Career Objective
Seeking the position of a junior civil engineer with an established construction firm where I
can explore my knowledge and skills while working towards challenging projects in the
structural and infrastructural fields.
Education
Carleton University – Ottawa, ON, Canada June, 2016
Bachelor of Engineering: Civil
Highlights
l Structural Design and Analysis l Highway & Transportation
l Geotechnical Engineering Engineering
l Project management l Municipal Engineering
l Concrete & Steel Design l Fluid Mechanics & Hydraulics
l Engineering Economics l Surveying
l Urban Planning l Wood Engineering
Personal and Technical Skills
• Bilingual (English and Arabic)
• Well versed with the civil engineering and architectural principles and methods
• Dedicated, highly motivated, and work well under pressure
• Strong interpersonal and communication skills, and team worker
• Willing to travel, relocate, or work overtime if deemed necessary
• Knowledge of the safety laws and precautionary measures applicable on site
• Good with numbers and statistics that help to calculate accurate measurements
• Excellent project management and budget projection abilities
• Proficient in Microsoft Office, AutoCAD, and Civil3D
• Good experience with surveying equipment such as steel tapes, total station, levels, and GPS
• Excellent knowledge of Canadian Structural and Civil Design Codes: Concrete Design
Manual (CSA A23.3-04), Steel Design Manual (CSA S16-01), National Building Code of
Canada (NBCC), and Wood Design Manual (CSAO86-01).
Page 2
Experience
Graduation Project
Elbow River Dam – Calgary, Alberta 2015 – 2016
n Designed an earth-fill dam to control the flow of the Elbow River to prevent tragedies such
as the flood of June 2013 from reoccurring.
n Took charge as project manager and displayed leadership.
n Performed feasibility analysis and cost estimation of project as well as several other
alternatives including a tunnel diversion system and dredging of existing reservoir.
n Performed geotechnical studies of existing soil in site area.
n Designed cofferdam and tunnel for temporary diversion as well as a contingency plan.
n Designed manhole system to control water flow through the dam.
n Completed progress reports and detailed final report of design plans.
RECAFCO – Kuwait City, Kuwait 06/2013 – 09/2013
Summer Intern
n Evaluate the structural designs and explain the project specifications to the workers.
n Supervised workers on site.
n Scheduled material and equipment purchases and deliveries.
n Scheduled deadlines and made sure they were met in time.
SQC International – Kuwait City, Kuwait 07/2016 – Present
Site Engineer Trainee
n Completed checklists of the work done on site.
n Reported progress of the works to the R.E.
n Supervised over the work and ensured it complies with the shop drawings and
specifications.
Organizations:
Ontario Society of Professional Engineers (OSPE) – Canada
Member ID: 40001395
Professional Engineers Ontario (PEO) – Canada
Engineer In Training (EIT)

Omar Ash Resume - Kuwait

  • 1.
    Omar Abou-Shaban omar.aboushaban@gmail.com Address –Canada Address – Kuwait Phone: 613-263-5194 Phone: +965 69976818 5-1157 Meadowlands Dr. East, Kuwait, Jabriya, Block 11, Street 8 Nepean, Ontario, K2E 6J5 House 13, Apt 5 Career Objective Seeking the position of a junior civil engineer with an established construction firm where I can explore my knowledge and skills while working towards challenging projects in the structural and infrastructural fields. Education Carleton University – Ottawa, ON, Canada June, 2016 Bachelor of Engineering: Civil Highlights l Structural Design and Analysis l Highway & Transportation l Geotechnical Engineering Engineering l Project management l Municipal Engineering l Concrete & Steel Design l Fluid Mechanics & Hydraulics l Engineering Economics l Surveying l Urban Planning l Wood Engineering Personal and Technical Skills • Bilingual (English and Arabic) • Well versed with the civil engineering and architectural principles and methods • Dedicated, highly motivated, and work well under pressure • Strong interpersonal and communication skills, and team worker • Willing to travel, relocate, or work overtime if deemed necessary • Knowledge of the safety laws and precautionary measures applicable on site • Good with numbers and statistics that help to calculate accurate measurements • Excellent project management and budget projection abilities • Proficient in Microsoft Office, AutoCAD, and Civil3D • Good experience with surveying equipment such as steel tapes, total station, levels, and GPS • Excellent knowledge of Canadian Structural and Civil Design Codes: Concrete Design Manual (CSA A23.3-04), Steel Design Manual (CSA S16-01), National Building Code of Canada (NBCC), and Wood Design Manual (CSAO86-01).
  • 2.
    Page 2 Experience Graduation Project ElbowRiver Dam – Calgary, Alberta 2015 – 2016 n Designed an earth-fill dam to control the flow of the Elbow River to prevent tragedies such as the flood of June 2013 from reoccurring. n Took charge as project manager and displayed leadership. n Performed feasibility analysis and cost estimation of project as well as several other alternatives including a tunnel diversion system and dredging of existing reservoir. n Performed geotechnical studies of existing soil in site area. n Designed cofferdam and tunnel for temporary diversion as well as a contingency plan. n Designed manhole system to control water flow through the dam. n Completed progress reports and detailed final report of design plans. RECAFCO – Kuwait City, Kuwait 06/2013 – 09/2013 Summer Intern n Evaluate the structural designs and explain the project specifications to the workers. n Supervised workers on site. n Scheduled material and equipment purchases and deliveries. n Scheduled deadlines and made sure they were met in time. SQC International – Kuwait City, Kuwait 07/2016 – Present Site Engineer Trainee n Completed checklists of the work done on site. n Reported progress of the works to the R.E. n Supervised over the work and ensured it complies with the shop drawings and specifications. Organizations: Ontario Society of Professional Engineers (OSPE) – Canada Member ID: 40001395 Professional Engineers Ontario (PEO) – Canada Engineer In Training (EIT)