Hybrid project
management
Hardware project or Non-
software projects Management
Project
Hybrid
- Worked as Telecom Project Engineer @ Aker solutions
- Worked as ICT user support consultant @Amesto Firstpoint
- Interested in telecom, IT and Project management.
Aziz Alriddan PMP PRINCE2
Outline
• What is a project?
• What is project management?
• Project Timeline
• How project management is important? Why?
• Types of Projects?
What is a Project?
I want to
build a car
Everyday is
different
Has a duration Ends with a product
Starts with idea
Building a car project
Start date: Aug -2020
End date: Jun - 2021
The product is
a car
Not business as usual
Project vs Operations
• All work in Life is either, a project or Operation!
• Building a house
• Writing a book
• Going for a picnic
Project
• Help desk in DNB
• Network maintenance in Telenor
• Barista in Espresso Torgallmenningen
Operation
Business
Case
Feasibility
study
Project
Customer
request
Legal
requirement
Market
demand Organizational
need
Continuous
improvement
Go
or
No-go?
Business
need or
idea
Project timeline
- Project manager role in Hybrid and waterfall
projects can be analogised as a pilot
Project managers spend 90% of time on
communications
Communicating with:
- Project team
- Sponsor
- Management
- Client/customer/Users
Buidling an Oil
platform using
Hybrid Method
Waterfall + Agile
- Hybrid is a combination of Waterfall + Agile
Waterfall/Predictive
Building an Oil Platform
• Requirements are defined
• No significant changes
• Client/provider relationship
• COST of change is High.
Agile/Adaptive
building Facebook App
• Requirements are NOT defined
• Changes are common
• Partners relationship
• Cost of change is low.
Example of a Hybrid project
Platform A work breakdown structure WBS
Platform A
Project
Separator
installation Drilling
workshop
Oil meter
Compressor 1
Main deck
Drilling
Workshop
North Crane Wi-Fi
Network
Reporting system
AppTop deck
Control
room
Hull
buidling
Generator
Gauges Agile
Agile
Design
• Collect requirements from customer in iterations
• Build in increments
• Refine 3D prototype
Build
• Using Kanban board
Control
• Phase gates
• Quality checks
Using PDMS CAD software to pr
Types of Hybrid
• Agile On individual work package level
• Agile on phase level of a Predictive approach
• Both on Horizontal and vertical levels
Conclusion
It is about combining the best of the two
There is no Better off!
Use each when needed
Agile is working for us, not we working for Agile
Why project management is important?
• It is based on best practices
• It avoids ambiguity (No I thaught you meant this not that)
• It unites terminologies (All are on same page speak same language)
• It controls changes (Change has to be authorized)
• It tracks progress (avoids disappointment)
• It defines roles and responsibilty (Battery limit)
Hybrid project mgmt

Hybrid project mgmt

  • 1.
    Hybrid project management Hardware projector Non- software projects Management Project Hybrid
  • 2.
    - Worked asTelecom Project Engineer @ Aker solutions - Worked as ICT user support consultant @Amesto Firstpoint - Interested in telecom, IT and Project management. Aziz Alriddan PMP PRINCE2
  • 3.
    Outline • What isa project? • What is project management? • Project Timeline • How project management is important? Why? • Types of Projects?
  • 4.
    What is aProject? I want to build a car Everyday is different Has a duration Ends with a product Starts with idea Building a car project Start date: Aug -2020 End date: Jun - 2021 The product is a car Not business as usual
  • 5.
    Project vs Operations •All work in Life is either, a project or Operation! • Building a house • Writing a book • Going for a picnic Project • Help desk in DNB • Network maintenance in Telenor • Barista in Espresso Torgallmenningen Operation
  • 6.
  • 7.
    - Project managerrole in Hybrid and waterfall projects can be analogised as a pilot
  • 8.
    Project managers spend90% of time on communications Communicating with: - Project team - Sponsor - Management - Client/customer/Users
  • 9.
    Buidling an Oil platformusing Hybrid Method Waterfall + Agile
  • 10.
    - Hybrid isa combination of Waterfall + Agile Waterfall/Predictive Building an Oil Platform • Requirements are defined • No significant changes • Client/provider relationship • COST of change is High. Agile/Adaptive building Facebook App • Requirements are NOT defined • Changes are common • Partners relationship • Cost of change is low.
  • 11.
    Example of aHybrid project Platform A work breakdown structure WBS Platform A Project Separator installation Drilling workshop Oil meter Compressor 1 Main deck Drilling Workshop North Crane Wi-Fi Network Reporting system AppTop deck Control room Hull buidling Generator Gauges Agile Agile
  • 12.
    Design • Collect requirementsfrom customer in iterations • Build in increments • Refine 3D prototype Build • Using Kanban board Control • Phase gates • Quality checks Using PDMS CAD software to pr
  • 13.
    Types of Hybrid •Agile On individual work package level • Agile on phase level of a Predictive approach • Both on Horizontal and vertical levels
  • 14.
    Conclusion It is aboutcombining the best of the two There is no Better off! Use each when needed Agile is working for us, not we working for Agile
  • 15.
    Why project managementis important? • It is based on best practices • It avoids ambiguity (No I thaught you meant this not that) • It unites terminologies (All are on same page speak same language) • It controls changes (Change has to be authorized) • It tracks progress (avoids disappointment) • It defines roles and responsibilty (Battery limit)