Tuesday, September 01, 2015
P.I. # 0000784
Brief, general description: The project aims to improve travel times and safety in the vicinity of the I-285/SR 400
interchange. This project is a priority for the metro Atlanta region and will be advanced through innovative project
delivery efforts. The project will be constructed by Design Build Finance (DBF), Public Private Partnership (P3). The
cost of the project is estimated at $725.9 million which includes the cost of preliminary design, environmental
approval, right of way acquisition, final design, construction, utility relocations, construction engineering and
inspection (CEI), and insurance.
Project Location: The project is located on the Top End of I-285, beginning west of Roswell Road in Fulton County
and ending east of Ashford Dunwoody Road in DeKalb County, a length of approximately 4.3 miles. It also includes
approximately 1.2 miles of improvements on SR 400 from the Glenridge Connector to Hammond Drive.
Project Details:
 The project proposes to construct new eastbound and westbound CD lanes along I-285, as well as northbound
and southbound CD lanes along SR-400, new flyover bridges, reconstruction of existing ramps, and widening
of existing bridges within the interchange.
 “Braided” ramps would be constructed in the vicinities of Ashford Dunwoody Road and Roswell Road to
eliminate conflicts between traffic entering and exiting SR 400 and traffic entering and exiting the Roswell
Road and Ashford Dunwoody interchanges, while preserving the recently completed projects at both of these
interchanges.
 Along SR 400, Along SR 400, the project would construct northbound and southbound CD lanes from
Glenridge Connector to Hammond Drive. This work would tie into the adjacent SR 400 CD lanes project (P.I.
# 721850-).
 An Environmental Assessment (EA)/Finding of No Significant Impact (FONSI) reflecting this preliminary
design was approved on May 19, 2015.
Project Schedule:
 Right of Way Acquisition:
o GDOT is currently acquiring required property for the project (between Glenridge Drive and the
MARTA overpass) and will complete acquisition by December 31, 2016.
o The selected Developer will acquire required property located west of Glenridge Drive and east of the
MARTA overpass.
 Procurement Phase:
o A shortlist of four teams to submit proposals on the project was announced on February 13, 2015.
AWH Roadbuilders, LLC
Contractors: Archer Western Contractors LLC and Hubbard Construction
Engineer: Parsons
Dragados-Flatiron-Prince JV
Contractors: Dragados USA Inc, Flat Iron Constructors Inc, Prince
Engineers: Figg Bridge Engineering, Stantec Consulting Services Inc
I-285/State Route (SR) 400 Interchange Reconstruction
Visit us on Facebook or Twitter.
North Perimeter Contractors
Contractor: Ferrovial Agroman US Corp
Engineers: The Louis Berger Group Inc, Neel-Shaffer
Skanska/Balfour Beatty, a Joint Venture
Contractors: Skanska, Balfour Beatty Infrastructure Inc
Engineer: Atkins
o The selected team will finance a portion of the project cost during the construction period and will be
paid back over a period of years after construction is complete.
o The final Request for Proposals (RFP) was issued to the shortlisted teams on July 8, 2015.
o The shortlisted teams will submit proposals on September 25, 2015.
o P3 Public Hearings will be held to present the executive summaries of the proposals.
October 20, 2015
St. Jude Catholic Church, Ministry Hall
7171 Glenridge Drive
Sandy Springs, GA 30328 (Fulton County)
11 am to 1 pm & 5 pm to 7 pm
October 22, 2015
Dunwoody Baptist Church Gymnasium
1445 Mt. Vernon Road
Dunwoody, GA 30338 (DeKalb County)
11 am to 1 pm & 5 pm to 7 pm
o The Best Value Proposal and selected Developer team will be announced on December 10, 2015.
o Financial Close with the Developer is anticipated to occur in April 2016.
 Final Design/Construction Phase:
o The Developer is anticipated to receive Notice to Proceed with Final Design in April 2016.
o Construction is anticipated to begin in late 2016/early 2017.
o Construction is anticipated to be complete by Spring 2020.
Contact:
Ms. Marlo Clowers, P.E., GDOT Project Manager
mclowers@dot.ga.gov
404-631-1713
www.dot.ga.gov/projects/Pages/default.aspx

More Related Content

What's hot

BKS_WORKS_SMALL
BKS_WORKS_SMALLBKS_WORKS_SMALL
BKS_WORKS_SMALL
Brian Shaffer
 
Leaside - Laird Construction Liaison Committee - July 2018
Leaside - Laird Construction Liaison Committee - July 2018Leaside - Laird Construction Liaison Committee - July 2018
Leaside - Laird Construction Liaison Committee - July 2018
Crosstown TO
 
RESUME-RDP
RESUME-RDPRESUME-RDP
RESUME-RDP
Bob Pooley
 
Diaa Anwar CV 1-6-2016
Diaa Anwar CV 1-6-2016Diaa Anwar CV 1-6-2016
Diaa Anwar CV 1-6-2016
Diaa Anwar
 
Resume Jamilatul Adawiah Rev.6
Resume Jamilatul Adawiah Rev.6Resume Jamilatul Adawiah Rev.6
Resume Jamilatul Adawiah Rev.6
Jamilatul Adawiah Mohd Aminudin
 
RESUME-RDP
RESUME-RDPRESUME-RDP
RESUME-RDP
Bob Pooley
 
Brown's Chapel Property Pond and Outfall Improvement
Brown's Chapel Property Pond and Outfall ImprovementBrown's Chapel Property Pond and Outfall Improvement
Brown's Chapel Property Pond and Outfall Improvement
Fairfax County
 
Braddock Rd. and Roberts Rd. Intersection and Sidewalk Improvements
Braddock Rd. and Roberts Rd. Intersection and Sidewalk ImprovementsBraddock Rd. and Roberts Rd. Intersection and Sidewalk Improvements
Braddock Rd. and Roberts Rd. Intersection and Sidewalk Improvements
Fairfax County
 
Omar Ash Resume - Kuwait
Omar Ash Resume - KuwaitOmar Ash Resume - Kuwait
Omar Ash Resume - Kuwait
Omar Abou-Shaban
 
Glade Drive Walkway - Middle Creek Lane to Glade Bank Way
Glade Drive Walkway - Middle Creek Lane to Glade Bank WayGlade Drive Walkway - Middle Creek Lane to Glade Bank Way
Glade Drive Walkway - Middle Creek Lane to Glade Bank Way
Fairfax County
 
Simarc property management - Application To freeholder for retrospective
Simarc property management - Application To freeholder for retrospectiveSimarc property management - Application To freeholder for retrospective
Simarc property management - Application To freeholder for retrospective
kellyortizlondon
 
Kevin B Nutt (3)
Kevin B Nutt (3)Kevin B Nutt (3)
Kevin B Nutt (3)
Kevin Nutt
 
01 CV 2016 Simon Barkley (1)
01 CV  2016 Simon Barkley  (1)01 CV  2016 Simon Barkley  (1)
01 CV 2016 Simon Barkley (1)
Simon Barkley
 
sami haider 5
sami haider 5sami haider 5
sami haider 5
Sami Haider
 
Georgetown Pike Walkway Phase IV
Georgetown Pike Walkway Phase IVGeorgetown Pike Walkway Phase IV
Georgetown Pike Walkway Phase IV
Fairfax County
 
North Shore Sidewalk Improvements
North Shore Sidewalk ImprovementsNorth Shore Sidewalk Improvements
North Shore Sidewalk Improvements
Fairfax County
 
Cochran Resume June 2016
Cochran Resume June 2016Cochran Resume June 2016
Cochran Resume June 2016
william cochran
 
Rt 50 Sidewalk - Cedar Hill Rd to Allen St and Graham Rd to Woodley Lane
Rt 50 Sidewalk - Cedar Hill Rd to Allen St and Graham Rd to Woodley LaneRt 50 Sidewalk - Cedar Hill Rd to Allen St and Graham Rd to Woodley Lane
Rt 50 Sidewalk - Cedar Hill Rd to Allen St and Graham Rd to Woodley Lane
Fairfax County
 
Wesolowski Zack 01 2015 1
Wesolowski Zack  01 2015 1Wesolowski Zack  01 2015 1
Wesolowski Zack 01 2015 1
Zachary Wesolowski
 
MJN Resume
MJN ResumeMJN Resume
MJN Resume
Marty Nally
 

What's hot (20)

BKS_WORKS_SMALL
BKS_WORKS_SMALLBKS_WORKS_SMALL
BKS_WORKS_SMALL
 
Leaside - Laird Construction Liaison Committee - July 2018
Leaside - Laird Construction Liaison Committee - July 2018Leaside - Laird Construction Liaison Committee - July 2018
Leaside - Laird Construction Liaison Committee - July 2018
 
RESUME-RDP
RESUME-RDPRESUME-RDP
RESUME-RDP
 
Diaa Anwar CV 1-6-2016
Diaa Anwar CV 1-6-2016Diaa Anwar CV 1-6-2016
Diaa Anwar CV 1-6-2016
 
Resume Jamilatul Adawiah Rev.6
Resume Jamilatul Adawiah Rev.6Resume Jamilatul Adawiah Rev.6
Resume Jamilatul Adawiah Rev.6
 
RESUME-RDP
RESUME-RDPRESUME-RDP
RESUME-RDP
 
Brown's Chapel Property Pond and Outfall Improvement
Brown's Chapel Property Pond and Outfall ImprovementBrown's Chapel Property Pond and Outfall Improvement
Brown's Chapel Property Pond and Outfall Improvement
 
Braddock Rd. and Roberts Rd. Intersection and Sidewalk Improvements
Braddock Rd. and Roberts Rd. Intersection and Sidewalk ImprovementsBraddock Rd. and Roberts Rd. Intersection and Sidewalk Improvements
Braddock Rd. and Roberts Rd. Intersection and Sidewalk Improvements
 
Omar Ash Resume - Kuwait
Omar Ash Resume - KuwaitOmar Ash Resume - Kuwait
Omar Ash Resume - Kuwait
 
Glade Drive Walkway - Middle Creek Lane to Glade Bank Way
Glade Drive Walkway - Middle Creek Lane to Glade Bank WayGlade Drive Walkway - Middle Creek Lane to Glade Bank Way
Glade Drive Walkway - Middle Creek Lane to Glade Bank Way
 
Simarc property management - Application To freeholder for retrospective
Simarc property management - Application To freeholder for retrospectiveSimarc property management - Application To freeholder for retrospective
Simarc property management - Application To freeholder for retrospective
 
Kevin B Nutt (3)
Kevin B Nutt (3)Kevin B Nutt (3)
Kevin B Nutt (3)
 
01 CV 2016 Simon Barkley (1)
01 CV  2016 Simon Barkley  (1)01 CV  2016 Simon Barkley  (1)
01 CV 2016 Simon Barkley (1)
 
sami haider 5
sami haider 5sami haider 5
sami haider 5
 
Georgetown Pike Walkway Phase IV
Georgetown Pike Walkway Phase IVGeorgetown Pike Walkway Phase IV
Georgetown Pike Walkway Phase IV
 
North Shore Sidewalk Improvements
North Shore Sidewalk ImprovementsNorth Shore Sidewalk Improvements
North Shore Sidewalk Improvements
 
Cochran Resume June 2016
Cochran Resume June 2016Cochran Resume June 2016
Cochran Resume June 2016
 
Rt 50 Sidewalk - Cedar Hill Rd to Allen St and Graham Rd to Woodley Lane
Rt 50 Sidewalk - Cedar Hill Rd to Allen St and Graham Rd to Woodley LaneRt 50 Sidewalk - Cedar Hill Rd to Allen St and Graham Rd to Woodley Lane
Rt 50 Sidewalk - Cedar Hill Rd to Allen St and Graham Rd to Woodley Lane
 
Wesolowski Zack 01 2015 1
Wesolowski Zack  01 2015 1Wesolowski Zack  01 2015 1
Wesolowski Zack 01 2015 1
 
MJN Resume
MJN ResumeMJN Resume
MJN Resume
 

Viewers also liked

salud e higiene.
salud e higiene.salud e higiene.
salud e higiene.
Yalimar
 
Energía presentación
Energía presentaciónEnergía presentación
Energía presentación
JesusMHM
 
Reported speech
Reported speechReported speech
Reported speech
hermine123
 
Ativismo coletivo
Ativismo coletivoAtivismo coletivo
Ativismo coletivo
claudiavisoni
 
La responsabilidad tic
La responsabilidad ticLa responsabilidad tic
La responsabilidad tic
Emmanuel Alejandro Gonzalez Reyes
 
Tarea nº 3
Tarea nº 3Tarea nº 3
Tarea nº 3
NOHE4MI
 
La autoestima presentacion 1 copy
La autoestima presentacion 1   copyLa autoestima presentacion 1   copy
La autoestima presentacion 1 copy
yvalentin
 
ASH 5 day Spirit of the Outback 1314
ASH 5 day Spirit of the Outback 1314ASH 5 day Spirit of the Outback 1314
ASH 5 day Spirit of the Outback 1314
Chris Chambers
 
circle of fourths
 circle of fourths  circle of fourths
circle of fourths
alonso guerrero lopez
 
Latihan
LatihanLatihan
Latihan
riniangganita
 
Test del-a¦ürbol
Test del-a¦ürbolTest del-a¦ürbol
Test del-a¦ürbol
Alma Maité Barajas Cárdenas
 
Pra latihan
Pra latihanPra latihan
Pra latihan
riniangganita
 
Bentley vandentop the cavalier king charles spaniel holland michigan
Bentley vandentop the cavalier king charles spaniel holland michiganBentley vandentop the cavalier king charles spaniel holland michigan
Bentley vandentop the cavalier king charles spaniel holland michigan
8184lumberjack
 
Praktek
PraktekPraktek
Praktek
riniangganita
 
Finding Blue Oceans in Product Management
Finding Blue Oceans in Product ManagementFinding Blue Oceans in Product Management
Finding Blue Oceans in Product Management
Jeremy Horn
 
Cvrenan
CvrenanCvrenan
sindrome adenomegalico
sindrome adenomegalicosindrome adenomegalico
sindrome adenomegalico
jesus tovar
 
Figuras relacionamento familiar
Figuras relacionamento familiarFiguras relacionamento familiar
Figuras relacionamento familiar
Alice Lirio
 
Fit 027 metodologia ponline1
Fit 027   metodologia ponline1Fit 027   metodologia ponline1
Fit 027 metodologia ponline1
Joe Nascimento
 
Toxicologia resumo
Toxicologia resumoToxicologia resumo
Toxicologia resumo
Vanderley Da Silva Castro
 

Viewers also liked (20)

salud e higiene.
salud e higiene.salud e higiene.
salud e higiene.
 
Energía presentación
Energía presentaciónEnergía presentación
Energía presentación
 
Reported speech
Reported speechReported speech
Reported speech
 
Ativismo coletivo
Ativismo coletivoAtivismo coletivo
Ativismo coletivo
 
La responsabilidad tic
La responsabilidad ticLa responsabilidad tic
La responsabilidad tic
 
Tarea nº 3
Tarea nº 3Tarea nº 3
Tarea nº 3
 
La autoestima presentacion 1 copy
La autoestima presentacion 1   copyLa autoestima presentacion 1   copy
La autoestima presentacion 1 copy
 
ASH 5 day Spirit of the Outback 1314
ASH 5 day Spirit of the Outback 1314ASH 5 day Spirit of the Outback 1314
ASH 5 day Spirit of the Outback 1314
 
circle of fourths
 circle of fourths  circle of fourths
circle of fourths
 
Latihan
LatihanLatihan
Latihan
 
Test del-a¦ürbol
Test del-a¦ürbolTest del-a¦ürbol
Test del-a¦ürbol
 
Pra latihan
Pra latihanPra latihan
Pra latihan
 
Bentley vandentop the cavalier king charles spaniel holland michigan
Bentley vandentop the cavalier king charles spaniel holland michiganBentley vandentop the cavalier king charles spaniel holland michigan
Bentley vandentop the cavalier king charles spaniel holland michigan
 
Praktek
PraktekPraktek
Praktek
 
Finding Blue Oceans in Product Management
Finding Blue Oceans in Product ManagementFinding Blue Oceans in Product Management
Finding Blue Oceans in Product Management
 
Cvrenan
CvrenanCvrenan
Cvrenan
 
sindrome adenomegalico
sindrome adenomegalicosindrome adenomegalico
sindrome adenomegalico
 
Figuras relacionamento familiar
Figuras relacionamento familiarFiguras relacionamento familiar
Figuras relacionamento familiar
 
Fit 027 metodologia ponline1
Fit 027   metodologia ponline1Fit 027   metodologia ponline1
Fit 027 metodologia ponline1
 
Toxicologia resumo
Toxicologia resumoToxicologia resumo
Toxicologia resumo
 

Similar to I-285-SR400InterchangeReconstruction

Fairfax County Glade Dr. Walkway Improvements August 2020
Fairfax County Glade Dr. Walkway Improvements August 2020Fairfax County Glade Dr. Walkway Improvements August 2020
Fairfax County Glade Dr. Walkway Improvements August 2020
Fairfax County
 
Eric Girod Project Resume
Eric Girod Project ResumeEric Girod Project Resume
Eric Girod Project Resume
Eric Girod
 
NCDOT Master Plan Presentation
NCDOT Master Plan PresentationNCDOT Master Plan Presentation
NCDOT Master Plan Presentation
Cub Berrian
 
WALID_TANBEDAWY_2016 R Dom Comp
WALID_TANBEDAWY_2016 R Dom CompWALID_TANBEDAWY_2016 R Dom Comp
WALID_TANBEDAWY_2016 R Dom Comp
Walid Tanbedawy, PE, MCM
 
JAIME_TOVAR
JAIME_TOVARJAIME_TOVAR
JAIME_TOVAR
Jaime Tovar
 
Telegraph Road Walkway
Telegraph Road WalkwayTelegraph Road Walkway
Telegraph Road Walkway
Fairfax County
 
Center Road sidewalk
Center Road sidewalkCenter Road sidewalk
Center Road sidewalk
Fairfax County
 
Wellborn Community Plan
Wellborn Community PlanWellborn Community Plan
Wellborn Community Plan
City of College Station
 
"News and Views" newsletter
"News and Views" newsletter "News and Views" newsletter
"News and Views" newsletter
Maribel Castillo
 
Quander Road Walkway
Quander Road WalkwayQuander Road Walkway
Quander Road Walkway
Fairfax County
 
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
The Piedmont Environmental Council
 
CKS_Portfolio_Min_CH2MHILL
CKS_Portfolio_Min_CH2MHILLCKS_Portfolio_Min_CH2MHILL
CKS_Portfolio_Min_CH2MHILL
Carmen Squires
 
Fairfax County Fleet Drive Walkway Improvements Sept 2020
Fairfax County Fleet Drive Walkway Improvements Sept 2020Fairfax County Fleet Drive Walkway Improvements Sept 2020
Fairfax County Fleet Drive Walkway Improvements Sept 2020
Fairfax County
 
City of orlando db colonial ped overpass technical
City of orlando db colonial ped overpass   technicalCity of orlando db colonial ped overpass   technical
City of orlando db colonial ped overpass technical
Brendan O'Connor
 
Braddock Road Walkway - Carlbern Drive to Clubside Lane
Braddock Road Walkway - Carlbern Drive to Clubside LaneBraddock Road Walkway - Carlbern Drive to Clubside Lane
Braddock Road Walkway - Carlbern Drive to Clubside Lane
Fairfax County
 
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
Fairfax County
 
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
Fairfax County
 
FDOT SR-997/Krome Avenue Safety Improvement Projects Status Update
FDOT SR-997/Krome Avenue Safety Improvement Projects Status UpdateFDOT SR-997/Krome Avenue Safety Improvement Projects Status Update
FDOT SR-997/Krome Avenue Safety Improvement Projects Status Update
Miami-Dade Transportation Planning Organization
 
RCTC & AGC: A Lasting Partnership (A. Mayer)
RCTC & AGC: A Lasting Partnership (A. Mayer)RCTC & AGC: A Lasting Partnership (A. Mayer)
RCTC & AGC: A Lasting Partnership (A. Mayer)
AGC of California
 
PowerPoint Westmoreland Street Bike Lanes - substantial completion
PowerPoint   Westmoreland Street Bike Lanes - substantial completionPowerPoint   Westmoreland Street Bike Lanes - substantial completion
PowerPoint Westmoreland Street Bike Lanes - substantial completion
Fairfax County
 

Similar to I-285-SR400InterchangeReconstruction (20)

Fairfax County Glade Dr. Walkway Improvements August 2020
Fairfax County Glade Dr. Walkway Improvements August 2020Fairfax County Glade Dr. Walkway Improvements August 2020
Fairfax County Glade Dr. Walkway Improvements August 2020
 
Eric Girod Project Resume
Eric Girod Project ResumeEric Girod Project Resume
Eric Girod Project Resume
 
NCDOT Master Plan Presentation
NCDOT Master Plan PresentationNCDOT Master Plan Presentation
NCDOT Master Plan Presentation
 
WALID_TANBEDAWY_2016 R Dom Comp
WALID_TANBEDAWY_2016 R Dom CompWALID_TANBEDAWY_2016 R Dom Comp
WALID_TANBEDAWY_2016 R Dom Comp
 
JAIME_TOVAR
JAIME_TOVARJAIME_TOVAR
JAIME_TOVAR
 
Telegraph Road Walkway
Telegraph Road WalkwayTelegraph Road Walkway
Telegraph Road Walkway
 
Center Road sidewalk
Center Road sidewalkCenter Road sidewalk
Center Road sidewalk
 
Wellborn Community Plan
Wellborn Community PlanWellborn Community Plan
Wellborn Community Plan
 
"News and Views" newsletter
"News and Views" newsletter "News and Views" newsletter
"News and Views" newsletter
 
Quander Road Walkway
Quander Road WalkwayQuander Road Walkway
Quander Road Walkway
 
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
Engineering Services RFP - PEC VDOT Rappahannock Fish-Passage Pilot Project -...
 
CKS_Portfolio_Min_CH2MHILL
CKS_Portfolio_Min_CH2MHILLCKS_Portfolio_Min_CH2MHILL
CKS_Portfolio_Min_CH2MHILL
 
Fairfax County Fleet Drive Walkway Improvements Sept 2020
Fairfax County Fleet Drive Walkway Improvements Sept 2020Fairfax County Fleet Drive Walkway Improvements Sept 2020
Fairfax County Fleet Drive Walkway Improvements Sept 2020
 
City of orlando db colonial ped overpass technical
City of orlando db colonial ped overpass   technicalCity of orlando db colonial ped overpass   technical
City of orlando db colonial ped overpass technical
 
Braddock Road Walkway - Carlbern Drive to Clubside Lane
Braddock Road Walkway - Carlbern Drive to Clubside LaneBraddock Road Walkway - Carlbern Drive to Clubside Lane
Braddock Road Walkway - Carlbern Drive to Clubside Lane
 
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
Bus Stop Safety and Accessibility Improvements: Hunter Mill, Braddock and Lee...
 
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
Lee Chapel Rd. Walkway Burke Lake Rd. to Britford Dr. July 2020
 
FDOT SR-997/Krome Avenue Safety Improvement Projects Status Update
FDOT SR-997/Krome Avenue Safety Improvement Projects Status UpdateFDOT SR-997/Krome Avenue Safety Improvement Projects Status Update
FDOT SR-997/Krome Avenue Safety Improvement Projects Status Update
 
RCTC & AGC: A Lasting Partnership (A. Mayer)
RCTC & AGC: A Lasting Partnership (A. Mayer)RCTC & AGC: A Lasting Partnership (A. Mayer)
RCTC & AGC: A Lasting Partnership (A. Mayer)
 
PowerPoint Westmoreland Street Bike Lanes - substantial completion
PowerPoint   Westmoreland Street Bike Lanes - substantial completionPowerPoint   Westmoreland Street Bike Lanes - substantial completion
PowerPoint Westmoreland Street Bike Lanes - substantial completion
 

I-285-SR400InterchangeReconstruction

  • 1. Tuesday, September 01, 2015 P.I. # 0000784 Brief, general description: The project aims to improve travel times and safety in the vicinity of the I-285/SR 400 interchange. This project is a priority for the metro Atlanta region and will be advanced through innovative project delivery efforts. The project will be constructed by Design Build Finance (DBF), Public Private Partnership (P3). The cost of the project is estimated at $725.9 million which includes the cost of preliminary design, environmental approval, right of way acquisition, final design, construction, utility relocations, construction engineering and inspection (CEI), and insurance. Project Location: The project is located on the Top End of I-285, beginning west of Roswell Road in Fulton County and ending east of Ashford Dunwoody Road in DeKalb County, a length of approximately 4.3 miles. It also includes approximately 1.2 miles of improvements on SR 400 from the Glenridge Connector to Hammond Drive. Project Details:  The project proposes to construct new eastbound and westbound CD lanes along I-285, as well as northbound and southbound CD lanes along SR-400, new flyover bridges, reconstruction of existing ramps, and widening of existing bridges within the interchange.  “Braided” ramps would be constructed in the vicinities of Ashford Dunwoody Road and Roswell Road to eliminate conflicts between traffic entering and exiting SR 400 and traffic entering and exiting the Roswell Road and Ashford Dunwoody interchanges, while preserving the recently completed projects at both of these interchanges.  Along SR 400, Along SR 400, the project would construct northbound and southbound CD lanes from Glenridge Connector to Hammond Drive. This work would tie into the adjacent SR 400 CD lanes project (P.I. # 721850-).  An Environmental Assessment (EA)/Finding of No Significant Impact (FONSI) reflecting this preliminary design was approved on May 19, 2015. Project Schedule:  Right of Way Acquisition: o GDOT is currently acquiring required property for the project (between Glenridge Drive and the MARTA overpass) and will complete acquisition by December 31, 2016. o The selected Developer will acquire required property located west of Glenridge Drive and east of the MARTA overpass.  Procurement Phase: o A shortlist of four teams to submit proposals on the project was announced on February 13, 2015. AWH Roadbuilders, LLC Contractors: Archer Western Contractors LLC and Hubbard Construction Engineer: Parsons Dragados-Flatiron-Prince JV Contractors: Dragados USA Inc, Flat Iron Constructors Inc, Prince Engineers: Figg Bridge Engineering, Stantec Consulting Services Inc I-285/State Route (SR) 400 Interchange Reconstruction
  • 2. Visit us on Facebook or Twitter. North Perimeter Contractors Contractor: Ferrovial Agroman US Corp Engineers: The Louis Berger Group Inc, Neel-Shaffer Skanska/Balfour Beatty, a Joint Venture Contractors: Skanska, Balfour Beatty Infrastructure Inc Engineer: Atkins o The selected team will finance a portion of the project cost during the construction period and will be paid back over a period of years after construction is complete. o The final Request for Proposals (RFP) was issued to the shortlisted teams on July 8, 2015. o The shortlisted teams will submit proposals on September 25, 2015. o P3 Public Hearings will be held to present the executive summaries of the proposals. October 20, 2015 St. Jude Catholic Church, Ministry Hall 7171 Glenridge Drive Sandy Springs, GA 30328 (Fulton County) 11 am to 1 pm & 5 pm to 7 pm October 22, 2015 Dunwoody Baptist Church Gymnasium 1445 Mt. Vernon Road Dunwoody, GA 30338 (DeKalb County) 11 am to 1 pm & 5 pm to 7 pm o The Best Value Proposal and selected Developer team will be announced on December 10, 2015. o Financial Close with the Developer is anticipated to occur in April 2016.  Final Design/Construction Phase: o The Developer is anticipated to receive Notice to Proceed with Final Design in April 2016. o Construction is anticipated to begin in late 2016/early 2017. o Construction is anticipated to be complete by Spring 2020. Contact: Ms. Marlo Clowers, P.E., GDOT Project Manager mclowers@dot.ga.gov 404-631-1713 www.dot.ga.gov/projects/Pages/default.aspx