In this Presentation 
1. Introduction 
2. Power plant layout 
3. Coal to Electricity Basics 
4. Main and Auxiliary Equipments . 
5. Combustion Process 
6. Power Plant Cycle 
7. Boilers. 
8. Burner Management System
Introduction 
 A Thermal Power Plant converts the heat energy of coal into 
electrical energy. 
 Coal is burnt in a boiler which converts water into steam. The 
expansion of steam in turbine produces mechanical power which 
drives the alternator coupled to the turbine. 
 Thermal Power Plants contribute maximum to the generation of 
Power for any country . Thermal Power Plants constitute 75.43% of 
the total installed captive and non-captive power generation in India . 
 In thermal generating stations coal, oil, natural gas etc. are employed 
as primary sources of energy.
General Layout of Thermal Power 
Station
Diagram of a typical coal - fired 
thermal power station 
1. Cooling tower 10. Steam Control valve 19. Superheater 
2. Cooling water pump 
11. High pressure steam 
turbine 
20. Forced draught 
(draft) fan 
3. transmission line (3- 
phase) 
12. Deaerator 21. Reheater 
4. Step-up 
transformer (3- 
phase) 
13. Feed water heater 
22. Combustion air 
intake 
5. Electrical 
generator (3-phase) 
14. Coal conveyor 23. Economiser 
6. Low pressure steam 
turbine 
15. Coal hopper 24. Air preheater 
7. Condensate pump 16. Coal pulveriser 25. Precipitator 
8. Surface condenser 17. Boiler steam drum 
26. Induced draught 
(draft) fan 
9. Intermediate 
pressure steam turbine 
18. Bottom ash hopper 27. Flue gas stack
Coal to Electricity ….. Basics 
Coal 
Chemical 
Energy 
Super Heated 
Steam 
Pollutants 
Thermal 
Energy 
Turbine 
Torque 
Heat Loss 
In 
Condenser 
Kinetic 
Energy 
Electrical 
Energy 
Alternating current 
in Stator 
Mech. Energy 
ASH Loss 
Heat 
Loss 
Elet. Energy 
Loss
Main and Auxiliary equipments 
1. Coal handling plant 
2. Pulverizing plant 
3. Draft fans 
4. Boiler 
5. Ash handling plant 
6. Turbine 
7. Condenser 
8. Cooling towers and ponds 
9. Economiser 
10. Superheater and Reheater 
11. Air preheater
Coal handling plant and Pulverizing Plant 
•The function of coal handling plant is automatic 
feeding of coal to the boiler furnace. 
• A thermal power plant burns enormous amounts 
of coal. 
•Coal is conveyed through rail wagon from out side 
of plant 
•Through conveyor system collected in hopper and 
ground to a very fine powder by large metal 
spheres in the pulverized fuel mill. 
•Pulverizing is a means of exposing a large surface 
area to the action of oxygen and consequently 
helping combustion. 
•A 200MW plant may require around 2000 tons of 
coal daily
Draft system 
 The circulation of air is caused by a difference in 
pressure, known as Draft. 
 Forced Draft fan use to feed pulverized coal to 
boiler 
 Induced Draft fan use to maintain the flow of flue 
gases in the boiler. 
Forced Draft Fan 
Induced Draft Fan
Boiler 
• A boiler or steam generator is a closed 
vessel in which water under pressure, is 
converted into steam. 
• It is one of the major components of a 
thermal power plant 
• Always designed to absorb maximum 
amount of heat released in the process of 
combustion 
Boilers are of two types- 
1. Fire tube boiler 
2. Water tube boiler
Superheater and Reheater 
 Superheater is a device used to convert saturated steam or 
wet steam into dry steam. 
 Output steam is called Superheated steam and the 
temperature is 540 Celsius. 
 Superheated steam used to rotate HP turbine. 
 Some of the heat of superheated steam is used to rotate 
the turbine where it loses some of its energy. 
 Reheated is added a heat to that steam. 
 The steam after reheating is used to rotate the second 
steam turbine where the heat is converted to mechanical 
energy.
BOILER FEED PUMP 
 Feed deoxygenated water to the boiler drum through economizer. 
SLEEVE 
SOLE PLATE 
(BASE PLATE) 
DE BEARING 
DE BEARING
DE AREATOR 
 A deaerator is a device that is widely used for the removal of air and 
other dissolved gases from the feed water to steam-generating 
boiler. 
 The condensed water is then passed by a feed pump through a 
deaerater.
Turbine 
 A steam turbine is a mechanical device that extracts thermal 
energy from pressurized steam, and converts it into rotary motion.
Ash handling plant 
 The percentage of ash in coal varies from 5% in good quality 
coal to about 40% in poor quality coal 
 Power plants generally use poor quality of coal , thus amount of 
ash produced by it is pretty large 
 A modern 2000MW plant produces about 5000 tons of ash daily
CONDENSER 
Condenser is a device or unit used to condense a substance from its gaseous to its liquid 
state, typically by cooling it. 
The exiting steam from steam turbine, now a little above its boiling point, is brought into 
thermal contact with cold water (pumped in from the cooling tower) in the condenser. 
where it condenses rapidly back into water, creating near vacuum-like conditions inside 
the condenser chest. 
Water Cooled Condenser Air Cooled Condenser
HPH 5 
PSH 
E 
C 
O 
HPH6 
LTSH FSH 
DRUM 
F 
U 
R 
N 
A 
C 
E 
HPT IPT LPT 
R/H 
LPH 1 
COND 
GSC 
CONDENSATE CYCLE 
DEA LPH3 LPH2 D/C
Cooling towers and ponds 
o A condenser needs huge quantity of water to condense the steam . 
o Typically a 2000MW plant needs about 1500MGallon of water. 
o Most plants use a closed cooling system where warm water coming from condenser is cooled 
and reused 
o Small plants use spray ponds and medium and large plants use cooling towers. 
o Cooling tower is a steel or concrete hyperbolic structure having a reservoir at the base for 
storage of cooled water 
o Height of the cooling tower may be 150 m or so and diameter at the base is 150 m
Economiser 
 Economizer are mechanical devices intended to reduce energy consumption, or to 
perform another useful function like preheating a fluid. 
 Flue gases coming out of the boiler carry lot of heat. An economiser extracts a part of 
this heat from flue gases and uses it for heating feed water. 
 This use of economiser results in saving coal consumption and higher boiler efficiency
Air preheater 
 After flue gases leave economiser, some further heat can be 
extracted from them and used to heat incoming heat. Cooling 
of flue gases by 20 degree centigrade increases the plant 
efficiency by 1%. 
 Air preheaters may be of three types 
 Plate type 
 Tubular type 
 Regenerative type
Rankine Cycle 
Adiabatic Expansion in 
Turbine 
Sensible heat Addition in 
Economizer 
Constant Pressure Heat 
Rejection in Condenser 
Pump Work 
ENTROPY 
T 
E 
M 
P 
E 
R 
A 
T 
U 
R 
E 
Latent Heat Addition in 
Evaporator (constt. Pressure) Super Heating 
L + V
Boiler
Boiler Temperature Measurement 
 Expansion of Solids 
 Thermostats 
 Expansion of Liquids 
 Temperature Gauges 
 Expansion of gases 
 Temperature Gauges 
 Thermal Electricity Thermocouples 
 Type K Chromel Alumel etc. 
 Change of Electric Resistance (RTD) 
 Pt100 
 Cu53 
 Intensity of total radiation 
 Optical Pyrometer 
 Radiation Pyrometer
Burner management system 
 Burner management system is designed to ensure the execution of 
a safe ,orderly operating sequence in the startup and shutdown of 
fuel firing equipments and to prevent errors of omission safe 
operating procedure. 
Function of BMS 
 TO PROVIDE SAFETY TO BOILER. 
 TO PROVIDE ORDERLY SEQUENCE IN THE S/U & S/D OF FUEL FIRING EQUIPMENTS. 
 CONTINUOUS FLAME MONITORING. 
 MAINTAIN THE APPROPRIATE TEMPERATION AND AIR PRESSURE INSIDE THE BURNER 
 Prevent firing unless a satisfactory furnace purge has first been completed.
THANK YOU

More Related Content

What's hot

Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipat
pratikguptateddy
 
Gas turbine power plants
Gas turbine power plantsGas turbine power plants
Gas turbine power plants
Nishkam Dhiman
 
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESHppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESHAKHILESH KUMAR
 
training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...
Sagar Mehta
 
thermal power plant
thermal power plant thermal power plant
thermal power plant
GOD BRAIN
 
report on thermal power plant
report on thermal power plantreport on thermal power plant
report on thermal power plant
sagar20jain
 
Vocational training report
Vocational training reportVocational training report
Vocational training report
ATUL RAJ
 
Ntpc dadri
Ntpc dadriNtpc dadri
Ntpc dadri
Ishant Gautam.
 
Industrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC FaridabadIndustrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC Faridabad
Pawan Agrawal
 
Ntpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardNtpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyard
I.E.T. lucknow
 
ntpc khalgaon
ntpc khalgaonntpc khalgaon
ntpc khalgaon
Vimal Tripathi
 
Thermal Power Plant training Report
Thermal Power Plant training ReportThermal Power Plant training Report
Thermal Power Plant training Report
Shani Kumar Singh
 
Thermal power Plant presentation
Thermal power Plant presentationThermal power Plant presentation
Thermal power Plant presentation
Shahzaib Hussain
 
NTPC summer training report
NTPC summer training reportNTPC summer training report
NTPC summer training report
sanjeevps12345
 
A report of the vocational training at MTPS(DVC) for mechanical only
A report of the vocational training at MTPS(DVC) for mechanical onlyA report of the vocational training at MTPS(DVC) for mechanical only
A report of the vocational training at MTPS(DVC) for mechanical onlyShobhan Biswas
 
Training Report on Barauni Thermal Power Station
Training Report on Barauni Thermal Power StationTraining Report on Barauni Thermal Power Station
Training Report on Barauni Thermal Power Station
Gulshan Singh
 
NTPC Singrauli
NTPC SingrauliNTPC Singrauli
NTPC Singrauli
Vinay Vishwakarma
 
Summer Training Report on thermal power plant
Summer Training Report on thermal power plantSummer Training Report on thermal power plant
Summer Training Report on thermal power plant
MohdAreebQureshi
 
rajwest thermal power plant
rajwest thermal power plantrajwest thermal power plant
rajwest thermal power plantRama Charan
 

What's hot (20)

Ntpc vocational training project report sipat
Ntpc vocational training project report sipatNtpc vocational training project report sipat
Ntpc vocational training project report sipat
 
Gas turbine power plants
Gas turbine power plantsGas turbine power plants
Gas turbine power plants
 
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESHppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
 
training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...training report on thermal power plant & thermal power generation by sagar me...
training report on thermal power plant & thermal power generation by sagar me...
 
thermal power plant
thermal power plant thermal power plant
thermal power plant
 
report on thermal power plant
report on thermal power plantreport on thermal power plant
report on thermal power plant
 
Vocational training report
Vocational training reportVocational training report
Vocational training report
 
Ntpc dadri
Ntpc dadriNtpc dadri
Ntpc dadri
 
Industrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC FaridabadIndustrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC Faridabad
 
Ntpc simhadri
Ntpc simhadriNtpc simhadri
Ntpc simhadri
 
Ntpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyardNtpc dadri thermal power plant & switchyard
Ntpc dadri thermal power plant & switchyard
 
ntpc khalgaon
ntpc khalgaonntpc khalgaon
ntpc khalgaon
 
Thermal Power Plant training Report
Thermal Power Plant training ReportThermal Power Plant training Report
Thermal Power Plant training Report
 
Thermal power Plant presentation
Thermal power Plant presentationThermal power Plant presentation
Thermal power Plant presentation
 
NTPC summer training report
NTPC summer training reportNTPC summer training report
NTPC summer training report
 
A report of the vocational training at MTPS(DVC) for mechanical only
A report of the vocational training at MTPS(DVC) for mechanical onlyA report of the vocational training at MTPS(DVC) for mechanical only
A report of the vocational training at MTPS(DVC) for mechanical only
 
Training Report on Barauni Thermal Power Station
Training Report on Barauni Thermal Power StationTraining Report on Barauni Thermal Power Station
Training Report on Barauni Thermal Power Station
 
NTPC Singrauli
NTPC SingrauliNTPC Singrauli
NTPC Singrauli
 
Summer Training Report on thermal power plant
Summer Training Report on thermal power plantSummer Training Report on thermal power plant
Summer Training Report on thermal power plant
 
rajwest thermal power plant
rajwest thermal power plantrajwest thermal power plant
rajwest thermal power plant
 

Similar to Industrial training at NTPC Shaktinagar

Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
Viren Patel
 
Thermal Power Plant (Bathinda) PPT
Thermal Power Plant (Bathinda) PPTThermal Power Plant (Bathinda) PPT
Thermal Power Plant (Bathinda) PPT
Fateh Singh
 
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Shubham Thakur
 
Coal Base Thermal Power Plant
Coal Base Thermal Power PlantCoal Base Thermal Power Plant
Coal Base Thermal Power Plant
Pankaj Mohan
 
Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01arvind singh rathore
 
Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01
Saurabh Patel
 
Bandel training
Bandel trainingBandel training
Bandel training
Subhadip Sadhukhan
 
coal based thermal power plant
coal based thermal power plantcoal based thermal power plant
coal based thermal power plant
00veerchauhan
 
Mtps ppt
Mtps pptMtps ppt
Mtps ppt
sourabhgnit
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
Vinay Garg
 
Thermalpwrplant 110924082908-phpapp02
Thermalpwrplant 110924082908-phpapp02Thermalpwrplant 110924082908-phpapp02
Thermalpwrplant 110924082908-phpapp02arvind singh rathore
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
Shikhar Sodhani
 
Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01Preeti Pradhan
 
Mejia Thermal Power Station
Mejia Thermal Power StationMejia Thermal Power Station
Mejia Thermal Power Station
sagnikchoudhury
 
Ppt aman
Ppt amanPpt aman
NTPC ,sipat voccational training
NTPC ,sipat voccational trainingNTPC ,sipat voccational training
NTPC ,sipat voccational training
bhumit1
 
Thermal Electric Power Generation Technology_Coal Fired/Fossil Fuel
Thermal Electric Power Generation Technology_Coal Fired/Fossil FuelThermal Electric Power Generation Technology_Coal Fired/Fossil Fuel
Thermal Electric Power Generation Technology_Coal Fired/Fossil Fuel
TheophilusATKamboJr2
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plantfoxycrow
 
Overview of Thermal Power Plants
Overview of Thermal Power PlantsOverview of Thermal Power Plants
Overview of Thermal Power Plants
Debajyoti Bose
 

Similar to Industrial training at NTPC Shaktinagar (20)

Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermal Power Plant (Bathinda) PPT
Thermal Power Plant (Bathinda) PPTThermal Power Plant (Bathinda) PPT
Thermal Power Plant (Bathinda) PPT
 
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
Thermal Power Plant - Full Detail About Plant and Parts (Also Contain Animate...
 
Coal Base Thermal Power Plant
Coal Base Thermal Power PlantCoal Base Thermal Power Plant
Coal Base Thermal Power Plant
 
Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01
 
Thermal power point
Thermal power pointThermal power point
Thermal power point
 
Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01
 
Bandel training
Bandel trainingBandel training
Bandel training
 
coal based thermal power plant
coal based thermal power plantcoal based thermal power plant
coal based thermal power plant
 
Mtps ppt
Mtps pptMtps ppt
Mtps ppt
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermalpwrplant 110924082908-phpapp02
Thermalpwrplant 110924082908-phpapp02Thermalpwrplant 110924082908-phpapp02
Thermalpwrplant 110924082908-phpapp02
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01Thermalpowerpoint 130818150844-phpapp01
Thermalpowerpoint 130818150844-phpapp01
 
Mejia Thermal Power Station
Mejia Thermal Power StationMejia Thermal Power Station
Mejia Thermal Power Station
 
Ppt aman
Ppt amanPpt aman
Ppt aman
 
NTPC ,sipat voccational training
NTPC ,sipat voccational trainingNTPC ,sipat voccational training
NTPC ,sipat voccational training
 
Thermal Electric Power Generation Technology_Coal Fired/Fossil Fuel
Thermal Electric Power Generation Technology_Coal Fired/Fossil FuelThermal Electric Power Generation Technology_Coal Fired/Fossil Fuel
Thermal Electric Power Generation Technology_Coal Fired/Fossil Fuel
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Overview of Thermal Power Plants
Overview of Thermal Power PlantsOverview of Thermal Power Plants
Overview of Thermal Power Plants
 

More from Rishikesh .

Introduction to un supervised learning
Introduction to un supervised learningIntroduction to un supervised learning
Introduction to un supervised learning
Rishikesh .
 
ACTIVE NOISE CANCELLATION IN A LABORATORY DUCT USING FUZZY LOGIC AND NEURAL ...
ACTIVE NOISE CANCELLATION IN A LABORATORY DUCT  USING FUZZY LOGIC AND NEURAL ...ACTIVE NOISE CANCELLATION IN A LABORATORY DUCT  USING FUZZY LOGIC AND NEURAL ...
ACTIVE NOISE CANCELLATION IN A LABORATORY DUCT USING FUZZY LOGIC AND NEURAL ...
Rishikesh .
 
Home automation and Digital notice board using android app
Home automation and Digital notice board using android appHome automation and Digital notice board using android app
Home automation and Digital notice board using android appRishikesh .
 
Android application
Android applicationAndroid application
Android application
Rishikesh .
 
J2EE and Servlet
J2EE and Servlet J2EE and Servlet
J2EE and Servlet
Rishikesh .
 
Laboratory Duct Active noise control using Adaptive Filters
Laboratory Duct Active noise control using Adaptive Filters Laboratory Duct Active noise control using Adaptive Filters
Laboratory Duct Active noise control using Adaptive Filters
Rishikesh .
 
Active noise control
Active noise controlActive noise control
Active noise controlRishikesh .
 

More from Rishikesh . (9)

Introduction to un supervised learning
Introduction to un supervised learningIntroduction to un supervised learning
Introduction to un supervised learning
 
project_letter
project_letterproject_letter
project_letter
 
ACTIVE NOISE CANCELLATION IN A LABORATORY DUCT USING FUZZY LOGIC AND NEURAL ...
ACTIVE NOISE CANCELLATION IN A LABORATORY DUCT  USING FUZZY LOGIC AND NEURAL ...ACTIVE NOISE CANCELLATION IN A LABORATORY DUCT  USING FUZZY LOGIC AND NEURAL ...
ACTIVE NOISE CANCELLATION IN A LABORATORY DUCT USING FUZZY LOGIC AND NEURAL ...
 
Home automation and Digital notice board using android app
Home automation and Digital notice board using android appHome automation and Digital notice board using android app
Home automation and Digital notice board using android app
 
Android application
Android applicationAndroid application
Android application
 
J2EE and Servlet
J2EE and Servlet J2EE and Servlet
J2EE and Servlet
 
Laboratory Duct Active noise control using Adaptive Filters
Laboratory Duct Active noise control using Adaptive Filters Laboratory Duct Active noise control using Adaptive Filters
Laboratory Duct Active noise control using Adaptive Filters
 
Active noise control
Active noise controlActive noise control
Active noise control
 
Labview
Labview Labview
Labview
 

Recently uploaded

NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
ShahidSultan24
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
R&R Consult
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Recently uploaded (20)

NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
addressing modes in computer architecture
addressing modes  in computer architectureaddressing modes  in computer architecture
addressing modes in computer architecture
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxCFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptx
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 

Industrial training at NTPC Shaktinagar

  • 1. INDUSTRIAL TRAINING AT NATIONAL THERMAL POWER STATION SINGRAULI , MADHYA PRADESH Submitted By: Rishikesh (11-1-6-002) NIT, Silchar
  • 2. In this Presentation 1. Introduction 2. Power plant layout 3. Coal to Electricity Basics 4. Main and Auxiliary Equipments . 5. Combustion Process 6. Power Plant Cycle 7. Boilers. 8. Burner Management System
  • 3. Introduction  A Thermal Power Plant converts the heat energy of coal into electrical energy.  Coal is burnt in a boiler which converts water into steam. The expansion of steam in turbine produces mechanical power which drives the alternator coupled to the turbine.  Thermal Power Plants contribute maximum to the generation of Power for any country . Thermal Power Plants constitute 75.43% of the total installed captive and non-captive power generation in India .  In thermal generating stations coal, oil, natural gas etc. are employed as primary sources of energy.
  • 4. General Layout of Thermal Power Station
  • 5. Diagram of a typical coal - fired thermal power station 1. Cooling tower 10. Steam Control valve 19. Superheater 2. Cooling water pump 11. High pressure steam turbine 20. Forced draught (draft) fan 3. transmission line (3- phase) 12. Deaerator 21. Reheater 4. Step-up transformer (3- phase) 13. Feed water heater 22. Combustion air intake 5. Electrical generator (3-phase) 14. Coal conveyor 23. Economiser 6. Low pressure steam turbine 15. Coal hopper 24. Air preheater 7. Condensate pump 16. Coal pulveriser 25. Precipitator 8. Surface condenser 17. Boiler steam drum 26. Induced draught (draft) fan 9. Intermediate pressure steam turbine 18. Bottom ash hopper 27. Flue gas stack
  • 6. Coal to Electricity ….. Basics Coal Chemical Energy Super Heated Steam Pollutants Thermal Energy Turbine Torque Heat Loss In Condenser Kinetic Energy Electrical Energy Alternating current in Stator Mech. Energy ASH Loss Heat Loss Elet. Energy Loss
  • 7. Main and Auxiliary equipments 1. Coal handling plant 2. Pulverizing plant 3. Draft fans 4. Boiler 5. Ash handling plant 6. Turbine 7. Condenser 8. Cooling towers and ponds 9. Economiser 10. Superheater and Reheater 11. Air preheater
  • 8. Coal handling plant and Pulverizing Plant •The function of coal handling plant is automatic feeding of coal to the boiler furnace. • A thermal power plant burns enormous amounts of coal. •Coal is conveyed through rail wagon from out side of plant •Through conveyor system collected in hopper and ground to a very fine powder by large metal spheres in the pulverized fuel mill. •Pulverizing is a means of exposing a large surface area to the action of oxygen and consequently helping combustion. •A 200MW plant may require around 2000 tons of coal daily
  • 9. Draft system  The circulation of air is caused by a difference in pressure, known as Draft.  Forced Draft fan use to feed pulverized coal to boiler  Induced Draft fan use to maintain the flow of flue gases in the boiler. Forced Draft Fan Induced Draft Fan
  • 10. Boiler • A boiler or steam generator is a closed vessel in which water under pressure, is converted into steam. • It is one of the major components of a thermal power plant • Always designed to absorb maximum amount of heat released in the process of combustion Boilers are of two types- 1. Fire tube boiler 2. Water tube boiler
  • 11. Superheater and Reheater  Superheater is a device used to convert saturated steam or wet steam into dry steam.  Output steam is called Superheated steam and the temperature is 540 Celsius.  Superheated steam used to rotate HP turbine.  Some of the heat of superheated steam is used to rotate the turbine where it loses some of its energy.  Reheated is added a heat to that steam.  The steam after reheating is used to rotate the second steam turbine where the heat is converted to mechanical energy.
  • 12. BOILER FEED PUMP  Feed deoxygenated water to the boiler drum through economizer. SLEEVE SOLE PLATE (BASE PLATE) DE BEARING DE BEARING
  • 13. DE AREATOR  A deaerator is a device that is widely used for the removal of air and other dissolved gases from the feed water to steam-generating boiler.  The condensed water is then passed by a feed pump through a deaerater.
  • 14. Turbine  A steam turbine is a mechanical device that extracts thermal energy from pressurized steam, and converts it into rotary motion.
  • 15. Ash handling plant  The percentage of ash in coal varies from 5% in good quality coal to about 40% in poor quality coal  Power plants generally use poor quality of coal , thus amount of ash produced by it is pretty large  A modern 2000MW plant produces about 5000 tons of ash daily
  • 16. CONDENSER Condenser is a device or unit used to condense a substance from its gaseous to its liquid state, typically by cooling it. The exiting steam from steam turbine, now a little above its boiling point, is brought into thermal contact with cold water (pumped in from the cooling tower) in the condenser. where it condenses rapidly back into water, creating near vacuum-like conditions inside the condenser chest. Water Cooled Condenser Air Cooled Condenser
  • 17. HPH 5 PSH E C O HPH6 LTSH FSH DRUM F U R N A C E HPT IPT LPT R/H LPH 1 COND GSC CONDENSATE CYCLE DEA LPH3 LPH2 D/C
  • 18. Cooling towers and ponds o A condenser needs huge quantity of water to condense the steam . o Typically a 2000MW plant needs about 1500MGallon of water. o Most plants use a closed cooling system where warm water coming from condenser is cooled and reused o Small plants use spray ponds and medium and large plants use cooling towers. o Cooling tower is a steel or concrete hyperbolic structure having a reservoir at the base for storage of cooled water o Height of the cooling tower may be 150 m or so and diameter at the base is 150 m
  • 19. Economiser  Economizer are mechanical devices intended to reduce energy consumption, or to perform another useful function like preheating a fluid.  Flue gases coming out of the boiler carry lot of heat. An economiser extracts a part of this heat from flue gases and uses it for heating feed water.  This use of economiser results in saving coal consumption and higher boiler efficiency
  • 20. Air preheater  After flue gases leave economiser, some further heat can be extracted from them and used to heat incoming heat. Cooling of flue gases by 20 degree centigrade increases the plant efficiency by 1%.  Air preheaters may be of three types  Plate type  Tubular type  Regenerative type
  • 21. Rankine Cycle Adiabatic Expansion in Turbine Sensible heat Addition in Economizer Constant Pressure Heat Rejection in Condenser Pump Work ENTROPY T E M P E R A T U R E Latent Heat Addition in Evaporator (constt. Pressure) Super Heating L + V
  • 23.
  • 24. Boiler Temperature Measurement  Expansion of Solids  Thermostats  Expansion of Liquids  Temperature Gauges  Expansion of gases  Temperature Gauges  Thermal Electricity Thermocouples  Type K Chromel Alumel etc.  Change of Electric Resistance (RTD)  Pt100  Cu53  Intensity of total radiation  Optical Pyrometer  Radiation Pyrometer
  • 25. Burner management system  Burner management system is designed to ensure the execution of a safe ,orderly operating sequence in the startup and shutdown of fuel firing equipments and to prevent errors of omission safe operating procedure. Function of BMS  TO PROVIDE SAFETY TO BOILER.  TO PROVIDE ORDERLY SEQUENCE IN THE S/U & S/D OF FUEL FIRING EQUIPMENTS.  CONTINUOUS FLAME MONITORING.  MAINTAIN THE APPROPRIATE TEMPERATION AND AIR PRESSURE INSIDE THE BURNER  Prevent firing unless a satisfactory furnace purge has first been completed.