SlideShare a Scribd company logo
1 of 32
ICT Applied to Crisis Management and
Seismic Risk Assessment for Post Event Management
Maryam Izadifar Alireza Babaee Lorenzo Vidus Rosin Vincenzo Milesi
 Introduction
 Scenario
 Seismic Damage Scenario
 Data Architecture
 ICT Architecture
 Presentation of the Applications
Contents
Introduction Dealing
with
Unpredic
table
Complex
Disaster
Crisis Organizational
Problem will
start
Often large
crisis are
made by
small crises
Main Problems:
• Destabilized everyday life
• Difficult to evaluate situation
• Decide
Main Challenges:
• Communication
• Coordination
• Control
• Cognition
Crisis
Management
application of
strategies
designed to help
an organization
deal with a
sudden and
significant
negative event
Quick
Decisions
Phases of
Seismic
Crisis
Management
Case Study
 Salò is a town and commune in the
Province of Brescia in the region of
Lombardy (northern Italy) on the
banks of Lake Garda. The town has a
history of seismic events.
Seismic Scenario
• Magnitude: 5.2 in Richter scale
• Duration: 25 seconds
• Epicenter: 6 Km North of city
• Date & Time: Wednesday 24th November 2004 at
midnight (23.59 PM, local time)
Seismic Damage Scenario: Buildings
Vulnerability
Index of
each
building
block
Seismic
acceleration
in the
building area
Buildings
Damage
GIVEN DATA
Peak Ground
Acceleration
log10(Y) = a + bM + clog10(R2+h2)1/2 + e1S1 + e2S2  
According to attenuation law Sabetta–Pugliese:
BUILDING DAMAGE
ROAD DAMAGE OBSTRUCTION
DENSITY OF
POPULATION
IN ZONES
Seismic Damage Scenario: Areas
building’s typology
(construction
material, isolation
condition, number
of floors and
maintenance status)
construction
year period
(in terms of
volume)
an average
vulnerability
index
approximated
for each
section of the
area
Average
Seismic
acceleration
in the area
Area’s
average
damage
rate
VULNERABILITY
BASED ON CENSUS DATA
MAP
DAMAGE MAP
BASED ON CENSUS
DATA
Activity Diagram
Team Management
Entity-Relationship
Diagram BUILDING OWNER
NAME
SURNAME
PHONE NO.
CODICE FISCALE
EMAIL
BIRTH DATE
REQUEST OF ASSESSMENT
DATE
TIME
BUILDING
(1,n)
(0,1)
ADDRESS
OWNER NAME
OWNER SURNAME
FLAG PUBLIC BUILDING
CATEGORY
ACCESSED BY
ROAD
ROAD NAME
TYPE
(1,n) (1,n)
BELONG TO
AREA
ZONE NO.
GEO-REFERENCED
COORDINATION
POPULATION (1,1)(1,n)
TEAM
ALLOCATED TO
DATE
TIME
ASSESSED BY
DATE
TIME
(1,n)(1,n)
(1,n) (1,n)
TEAM ID
TEAM MEMBER
TEAM MEMBER ID
NAME
SURNAME
PHONE NO.
EMAIL
(1,n)
COMPOSED BY
(1,1)
ENGINEER ARCHITECHT FIREMAN
ENTITY-RELATIONSHIP DIAGRAM
BUILDING ID
Data Architecture
Use Case Diagram
ICT Architecture
Use Cases
Use Cases
Use Cases
Use Cases
Interface Design One (Assessment Request)
Step 1: Building owner enters his/her data Step 2: System shows the owner his/her buildings to be confirmed
Step 3: System shows the owner the position of the building Step 4: System gives a request code
Interface Design
Step 1: Log in page for authorizing Step 2: User can choose one option to enter its appropriate part
HR RESPONSIBLE
Authorized User 
Interface Design Two (Visualization of Requests)
Step 1: User chooses part one (visualization of requests) Step 2: System asks a date to show the requests till that time
Step 3: System shows requests, including pending from previous days Step 4: System shows all requests on the map
Interface Design Three (Team Composition)
Step 1: User chooses part two (team composition) Step 2: System asks a date Step 3: System shows list of available surveyors
Step 4: User chooses one engineer, one architect and one fireman Step 5: system shows the team composition to be confirmed
Interface Design Four (Team Planning)
Step 1: User chooses part three (team planning) Step 2: System asks a date for planning a team
Step 3: System shows a map with the zones to be chosen Step 4: System shows all requests on the chosen zone
Interface Design Four (Team Planning)
Step 5: User chooses building requests to be assessed Step 6: System shows all composed teams for that date
Step 7: User chooses one team
Step 8: System shows the result
(team, team members, buildings to be assessed, date, and time)
ICT applied to crisis management and seismic risk assessment for post event management for a given earthquake scenario in Salo city, Italy

More Related Content

Similar to ICT applied to crisis management and seismic risk assessment for post event management for a given earthquake scenario in Salo city, Italy

1 sad-01-introduction-june2015-rev
1 sad-01-introduction-june2015-rev1 sad-01-introduction-june2015-rev
1 sad-01-introduction-june2015-rev
Fajar Baskoro
 
Netmotion2
Netmotion2Netmotion2
Netmotion2
luisbjr
 
ACCOUNTING INFORMATION SYSTEM_Pertemuan 1_SIAII.pdf
ACCOUNTING INFORMATION SYSTEM_Pertemuan 1_SIAII.pdfACCOUNTING INFORMATION SYSTEM_Pertemuan 1_SIAII.pdf
ACCOUNTING INFORMATION SYSTEM_Pertemuan 1_SIAII.pdf
RiaMennita
 
Information Systems Development and Acquisition
Information Systems Development and AcquisitionInformation Systems Development and Acquisition
Information Systems Development and Acquisition
Yonathan Hadiputra
 
Reverse engeenering ikf presentation
Reverse engeenering ikf presentationReverse engeenering ikf presentation
Reverse engeenering ikf presentation
juanvidal71
 
Introduction to Systems Engineering
Introduction to Systems EngineeringIntroduction to Systems Engineering
Introduction to Systems Engineering
Ali Saaboonchi
 
“Applying the Right Deep Learning Model with the Right Data for Your Applicat...
“Applying the Right Deep Learning Model with the Right Data for Your Applicat...“Applying the Right Deep Learning Model with the Right Data for Your Applicat...
“Applying the Right Deep Learning Model with the Right Data for Your Applicat...
Edge AI and Vision Alliance
 

Similar to ICT applied to crisis management and seismic risk assessment for post event management for a given earthquake scenario in Salo city, Italy (20)

1 sad-01-introduction-june2015-rev
1 sad-01-introduction-june2015-rev1 sad-01-introduction-june2015-rev
1 sad-01-introduction-june2015-rev
 
Netmotion2
Netmotion2Netmotion2
Netmotion2
 
Legal Markup Generation in the Large: An Experience Report
Legal Markup Generation in the Large: An Experience ReportLegal Markup Generation in the Large: An Experience Report
Legal Markup Generation in the Large: An Experience Report
 
System development life cycle
System development life cycleSystem development life cycle
System development life cycle
 
Assignments Three And Four Object-Oriented Software Design And Implementatio...
Assignments Three And Four  Object-Oriented Software Design And Implementatio...Assignments Three And Four  Object-Oriented Software Design And Implementatio...
Assignments Three And Four Object-Oriented Software Design And Implementatio...
 
ACCOUNTING INFORMATION SYSTEM_Pertemuan 1_SIAII.pdf
ACCOUNTING INFORMATION SYSTEM_Pertemuan 1_SIAII.pdfACCOUNTING INFORMATION SYSTEM_Pertemuan 1_SIAII.pdf
ACCOUNTING INFORMATION SYSTEM_Pertemuan 1_SIAII.pdf
 
Information Systems Development and Acquisition
Information Systems Development and AcquisitionInformation Systems Development and Acquisition
Information Systems Development and Acquisition
 
Spm intro
Spm introSpm intro
Spm intro
 
System integration final exam
System integration final examSystem integration final exam
System integration final exam
 
Reverse engeenering ikf presentation
Reverse engeenering ikf presentationReverse engeenering ikf presentation
Reverse engeenering ikf presentation
 
Envitter (Environmental Social Media as Twitter)
Envitter (Environmental Social Media as Twitter)Envitter (Environmental Social Media as Twitter)
Envitter (Environmental Social Media as Twitter)
 
Verizon Breach Investigation Report (VBIR).pdf
Verizon Breach Investigation Report (VBIR).pdfVerizon Breach Investigation Report (VBIR).pdf
Verizon Breach Investigation Report (VBIR).pdf
 
Introduction to Systems Engineering
Introduction to Systems EngineeringIntroduction to Systems Engineering
Introduction to Systems Engineering
 
Housing repairs alpha show & tell 2 - 3 February 2020
Housing repairs alpha show & tell 2 - 3 February 2020Housing repairs alpha show & tell 2 - 3 February 2020
Housing repairs alpha show & tell 2 - 3 February 2020
 
Enterprise-architects as practical futurists
Enterprise-architects as practical futuristsEnterprise-architects as practical futurists
Enterprise-architects as practical futurists
 
chapt_1_Introduction_computer_science.pptx
chapt_1_Introduction_computer_science.pptxchapt_1_Introduction_computer_science.pptx
chapt_1_Introduction_computer_science.pptx
 
RA Lecture 2 requirements analysis facilities
RA Lecture 2 requirements analysis  facilitiesRA Lecture 2 requirements analysis  facilities
RA Lecture 2 requirements analysis facilities
 
“Applying the Right Deep Learning Model with the Right Data for Your Applicat...
“Applying the Right Deep Learning Model with the Right Data for Your Applicat...“Applying the Right Deep Learning Model with the Right Data for Your Applicat...
“Applying the Right Deep Learning Model with the Right Data for Your Applicat...
 
TMPA-2017: Stemming Architectural Decay in Software Systems
TMPA-2017:  Stemming Architectural Decay in Software SystemsTMPA-2017:  Stemming Architectural Decay in Software Systems
TMPA-2017: Stemming Architectural Decay in Software Systems
 
ONLINE VOTING SYSTEM.docx
ONLINE VOTING SYSTEM.docxONLINE VOTING SYSTEM.docx
ONLINE VOTING SYSTEM.docx
 

Recently uploaded

Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
pritamlangde
 

Recently uploaded (20)

UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Digital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptxDigital Communication Essentials: DPCM, DM, and ADM .pptx
Digital Communication Essentials: DPCM, DM, and ADM .pptx
 

ICT applied to crisis management and seismic risk assessment for post event management for a given earthquake scenario in Salo city, Italy

  • 1. ICT Applied to Crisis Management and Seismic Risk Assessment for Post Event Management Maryam Izadifar Alireza Babaee Lorenzo Vidus Rosin Vincenzo Milesi
  • 2.  Introduction  Scenario  Seismic Damage Scenario  Data Architecture  ICT Architecture  Presentation of the Applications Contents
  • 4. Crisis Organizational Problem will start Often large crisis are made by small crises Main Problems: • Destabilized everyday life • Difficult to evaluate situation • Decide Main Challenges: • Communication • Coordination • Control • Cognition
  • 5. Crisis Management application of strategies designed to help an organization deal with a sudden and significant negative event Quick Decisions
  • 7. Case Study  Salò is a town and commune in the Province of Brescia in the region of Lombardy (northern Italy) on the banks of Lake Garda. The town has a history of seismic events.
  • 8. Seismic Scenario • Magnitude: 5.2 in Richter scale • Duration: 25 seconds • Epicenter: 6 Km North of city • Date & Time: Wednesday 24th November 2004 at midnight (23.59 PM, local time)
  • 9. Seismic Damage Scenario: Buildings Vulnerability Index of each building block Seismic acceleration in the building area Buildings Damage
  • 11. Peak Ground Acceleration log10(Y) = a + bM + clog10(R2+h2)1/2 + e1S1 + e2S2   According to attenuation law Sabetta–Pugliese:
  • 12.
  • 16. Seismic Damage Scenario: Areas building’s typology (construction material, isolation condition, number of floors and maintenance status) construction year period (in terms of volume) an average vulnerability index approximated for each section of the area Average Seismic acceleration in the area Area’s average damage rate
  • 18. DAMAGE MAP BASED ON CENSUS DATA
  • 20. Entity-Relationship Diagram BUILDING OWNER NAME SURNAME PHONE NO. CODICE FISCALE EMAIL BIRTH DATE REQUEST OF ASSESSMENT DATE TIME BUILDING (1,n) (0,1) ADDRESS OWNER NAME OWNER SURNAME FLAG PUBLIC BUILDING CATEGORY ACCESSED BY ROAD ROAD NAME TYPE (1,n) (1,n) BELONG TO AREA ZONE NO. GEO-REFERENCED COORDINATION POPULATION (1,1)(1,n) TEAM ALLOCATED TO DATE TIME ASSESSED BY DATE TIME (1,n)(1,n) (1,n) (1,n) TEAM ID TEAM MEMBER TEAM MEMBER ID NAME SURNAME PHONE NO. EMAIL (1,n) COMPOSED BY (1,1) ENGINEER ARCHITECHT FIREMAN ENTITY-RELATIONSHIP DIAGRAM BUILDING ID Data Architecture
  • 21. Use Case Diagram ICT Architecture
  • 26. Interface Design One (Assessment Request) Step 1: Building owner enters his/her data Step 2: System shows the owner his/her buildings to be confirmed Step 3: System shows the owner the position of the building Step 4: System gives a request code
  • 27. Interface Design Step 1: Log in page for authorizing Step 2: User can choose one option to enter its appropriate part HR RESPONSIBLE Authorized User 
  • 28. Interface Design Two (Visualization of Requests) Step 1: User chooses part one (visualization of requests) Step 2: System asks a date to show the requests till that time Step 3: System shows requests, including pending from previous days Step 4: System shows all requests on the map
  • 29. Interface Design Three (Team Composition) Step 1: User chooses part two (team composition) Step 2: System asks a date Step 3: System shows list of available surveyors Step 4: User chooses one engineer, one architect and one fireman Step 5: system shows the team composition to be confirmed
  • 30. Interface Design Four (Team Planning) Step 1: User chooses part three (team planning) Step 2: System asks a date for planning a team Step 3: System shows a map with the zones to be chosen Step 4: System shows all requests on the chosen zone
  • 31. Interface Design Four (Team Planning) Step 5: User chooses building requests to be assessed Step 6: System shows all composed teams for that date Step 7: User chooses one team Step 8: System shows the result (team, team members, buildings to be assessed, date, and time)