The document appears to be a list of IEEE final year projects from 2011-2012 provided by Elysium Technologies Private Limited. It includes 12 project abstracts related to networking and wireless technologies. The projects focus on topics such as failure localization in optical networks, peer-to-peer streaming, heterogeneous network flows, wireless multicast broadcasting, cooperative ad hoc networks, CSMA scheduling algorithms, wireless network coordination, traffic counters, buffer sizing, CSMA network capacity, and channel assignment in wireless networks. Elysium Technologies is an ISO certified research and development company with locations in India and Singapore.