiring rates, cost, retirement age, and so on • Target revenue and head count across time by LoB, location, current role, and strategic role Innovations Solutions Technology • Mobility • Business analytics • In-memory computing Delivery • Rapid-deployment solutions • Customer co-innovation • Ecosystem • Road map • Recent innovations Future • Common area maint. • Commercial proj. mgmt Back
  • 37.
    © 2011 SAPAG. All rights reserved. 37 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points SAP in-memory computing for EC&O Business development Opportunity for the business In-memory-enabled innovation/SAP HANA use cases Capability enabled by Customer 360-degree ‒ Account intelligence highlights areas to focus on, and identifies activity- based outliers and at-risk customers for improved account management. • Account intelligence ‒ a mobile analytic application with super-fast access to real-time customer interactions, operational results, and customer satisfaction in a central view. Planned standard solution Real-time sales analysis ‒ Timely evaluation of sales pipeline to compare actual vs. projected backlog enables accurate forecasting. • Real-time sales analysis  Access and analyze vast amounts of sales data by customer/project/location in real time  Identify where project volume varies greatly from forecast, so funds or resources can be redirected to meet opportunities Planned standard solution Innovations Solutions Technology • Mobility • Business analytics • In-memory computing Delivery • Rapid-deployment solutions • Customer co-innovation • Ecosystem • Road map • Recent innovations Future • Common area maint. • Commercial proj mgmt Back
  • 38.
    © 2011 SAPAG. All rights reserved. 38 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Mobility for EC&O Opportunities for the business Business Development DetailsDetails DetailsDetails Project Operations Project Performance IT  Provide business development staff anywhere, anytime access to critical SAP CRM data using smart phones, such as iPhones and Windows Mobile devices  Provide full access to SAP CRM accounts, contacts, leads, opportunities, activities, and analytics from a mobile device  Increase business development efficiency  Gain efficiency by enabling on-site project procurement and materials management  Maximize labor and equipment productivity by enabling mobile equipment management on-site  Help ensure safety and compliance by enabling on-device safety observation reporting and audits  Increase the efficiency and accuracy of capturing time and attendance  Link construction operations and financial performance with time-relevant reporting on device  Increase visibility of project performance for project managers, engineers, and superintendents in the field  Simplify sharing of project status by providing updates on mobile devices  Reduce manual and double entry of project task input and updating  Leverage the industry’s most powerful solution for managing and securing mobile data, devices, and applications.  Allow mobile workers to receive and manage processes supported by SAP software on their mobile device of choice  Build your own mobile applications to receive a competitive edge on a single platform Innovations Solutions Technology • Mobility • Business analytics • In-memory computing Delivery • Rapid-deployment solutions • Customer co-innovation • Ecosystem • Road map • Recent innovations Future • Common area maint. • Commercial proj. mgmt
  • 39.
    © 2011 SAPAG. All rights reserved. 39 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Mobility for EC&O Project performance use cases Opportunity for the business Mobility-enabled innovations/Mobility use cases Capability enabled by Gain efficiency by enabling on- site project procurement and materials management • Mobile purchasing and purchase requisitions for projects Future and custom- made • Mobile materials receiving and materials management for projects Maximize labor and equipment productivity by enabling mobile equipment management on site  Mobile equipment management Future and custom- made Help ensure safety and compliance by enabling on- device safety observation reporting and audits  Project safety reporting and tracking Future and custom- made Increase the efficiency and accuracy of capturing time and attendance • Time and expense entry Future and custom- made Innovations Solutions Technology • Mobility • Business analytics • In-memory computing Delivery • Rapid-deployment solutions • Customer co-innovation • Ecosystem • Road map • Recent innovations Future • Common area maint. • Commercial proj. mgmt Back
  • 40.
    © 2011 SAPAG. All rights reserved. 40 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Mobility for EC&O Project operations use cases Opportunity for the business Mobility-enabled innovations/Mobility use cases Capability enabled by Link construction operations and financial performance with time- relevant reporting on device • Mobile analytics for construction • Based on mobile SAP Business Objects Explorer software (available) with customer-specific analysis • Future Increase visibility of project performance for project managers, engineers, and superintendents in the field Simplify sharing of project status by providing updates via mobile device Reduce manual and double entry of project task input and updating Innovations Solutions Technology • Mobility • Business analytics • In-memory computing Delivery • Rapid-deployment solutions • Customer co-innovation • Ecosystem • Road map • Recent innovations Future • Common area maint. • Commercial proj. mgmt Back
  • 41.
    © 2011 SAPAG. All rights reserved. 41 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Mobility for EC&O Business development use cases Opportunity for the business Mobility-enabled innovations/Mobility use cases Capability enabled by Provide business development staff anywhere, anytime access to critical SAP Customer Relationship Management (SAP CRM) application data using smart phones, such as iPhones and Windows Mobile devices • Sales on device • Based on Sybase Mobile Sales application Provide full access to SAP CRM accounts, contacts, leads, opportunities, activities, and analytics from a mobile device  Mobile sales analytics • Based on mobile SAP BusinessObjects Explorer with customer- specific analysis Increase business development efficiency Innovations Solutions Technology • Mobility • Business analytics • In-memory computing Delivery • Rapid-deployment solutions • Customer co-innovation • Ecosystem • Road map • Recent innovations Future • Common area maint. • Commercial proj. mgmt Back
  • 42.
    © 2011 SAPAG. All rights reserved. 42 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Mobility for EC&O Information technology use cases Opportunity for the business Mobility-enabled innovations/Mobility use cases Capability enabled by Leverage the industry’s most powerful solution for managing and securing mobile data, devices, and applications. • Mobile device management • Afaria mobile device management solution Allow mobile workers to receive and manage processes supported by SAP Business Suite software on their mobile device of choice • Mobile workflow management • Sybase Mobile Workflow application for SAP Business Suite Build your own mobile applications to receive a competitive edge on a single platform • Mobile platform • Sybase Unwired Platform Innovations Solutions Technology • Mobility • Business analytics • In-memory computing Delivery • Rapid-deployment solutions • Customer co-innovation • Ecosystem • Road map • Recent innovations Future • Common area maint. • Commercial proj mgmt Back
  • 43.
    © 2011 SAPAG. All rights reserved. 43 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Business analytics for EC&O Opportunities for your business Project Performance Management Business Performance Management  Analyze margin and margin variance for a project in execution and investigate the source of margin variance – multilevel analysis of revenue, costs, and productivity for a project  Analyze cash position and cash-in and cash- out for a project and investigate various causes of variance in cash flow  Analyze materials requirement for a job and plan material purchasing and delivery as per execution schedule to ensure just-in-time availability  Analyze project execution progress in terms of schedule and earned value and forecast project completion  Analyze resource productivity and equipment utilization for a project and their impact on project progress and project costs  Analyze correlated historical bids, backlog, and profitability information to optimize the bid – maximize probability of winning and profitability  Analyze profitability indicators for project portfolios, lines of work, and markets  Analyze cash position and cash flow for various jobs and assess cash requirements for meeting short-term commitments  Analyze progress of various projects in execution and assess impact on revenue, cost, and profitability  Analyze firm’s performance on safety standards and its impact on financial risk and profitability of the firm DetailsDetails Innovations Solutions Technology • Mobility • Business analytics • In-memory computing Delivery • Rapid-deployment solutions • Customer co-innovation • Ecosystem • Road map • Recent innovations Future • Common area maint. • Commercial proj mgmt
  • 44.
    © 2011 SAPAG. All rights reserved. 44 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Business analytics for EC&O Project performance management use cases Opportunity for the business Analytics-Enabled innovations/Analytics use cases Capability enabled by Analyze margin and margin variance for a project in execution and investigate the source of margin variance – multilevel analysis of revenue, costs, and productivity for a project  Profitability Plan to develop and release the solution by Q2/2012 Analyze cash position and cash-in and cash-out for a project and investigate various causes of variance in cash flow  Cash flow Analyze materials requirement for a job and plan material purchasing and delivery as per execution schedule to ensure just-in- time availability  Materials planning Analyze project execution progress in terms of schedule and earned value and forecast project completion  Project delivery Analyze resource productivity and equipment utilization for a project and their impact on project progress and project costs  Resource productivity and utilization Innovations Solutions Technology • Mobility • Business analytics • In-memory computing Delivery • Rapid-deployment solutions • Customer co-innovation • Ecosystem • Road map • Recent innovations Future • Common area maint. • Commercial proj. mgmt Back
  • 45.
    © 2011 SAPAG. All rights reserved. 45 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Business analytics for EC&O Business performance management use cases Opportunity for the business Analytics-Enabled innovations/Analytics use cases Capability enabled by Analyze correlated historical bids, backlog, and profitability information to optimize the bid – maximize probability of winning and profitability  Bid planning and optimization Plan to develop and release the solution by Q2/2012 Analyze profitability indicators for project portfolios, lines of work, and markets  Profitability Analyze cash position and cash flow for various jobs and assess cash requirements for meeting short-term commitments  Liquidity Analyze progress of various projects in execution and assess impact on revenue, cost, and profitability  Project delivery (portfolio) Analyze firm’s performance on safety standards and its impact on financial risk and profitability of the firm  Risk management Innovations Solutions Technology • Mobility • Business analytics • In-memory computing Delivery • Rapid-deployment solutions • Customer co-innovation • Ecosystem • Road map • Recent innovations Future • Common area maint. • Commercial proj. mgmt Back
  • 46.
    © 2011 SAPAG. All rights reserved. 46 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Delivery innovations Innovations Solutions Technology • Mobility • Business analytics • In-memory computing Delivery • Rapid-deployment solutions • Customer co-innovation • Ecosystem • Road map • Recent innovations Future • Common area maint. • Commercial proj. mgmt
  • 47.
    © 2011 SAPAG. All rights reserved. 47 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points SAP ERP rapid-deployment solution for operational reporting with SAP HANA software Opportunity for the business Solution Ready-to-run, SAP ERP rapid-deployment solution for operational reporting with SAP HANA software is essential reporting software with fixed scope, predefined services at a predictable price with the flexibility for future extension. Shifting from a reactive business model, EC&O companies can immediately respond to productivity and profitability changes and proactively detect project cost overruns and scope change. Real-time, detailed visibility into project margin variance and unapproved change orders Immediate, self-service access to engineer- procure-construct processes to facilitate on-time purchasing and materials management Instantly examine high-volume internal and external design, build, and estimate/submittal data  This SAP Rapid Deployment solution provides a set of models from the business areas of sales, financial, shipping, procurement, and master data. The usage via in-memory technology will ensure good performance even with high data volumes (which cannot currently be provided without in-memory technology). Different clients can be used to visualize the results.  Business models and reports including:  Financial reports  Sales reports  Procurement reports  Master data reports Rapid-deployment solutions Innovations Solutions Technology • Mobility • Business analytics • In-memory computing Delivery • Rapid-deployment solutions • Customer co-innovation • Ecosystem • Road map • Recent innovations Future • Common area maint. • Commercial proj. mgmt
  • 48.
    © 2011 SAPAG. All rights reserved. 48 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Customer co-innovation SAP Community Network This online hub supports customers, partners, consultants, experts, and SAP employees. Companies can find answers to questions and benefit from the expertise of other community members as they develop their own products. the idea place Just launched – an open online forum for customers and ecosystem partners to connect and provide feedback on new developments from SAP. SAP BusinessObjects innovation center This interactive online forum lets customers sample SAP technology that is in development. Companies can download prototype software and offer their feedback. SAP Premier Customer Network Successful companies that SAP has selected to collaborate and share ideas. Network members participate in programs designed to cultivate, diversify, and transform ideas into tangible business improvements. Innovations Solutions Technology • Mobility • Business analytics • In-memory computing Delivery • Rapid-deployment solutions • Customer co-innovation • Road map • Recent innovations Future • Common area maint. • Commercial proj. mgmt Business analytics for construction Commercial project management • Ecosystem
  • 49.
    © 2011 SAPAG. All rights reserved. 49 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Ecosystem Consulting and integration System integrators for EC&O Qualified SAP Business All-in-One partner solutions for EC&O Independent software vendors for building information modeling For more details, see the SAP Communities site on SAP.com: SAP Communities Innovations Solutions Technology • Mobility • Business analytics • In-memory computing Delivery • Rapid-deployment solutions • Customer co-innovation • Ecosystem • Road map • Recent innovations Future • Common area maint. • Commercial proj. mgmt
  • 50.
    © 2011 SAPAG. All rights reserved. 50 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Key trends driving future innovations Innovations Solutions Technology • Mobility • Business analytics • In-memory computing Delivery • Rapid-deployment solutions • Customer co-innovation • Ecosystem • Road map • Recent innovations Future • Common area maint. • Commercial proj. mgmt Business Development Collaborative Bid & Proposal Capability Enhance Pipeline and Forecasting Capability Enable Digital Construction / Building Information Modeling Project Management Comprehensive Project-centric Enterprise Solutions Complete Construction Life-Cycle Solutions Collaborative Approach to Project Stakeholders Risk and Performance Management Reporting / Analytics BAS Risk-based performance management Extended Capabilities Offer new level of project visualization, integrating CAD, simulation tools, engineering-centric data management applications
  • 51.
    © 2011 SAPAG. All rights reserved. 51 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points References and results Proof Points High Companies Larsen & Toubro
  • 52.
    © 2011 SAPAG. All rights reserved. 52 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Proof Points High Companies Larsen & Toubro Larsen & Toubro (L&T) is a diverse technology, engineering, construction, and manufacturing company with 60,000 employees and $9.8 billion in revenue. L&T wanted to establish a single database for its employees, to improve local as well as global access to employee information. Leveraged cost-effective shared services and single HR platform Created common template for rollouts across all businesses Retired multiple stand-alone custom-built systems and paper–based processes Gained process scalability to support future growth Used employee data in different systems, saving time and improving HR productivity 25% reduction in response time for HR data analysis requests 30% reduction in HR transaction processing time 95% reduction in time to generate HR reports
  • 53.
    © 2011 SAPAG. All rights reserved. 53 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Proof Points High Companies Larsen & Toubro The High® Companies, a US based engineering, construction and operations innovator , has 2,400 employees and specializes in steel fabrication and precast/prestressed concrete system projects. Legacy IT solutions kept track of production history – but couldn’t help management track day-to-day inventory or accurately forecast completion of projects. Closer tracking of materials and labor was needed in addition to creating best practices–based job- costing processes and implementing postmortem profitability reporting. Replaced antiquated IT solutions Eliminated high volumes of custom reports Reduced materials waste and loss Enhanced ability to manage labor allocations Reduced number of FTEs in accounts payable 40% reduction in time needed to close accounting period 25 number of reports needed, reduced from several hundred
  • 54.
    © 2011 SAPAG. All rights reserved. 54 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points SAP solutions help EC&O companies run better Strategy Business value “End to end” processes for multi industry value chains combining horizontal and industry specific solutions  Collaborate better: Capture new revenue by enabling complete lifecycle services  Adapt better: Increase project profitability with real-time insight  Decide better: Align design and construction to maximize productivity  Operate better: Manage and mitigate risks to improve operational results SAP innovations enable business transformation Mobility Business Analytics In-Memory Computing IT value Orchestration across on premise, on demand, and on device providing flexibility, security, and scalability on a single IT platform  Easily consumable through implementable steps  Quick ROI through rapid-deployment solutions  Secure reliable operations tuned for your business
  • 55.
    © 2011 SAPAG. All rights reserved. 55 Drivers Innovations Take AwayStrategyRun Better Transformation Solutions Proof Points Take Away Completely integrated - SAP offers the only enterprise platform that provides construction customers with a solution across the entire value chain and project lifecycle. Better communication and collaboration - SAP’s innovations in mobility and real-time analytics enable construction users to complete all of their daily functions and tasks for managing their projects in the field. Operations focused - SAP integrates operational data with backend data, across all systems, not just financials and controlling. 1 2 3 Take Away
  • 56.
    © 2011 SAPAG. All rights reserved. SAP, R/3, SAP NetWeaver, Duet, PartnerEdge, ByDesign, SAP BusinessObjects Explorer, StreamWork, and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and other countries. Business Objects and the Business Objects logo, BusinessObjects, Crystal Reports, Crystal Decisions, Web Intelligence, Xcelsius, and other Business Objects products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of Business Objects Software Ltd. Business Objects is an SAP company. Sybase and Adaptive Server, iAnywhere, Sybase 365, SQL Anywhere, and other Sybase products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of Sybase, Inc. Sybase is an SAP company. All other product and service names mentioned are the trademarks of their respective companies. Data contained in this document serves informational purposes only. National product specifications may vary. These materials are subject to change without notice. These materials are provided by SAP AG and its affiliated companies (“SAP Group”) for informational purposes only, without representation or warranty of any kind, and SAP Group shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP Group products and services are those that are set forth in the express warranty statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional warranty.