Introducing Industrial Solar Rooftop System Installation PowerPoint Presentation Slides. The purpose of this presentation is to reduce annual electricity bill costs by shifting to solar energy. By using this solar power plant PPT visuals, you can showcase the energy consumption analysis of the manufacturing plant. Present issues and challenges related to the solar system with the help of a ready-to-use PPT complete deck. After that, depict the solutions to counter energy issues using a content-ready solar system for industry PowerPoint layouts. Highlight the renewable technologies that the industry can adopt and cost overview of different technologies. You can also depict the application of the solar system and illustrate various solar PV integration model workflow. The slides also explain permissions and regulatory key considerations required before project implementation. Power plant details, along with project description and specifications, are also included in our PPT slideshow. Showcase decision-making checklist for the solar project by using the installation of renewable energy PPT infographics. Depict estimated cost for the solar project, implementation schedule, PV operational and maintenance plan, etc., by incorporating professionally designed solar rooftop system PPT slide deck. https://bit.ly/2SSa2bt
2. Text Here Text Here
02 03
01
A Manufacturing firm wants to optimize its energy
consumption and reduce annual electricity bill
cost by shifting to renewable energy resources
mainly solar energy.
Agenda for Industrial Solar
Rooftop System
Installation
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
2
3. Table of Contents
03
05
06
07
01
04
10
12
13
14
09
08
11
02
Estimated Cost of Solar Project
Implementation Schedule
Maintenance Plan and Schedule
• Operational and Maintenance Plan
• PV Module Maintenance Checklist
• Inverter Maintenance Checklist
Risk & Mitigation Strategies
Barriers & Solutions for Solar Energy Application
Performance Tracking Dashboards
Impact on Performance
• Plant Capacity Per Annum
• Electricity Bill Saving
Available Solutions to Counter Energy Issues
• Renewable Technologies We can Adopt
• Electricity Cost Overview of Different Technologies
Permission & Regulatory Key Considerations
Decision Making Checklist for Solar Project
Issues We are Currently Facing
Solar System Overview
• Solar System Types and Applications
• Solar PV Integration Models
Project Description and Specifications
• Power Plant Details
• Building Area
• Solar Module and Components
Energy Consumption Analysis
• Composition of Electricity by Resource
• Energy Utilization Rate
• Intraday
• Monthly
• Annually
• Share of Electricity Demand
• Energy Star Rating of Current Appliances
• Electricity Bill
3
4. 01
Energy Consumption Analysis
• Composition of Electricity by Resource
• Energy Utilization Rate
• Intraday
• Monthly
• Annually
• Share of Electricity Demand
• Energy Star Rating of Current Appliances
• Electricity Bill
Table of Content
4
5. Composition of Electricity by Resource
Following slide covers statistics about plant composition of electricity by resource. Manufacturing Plant depends 77% on the electricity supply provided by government.
Key Takeaways
• 67% functioning of Plant machineries are
dependent on the industrial supply provided
by government substations
• On an average, plant uses diesel generators
to meet its 33% electricity demand during
peak hours.
• Add text
• Add text
Electricity generated from diesel
generator
Electricity provided by electricity
generating station
33%
67%
Text
Here
This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”.
5
6. Energy Utilization Rate - Intraday Consumption
0
20
40
60
80
100
120
00:00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00
Average Power Consumption (kW)
Key Takeaways
• Peak hours of manufacturing plant are in
between 8 am to 4 pm slot, where
electricity from diesel generators are
used to meet the required demand.
• Add text
• Add text
Government
Electricity
Diesel
Following slide provide information about energy utilization rate by intraday consumption. Peak hours of manufacturing plant are in between 8 am to 4 pm slot.
This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”.
6
7. Energy Utilization Rate - Monthly Consumption
Month
Electricity
Consumption
(in kWh)
Cost
(in $)
Baseload
(kW)
Avg
Peak
Electric
Consumption kWh/m2
January 4500 $77000 45 90 122
February 3280 $63000 40 80 106
March XXXXXX $XXXXX XX XX XX
April XXXXXX $XXXXX XX XX XX
01 02 03 04 05 06
Building Building Area 1
This slide provide information about energy utilization rate by monthly consumption. It covers details such as building, monthly electricity consumption, annual cost, baseload, average peak and electric consumption.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
7
8. Key Takeaways
• In year 2020, per month electricity
consumption rise from 100 kw to 120 kw (
On an average)
• Add text here
• Add text
• Add text
Energy Utilization Rate – Annual Consumption
2019
0
20
40
60
80
100
120
140
160
180
200
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Diesel Electricity Consumption (kWh)
2020
0
20
40
60
80
100
120
140
160
180
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Diesel Electricity Consumption (kWh)
This slide provide information about energy utilization rate by annual consumption. It displays plant utilization statistics of 2019 and 2020.
This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”.
8
9. 02
Table of Content
Energy Consumption Analysis
• Share of Electricity Demand
• Energy Star Rating of Current Appliances
• Electricity Bill
9
10. Share of Electricity Demand in 2020
57%
20%
14%
9%
Machines
HVAC
Lighting
Add text here
Key Takeaways
• Machines functionality shares 57% share
of electricity demand in year 2020.
• Add text here
• Add text
• Add text
Mentioned pie chart illustrates share of electricity demand utilized by manufacturing plant in 2020. Machineries installed in the plant utilised highest share of electricity that is 57%.
This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”.
10
11. Energy Star Rating of Current Appliances
0
5
10
15
20
25
30
35
Air Conditioner Lights Fan Add text Add text
1 Star 2 Star 3 Star 4 Star No Star Not Sure
Key Takeaways
• Most of the installed air conditioners
have five-star ratings.
• Add text
• Add text
This slide illustrates energy star rating of current appliances. Among all the appliances, there are most of the air conditioners that have five star ratings.
This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”.
11
12. Monthly Electricity Bill of the Plant
Machine/
Equipment/Device
Wattage
Operational Hours Electricity Consumption (in kWh)
Bill Cost (in $)
Min. Max. Min. Max.
Machine 1 1100 Watts 144 hours 240 hours 158.4 264 $XXXXXX
Machine 2 1200 Watts 182 hours 240 hours 218.4 288 $XXXXXX
Machine 3 XXXX Watts XX hour XX hour XX hour XX hour $XXXXXX
Machine 4 XXXX Watts XX hour XX hour XX hour XX hour $XXXXXX
Following table shows the monthly electricity bill of the manufacturing plant. It includes machine name, wattage details, operational hours and electricity consumption.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
12
14. Issues We are Currently Facing
Machine Downtime
Power cut results average 7 hours
downtime recorded in 2020 as
compared to 3.2 hours in 2019
Co2 Emission
In order to meet electricity demand
plant is operating diesel generators on
an average 1.3 hours a day which is
contributing to air pollution
Energy Consumption
Low energy rating appliances are
consuming more electricity resulting
an increase of 15% in monthly
electricity bills
Mentioned slide covers various energy issues faced by the plant. It includes issues such as machine downtime, energy consumption and Co2 emission.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
14
15. 04
Table of Content
Available Solutions to Counter
Energy Issues
• Renewable Technologies We can Adopt
• Electricity Cost Overview of Different
Technologies
15
16. Renewable Technologies we can Adopt
This slide is 100% editable. Adapt it to
your needs and capture your
audience's attention.
This slide is 100% editable. Adapt it to
your needs and capture your
audience's attention.
This slide is 100% editable. Adapt it to
your needs and capture your
audience's attention.
Solar Photovoltaic & Thermal
System & Application
Biogas Plants (Waste to
energy systems)
Heat
Pumps
Following slide covers various renewable energies such as solar energy, thermal energy and biogas energy that can be installed or used at manufacturing plant.
16
17. Electricity Cost Overview of Different Technologies
$52
$92
$59
$68
$55
$0
$50
$100
$150
$200
$250
$300
$350
$400
2012 2013 2014 2015 2016 2017 2018 2019 2020
Solar PV
Concentrating Solar Power
Bioenergy
Geothermal
Add text
Renewable Technologies
Global Weighted-Average Cost of
Electricity ($/kWh) 2020
Solar Photovoltaics 0.052
Concentrating Solar Power 0.092
Bioenergy 0.059
Geothermal 0.068
Add text here XXXX
This slide covers cost of electricity overview of various renewable technologies. It also includes information about global weighted average cost of electricity in dollars per kilowatt hour and megawatt hour.
This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”.
17
18. 05
Table of Content
Solar System Overview
• Solar System Types and Applications
• Solar PV Integration Models
18
19. Solar Technology Type System and Application
Technology Type System Application
PV (Solar Electric)
Grid connected
Main supply supplementation
Add text
Stand-alone
Lighting of plant
Add text
Solar Thermal
Connected to existing heating system
Hot water supply to machineries
Add text
Stand-alone
Water heating
Add text
This slide shows information about solar technology type, System and Application. Technology type covered are solar electric and solar thermal.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
19
20. Solar PV Integration Models Workflow
Grid-Tied Solar System
Solar Panels
Meter
Utility Grid
Plant
Off-Grid Solar System
Battery Bank Plant
Optional Generator
Solar Panels
Charge Controller
Hybrid Solar System
Battery Bank Plant
Solar Panels
Charge Controller
Meter
Utility Grid
This slide illustrates various solar PV integration models. Models covered in the slide are on-grid system, off-grid system and hybrid system.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
20
22. Permission and Regulatory Key Considerations
Permit Authority Checklist Status (Yes/No)
Environmental Authorization Department of Environmental Affairs
Initial Environmental Examination
completed
Yes
Building Permit Municipality
Provided relevant supporting
documents to regulatory authority
Yes
Energy License Department of Energy Electricity generation license Yes
Add text Add text Add text Add text
Following slide explains key considerations about permission and regulatory required before project implementation. It includes details about permit, authority, checklist and status of confirmation.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
22
23. 07
Table of Content
Project Description and
Specifications
• Power Plant Details
• Building Area
• Solar Module and Components
23
24. Project Description and Specifications – Power Plant Details
Project Objective
Generate electricity from solar power plant to meet energy demand of plant machineries and decrease cost of monthly electricity bill
Project Name: Solar PV plant installation on ABC Manufacturing Plant
Project Cost: $2.6MM
Project Duration: 1 April 2020 – 31 Oct 2020
Details about
Proposed Power Plant
• Proposed capacity – 1500 kW
• Plant proposed at single/multiple
site – Multiple
• Interconnection with electricity at
single/multiple point – Single
Expected Outcomes
• Clean energy generated from solar PV will be used
in machine, HVAC operations and plant lighting
purposes.
• Add expected outcome here
• Add expected outcome here
This slide provides description and specifications about power plant. It covers details about proposed power plant, project objective and expected outcomes
24
25. Project Description and Specifications –Building Area
Plant
(Building Area)
Connected
Load (KW)
Roof Space Available (Square
Meter)
Potential Plant
Size (kW)
Plant Size to be commissioned
(KW)
Expected Electricity Generation
in a month (MWh)
Building Area 1 880 5380 1100 800 37
Building Area 2 750 5452 1000 700 32
Add text XXXX XXXX XXXX XXXX XXXX
Add text XXXX XXXX XXXX XXXX XXXX
Total XXXX XXXX XXXX XXXX XXXX
01 02 03 04 05 06
Following slide covers description and specification about plant area. It included information such as connected load, roof space available, potential plant size, plant size to be commissioned and expected electricity generation in a month.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
25
26. Project Description and Specifications – Solar Module and Components
Technical Specification of PV Module
Manufacture Add name
Module Model Add name
Type Monocrystalline
Nominal Power (PMPP) 330 Wp
Power Tolerance 0/+3%
Voltage at PMax (VMPP) 3O.2V
Current at PMax (IMPP) 8.13A
Open Circuit Voltage (VSC) 37.5V
Short Circuit Current (ISC) 8.68A
Maximum System Voltage 1000VDC
Module Efficiency 15.00%
Operating Temperature -40 C to +850C
Temperature Coefficient of PMPP -0.43%/0C
Dimensions 1600*990*40mm
Module Area 1.64m2
Weight 18.5kg
Maximum Load 5400Pa
Product Warranty 10 years
Performance Guarantee
90% after 10 year;
82% after 25 years
Technical Specification of Inverter
Inverter Model Add name
Inputs
Maximum DC Power 952kW
MPP Voltage Range 681-850V
Maximum Input Voltage 1,000V
Maximum Input Current / MPPT 1,400A
Number of MPP Trackers 1
Outputs
Rated AC Power at 250C 935VA
Maximum AC Output Current 1,411A
Rated AC Voltage 386V
AC Grid Frequency 60Hz
Efficiency
Maximum Efficiency 98.6%
Standby Consumption <100W
Operation Consumption 1,900W
General Data
IP Rating IP54, IP43
Operating Temperature Range -250C to +620C
Relative Humidity 15-95%
Dimension (H x W x D) 2270*2565*950mm
Weight (kg) 32Kg
Following slide provides description and specification about solar module and related components. It shows technical specification of PV module and inverter that will be installed on the manufacturing plant.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
26
28. Supplier Identification and Track record checked? Yes
3rd party warranty insurance provided No
Required certification obtained Yes
Add text here Add text
Supplier Identification and Track record checked? No
Product warranty documents provided? Yes
Provided structure is in line with market standards? Yes
Add text here Add text
Compatible with National Grid Code Yes
Have suitable capacity for desired project size Yes
Supplier identification and track record checked? Yes
Add text here Add text
Add text here Add text
PV
Module
Selection
Checklist
Mounting
Structure
Selection
Checklist
Inverter
Selection
Checklist
Status (Yes/No)
Following slide covers decision making checklist for solar project. It covers selection checklist and status information of PV module, inverter and mounting structure.
Decision Making
Checklist for
Solar Project
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
28
30. Estimated Cost of Solar Project
Solar Project Capacity 1.5 MW
Particulars Unit Cost (in $) Quantity Required Total Cost (in $)
SPV Module 100 70 7000
Inverters 250 1 250
Module Mounting Structure XX XX XX
Electrical wires XX XX XX
Add text XX XX XX
Add text XX XX XX
Total XX XX XX
01 02
Following slide provides description and specification about solar module and related components. It shows technical specification of PV module and inverter that will be installed on the manufacturing plant.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
30
32. Solar PV Project Execution Schedule
Work Sub-Work 01 02 03 04 05 06 07 08
Design & Engineering ED Draft
EPC Contract Finalization Paperwork Review
Plant Construction Mobilization
Vertical Post Installation
Module Installation
Electrical Wiring
Add text
Add text
Add text
Add text
Supply Schedule (site) Module mounting Structure
SPV Module
Add text
Add text
Weeks
Mentioned slide shows solar PV project execution schedule. It includes information about work, sub-work and specific week.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
32
33. 11
Table of Content
Maintenance Plan and
Schedule
• Operational and Maintenance Plan
• PV Module Maintenance Checklist
• Inverter Maintenance Checklist
33
34. PV Operational and Maintenance Plan
Task Weekly Monthly Semiannually
Inspect modules for damage
Address array shading issues
Load-test batteries
Inspect array mounting system
Adjust array tilt
Inspect & clean all electrical equipment
Inspect battery enclosure
Inspect battery terminals & connections
Add text
Add text
Add text
Add text
Add text
Add text
Add text
This slide provides photo voltaic operational and maintenance plan. It includes information of task, weekly, monthly and semi annually requirement.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
34
35. Sr. No.
PV Module Maintenance Schedule
Check Points D W M Q Y
01 Check Module Cleanliness Yes
02 Check Module against any cracks Yes
03 Check the tightness of electric connection Yes
04 Add text Yes
05 Add text Yes
06 Add text Yes
07 Add text Yes
08 Add text Yes
D - Daily W - Weekly M - Monthly Q - Quarterly Y - Yearly
This slide covers solar PV module maintenance schedule along with check points. Schedule covered are daily, weekly, monthly, quarterly and yearly.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
35
36. Sr. No.
Inverter Maintenance Schedule
Check Points D W M Q Y
01 Check the fan functioning Yes
02 Check the interior cabinet for dust Yes
03 Check screw connections Yes
04 Add text Yes
05 Add text Yes
06 Add text Yes
D - Daily W - Weekly M - Monthly Q - Quarterly Y - Yearly
Following slide shows maintenance schedule for inverter. Schedule covered are daily, weekly, monthly, quarterly and yearly.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
36
38. Plant Capacity Per Annum
Plant
Area
Capacity
Installed (MW)
Average Units Generated
Per month (MWh)
Average Units Generated Per Year
(MWh)
Payback
Period
Building Area 1 0.8 35 420 2.27
Building Area 2 0.7 30 360 2.21
Add text here XXXXX XXXXX XXXXX XX
Add text here XXXXX XXXXX XXXXX XX
01 03 04 05
02
Following table provides information about plant capacity per annum. It includes information about plant area, capacity installed, average units generated per month and annually, payback period.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
38
39. Electricity Bill Saving Forecasting
Month
Total Plant Energy
Consumption (kWh)
Solar PV Electricity
generation (kWh)
Billable
Units (kWh)
November 2020 10800 3700 70100
December 2020 14200 3200 11000
January 2021 XXXXX XXXXX XXXXX
February 2021 XXXXX XXXXX XXXXX
This slide shows forecasting information about monthly electricity bill. It provides details about billable units saved after installing solar power plant.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
39
41. Risk and Mitigation Strategies
Risk
Classification
Likelihood Impact
Risk
Rating
Mitigation
Strategy
Delay in Construction Low Medium Low
By providing required resources on
time during project implementation
Statutory and Environmental
Clearances
Low High Medium Add text here
Natural Disaster Low High High Add text here
Add text here Add text here Add text here Add text here Add text here
Mentioned slide explains possible risk and mitigation strategies. It covers risk classification, likelihood, impact, risk rating and ,mitigation strategies.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
41
43. Barriers and Solutions for Solar Energy Application
Possible Barriers
• High Installation Cost
• Government Policies
• Add text
Right Solution
• Go for module manufactured by local manufacturers with
same or almost same efficiency
• By Strictly following the guidelines provided by the
government agency in the new policies
• Add text
Description
• High cost of Imported solar module or relatable
components
• Anti-dumping imposed by the government
• Add text
Mentioned slide shows possible barrier that may occur while installing solar project and right solutions to overcome them. Risk covered are high installation cost, government policies.
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
43
45. Solar Power Plant Performance Tracking Dashboards
Consumption
1.05kw/h
Solar Production
2.19kw/h
Import from Grid
0.15kw/h
Export to Grid
1.04kw/h
12:00
2 1.2
3.2
3.8
1.5
12:00
2.2
2.5
3.8
2.1 2
0
1
2
3
4
5
05:00 09:00 13:00 17:00 21:00 01:00
(Values
in
KW/h)
Comsumption Production
Consumptions Details
HVAC
Lightings
Add text
Machineries
25%
20%
10%
45%
Following slide shows performance tracking dashboard for solar power plant. It includes details such as consumption rate, daily production rate, electricity export & import from grid.
This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”.
45
48. About Us
Target Audiences
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
Preferred by Many
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
Value Clients
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
48
49. Meet Our Team
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
Designation
Name Here
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
Designation
Name Here
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
Designation
Name Here
49
50. Our Mission
Vision
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
Mission
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
Goal
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
50
51. Post It Notes
Text Here
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Text Here
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Text Here
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
51
52. Venn
04
07
05
08
06
09
01
03
02
10
Text Here
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
Text Here
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
Text Here
This slide is 100% editable. Adapt it to your needs and
capture your audience's attention.
52
53. Roadmap
Process
This slide is 100% editable. Adapt it to
your needs and capture your
audience's attention.
2017
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
2020
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
2019
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
2018
53
54. Idea Generate
This slide is 100% editable. Adapt it to
your needs and capture your
audience's attention.
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
This slide is 100% editable. Adapt it to
your needs and capture your
audience's attention.
Idea
01
Idea
02
Idea
03
54
55. Puzzle
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Text Here
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Text Here
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Text Here
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Text Here
55