SlideShare a Scribd company logo
1 of 1
Download to read offline
1
www.merrick.com
© Copyright 2017 Merrick & Company
1. Surely, these old school knowledge areas do not
necessarily apply to the new bio-economy; Right? The
bio-economy or IB projects are all about new technology,
creative ideas and innovative ways of doing things. Yet,
because of these ground-breaking approaches, what
the industry needs more than ever is sound fundamental
project execution. Unfortunately, as we have seen in the
last decade, there are too many failed projects paved
with brilliant ideas. Many of these projects were hindered
by execution lacking in certain knowledge areas of the
PMBOK 10. The PMBOK knowledge areas are universal for
just about all projects.
2. Don’t industrial biotechnology projects have unique
areas, which are vitally important, but are not covered
by the PMBOK? The PMBOK knowledge areas do not
specifically identify vitally important IB project execution
issues such as confidentiality, safety, security, and
change control. However, the table below shows how all
of these issues align with the PMBOK knowledge area
and suggests a table of contents for a typical IB project
execution plan.
By Chris Biondolilo
The Project Management Institute (PMI) publishes the
Project Management Book of Knowledge (PMBOK). The
most recent 5th edition includes 10 knowledge areas that
apply to project execution as shown in the following table:
Order PMBOK Knowledge Areas
1 Project Integration Management
2 Project Scope Management
3 Project Time Management
4 Project Cost Management
5 Project Quality Management
6 Project Human Resource Management
7 Project Communications Management
8 Project Risk Management
9 Project Procurement Management
10 Project Stakeholder Management (new in 5th Ed)
This raises two questions relative to industrial
biotechnology (IB) projects.
Aligning PMI PMBOK Knowledge Areas with Industrial Biotechnology Project Execution
Sect #
Typical Industrial Biotechnology
Project Execution Plan TOC
PMBOK Associated Knowledge Area
1 Introduction, Project Background, and Objectives Project Integration Management
2A Scope of Work Project Scope Management
2B Project Deliverables Project Scope Management
3 Project Schedule Project Time Management
4 Project Budget Project Cost Management
5A Primary Design Standards, CAD Management Project Quality Management
5B Quality Assurance Project Quality Management
6 Project Organization Project Resource Management
7A Confidentiality and Communication Plan Project Communication Management
7B Document Control Project Communication and Quality Management
8 Risk Management Project Risk Management
9 Procurement, Acquisition Plan, Contracting Strategy Project Procurement Management
10 Project Reporting Requirements (Project Controls) Project Stakeholder Management (5th ed.)
11 Safety (includes site access and construction safety) Project Quality Management
12 Security Project Communication and Risk Management
13 Change Control Project Scope, Time, and Budget Management

More Related Content

Similar to IB vs. PMBOK

How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...Fabio Roberti
 
5 Ways Prefabrication Benefits your Construction Project.pptx
5 Ways Prefabrication Benefits your Construction Project.pptx5 Ways Prefabrication Benefits your Construction Project.pptx
5 Ways Prefabrication Benefits your Construction Project.pptxArpitGautam20
 
Delay Analysis for an On-Going Residential Project
Delay Analysis for an On-Going Residential ProjectDelay Analysis for an On-Going Residential Project
Delay Analysis for an On-Going Residential ProjectIRJET Journal
 
PMIBC162001_PMIBC-16-2-001_Murari_Construction_Program_Management
PMIBC162001_PMIBC-16-2-001_Murari_Construction_Program_ManagementPMIBC162001_PMIBC-16-2-001_Murari_Construction_Program_Management
PMIBC162001_PMIBC-16-2-001_Murari_Construction_Program_ManagementMurari Thayi, PgMP, PMP
 
CHAPTER 3PROJECT MANAGEMENTT.docx
CHAPTER 3PROJECT MANAGEMENTT.docxCHAPTER 3PROJECT MANAGEMENTT.docx
CHAPTER 3PROJECT MANAGEMENTT.docxwalterl4
 
CHAPTER 1 - Project Management.pdf
CHAPTER 1 - Project Management.pdfCHAPTER 1 - Project Management.pdf
CHAPTER 1 - Project Management.pdfMartinsAras
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET Journal
 
1 Module KB7035 Module Title Procurement and Su
1  Module KB7035 Module Title Procurement and Su1  Module KB7035 Module Title Procurement and Su
1 Module KB7035 Module Title Procurement and SuMartineMccracken314
 
1 Module KB7035 Module Title Procurement and Su
1  Module KB7035 Module Title Procurement and Su1  Module KB7035 Module Title Procurement and Su
1 Module KB7035 Module Title Procurement and SuAbbyWhyte974
 
Business basis of design
Business basis of design Business basis of design
Business basis of design Bob Prieto
 
EBOOK_Project_Management_in_Practice_----_(PART_1_SETTING_THE_SCENE).pdf
EBOOK_Project_Management_in_Practice_----_(PART_1_SETTING_THE_SCENE).pdfEBOOK_Project_Management_in_Practice_----_(PART_1_SETTING_THE_SCENE).pdf
EBOOK_Project_Management_in_Practice_----_(PART_1_SETTING_THE_SCENE).pdfNariman Heydari, MBA, GCP
 
Overview of project management in engineering environment
Overview of project management in engineering environmentOverview of project management in engineering environment
Overview of project management in engineering environmentMounir Ajam
 
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...IRJET Journal
 
Applying risk factors in the strategic selection of portfolio projects, prese...
Applying risk factors in the strategic selection of portfolio projects, prese...Applying risk factors in the strategic selection of portfolio projects, prese...
Applying risk factors in the strategic selection of portfolio projects, prese...Association for Project Management
 
IRJET- Development of R&D Project Management Model in Indian Construction Ind...
IRJET- Development of R&D Project Management Model in Indian Construction Ind...IRJET- Development of R&D Project Management Model in Indian Construction Ind...
IRJET- Development of R&D Project Management Model in Indian Construction Ind...IRJET Journal
 
About this research note Technology Insight notes descr.docx
About this research note Technology Insight notes descr.docxAbout this research note Technology Insight notes descr.docx
About this research note Technology Insight notes descr.docxransayo
 
CE-545_Fall 2015_TPG_03_Final_Report
CE-545_Fall 2015_TPG_03_Final_ReportCE-545_Fall 2015_TPG_03_Final_Report
CE-545_Fall 2015_TPG_03_Final_ReportMuhammad Daniyal
 

Similar to IB vs. PMBOK (20)

How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...
 
5 Ways Prefabrication Benefits your Construction Project.pptx
5 Ways Prefabrication Benefits your Construction Project.pptx5 Ways Prefabrication Benefits your Construction Project.pptx
5 Ways Prefabrication Benefits your Construction Project.pptx
 
Delay Analysis for an On-Going Residential Project
Delay Analysis for an On-Going Residential ProjectDelay Analysis for an On-Going Residential Project
Delay Analysis for an On-Going Residential Project
 
PMIBC162001_PMIBC-16-2-001_Murari_Construction_Program_Management
PMIBC162001_PMIBC-16-2-001_Murari_Construction_Program_ManagementPMIBC162001_PMIBC-16-2-001_Murari_Construction_Program_Management
PMIBC162001_PMIBC-16-2-001_Murari_Construction_Program_Management
 
CHAPTER 3PROJECT MANAGEMENTT.docx
CHAPTER 3PROJECT MANAGEMENTT.docxCHAPTER 3PROJECT MANAGEMENTT.docx
CHAPTER 3PROJECT MANAGEMENTT.docx
 
CHAPTER 1 - Project Management.pdf
CHAPTER 1 - Project Management.pdfCHAPTER 1 - Project Management.pdf
CHAPTER 1 - Project Management.pdf
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
 
1 Module KB7035 Module Title Procurement and Su
1  Module KB7035 Module Title Procurement and Su1  Module KB7035 Module Title Procurement and Su
1 Module KB7035 Module Title Procurement and Su
 
1 Module KB7035 Module Title Procurement and Su
1  Module KB7035 Module Title Procurement and Su1  Module KB7035 Module Title Procurement and Su
1 Module KB7035 Module Title Procurement and Su
 
Business basis of design
Business basis of design Business basis of design
Business basis of design
 
EBOOK_Project_Management_in_Practice_----_(PART_1_SETTING_THE_SCENE).pdf
EBOOK_Project_Management_in_Practice_----_(PART_1_SETTING_THE_SCENE).pdfEBOOK_Project_Management_in_Practice_----_(PART_1_SETTING_THE_SCENE).pdf
EBOOK_Project_Management_in_Practice_----_(PART_1_SETTING_THE_SCENE).pdf
 
Overview of project management in engineering environment
Overview of project management in engineering environmentOverview of project management in engineering environment
Overview of project management in engineering environment
 
Overview of project management in engineering environment
Overview of project management in engineering environmentOverview of project management in engineering environment
Overview of project management in engineering environment
 
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...IRJET - Forecasting and Management of Triple Constraints in Construction proj...
IRJET - Forecasting and Management of Triple Constraints in Construction proj...
 
Applying risk factors in the strategic selection of portfolio projects, prese...
Applying risk factors in the strategic selection of portfolio projects, prese...Applying risk factors in the strategic selection of portfolio projects, prese...
Applying risk factors in the strategic selection of portfolio projects, prese...
 
Managing IT Projects
Managing IT ProjectsManaging IT Projects
Managing IT Projects
 
IRJET- Development of R&D Project Management Model in Indian Construction Ind...
IRJET- Development of R&D Project Management Model in Indian Construction Ind...IRJET- Development of R&D Project Management Model in Indian Construction Ind...
IRJET- Development of R&D Project Management Model in Indian Construction Ind...
 
MCP2
MCP2MCP2
MCP2
 
About this research note Technology Insight notes descr.docx
About this research note Technology Insight notes descr.docxAbout this research note Technology Insight notes descr.docx
About this research note Technology Insight notes descr.docx
 
CE-545_Fall 2015_TPG_03_Final_Report
CE-545_Fall 2015_TPG_03_Final_ReportCE-545_Fall 2015_TPG_03_Final_Report
CE-545_Fall 2015_TPG_03_Final_Report
 

More from Merrick & Company

Biogas recent trends, challenges and opportunities
Biogas recent trends, challenges and opportunitiesBiogas recent trends, challenges and opportunities
Biogas recent trends, challenges and opportunitiesMerrick & Company
 
Sulfur Contaminants in Bio-Derived Products
Sulfur Contaminants in Bio-Derived ProductsSulfur Contaminants in Bio-Derived Products
Sulfur Contaminants in Bio-Derived ProductsMerrick & Company
 
Conceptual Design of Material Handling Processes
Conceptual Design of Material Handling ProcessesConceptual Design of Material Handling Processes
Conceptual Design of Material Handling ProcessesMerrick & Company
 
Decision & Risk Analysis for Industrial Biotechnology
Decision & Risk Analysis for Industrial BiotechnologyDecision & Risk Analysis for Industrial Biotechnology
Decision & Risk Analysis for Industrial BiotechnologyMerrick & Company
 
Waste watertreatment Merrick
Waste watertreatment MerrickWaste watertreatment Merrick
Waste watertreatment MerrickMerrick & Company
 
Glovebox design challenges with highly integrated equipment
Glovebox design challenges with highly integrated equipmentGlovebox design challenges with highly integrated equipment
Glovebox design challenges with highly integrated equipmentMerrick & Company
 
Geoverse Case Study: Using LiDAR to perform statewide inventory of sign assets
Geoverse Case Study: Using LiDAR to perform statewide inventory of sign assetsGeoverse Case Study: Using LiDAR to perform statewide inventory of sign assets
Geoverse Case Study: Using LiDAR to perform statewide inventory of sign assetsMerrick & Company
 
Tackling "BIG Data": Mobile LiDAR Transportation Project Use Case
Tackling "BIG Data": Mobile LiDAR Transportation Project Use CaseTackling "BIG Data": Mobile LiDAR Transportation Project Use Case
Tackling "BIG Data": Mobile LiDAR Transportation Project Use CaseMerrick & Company
 
Real-Time 3D Data Visualization and Analysis of Unlimited Detail
Real-Time 3D Data Visualization and Analysis of Unlimited DetailReal-Time 3D Data Visualization and Analysis of Unlimited Detail
Real-Time 3D Data Visualization and Analysis of Unlimited DetailMerrick & Company
 
Advancements In Visualization Of Remotely Sensed 3D Data
Advancements In Visualization Of Remotely Sensed 3D DataAdvancements In Visualization Of Remotely Sensed 3D Data
Advancements In Visualization Of Remotely Sensed 3D DataMerrick & Company
 
Unmanned Aircraft System (UAS) 3D Product Comparisons to Airborne LiDAR
Unmanned Aircraft System (UAS) 3D Product Comparisons to Airborne LiDARUnmanned Aircraft System (UAS) 3D Product Comparisons to Airborne LiDAR
Unmanned Aircraft System (UAS) 3D Product Comparisons to Airborne LiDARMerrick & Company
 
Mapping with Unmanned Airborne Systems (UAS)
Mapping with Unmanned Airborne Systems (UAS)Mapping with Unmanned Airborne Systems (UAS)
Mapping with Unmanned Airborne Systems (UAS)Merrick & Company
 
Streaming LiDAR: The Intersection of Geospatial & Gaming
Streaming LiDAR: The Intersection of Geospatial & GamingStreaming LiDAR: The Intersection of Geospatial & Gaming
Streaming LiDAR: The Intersection of Geospatial & GamingMerrick & Company
 
Value Added Applications for Optech Sensors
Value Added Applications for Optech SensorsValue Added Applications for Optech Sensors
Value Added Applications for Optech SensorsMerrick & Company
 
Automated LiDAR Data Quality Control
Automated LiDAR Data Quality ControlAutomated LiDAR Data Quality Control
Automated LiDAR Data Quality ControlMerrick & Company
 

More from Merrick & Company (17)

Biogas recent trends, challenges and opportunities
Biogas recent trends, challenges and opportunitiesBiogas recent trends, challenges and opportunities
Biogas recent trends, challenges and opportunities
 
Sulfur Contaminants in Bio-Derived Products
Sulfur Contaminants in Bio-Derived ProductsSulfur Contaminants in Bio-Derived Products
Sulfur Contaminants in Bio-Derived Products
 
Conceptual Design of Material Handling Processes
Conceptual Design of Material Handling ProcessesConceptual Design of Material Handling Processes
Conceptual Design of Material Handling Processes
 
Hydrothermal Liquefaction
Hydrothermal LiquefactionHydrothermal Liquefaction
Hydrothermal Liquefaction
 
Instrument cost estimating
Instrument cost estimatingInstrument cost estimating
Instrument cost estimating
 
Decision & Risk Analysis for Industrial Biotechnology
Decision & Risk Analysis for Industrial BiotechnologyDecision & Risk Analysis for Industrial Biotechnology
Decision & Risk Analysis for Industrial Biotechnology
 
Waste watertreatment Merrick
Waste watertreatment MerrickWaste watertreatment Merrick
Waste watertreatment Merrick
 
Glovebox design challenges with highly integrated equipment
Glovebox design challenges with highly integrated equipmentGlovebox design challenges with highly integrated equipment
Glovebox design challenges with highly integrated equipment
 
Geoverse Case Study: Using LiDAR to perform statewide inventory of sign assets
Geoverse Case Study: Using LiDAR to perform statewide inventory of sign assetsGeoverse Case Study: Using LiDAR to perform statewide inventory of sign assets
Geoverse Case Study: Using LiDAR to perform statewide inventory of sign assets
 
Tackling "BIG Data": Mobile LiDAR Transportation Project Use Case
Tackling "BIG Data": Mobile LiDAR Transportation Project Use CaseTackling "BIG Data": Mobile LiDAR Transportation Project Use Case
Tackling "BIG Data": Mobile LiDAR Transportation Project Use Case
 
Real-Time 3D Data Visualization and Analysis of Unlimited Detail
Real-Time 3D Data Visualization and Analysis of Unlimited DetailReal-Time 3D Data Visualization and Analysis of Unlimited Detail
Real-Time 3D Data Visualization and Analysis of Unlimited Detail
 
Advancements In Visualization Of Remotely Sensed 3D Data
Advancements In Visualization Of Remotely Sensed 3D DataAdvancements In Visualization Of Remotely Sensed 3D Data
Advancements In Visualization Of Remotely Sensed 3D Data
 
Unmanned Aircraft System (UAS) 3D Product Comparisons to Airborne LiDAR
Unmanned Aircraft System (UAS) 3D Product Comparisons to Airborne LiDARUnmanned Aircraft System (UAS) 3D Product Comparisons to Airborne LiDAR
Unmanned Aircraft System (UAS) 3D Product Comparisons to Airborne LiDAR
 
Mapping with Unmanned Airborne Systems (UAS)
Mapping with Unmanned Airborne Systems (UAS)Mapping with Unmanned Airborne Systems (UAS)
Mapping with Unmanned Airborne Systems (UAS)
 
Streaming LiDAR: The Intersection of Geospatial & Gaming
Streaming LiDAR: The Intersection of Geospatial & GamingStreaming LiDAR: The Intersection of Geospatial & Gaming
Streaming LiDAR: The Intersection of Geospatial & Gaming
 
Value Added Applications for Optech Sensors
Value Added Applications for Optech SensorsValue Added Applications for Optech Sensors
Value Added Applications for Optech Sensors
 
Automated LiDAR Data Quality Control
Automated LiDAR Data Quality ControlAutomated LiDAR Data Quality Control
Automated LiDAR Data Quality Control
 

Recently uploaded

Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 

Recently uploaded (20)

Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 

IB vs. PMBOK

  • 1. 1 www.merrick.com © Copyright 2017 Merrick & Company 1. Surely, these old school knowledge areas do not necessarily apply to the new bio-economy; Right? The bio-economy or IB projects are all about new technology, creative ideas and innovative ways of doing things. Yet, because of these ground-breaking approaches, what the industry needs more than ever is sound fundamental project execution. Unfortunately, as we have seen in the last decade, there are too many failed projects paved with brilliant ideas. Many of these projects were hindered by execution lacking in certain knowledge areas of the PMBOK 10. The PMBOK knowledge areas are universal for just about all projects. 2. Don’t industrial biotechnology projects have unique areas, which are vitally important, but are not covered by the PMBOK? The PMBOK knowledge areas do not specifically identify vitally important IB project execution issues such as confidentiality, safety, security, and change control. However, the table below shows how all of these issues align with the PMBOK knowledge area and suggests a table of contents for a typical IB project execution plan. By Chris Biondolilo The Project Management Institute (PMI) publishes the Project Management Book of Knowledge (PMBOK). The most recent 5th edition includes 10 knowledge areas that apply to project execution as shown in the following table: Order PMBOK Knowledge Areas 1 Project Integration Management 2 Project Scope Management 3 Project Time Management 4 Project Cost Management 5 Project Quality Management 6 Project Human Resource Management 7 Project Communications Management 8 Project Risk Management 9 Project Procurement Management 10 Project Stakeholder Management (new in 5th Ed) This raises two questions relative to industrial biotechnology (IB) projects. Aligning PMI PMBOK Knowledge Areas with Industrial Biotechnology Project Execution Sect # Typical Industrial Biotechnology Project Execution Plan TOC PMBOK Associated Knowledge Area 1 Introduction, Project Background, and Objectives Project Integration Management 2A Scope of Work Project Scope Management 2B Project Deliverables Project Scope Management 3 Project Schedule Project Time Management 4 Project Budget Project Cost Management 5A Primary Design Standards, CAD Management Project Quality Management 5B Quality Assurance Project Quality Management 6 Project Organization Project Resource Management 7A Confidentiality and Communication Plan Project Communication Management 7B Document Control Project Communication and Quality Management 8 Risk Management Project Risk Management 9 Procurement, Acquisition Plan, Contracting Strategy Project Procurement Management 10 Project Reporting Requirements (Project Controls) Project Stakeholder Management (5th ed.) 11 Safety (includes site access and construction safety) Project Quality Management 12 Security Project Communication and Risk Management 13 Change Control Project Scope, Time, and Budget Management