Who are IKM
Challenging Convention
IKM Testing Offices located in 14 countries
750 employees around the world
5
15
20 2122
45
39
43
0 0 0
1415
24 24
38
0
5
10
15
20
25
30
35
40
45
50
2011 2012 2013 2014
Pipeline Process Design Clients
2011 2012 2013 2014
Clients 15 24 24 38
Pipeline projects 5 15 20 21
Process projects 22 45 39 43
Design projects 0 0 0 14
Total 27 60 59 78
Experience
IKM (Aberdeen) Clients
IKM SERVICES
Process Services
Project Management
Nitrogen Services
Helium Leak Detection
Bolt Torquing & Tensioning
Flange Management
Chemical Cleaning
Hot Oil Flushing
Hydrojetting
Temperature Controlled Pipe Freezing
Insitu Machining
Flow Coding
Video Inspection
Pressure Testing
Pipeline Services
Project Management
Pre-commissioning Pigging & Testing Operations
Hydrotesting
Barrier Testing
Pipeline Cleaning
Chemical Cleaning
Gel Pigging
Pipeline Decommissioning
Dewatering / Conditioning
Air, Nitrogen and Vacuum Drying
High Velocity Flushing
Fluid Pumping
Riser Annulus Volume Verification Testing
Umbilical Testing (Hydraulic, Electrical, Fibre)
TRAINING & COMPETENCY
IKM Training and Competence Centre
IKM Testing dedicated training and development centre.
Field employees go through formal competence assurance
process in applicable service lines.
Commitment - Our Competence Management System forms
part of our KPI’s.
International Director personally and proactively drives
competence in IKM Testing.
Why are we different?
Actively encourage employees to become skilled in more than
one service line.
To gain promotion beyond supervisor level IKM employees
enrolled in the IKM Competency Programme must have
competence in at least two service lines.
Assessors and Verifiers are either SQA certified or trained.
IKM Client Courses
Contract awarded from Total to provide N2 Awareness &
Testing training to over 220 offshore personnel.
Pressure Testing training conducted for Forum Technologies
personnel for overseas projects.
Courses currently under development for Petrofac for
offshore personnel.
Bespoke training courses developed to meet clients needs.
ORGANISATION
Barry Summers
Operations
Operations
Manager
Account Lead
Asset Lead Asset Lead Asset Lead
Support
Lindsey Duthie
Planner
Thomas Bampatsis
HSE Manager
Graham Grant
Equipment
Manager
Stuart Reid
Commercial
Manager
Account Lead
o Holds an overview of all
operations contracted to IKM
o Provides a single point of contact
for new enquiries.
o Process Operations Manager will
cover the account lead position
in absence.
Weekly operations meetings
highlight all ongoing and upcoming
activities
Planning meetings are conduced
twice weekly
This structure is the basis of IKM’s
success, forming a reliable team
Operations Support
Organisation
Operations Support
PERFORMANCE
FPAL Ratings
FPAL Ratings
FPAL Competitor Analysis as of
24th October 2014
Competitors:
o Halliburton
o Altus
o Enermec
o Hydratight
o Bakers
o Stork
o PNS
Any Questions

Information

  • 1.
  • 2.
    IKM Testing Officeslocated in 14 countries 750 employees around the world
  • 3.
    5 15 20 2122 45 39 43 0 00 1415 24 24 38 0 5 10 15 20 25 30 35 40 45 50 2011 2012 2013 2014 Pipeline Process Design Clients 2011 2012 2013 2014 Clients 15 24 24 38 Pipeline projects 5 15 20 21 Process projects 22 45 39 43 Design projects 0 0 0 14 Total 27 60 59 78 Experience
  • 4.
  • 5.
  • 6.
    Process Services Project Management NitrogenServices Helium Leak Detection Bolt Torquing & Tensioning Flange Management Chemical Cleaning Hot Oil Flushing Hydrojetting Temperature Controlled Pipe Freezing Insitu Machining Flow Coding Video Inspection Pressure Testing
  • 7.
    Pipeline Services Project Management Pre-commissioningPigging & Testing Operations Hydrotesting Barrier Testing Pipeline Cleaning Chemical Cleaning Gel Pigging Pipeline Decommissioning Dewatering / Conditioning Air, Nitrogen and Vacuum Drying High Velocity Flushing Fluid Pumping Riser Annulus Volume Verification Testing Umbilical Testing (Hydraulic, Electrical, Fibre)
  • 8.
  • 9.
    IKM Training andCompetence Centre IKM Testing dedicated training and development centre. Field employees go through formal competence assurance process in applicable service lines. Commitment - Our Competence Management System forms part of our KPI’s. International Director personally and proactively drives competence in IKM Testing.
  • 10.
    Why are wedifferent? Actively encourage employees to become skilled in more than one service line. To gain promotion beyond supervisor level IKM employees enrolled in the IKM Competency Programme must have competence in at least two service lines. Assessors and Verifiers are either SQA certified or trained.
  • 11.
    IKM Client Courses Contractawarded from Total to provide N2 Awareness & Testing training to over 220 offshore personnel. Pressure Testing training conducted for Forum Technologies personnel for overseas projects. Courses currently under development for Petrofac for offshore personnel. Bespoke training courses developed to meet clients needs.
  • 12.
  • 13.
    Barry Summers Operations Operations Manager Account Lead AssetLead Asset Lead Asset Lead Support Lindsey Duthie Planner Thomas Bampatsis HSE Manager Graham Grant Equipment Manager Stuart Reid Commercial Manager Account Lead o Holds an overview of all operations contracted to IKM o Provides a single point of contact for new enquiries. o Process Operations Manager will cover the account lead position in absence. Weekly operations meetings highlight all ongoing and upcoming activities Planning meetings are conduced twice weekly This structure is the basis of IKM’s success, forming a reliable team Operations Support Organisation Operations Support
  • 14.
  • 15.
  • 16.
    FPAL Ratings FPAL CompetitorAnalysis as of 24th October 2014 Competitors: o Halliburton o Altus o Enermec o Hydratight o Bakers o Stork o PNS
  • 17.

Editor's Notes

  • #3 IKM Testing are a global multi-discipline sub supplier who focus primarily on the oil and gas industry. It all started out in 1989 when IKM Labratorium were Founded in Norway as a Measurement Technology company offering calibration, service and rental to the industry IKM Testing first established in 1992. Opened first premises in the UK 1998 Invested heavily in 2010 and moved to New, IKM owned premises in April 2014.
  • #5 Major Projects Completed by Aberdeen Allseas Laggan Tormore Project - Flooding & Testing - 30” 233 km Export Line & 2 x 18” 143.5 km Production Lines Maersk Gryphon Hook- up - Call off contract Saipem Total Katy Field Development Pipeline Pre-commissioning - Livorno (Italy)Pipeline Pre-commissioning - York Project Pipeline Pre-commissioning & Commissioning Bluewater FPSO Haewene Brim Hook-up Bibby Shell Pierce Project Pipeline Pre-commissioning Shell Anasuria TAR