After choosing the site, I have chosen to propose a commercial building that
is to build a digital like mall which specialise in buying and selling electronic devices. In
this day and age of high definition technology, the most appropriate commercial building
will be a technology mall which caters to the needs of all professionals both locally and
foreign. A place which offers work, play and also provides the latest in information and
communications technology. This building is maintained using solar power thus cutting
costs by tapping energy naturally and conserving for further uses at night as well as
powering a standby
generator. Rainwater
is also collected via a
ducting system where
it will maintain the greenery as well as habitats of nature. The interior and exterior structure
will be using sustainable wall panels which can resist heat and keep the environment cool
while reducing noise.
All units in the building will have sufficient lighting and space for their
specific use as in Small Office Home Office (SOHO), Small Office Versatile Office
(SOVO) and family needs. The car park will be using the Smart Parking System where
spaces are optimised and improve parking efficiency. Dining will be alfresco style
(outdoors) where one can enjoy the breeze on an outdoor patio and enjoy the leisure of
eating.
Concept of the Project
There a few reasons to why I wanted to propose a mall there, one of them is certainly
promoting more technology and electronic
devices. Given that the Subang area doesn’t
really have a large place that specialises in
only electronic devices, I decided to help
encourage technology to the Subang area
by proposing one. This will be the place to
shop for all your electronic needs and what’s more, it is also convenient and transport are
available everywhere such as bus or rail (KTM)
situated behind it.
Technology is the future, in order to keep up
with today’s trend, this mall is built to spread
technology all over Subang Jaya and further. It
will
also be a popular tourist attraction as they can
participate and enjoy themselves in a mall filled
with all sorts of amazing technology. Since
there is not much “Tech” malls in Malaysia,
this proposed building will be a success! Some
inspirations are drawn from a few popular malls specialises in technology such as Digital
mall and Low Yat Plaza. These two malls are highly successful and respectively helped
spread technology in their area.
Parking System
As usually parking can be a rather huge problem for shopping malls, I would like to include
the “Smart Parking System”. The smart parking system is basically an Automated
Mechanized Parking system that provide a quick and reliable solution to parking problems.
Smart Parking is very flexible and can be installed in multiple layouts entirely dependent on
site location and requirements.
Some of examples of how the parking system will work
Elements in the Project
Before proposing the development of the building, I have already brief through various types
of shop lots in the propose building. Here are a few images to show the concept of the types
of shop there. Examples:-
BankCamera Shops
IT Hypermarket
Game ShopsMobile Shops
Parking
Further Explanation of Each Element
Camera Shops
Camera shops are highly essential to any mall at this
time and age. Since this is the age of technology, it
is only logical for a mall that specialises in
electronic devices to have it there. People all around
the world love taking photos, camera shops are able
to provide the latest camera or accessories to help
the user take better and high quality pictures.
Mobile Shops
Company such as Samsung or Apple can always be
seen in any mall. Mobile devices are always sold
everywhere, there will be more mobile devices shops
all over the newly propose building as a mean to
promote technology even further. These shops will
not only be selling mobile phones but tablets and
accessories as well.
Bank
Given that majority of today’s technology has a higher
cost value, regular customers won’t be going around
bring a lot of cash on hand. A small bank and ATM
machines will be located around the mall to deposit
cash or to withdraw. ATM banks are highly convenient
and easy to use. So customers may be able to purchase
high cost items with cheque or even cash.
Game Shops
Gaming shops are widely popular among
teenagers, opening a few game shops in the
mall would help promote gaming. Usually
malls that specialise in selling electronic
devices tend to place gaming as one of their
highest profitable shops.
IT Hypermarket
IT Hypermarket is basically a market but sells
only electronic devices. It is amazing place to
purchase all sorts devices and accessories there.
It widely praise as device user heaven as it has
everything your electronic device needs.
Placing this in mall is a good choice as it will
attract a lot of customers around the area and
beyond.
Parking
Given that the mall is not as huge as other
megamalls, a suitable parking space for the
mall is a Smart Parking system. This system
does not occupy more space than usual parking
space and fully utilised the area to save space.
This is incredibly advance and good method for
parking your vehicle.
Benefits
- Provide more job opportunity to the locals
- Easy access to transportation
- Reduces time of travelling
- Provides high level of information and communication technology
- Increase economy by buying and selling high technology devices
- Encourages the increase of greenery in that area
- Promotes a greener environment
- Smart parking system where it optimises parking spaceand create
- efficient parking
- Alfresco dining promotes healthier environment and space
- Sustainable living through solar power
- The only building in that area that specialised in technology and more
- Attracts talent in specialised field
- Revitalise the local community by make use of underutilised of public
land available for private sector
Rationale
- Attract private investment in the area
- To showcase the latest technology
- To promote technology of the future
- Educating the community on the convenience of using the latest technology
- Introducing the new way of life with technology combine with greenery and cost
saving
- To encourage the usage of solar energy or renewable energy all over
- Promoting technology to the younger generation and allow them to learn and practice
for current and future usage
- Widen the knowledge of computer literacy to the current and future generation
- Setting a precedent of a fully integrated green building
- Encouraging innovation and invention of brand new ideas and system
Advantages
- To facilitate and give access to digital technology for the community and all involved
- Providing high technology facilities
- To promote community awareness of technology advancement
- Attracting IT savvy professionals to congregate and network
- Advertising of products and services more effectively
- There will be no disruption power or time by using the solar power system
Disadvantages
- Noise Pollution
- Air Pollution
- Ineffective way of cleaning up the debris
- Having concrete built building will result in an increase in the carbon footprint
produced in the area
- With the KTM near the chosen site and a highway, there will bound to be a heavy
traffic jam
Risk 1
Unable to complete the project in the amount of time given
Outcome
 Amount of time wasted
 Amount of money wasted
 Waste of resources
 Waste of space
 Project will likely be abandoned
 The client will be unhappy and refuse any cooperation in the near future
causing loss of a business
Ways to Overcome This Problem
 Good Project Coordination
 Project must be planned properly by a certified project manager
 Time management
Risk 2
Fail to receive the approval needed from the authorities to construct the building on
the site
Outcome
 Time wastage
 Energy wastage
 Wasting of man power
 Money wastage
 Project will be abandoned even before construction begins
 The project will not be able to be open to the public
Ways to Overcome This Problem
 The project must first be planned accordingly to prevent any unnecessary
problems from happening
 The design of the project must be good and stable
 The project must follow a series of procedures and the law before
constructing
Risk 3
The sudden drop out of the project by the consultant, quantity surveyor or any other
party involve in it due to unexpected reasons
Outcomes
 Time wasted in search of a new employee
 Project must be postponed
Ways to Overcome This Problem
 Hire experienced people to work with decrease the likeliness of them
dropping out and seeing the project through and through
 Provide good worker conditions and timing
Risk 4
Clients changes their mind about the project at the last minute
Outcomes
 Time wastage
 Supplies wastage
 Waste of energy
Ways to Overcome This Problem
 Convince the client that the project is able to be successfully completed
without any disappointment
Risk 5
Weather affects the project construction
Outcomes
 More time needed to complete
 May cause construction to be damaged
 More cost to repair and continue the construction
 Wastage of energy
 Whole project may be in danger
Ways to Overcome This Problem
 Build stronger base once the construction starts
 Use good quality material
 Cover the construction properly and securely
 Plan the working time according to weather forecast
Risk 6
Insufficient Budget is provided
Outcome
 Project cannot be successfully completed
 Materials used for construction are limited
Ways to Overcome This Problem
 Material must be used wisely and properly to avoid any wastage at any
cost
 A good quantity surveyor must be hired to take on any construction
project to manage and handle the budget properly so that the project can
still be completed even if the budget is low
Risk 7
Accidents or anything bad that might happen to the construction workers
Outcomes
 Project cannot be completed successfully
 It will affect the productivity of the workers
 Longer duration to complete the construction
 Other companies will have no confidence in cooperating in the future
Ways to Overcome this Problem
 Priorities the safety to all the workers
 Provide insurance to all the construction workers
 Supervise the workers at all times
 Ensure that the workers follow construction procedure
 Make sure that they are not engaged in dangerous acts at the construction
site
Conclusion
At the end of this project, we have concluded that it is very important to
coordinate and develop an understanding of coherent working relations among
various industry players and how to effectively communicate with other fields
an=bout what we wanted. We also learnt how to document our observations and
understanding mainly from the research we did as well as to place and compile
all of our findings in this report in a systematic way. We are also able to fully
use the area of an empty spaceto its maximum potential rather than just living it
there as a waste of space.
Authority Procedures
Step 1
Applicant Submits Application to Secretariat of One Stop Centre the One Stop Centre (OSC)
Secretariat shall check and examine all documents submitted based on the checklist prepared
for application towards Planning Permission, Building Plan Approval, Earthworks Plan and
application for Road and Drainage. If the application is incomplete, the OSC Secretariat will
request the applicant to submit the necessary or addition documents/plans. The OSC Secretariat
shall: • Register the application • Receive the receipt of processing fees • Key in data for
electronic submission, if applicable: and • Issue letter receipt application to the applicant
Step 2
OSC Secretariat Distributes Application to Relevant Departments The OSC secretariat shall
distribute the application with all accompanying documents to the relevant departments for
processing and for land development applications, technical departments/agencies referred to
area: • State Town and Country Planning Department; • Department of Valuation and
Property (JPPH); • Planning Department of Local Authority; • Department of Agriculture (if
necessary); and • Other related technical departments/agencies
Step 3A
Processing Land Development Applications (Section 124A NLC) by the Land Office For
simultaneous application for conversion and subdivision under Section 124A NLC, the
process and procedure shall be as follows: i. Receive application from OSC Secretariat; ii.
Receive payment or prove of payment; iii. Examine Form 7D, pre-computation plan*, letter
of consent from other land owner/s, and power of attorney (if required); iv. Examine status of
land (caveat, land restrictions, expressed conditions, and others); v. Register application in
the ownership document; vi. Prepare land report; vii. Make preliminary charting; and viii.
Land Administrator prepares comments to the Director of Town Planning of the Local
Authority, and make copies to OSC Secretariat by fax, post, email or by hand. For Malay
Reserve Land, prescribed form in the State Land Rules has to be used.
Step 3B
Processing of Planning Permission Application by the Department of Town Planning Local
Authority For application of Planning Permission, the process and procedure shall be as
follows: • Receive application letter from the One Stop Centre Secretariat and open file; •
Check application fee; • Check documents as in the detail checklist • Refer to Development
Plans and Planning Guidelines; • Check content of Development Proposal Report prepared
according to the Development Proposal Report prepared according to the Development
Proposal Report Manual JPBD, Peninsular Malaysia • Send notice to neigbouring lot owners
/ hearing of objections (for areas without a local plan) as in Schedule VIII Development
Control (General) Rules 1986; • Refer to the State Planning Committee and the National
Physical Planning Council (if required) and the period taken will depend on the meeting date
of the SPC/MPFN; • Receive comments from technical departments/agencies and coordinate
the conditions and comments; • Prepare written directions to the applicant and ensures all
requirements are complied with, within 7 days (or extended period granted); and • Prepare
recommendation paper to the One Stop Centre Secretariat
Step 3C
Processing of Building Plan Application by the Department of Town Planning Local
Authority For the building plan approval, the officer in the Building Department shall
undertake the following process and procedure: • Receive application letter with complete
documents from the One Stop Centre Secretariat and open file; • Check fee payment; • Check
Form A (Schedule II Uniform Building By Laws 1984); • Check the building plan based on
detailed checklist • Receive comments from technical departments/agencies and coordinate
comments with the agreed layout plan; • Prepare written directions to the applicant and
ensures applicant comply with conditions; • Prepare recommendation paper to the One Stop
Centre Secretariat The Director of Building Department shall table the recommendation
paper in the OSC Committee Meeting.
Step 3D
Processing the Earthworks Plan and the Road Drainage Plan Application by the Department
of Engineering Local Authority For earthworks plan and road and drainage plan approval, the
Engineering Department shall undertake the following procedures: • Receive application
letter with complete documents from the One Stop Centre Secretariat and open file; • Check
fee payment; • Check document as in the detail checklist i. Earthwork Plan ii. Road &
Drainage Plan • Receive and coordinate comments from technical departments/agencies and
coordinates comments with the agreed layout plans; • Prepare written directions to applicant
and ensure applicant had amended the plans within the stipulated timeframe; and • Prepare
recommendation paper to the One Stop Centre Secretariat The Director of Engineering
Department shall table the recommendation paper in the OSC Committee Meeting. Step 3E
Comments by Technical Department/Agencies • The relevant departments/agencies receive
complete documents from the One Stop Centre Secretariat; • Check the application; • Prepare
and submit comments to the relevant processing departments according to application; •
Submit c.c of comments to the One Stop Centre Secretariat
Step 4
Complied and Coordinates Recommendation Papers the One Stop Centre Secretariat shall: •
compile and coordinate all recommendation papers; • issue letter of calling for meeting
attached with meeting agenda to all members of the OSC Committee; and • distribute
recommendation papers. Should a technical department/agency not able to provide comments
within the stipulated time without a valid reason, the One Stop Centre Committee shall
proceed to consider the application and make decision. For applications that had submitted
the pre-computation plan at the early stage, any differences noted between the pre-
computation plan and the layout plan, the OSC Secretariat will have to inform the applicant
to make the necessary amendments.
Step 5
One Stop Centre Committee Meeting The OSC Committee Meeting shall undertake to
consider and make decisions on the applications for planning permission, building plans,
earthwork plans, road and drainage plans. The committee shall make recommendations for: •
pre-computation plan; • application for simultaneous subdivision and conversion under
section 124A NLC in accordance with subparagraph 136 (1)(c)(i) NLC or application for
surrender and re-alienation section 204D NLC in accordance with paragraph 204D(1)(d)
NLC. The decision of the planning permission in the OSC Committee Meeting shall be
issued through; • Form C1, Schedule I Development Control (General) Rules, 1986 - Award
Planning Permission to Applicant; and • Form B, Schedule IV Development Control
(General) Rules, 1986 - Notice to Person who Object the Planning Permission; or • Form C2,
Schedule I Development Control (General) Rules, 1986 - Reject to grant planning permission
These documents shall be signed by YDP or empowerment to the Director of Planning
Department Local Authority.
Step 6
Preparation of Notification of Planning Approval to Land Administrator The OSC Secretariat
shall prepare the necessary documents to be submitted to the Land Administrator: • Approved
documents (layout and pre-computation plans that had been signed); • Form C1, Schedule I
Development Control (General Rules), 1986 - planning permission approval; • letter of
confirmation of approval
Step 7
Prepare Recommendation Paper to the State Executive Council (EXCO) The Land
Administrator shall prepare a recommendation paper to the State Director of Lands and
Mines to be tabled at the meeting of the State Executive Council for decision. The State
Director for Lands and Mines shall inform the State's decision to the Land Administrator and
make copy of the decision to the One Stop Centre Secretariat.
Step 8
The Land Administrator informs the Applicant of the Decision on the Land Development
Application Under section 124A, the Land Administrator shall inform the applicant of the
following:- 1. The subdivision that has been approved; 2. For every subdivision, the category,
conditions and expressed conditions (if applicable) as directed by the State Authority; 3.
Additional premium rate and quit rent for every subdivision as well as other payments that
need to be made; 4. The period for the payment of additional premium, quit rent and others;
and 5. Other conditions of approval as imposed by the State Authority. As the same time, the
Land Administrator need to present the notice in Form 7G requesting the applicant to make
the necessary payments within the stipulated time as follows: - 1. Surveying fees if the survey
is to be done by the Department of Land Survey; and 2. Payment for the preparation and
registration of the Qualified Title for every lot in the subdivision. For section 204D, the Land
Administrator shall inform the applicant of the following: - • The terms of the approval for
each unit that shall be re-alienated; • The additional premium and tax rates for each unit that
shall be re-alienated; • Period of payment of the additional premium, tax and other payments
that is charged; and • The amount of premium in Form 5A in relation with each unit. The
survey charges shall not be included in Form 5A if the survey is to be undertaken by a
licensed surveyor and the Land Administrator has been given the assurance by the Board of
Surveyors.
Step 9
Prepare Decision Paper for Acknowledgement to the Full Council The OSC secretariat shall
prepare decision paper of the One Stop Centre Committee to be acknowledged at the Full
Council Meeting of the Local Authority.
Step 10
Inform the Approval to the Applicant The One Stop Centre secretariat shall: • collect the
approved documents signed by the YDP or through empowerment to the Director of
Planning, Director of Building and Director of Engineering. • inform the applicant the on the
decision of the application enclosing the approved layout plan, building plan and other related
plans. The total time frame for the processing of simultaneous application is suggested as 92
days (3 months and 2 days). If the application falls within an area with the gazetted local
plan, the normal time to process shall be 67 days (2 months and 7 days)

More Related Content

Similar to Ici

Buy integrated circuit
Buy integrated circuit Buy integrated circuit
Buy integrated circuit 779061702
 
TAQAT Planet Technology Investment.pdf
TAQAT Planet Technology Investment.pdfTAQAT Planet Technology Investment.pdf
TAQAT Planet Technology Investment.pdfMohamed Adam
 
Jeremy Kane Beyond 2010 Presentation
Jeremy Kane Beyond 2010 PresentationJeremy Kane Beyond 2010 Presentation
Jeremy Kane Beyond 2010 Presentationeventwithme
 
TATA STEEL IDEATION - UNIFIED COMMUNICATION & COLLABORATION
TATA STEEL IDEATION - UNIFIED COMMUNICATION & COLLABORATIONTATA STEEL IDEATION - UNIFIED COMMUNICATION & COLLABORATION
TATA STEEL IDEATION - UNIFIED COMMUNICATION & COLLABORATIONSuman Kumar
 
Proposal a pasar desa
Proposal a pasar desaProposal a pasar desa
Proposal a pasar desaLeon Lim
 
Taking the Proactive Roles Through Smart Technologies
Taking the Proactive Roles Through Smart TechnologiesTaking the Proactive Roles Through Smart Technologies
Taking the Proactive Roles Through Smart TechnologiesDr. Mazlan Abbas
 
2016 IDC Pan-European Utilities Summit: Open for Business
2016 IDC Pan-European Utilities Summit: Open for Business2016 IDC Pan-European Utilities Summit: Open for Business
2016 IDC Pan-European Utilities Summit: Open for BusinessOMNETRIC
 
2nd Annual M2M and IoT Strategies Summit - production-1-new brochure-2
2nd Annual M2M and IoT Strategies Summit - production-1-new brochure-22nd Annual M2M and IoT Strategies Summit - production-1-new brochure-2
2nd Annual M2M and IoT Strategies Summit - production-1-new brochure-2Jorge Rivero Sanchez
 
Best Embedded Systems Projects Ideas In 2015
Best Embedded Systems Projects Ideas In 2015Best Embedded Systems Projects Ideas In 2015
Best Embedded Systems Projects Ideas In 2015elprocus
 
Technological implication of e business
Technological implication of e businessTechnological implication of e business
Technological implication of e businessAnurag Garg
 
IDTechEx Research: Internet of Things - After the Hype: So Who's Buying IoT?
IDTechEx Research: Internet of Things - After the Hype: So Who's Buying IoT?IDTechEx Research: Internet of Things - After the Hype: So Who's Buying IoT?
IDTechEx Research: Internet of Things - After the Hype: So Who's Buying IoT?IDTechEx
 
Digital Transformation Depends on Effective Implementation of Intelligent Sys...
Digital Transformation Depends on Effective Implementation of Intelligent Sys...Digital Transformation Depends on Effective Implementation of Intelligent Sys...
Digital Transformation Depends on Effective Implementation of Intelligent Sys...Aidrivers Ltd.
 
A Case study on encouraging electric car usage
A Case study on encouraging electric car usageA Case study on encouraging electric car usage
A Case study on encouraging electric car usageCGI
 
Operations Management - Process Technology
Operations Management - Process TechnologyOperations Management - Process Technology
Operations Management - Process TechnologyNelson Opeña
 
Preparing for the Future - What It Will Take to Compete in 2021 - Connie Palu...
Preparing for the Future - What It Will Take to Compete in 2021 - Connie Palu...Preparing for the Future - What It Will Take to Compete in 2021 - Connie Palu...
Preparing for the Future - What It Will Take to Compete in 2021 - Connie Palu...Bob Dopico
 
20562-38940-1-PB.pdf
20562-38940-1-PB.pdf20562-38940-1-PB.pdf
20562-38940-1-PB.pdfIjictTeam
 

Similar to Ici (20)

Buy integrated circuit
Buy integrated circuit Buy integrated circuit
Buy integrated circuit
 
Smart X
Smart XSmart X
Smart X
 
Sgcp14beart1
Sgcp14beart1Sgcp14beart1
Sgcp14beart1
 
TAQAT Planet Technology Investment.pdf
TAQAT Planet Technology Investment.pdfTAQAT Planet Technology Investment.pdf
TAQAT Planet Technology Investment.pdf
 
Jeremy Kane Beyond 2010 Presentation
Jeremy Kane Beyond 2010 PresentationJeremy Kane Beyond 2010 Presentation
Jeremy Kane Beyond 2010 Presentation
 
TATA STEEL IDEATION - UNIFIED COMMUNICATION & COLLABORATION
TATA STEEL IDEATION - UNIFIED COMMUNICATION & COLLABORATIONTATA STEEL IDEATION - UNIFIED COMMUNICATION & COLLABORATION
TATA STEEL IDEATION - UNIFIED COMMUNICATION & COLLABORATION
 
Proposal a pasar desa
Proposal a pasar desaProposal a pasar desa
Proposal a pasar desa
 
Smart Industry
Smart IndustrySmart Industry
Smart Industry
 
Taking the Proactive Roles Through Smart Technologies
Taking the Proactive Roles Through Smart TechnologiesTaking the Proactive Roles Through Smart Technologies
Taking the Proactive Roles Through Smart Technologies
 
2016 IDC Pan-European Utilities Summit: Open for Business
2016 IDC Pan-European Utilities Summit: Open for Business2016 IDC Pan-European Utilities Summit: Open for Business
2016 IDC Pan-European Utilities Summit: Open for Business
 
2nd Annual M2M and IoT Strategies Summit - production-1-new brochure-2
2nd Annual M2M and IoT Strategies Summit - production-1-new brochure-22nd Annual M2M and IoT Strategies Summit - production-1-new brochure-2
2nd Annual M2M and IoT Strategies Summit - production-1-new brochure-2
 
Best Embedded Systems Projects Ideas In 2015
Best Embedded Systems Projects Ideas In 2015Best Embedded Systems Projects Ideas In 2015
Best Embedded Systems Projects Ideas In 2015
 
Technological implication of e business
Technological implication of e businessTechnological implication of e business
Technological implication of e business
 
IDTechEx Research: Internet of Things - After the Hype: So Who's Buying IoT?
IDTechEx Research: Internet of Things - After the Hype: So Who's Buying IoT?IDTechEx Research: Internet of Things - After the Hype: So Who's Buying IoT?
IDTechEx Research: Internet of Things - After the Hype: So Who's Buying IoT?
 
Eng. Florence Seriki
Eng. Florence SerikiEng. Florence Seriki
Eng. Florence Seriki
 
Digital Transformation Depends on Effective Implementation of Intelligent Sys...
Digital Transformation Depends on Effective Implementation of Intelligent Sys...Digital Transformation Depends on Effective Implementation of Intelligent Sys...
Digital Transformation Depends on Effective Implementation of Intelligent Sys...
 
A Case study on encouraging electric car usage
A Case study on encouraging electric car usageA Case study on encouraging electric car usage
A Case study on encouraging electric car usage
 
Operations Management - Process Technology
Operations Management - Process TechnologyOperations Management - Process Technology
Operations Management - Process Technology
 
Preparing for the Future - What It Will Take to Compete in 2021 - Connie Palu...
Preparing for the Future - What It Will Take to Compete in 2021 - Connie Palu...Preparing for the Future - What It Will Take to Compete in 2021 - Connie Palu...
Preparing for the Future - What It Will Take to Compete in 2021 - Connie Palu...
 
20562-38940-1-PB.pdf
20562-38940-1-PB.pdf20562-38940-1-PB.pdf
20562-38940-1-PB.pdf
 

More from Quo Ming

Financial management Group assignment
Financial management Group assignmentFinancial management Group assignment
Financial management Group assignmentQuo Ming
 
PP2 - Assignment
PP2 - AssignmentPP2 - Assignment
PP2 - AssignmentQuo Ming
 
Business report complete
Business report completeBusiness report complete
Business report completeQuo Ming
 
English essay lew quo ming1
English essay lew quo ming1English essay lew quo ming1
English essay lew quo ming1Quo Ming
 
English essay lew quo ming
English essay lew quo mingEnglish essay lew quo ming
English essay lew quo mingQuo Ming
 
Assignment 1 compare contrast essay
Assignment 1 compare   contrast essayAssignment 1 compare   contrast essay
Assignment 1 compare contrast essayQuo Ming
 
Course outline (2015)
Course outline (2015)Course outline (2015)
Course outline (2015)Quo Ming
 
Assignment 2 (research report)
Assignment 2 (research report)Assignment 2 (research report)
Assignment 2 (research report)Quo Ming
 
Psy presentation 2
Psy presentation 2 Psy presentation 2
Psy presentation 2 Quo Ming
 
Psycho report
Psycho reportPsycho report
Psycho reportQuo Ming
 
Fnbe research project
Fnbe research projectFnbe research project
Fnbe research projectQuo Ming
 
Fnbe research project
Fnbe research projectFnbe research project
Fnbe research projectQuo Ming
 
Social psychology
Social psychologySocial psychology
Social psychologyQuo Ming
 
Psycho report
Psycho reportPsycho report
Psycho reportQuo Ming
 
Fnbe journal assignment
Fnbe journal assignmentFnbe journal assignment
Fnbe journal assignmentQuo Ming
 
Fnbe course outline
Fnbe  course outline Fnbe  course outline
Fnbe course outline Quo Ming
 
Bus30104 intro to biz final project aug 2015
Bus30104 intro to biz final project   aug 2015Bus30104 intro to biz final project   aug 2015
Bus30104 intro to biz final project aug 2015Quo Ming
 
Final pawnshop-slide
Final pawnshop-slideFinal pawnshop-slide
Final pawnshop-slideQuo Ming
 
Final presentation project
Final presentation projectFinal presentation project
Final presentation projectQuo Ming
 
Epc p2-slides
Epc p2-slidesEpc p2-slides
Epc p2-slidesQuo Ming
 

More from Quo Ming (20)

Financial management Group assignment
Financial management Group assignmentFinancial management Group assignment
Financial management Group assignment
 
PP2 - Assignment
PP2 - AssignmentPP2 - Assignment
PP2 - Assignment
 
Business report complete
Business report completeBusiness report complete
Business report complete
 
English essay lew quo ming1
English essay lew quo ming1English essay lew quo ming1
English essay lew quo ming1
 
English essay lew quo ming
English essay lew quo mingEnglish essay lew quo ming
English essay lew quo ming
 
Assignment 1 compare contrast essay
Assignment 1 compare   contrast essayAssignment 1 compare   contrast essay
Assignment 1 compare contrast essay
 
Course outline (2015)
Course outline (2015)Course outline (2015)
Course outline (2015)
 
Assignment 2 (research report)
Assignment 2 (research report)Assignment 2 (research report)
Assignment 2 (research report)
 
Psy presentation 2
Psy presentation 2 Psy presentation 2
Psy presentation 2
 
Psycho report
Psycho reportPsycho report
Psycho report
 
Fnbe research project
Fnbe research projectFnbe research project
Fnbe research project
 
Fnbe research project
Fnbe research projectFnbe research project
Fnbe research project
 
Social psychology
Social psychologySocial psychology
Social psychology
 
Psycho report
Psycho reportPsycho report
Psycho report
 
Fnbe journal assignment
Fnbe journal assignmentFnbe journal assignment
Fnbe journal assignment
 
Fnbe course outline
Fnbe  course outline Fnbe  course outline
Fnbe course outline
 
Bus30104 intro to biz final project aug 2015
Bus30104 intro to biz final project   aug 2015Bus30104 intro to biz final project   aug 2015
Bus30104 intro to biz final project aug 2015
 
Final pawnshop-slide
Final pawnshop-slideFinal pawnshop-slide
Final pawnshop-slide
 
Final presentation project
Final presentation projectFinal presentation project
Final presentation project
 
Epc p2-slides
Epc p2-slidesEpc p2-slides
Epc p2-slides
 

Recently uploaded

306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social Media306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social MediaD SSS
 
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai DouxDubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Douxkojalkojal131
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricksabhishekparmar618
 
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)jennyeacort
 
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Narsimha murthy
 
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Gariahat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Roomdivyansh0kumar0
 
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130Suhani Kapoor
 
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一F dds
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,bhuyansuprit
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`dajasot375
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一F La
 
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一Fi sss
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Rndexperts
 
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一lvtagr7
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一Fi L
 

Recently uploaded (20)

young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
 
306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social Media306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social Media
 
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai DouxDubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
Dubai Call Girls Pro Domain O525547819 Call Girls Dubai Doux
 
Call Girls in Pratap Nagar, 9953056974 Escort Service
Call Girls in Pratap Nagar,  9953056974 Escort ServiceCall Girls in Pratap Nagar,  9953056974 Escort Service
Call Girls in Pratap Nagar, 9953056974 Escort Service
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricks
 
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
Call Us ✡️97111⇛47426⇛Call In girls Vasant Vihar༒(Delhi)
 
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...Revit Understanding Reference Planes and Reference lines in Revit for Family ...
Revit Understanding Reference Planes and Reference lines in Revit for Family ...
 
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Gariahat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Room
 
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
VIP Call Girls Service Kukatpally Hyderabad Call +91-8250192130
 
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
 
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
 
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025
 
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
定制(RMIT毕业证书)澳洲墨尔本皇家理工大学毕业证成绩单原版一比一
 
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
 
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
办理学位证(TheAuckland证书)新西兰奥克兰大学毕业证成绩单原版一比一
 

Ici

  • 1. Suggestionsand Proposal After choosing the site, I have chosen to propose a commercial building that is to build a digital like mall which specialise in buying and selling electronic devices. In this day and age of high definition technology, the most appropriate commercial building will be a technology mall which caters to the needs of all professionals both locally and foreign. A place which offers work, play and also provides the latest in information and communications technology. This building is maintained using solar power thus cutting costs by tapping energy naturally and conserving for further uses at night as well as powering a standby generator. Rainwater is also collected via a ducting system where it will maintain the greenery as well as habitats of nature. The interior and exterior structure will be using sustainable wall panels which can resist heat and keep the environment cool while reducing noise. All units in the building will have sufficient lighting and space for their specific use as in Small Office Home Office (SOHO), Small Office Versatile Office (SOVO) and family needs. The car park will be using the Smart Parking System where spaces are optimised and improve parking efficiency. Dining will be alfresco style (outdoors) where one can enjoy the breeze on an outdoor patio and enjoy the leisure of eating.
  • 2. Concept of the Project There a few reasons to why I wanted to propose a mall there, one of them is certainly promoting more technology and electronic devices. Given that the Subang area doesn’t really have a large place that specialises in only electronic devices, I decided to help encourage technology to the Subang area by proposing one. This will be the place to shop for all your electronic needs and what’s more, it is also convenient and transport are available everywhere such as bus or rail (KTM) situated behind it. Technology is the future, in order to keep up with today’s trend, this mall is built to spread technology all over Subang Jaya and further. It will also be a popular tourist attraction as they can participate and enjoy themselves in a mall filled with all sorts of amazing technology. Since there is not much “Tech” malls in Malaysia, this proposed building will be a success! Some inspirations are drawn from a few popular malls specialises in technology such as Digital mall and Low Yat Plaza. These two malls are highly successful and respectively helped spread technology in their area.
  • 3. Parking System As usually parking can be a rather huge problem for shopping malls, I would like to include the “Smart Parking System”. The smart parking system is basically an Automated Mechanized Parking system that provide a quick and reliable solution to parking problems. Smart Parking is very flexible and can be installed in multiple layouts entirely dependent on site location and requirements. Some of examples of how the parking system will work
  • 4. Elements in the Project Before proposing the development of the building, I have already brief through various types of shop lots in the propose building. Here are a few images to show the concept of the types of shop there. Examples:- BankCamera Shops IT Hypermarket Game ShopsMobile Shops Parking
  • 5. Further Explanation of Each Element Camera Shops Camera shops are highly essential to any mall at this time and age. Since this is the age of technology, it is only logical for a mall that specialises in electronic devices to have it there. People all around the world love taking photos, camera shops are able to provide the latest camera or accessories to help the user take better and high quality pictures. Mobile Shops Company such as Samsung or Apple can always be seen in any mall. Mobile devices are always sold everywhere, there will be more mobile devices shops all over the newly propose building as a mean to promote technology even further. These shops will not only be selling mobile phones but tablets and accessories as well. Bank Given that majority of today’s technology has a higher cost value, regular customers won’t be going around bring a lot of cash on hand. A small bank and ATM machines will be located around the mall to deposit cash or to withdraw. ATM banks are highly convenient and easy to use. So customers may be able to purchase high cost items with cheque or even cash.
  • 6. Game Shops Gaming shops are widely popular among teenagers, opening a few game shops in the mall would help promote gaming. Usually malls that specialise in selling electronic devices tend to place gaming as one of their highest profitable shops. IT Hypermarket IT Hypermarket is basically a market but sells only electronic devices. It is amazing place to purchase all sorts devices and accessories there. It widely praise as device user heaven as it has everything your electronic device needs. Placing this in mall is a good choice as it will attract a lot of customers around the area and beyond. Parking Given that the mall is not as huge as other megamalls, a suitable parking space for the mall is a Smart Parking system. This system does not occupy more space than usual parking space and fully utilised the area to save space. This is incredibly advance and good method for parking your vehicle.
  • 7. Benefits - Provide more job opportunity to the locals - Easy access to transportation - Reduces time of travelling - Provides high level of information and communication technology - Increase economy by buying and selling high technology devices - Encourages the increase of greenery in that area - Promotes a greener environment - Smart parking system where it optimises parking spaceand create - efficient parking - Alfresco dining promotes healthier environment and space - Sustainable living through solar power - The only building in that area that specialised in technology and more - Attracts talent in specialised field - Revitalise the local community by make use of underutilised of public land available for private sector
  • 8. Rationale - Attract private investment in the area - To showcase the latest technology - To promote technology of the future - Educating the community on the convenience of using the latest technology - Introducing the new way of life with technology combine with greenery and cost saving - To encourage the usage of solar energy or renewable energy all over - Promoting technology to the younger generation and allow them to learn and practice for current and future usage - Widen the knowledge of computer literacy to the current and future generation - Setting a precedent of a fully integrated green building - Encouraging innovation and invention of brand new ideas and system
  • 9. Advantages - To facilitate and give access to digital technology for the community and all involved - Providing high technology facilities - To promote community awareness of technology advancement - Attracting IT savvy professionals to congregate and network - Advertising of products and services more effectively - There will be no disruption power or time by using the solar power system Disadvantages - Noise Pollution - Air Pollution - Ineffective way of cleaning up the debris - Having concrete built building will result in an increase in the carbon footprint produced in the area - With the KTM near the chosen site and a highway, there will bound to be a heavy traffic jam
  • 10. Risk 1 Unable to complete the project in the amount of time given Outcome  Amount of time wasted  Amount of money wasted  Waste of resources  Waste of space  Project will likely be abandoned  The client will be unhappy and refuse any cooperation in the near future causing loss of a business Ways to Overcome This Problem  Good Project Coordination  Project must be planned properly by a certified project manager  Time management
  • 11. Risk 2 Fail to receive the approval needed from the authorities to construct the building on the site Outcome  Time wastage  Energy wastage  Wasting of man power  Money wastage  Project will be abandoned even before construction begins  The project will not be able to be open to the public Ways to Overcome This Problem  The project must first be planned accordingly to prevent any unnecessary problems from happening  The design of the project must be good and stable  The project must follow a series of procedures and the law before constructing
  • 12. Risk 3 The sudden drop out of the project by the consultant, quantity surveyor or any other party involve in it due to unexpected reasons Outcomes  Time wasted in search of a new employee  Project must be postponed Ways to Overcome This Problem  Hire experienced people to work with decrease the likeliness of them dropping out and seeing the project through and through  Provide good worker conditions and timing Risk 4 Clients changes their mind about the project at the last minute Outcomes  Time wastage  Supplies wastage  Waste of energy Ways to Overcome This Problem  Convince the client that the project is able to be successfully completed without any disappointment
  • 13. Risk 5 Weather affects the project construction Outcomes  More time needed to complete  May cause construction to be damaged  More cost to repair and continue the construction  Wastage of energy  Whole project may be in danger Ways to Overcome This Problem  Build stronger base once the construction starts  Use good quality material  Cover the construction properly and securely  Plan the working time according to weather forecast Risk 6 Insufficient Budget is provided Outcome  Project cannot be successfully completed  Materials used for construction are limited Ways to Overcome This Problem  Material must be used wisely and properly to avoid any wastage at any cost
  • 14.  A good quantity surveyor must be hired to take on any construction project to manage and handle the budget properly so that the project can still be completed even if the budget is low Risk 7 Accidents or anything bad that might happen to the construction workers Outcomes  Project cannot be completed successfully  It will affect the productivity of the workers  Longer duration to complete the construction  Other companies will have no confidence in cooperating in the future Ways to Overcome this Problem  Priorities the safety to all the workers  Provide insurance to all the construction workers  Supervise the workers at all times  Ensure that the workers follow construction procedure  Make sure that they are not engaged in dangerous acts at the construction site
  • 15. Conclusion At the end of this project, we have concluded that it is very important to coordinate and develop an understanding of coherent working relations among various industry players and how to effectively communicate with other fields an=bout what we wanted. We also learnt how to document our observations and understanding mainly from the research we did as well as to place and compile all of our findings in this report in a systematic way. We are also able to fully use the area of an empty spaceto its maximum potential rather than just living it there as a waste of space.
  • 16. Authority Procedures Step 1 Applicant Submits Application to Secretariat of One Stop Centre the One Stop Centre (OSC) Secretariat shall check and examine all documents submitted based on the checklist prepared for application towards Planning Permission, Building Plan Approval, Earthworks Plan and application for Road and Drainage. If the application is incomplete, the OSC Secretariat will request the applicant to submit the necessary or addition documents/plans. The OSC Secretariat shall: • Register the application • Receive the receipt of processing fees • Key in data for electronic submission, if applicable: and • Issue letter receipt application to the applicant Step 2 OSC Secretariat Distributes Application to Relevant Departments The OSC secretariat shall distribute the application with all accompanying documents to the relevant departments for processing and for land development applications, technical departments/agencies referred to area: • State Town and Country Planning Department; • Department of Valuation and Property (JPPH); • Planning Department of Local Authority; • Department of Agriculture (if necessary); and • Other related technical departments/agencies Step 3A Processing Land Development Applications (Section 124A NLC) by the Land Office For simultaneous application for conversion and subdivision under Section 124A NLC, the process and procedure shall be as follows: i. Receive application from OSC Secretariat; ii. Receive payment or prove of payment; iii. Examine Form 7D, pre-computation plan*, letter of consent from other land owner/s, and power of attorney (if required); iv. Examine status of land (caveat, land restrictions, expressed conditions, and others); v. Register application in the ownership document; vi. Prepare land report; vii. Make preliminary charting; and viii.
  • 17. Land Administrator prepares comments to the Director of Town Planning of the Local Authority, and make copies to OSC Secretariat by fax, post, email or by hand. For Malay Reserve Land, prescribed form in the State Land Rules has to be used. Step 3B Processing of Planning Permission Application by the Department of Town Planning Local Authority For application of Planning Permission, the process and procedure shall be as follows: • Receive application letter from the One Stop Centre Secretariat and open file; • Check application fee; • Check documents as in the detail checklist • Refer to Development Plans and Planning Guidelines; • Check content of Development Proposal Report prepared according to the Development Proposal Report prepared according to the Development Proposal Report Manual JPBD, Peninsular Malaysia • Send notice to neigbouring lot owners / hearing of objections (for areas without a local plan) as in Schedule VIII Development Control (General) Rules 1986; • Refer to the State Planning Committee and the National Physical Planning Council (if required) and the period taken will depend on the meeting date of the SPC/MPFN; • Receive comments from technical departments/agencies and coordinate the conditions and comments; • Prepare written directions to the applicant and ensures all requirements are complied with, within 7 days (or extended period granted); and • Prepare recommendation paper to the One Stop Centre Secretariat Step 3C Processing of Building Plan Application by the Department of Town Planning Local Authority For the building plan approval, the officer in the Building Department shall undertake the following process and procedure: • Receive application letter with complete documents from the One Stop Centre Secretariat and open file; • Check fee payment; • Check Form A (Schedule II Uniform Building By Laws 1984); • Check the building plan based on detailed checklist • Receive comments from technical departments/agencies and coordinate
  • 18. comments with the agreed layout plan; • Prepare written directions to the applicant and ensures applicant comply with conditions; • Prepare recommendation paper to the One Stop Centre Secretariat The Director of Building Department shall table the recommendation paper in the OSC Committee Meeting. Step 3D Processing the Earthworks Plan and the Road Drainage Plan Application by the Department of Engineering Local Authority For earthworks plan and road and drainage plan approval, the Engineering Department shall undertake the following procedures: • Receive application letter with complete documents from the One Stop Centre Secretariat and open file; • Check fee payment; • Check document as in the detail checklist i. Earthwork Plan ii. Road & Drainage Plan • Receive and coordinate comments from technical departments/agencies and coordinates comments with the agreed layout plans; • Prepare written directions to applicant and ensure applicant had amended the plans within the stipulated timeframe; and • Prepare recommendation paper to the One Stop Centre Secretariat The Director of Engineering Department shall table the recommendation paper in the OSC Committee Meeting. Step 3E Comments by Technical Department/Agencies • The relevant departments/agencies receive complete documents from the One Stop Centre Secretariat; • Check the application; • Prepare and submit comments to the relevant processing departments according to application; • Submit c.c of comments to the One Stop Centre Secretariat Step 4 Complied and Coordinates Recommendation Papers the One Stop Centre Secretariat shall: • compile and coordinate all recommendation papers; • issue letter of calling for meeting attached with meeting agenda to all members of the OSC Committee; and • distribute recommendation papers. Should a technical department/agency not able to provide comments within the stipulated time without a valid reason, the One Stop Centre Committee shall
  • 19. proceed to consider the application and make decision. For applications that had submitted the pre-computation plan at the early stage, any differences noted between the pre- computation plan and the layout plan, the OSC Secretariat will have to inform the applicant to make the necessary amendments. Step 5 One Stop Centre Committee Meeting The OSC Committee Meeting shall undertake to consider and make decisions on the applications for planning permission, building plans, earthwork plans, road and drainage plans. The committee shall make recommendations for: • pre-computation plan; • application for simultaneous subdivision and conversion under section 124A NLC in accordance with subparagraph 136 (1)(c)(i) NLC or application for surrender and re-alienation section 204D NLC in accordance with paragraph 204D(1)(d) NLC. The decision of the planning permission in the OSC Committee Meeting shall be issued through; • Form C1, Schedule I Development Control (General) Rules, 1986 - Award Planning Permission to Applicant; and • Form B, Schedule IV Development Control (General) Rules, 1986 - Notice to Person who Object the Planning Permission; or • Form C2, Schedule I Development Control (General) Rules, 1986 - Reject to grant planning permission These documents shall be signed by YDP or empowerment to the Director of Planning Department Local Authority. Step 6 Preparation of Notification of Planning Approval to Land Administrator The OSC Secretariat shall prepare the necessary documents to be submitted to the Land Administrator: • Approved documents (layout and pre-computation plans that had been signed); • Form C1, Schedule I Development Control (General Rules), 1986 - planning permission approval; • letter of confirmation of approval
  • 20. Step 7 Prepare Recommendation Paper to the State Executive Council (EXCO) The Land Administrator shall prepare a recommendation paper to the State Director of Lands and Mines to be tabled at the meeting of the State Executive Council for decision. The State Director for Lands and Mines shall inform the State's decision to the Land Administrator and make copy of the decision to the One Stop Centre Secretariat. Step 8 The Land Administrator informs the Applicant of the Decision on the Land Development Application Under section 124A, the Land Administrator shall inform the applicant of the following:- 1. The subdivision that has been approved; 2. For every subdivision, the category, conditions and expressed conditions (if applicable) as directed by the State Authority; 3. Additional premium rate and quit rent for every subdivision as well as other payments that need to be made; 4. The period for the payment of additional premium, quit rent and others; and 5. Other conditions of approval as imposed by the State Authority. As the same time, the Land Administrator need to present the notice in Form 7G requesting the applicant to make the necessary payments within the stipulated time as follows: - 1. Surveying fees if the survey is to be done by the Department of Land Survey; and 2. Payment for the preparation and registration of the Qualified Title for every lot in the subdivision. For section 204D, the Land Administrator shall inform the applicant of the following: - • The terms of the approval for each unit that shall be re-alienated; • The additional premium and tax rates for each unit that shall be re-alienated; • Period of payment of the additional premium, tax and other payments that is charged; and • The amount of premium in Form 5A in relation with each unit. The survey charges shall not be included in Form 5A if the survey is to be undertaken by a
  • 21. licensed surveyor and the Land Administrator has been given the assurance by the Board of Surveyors. Step 9 Prepare Decision Paper for Acknowledgement to the Full Council The OSC secretariat shall prepare decision paper of the One Stop Centre Committee to be acknowledged at the Full Council Meeting of the Local Authority. Step 10 Inform the Approval to the Applicant The One Stop Centre secretariat shall: • collect the approved documents signed by the YDP or through empowerment to the Director of Planning, Director of Building and Director of Engineering. • inform the applicant the on the decision of the application enclosing the approved layout plan, building plan and other related plans. The total time frame for the processing of simultaneous application is suggested as 92 days (3 months and 2 days). If the application falls within an area with the gazetted local plan, the normal time to process shall be 67 days (2 months and 7 days)