1 | P a g e - P r o j e c t M a n a g e m e n t - H W / A s s i g n m e n t W 1 0
Homework/Assignment 7
Full Name of submitter: Nguyễn Thị Quỳnh Như Student ID: IELSIU18111
Your Group number is: 5
Group members are:
MEMBER ID
Nguyễn Thị Quỳnh Như (Leader) IELSIU18111
Trần Thị Thanh Ngân IELSIU18223
Hoàng Minh Tuyền IELSIU18168
Lê Nguyễn Hồng Hạnh IELSIU18038
Phạm Ngọc Xuân Mai IELSIU18075
Hồ Yến Na IELSIU18086
Trần Như Bình IELSIU18191
Lương Thanh Bảo Ngọc IELSIU18096
Trương Ngọc Huyền Linh IELSIU18068
1. In your Semester (Group) Project
a. Propose a “sampling plan” of pacticular activity
b. What are the main tasks to ensure qualily
Note:
- Continue using this form to complete your works and submit on Blackboard
- Name your file
o If you submit individually: BT21_PJM_HW7_StudentID_FullName
o If you submit for a group (Group # are finalized by lecturer): BT21_PJM_HW7_G#
- Due Date is defined in detail at each “ASSIGNMENT INFORMATION” from Blackboard
- Maximum score of late submission is two third of “Point Possible”
- If you can’t submit on Blackboard: Email your work to TA, copy your Lecturer, attached also the
screenshot of your Blackboard showing error in that transaction
---------
Answers/Works
NB
2 | P a g e - P r o j e c t M a n a g e m e n t - H W / A s s i g n m e n t W 1 0
1. Our group project’s topic: IMPROVING DRAGON FRUIT WAREHOUSE
a)
Activity: Installing new Dragon Fruit washing machine
Requirement:
• Reasonable area for installing new machine.
• Stable electricity and water system to ensure the productivity of the machine.
• Tools needed to installation and repair the machine in an emergency such as electrical
leakage, jammed conveyor belt and etc.
Raw material:
• New machine.
• Vehicles to assist in transporting machine.
• Machine installation and repair tools.
• Water pumps
• Electricity supply
Detail:
1. Area selection
- Measure the length and width to save space and suit the warehouse layout.
- Check the stability of the power and water supply to ensure the safety of the warehouse.
2. Moving the machine
- Check the entrance to avoid collisions while moving.
- Move each machine component to a selected area in preparation for installation.
3. Installation the machine
- Check the machine components carefully before assembling to avoid damage during usage.
- Check whether the water and electricity pipes meet the required standards.
- Sturdy and safe assembly.
4. Testing quality
- Test the machine performance during peak time of a day: 8 am to 12 noon and 2 pm to 7
pm.
- People-in-charge:
- Mr. A, Dragon Fruit warehouse owner
- Mr. B, machine supplier
- Mr. C, machine purchaser
- Mr. D, Mr. E, machine assembly engineer
Timeline:
NB
3 | P a g e - P r o j e c t M a n a g e m e n t - H W / A s s i g n m e n t W 1 0
To ensure the productivity and durability of the machine, we run the machine for testing at dif-
ferent times under different conditions. The trial time period is determined from 5th
May to 7th
May.
Due to the special relation, the area selection, moving the machine and installation the machine
sampling activities are completed in 1 day.
Morning Afternoon Evening
High
dragon fruit
capacity
(7h – 10h)
Normal
dragon fruit
capacity
(10h –
11h30)
High
dragon fruit
capacity
(12h – 16h)
Normal
dragon fruit
capacity
(16h – 18h)
High dragon
fruit capacity
(6h – 8h)
Normal
dragon fruit
capacity (8h
– 10h)
5th
May
Area selec-
tion
Moving the
machine
Installation
the machine
Installation
the machine
6th
May
Testing
quality
Testing
quality
Testing quali-
ty
7th
May
Testing qual-
ity
Testing qual-
ity
Testing
quality
Summary of conducted activities:
Area selection Moving the machine
Installation the
machine
Testing quality
Sample
unit
Measurement Vehicle and people
Tools and engi-
neer
Engineer, electricity and
water
Sample
size
• 5 different sizes
• 5 types of vehicle
• 5 people
• 2 engineers
• 2 engineers
• 1 electricity supply
• 1 water supply
Sample
procure
Choose 5 different
ways to place the
machine namely
vertical, horizontal,
diagonal, corner,
zigzag and calculate
to save the most ar-
ea.
Choose 5 types of ve-
hicles such as trolley,
forklift, … and check
whether the machine
can fit through the
entrance. Find the
most suitable vehicle
for moving.
2 engineers
check machine
components and
assemble care-
fully to avoid re-
dismantling
when detecting
errors.
2 engineers test the ma-
chine for 2 days with
stable electricity and
water at different times.
Find the time when the
machine is running at
the highest productivity
in minimal time.
NB
4 | P a g e - P r o j e c t M a n a g e m e n t - H W / A s s i g n m e n t W 1 0
b)
The main tasks to ensure quality of our project.
✰ Monitoring & controlling: Perform quality control
- Assigning quality management responsibility of particular activities/tasks for each person.
- Sticking to the project requirements. Ensure the deliverables are correct and free of defects
and focus on quality from the beginning to the end of the project.
- Requirements management and quality management go hand in hand. We should focus on
improving the requirements process — eliciting, analyzing, documenting and validating
them.
- Performing inspections to identify defects.
- Working and checking carefully in order to bring a defective or non-conforming items into
compliance with quality standards.
- Often reviewing acceptable range of stakeholders’ expectation with current situation.
- Identifying and correcting defects close to the point of origin saves time and money
- Following quality assurance to make improvements.
- Usually having interaction with other departments/people to keep track the situation.
- Updating the cost, budget, risk, schedule continuously to replanning quality management
✰ Planning: Plan quality
- Building quality policies, quality control plan and quality assurance plan for each activity/
product/ deliverables to achieve objectives. Consider risk factors and complexity of the pro-
ject and adapt processes to provide the requisite level of quality.
- Identifying professional standards and regulations in the field of construction including legal,
environmental, economic, and construction safety.
- Collecting the scope statement: project deliverables, project objectives.
- Building framework for quality control, together with sampling plan
- Building good data representation (mind mapping, logical data model,...) for supporting data
such as: budget, cost, risk, schedule,... to make it easy to construct the plans
- Balancing needs and expectations of customers and stakeholders with cost, schedule, and
professional standards.
- Evaluating the costs and benefits of selected quality objectives and the processes to be used
to achieve objectives.
✰ Executing: Perform quality assurance
- Gathering the results of quality control measurements.
- Conducting quality audits (both scheduled and randomly) to identify some improvements can
be made to the project in case you have unexpected, negative or whimsical trends in meas-
urements.
NB
5 | P a g e - P r o j e c t M a n a g e m e n t - H W / A s s i g n m e n t W 1 0
- Quantitatively recognizing the effect of each source of mistakes or defects.
- Setting weekly meetings to review the plan regularly.
- Inspecting a process, e.g. construction schedule, to determine whether it’s functioning timely
and optimally.
- Benchmarking process-improvement objectives to enhance process results.
- Distinguishing multiple factors within the process that can be modified in conjunction with
one another to enhance to process.

More Related Content

What's hot (20)

Devon McDonald's (Resume)rev.1
Devon McDonald's (Resume)rev.1Devon McDonald's (Resume)rev.1
Devon McDonald's (Resume)rev.1
 
Robert
RobertRobert
Robert
 
Resume -UD
Resume -UDResume -UD
Resume -UD
 
Curriculum Vitae (2)
Curriculum Vitae (2)Curriculum Vitae (2)
Curriculum Vitae (2)
 
RScoinsQ2016
RScoinsQ2016RScoinsQ2016
RScoinsQ2016
 
QUALITY CONTROLPROCEDURE
QUALITY CONTROLPROCEDUREQUALITY CONTROLPROCEDURE
QUALITY CONTROLPROCEDURE
 
Mauricio Rojo resume October 2016
Mauricio Rojo resume October 2016Mauricio Rojo resume October 2016
Mauricio Rojo resume October 2016
 
resume jerry
resume jerryresume jerry
resume jerry
 
Rajesh mba resume - dubai
Rajesh mba resume - dubaiRajesh mba resume - dubai
Rajesh mba resume - dubai
 
Supplier Quality Engineer
Supplier Quality EngineerSupplier Quality Engineer
Supplier Quality Engineer
 
Shawn Resume
Shawn ResumeShawn Resume
Shawn Resume
 
Production &Industrial Engineering3
Production &Industrial Engineering3Production &Industrial Engineering3
Production &Industrial Engineering3
 
Managerial skills required for Civil engineers
Managerial skills required for Civil engineersManagerial skills required for Civil engineers
Managerial skills required for Civil engineers
 
Power Point Resume
Power Point ResumePower Point Resume
Power Point Resume
 
sanjay resume
sanjay resumesanjay resume
sanjay resume
 
Pranshu Resume (Jan16)
Pranshu Resume (Jan16)Pranshu Resume (Jan16)
Pranshu Resume (Jan16)
 
ResumePDF - Malcolm
ResumePDF - MalcolmResumePDF - Malcolm
ResumePDF - Malcolm
 
sha (1)
sha (1)sha (1)
sha (1)
 
Curriculum vitae
Curriculum vitaeCurriculum vitae
Curriculum vitae
 
Resume Rafael Ortega
Resume Rafael OrtegaResume Rafael Ortega
Resume Rafael Ortega
 

Similar to HW7_Week10.pdf

2018-11-141Project ManagementClass – 10Project Q
2018-11-141Project ManagementClass – 10Project Q2018-11-141Project ManagementClass – 10Project Q
2018-11-141Project ManagementClass – 10Project Q
cargillfilberto
 
Nguyen Tan Thanh 040076000124 new
Nguyen Tan Thanh 040076000124 newNguyen Tan Thanh 040076000124 new
Nguyen Tan Thanh 040076000124 new
Thanh Qn
 
Hany Salah last update C.V
Hany Salah last update C.VHany Salah last update C.V
Hany Salah last update C.V
hany salah
 
Hany Salah last update C.V
Hany Salah last update C.VHany Salah last update C.V
Hany Salah last update C.V
hany salah
 
Hany Salah last update C.V
Hany Salah last update C.VHany Salah last update C.V
Hany Salah last update C.V
hany salah
 
Hany Salah last update C.V
Hany Salah last update C.VHany Salah last update C.V
Hany Salah last update C.V
hany salah
 
Hany Salah last update C.V
Hany Salah last update C.VHany Salah last update C.V
Hany Salah last update C.V
hany salah
 
Melanie D. Manalo - Updated CV
Melanie D. Manalo - Updated CVMelanie D. Manalo - Updated CV
Melanie D. Manalo - Updated CV
Melanie Manalo
 
Resume Vaibhav Kolapkar _ Exp 7+ Yrs
Resume Vaibhav Kolapkar _ Exp 7+ YrsResume Vaibhav Kolapkar _ Exp 7+ Yrs
Resume Vaibhav Kolapkar _ Exp 7+ Yrs
VAIBHAV KOLAPKAR
 

Similar to HW7_Week10.pdf (20)

PROJECT MANAGEMENT
PROJECT MANAGEMENTPROJECT MANAGEMENT
PROJECT MANAGEMENT
 
CCM821S _ Contract Management _ 8. Monitoring Project Performance.pptx
CCM821S _ Contract Management _ 8. Monitoring Project Performance.pptxCCM821S _ Contract Management _ 8. Monitoring Project Performance.pptx
CCM821S _ Contract Management _ 8. Monitoring Project Performance.pptx
 
Medaht Cv
Medaht CvMedaht Cv
Medaht Cv
 
Sachin be mech_8_yrs_exp
Sachin be mech_8_yrs_expSachin be mech_8_yrs_exp
Sachin be mech_8_yrs_exp
 
2018-11-141Project ManagementClass – 10Project Q
2018-11-141Project ManagementClass – 10Project Q2018-11-141Project ManagementClass – 10Project Q
2018-11-141Project ManagementClass – 10Project Q
 
Manufacturing Recap
Manufacturing RecapManufacturing Recap
Manufacturing Recap
 
Nguyen Tan Thanh 040076000124 new
Nguyen Tan Thanh 040076000124 newNguyen Tan Thanh 040076000124 new
Nguyen Tan Thanh 040076000124 new
 
Hany Salah last update C.V
Hany Salah last update C.VHany Salah last update C.V
Hany Salah last update C.V
 
Hany Salah last update C.V
Hany Salah last update C.VHany Salah last update C.V
Hany Salah last update C.V
 
Hany Salah last update C.V
Hany Salah last update C.VHany Salah last update C.V
Hany Salah last update C.V
 
Hany Salah last update C.V
Hany Salah last update C.VHany Salah last update C.V
Hany Salah last update C.V
 
Hany Salah last update C.V
Hany Salah last update C.VHany Salah last update C.V
Hany Salah last update C.V
 
Mba ii pmom_unit-1.2 production planning & control a
Mba ii pmom_unit-1.2 production planning & control aMba ii pmom_unit-1.2 production planning & control a
Mba ii pmom_unit-1.2 production planning & control a
 
Melanie D. Manalo - Updated CV
Melanie D. Manalo - Updated CVMelanie D. Manalo - Updated CV
Melanie D. Manalo - Updated CV
 
Resume Vaibhav Kolapkar _ Exp 7+ Yrs
Resume Vaibhav Kolapkar _ Exp 7+ YrsResume Vaibhav Kolapkar _ Exp 7+ Yrs
Resume Vaibhav Kolapkar _ Exp 7+ Yrs
 
Cleaner production
Cleaner productionCleaner production
Cleaner production
 
CV-LAJ
CV-LAJCV-LAJ
CV-LAJ
 
-Test management.pptx
-Test management.pptx-Test management.pptx
-Test management.pptx
 
SUFIYAN HVAC CV
SUFIYAN HVAC CVSUFIYAN HVAC CV
SUFIYAN HVAC CV
 
The Chunnel Project - Quality Management
The Chunnel Project - Quality ManagementThe Chunnel Project - Quality Management
The Chunnel Project - Quality Management
 

Recently uploaded

會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
中 央社
 
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
中 央社
 

Recently uploaded (20)

ANTI PARKISON DRUGS.pptx
ANTI         PARKISON          DRUGS.pptxANTI         PARKISON          DRUGS.pptx
ANTI PARKISON DRUGS.pptx
 
Exploring Gemini AI and Integration with MuleSoft | MuleSoft Mysore Meetup #45
Exploring Gemini AI and Integration with MuleSoft | MuleSoft Mysore Meetup #45Exploring Gemini AI and Integration with MuleSoft | MuleSoft Mysore Meetup #45
Exploring Gemini AI and Integration with MuleSoft | MuleSoft Mysore Meetup #45
 
BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...
BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...
BỘ LUYỆN NGHE TIẾNG ANH 8 GLOBAL SUCCESS CẢ NĂM (GỒM 12 UNITS, MỖI UNIT GỒM 3...
 
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文會考英文
 
Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...Andreas Schleicher presents at the launch of What does child empowerment mean...
Andreas Schleicher presents at the launch of What does child empowerment mean...
 
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽會考英聽
 
Basic Civil Engineering notes on Transportation Engineering, Modes of Transpo...
Basic Civil Engineering notes on Transportation Engineering, Modes of Transpo...Basic Civil Engineering notes on Transportation Engineering, Modes of Transpo...
Basic Civil Engineering notes on Transportation Engineering, Modes of Transpo...
 
Spring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community PartnershipsSpring gala 2024 photo slideshow - Celebrating School-Community Partnerships
Spring gala 2024 photo slideshow - Celebrating School-Community Partnerships
 
demyelinated disorder: multiple sclerosis.pptx
demyelinated disorder: multiple sclerosis.pptxdemyelinated disorder: multiple sclerosis.pptx
demyelinated disorder: multiple sclerosis.pptx
 
How to Analyse Profit of a Sales Order in Odoo 17
How to Analyse Profit of a Sales Order in Odoo 17How to Analyse Profit of a Sales Order in Odoo 17
How to Analyse Profit of a Sales Order in Odoo 17
 
ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...
ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...
ĐỀ THAM KHẢO KÌ THI TUYỂN SINH VÀO LỚP 10 MÔN TIẾNG ANH FORM 50 CÂU TRẮC NGHI...
 
Graduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptxGraduate Outcomes Presentation Slides - English (v3).pptx
Graduate Outcomes Presentation Slides - English (v3).pptx
 
IPL Online Quiz by Pragya; Question Set.
IPL Online Quiz by Pragya; Question Set.IPL Online Quiz by Pragya; Question Set.
IPL Online Quiz by Pragya; Question Set.
 
Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17
Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17
Removal Strategy _ FEFO _ Working with Perishable Products in Odoo 17
 
The Ball Poem- John Berryman_20240518_001617_0000.pptx
The Ball Poem- John Berryman_20240518_001617_0000.pptxThe Ball Poem- John Berryman_20240518_001617_0000.pptx
The Ball Poem- John Berryman_20240518_001617_0000.pptx
 
“O BEIJO” EM ARTE .
“O BEIJO” EM ARTE                       .“O BEIJO” EM ARTE                       .
“O BEIJO” EM ARTE .
 
Features of Video Calls in the Discuss Module in Odoo 17
Features of Video Calls in the Discuss Module in Odoo 17Features of Video Calls in the Discuss Module in Odoo 17
Features of Video Calls in the Discuss Module in Odoo 17
 
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT VẬT LÝ 2024 - TỪ CÁC TRƯỜNG, TRƯ...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT VẬT LÝ 2024 - TỪ CÁC TRƯỜNG, TRƯ...TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT VẬT LÝ 2024 - TỪ CÁC TRƯỜNG, TRƯ...
TỔNG HỢP HƠN 100 ĐỀ THI THỬ TỐT NGHIỆP THPT VẬT LÝ 2024 - TỪ CÁC TRƯỜNG, TRƯ...
 
Capitol Tech Univ Doctoral Presentation -May 2024
Capitol Tech Univ Doctoral Presentation -May 2024Capitol Tech Univ Doctoral Presentation -May 2024
Capitol Tech Univ Doctoral Presentation -May 2024
 
Envelope of Discrepancy in Orthodontics: Enhancing Precision in Treatment
 Envelope of Discrepancy in Orthodontics: Enhancing Precision in Treatment Envelope of Discrepancy in Orthodontics: Enhancing Precision in Treatment
Envelope of Discrepancy in Orthodontics: Enhancing Precision in Treatment
 

HW7_Week10.pdf

  • 1. NB 1 | P a g e - P r o j e c t M a n a g e m e n t - H W / A s s i g n m e n t W 1 0 Homework/Assignment 7 Full Name of submitter: Nguyễn Thị Quỳnh Như Student ID: IELSIU18111 Your Group number is: 5 Group members are: MEMBER ID Nguyễn Thị Quỳnh Như (Leader) IELSIU18111 Trần Thị Thanh Ngân IELSIU18223 Hoàng Minh Tuyền IELSIU18168 Lê Nguyễn Hồng Hạnh IELSIU18038 Phạm Ngọc Xuân Mai IELSIU18075 Hồ Yến Na IELSIU18086 Trần Như Bình IELSIU18191 Lương Thanh Bảo Ngọc IELSIU18096 Trương Ngọc Huyền Linh IELSIU18068 1. In your Semester (Group) Project a. Propose a “sampling plan” of pacticular activity b. What are the main tasks to ensure qualily Note: - Continue using this form to complete your works and submit on Blackboard - Name your file o If you submit individually: BT21_PJM_HW7_StudentID_FullName o If you submit for a group (Group # are finalized by lecturer): BT21_PJM_HW7_G# - Due Date is defined in detail at each “ASSIGNMENT INFORMATION” from Blackboard - Maximum score of late submission is two third of “Point Possible” - If you can’t submit on Blackboard: Email your work to TA, copy your Lecturer, attached also the screenshot of your Blackboard showing error in that transaction --------- Answers/Works
  • 2. NB 2 | P a g e - P r o j e c t M a n a g e m e n t - H W / A s s i g n m e n t W 1 0 1. Our group project’s topic: IMPROVING DRAGON FRUIT WAREHOUSE a) Activity: Installing new Dragon Fruit washing machine Requirement: • Reasonable area for installing new machine. • Stable electricity and water system to ensure the productivity of the machine. • Tools needed to installation and repair the machine in an emergency such as electrical leakage, jammed conveyor belt and etc. Raw material: • New machine. • Vehicles to assist in transporting machine. • Machine installation and repair tools. • Water pumps • Electricity supply Detail: 1. Area selection - Measure the length and width to save space and suit the warehouse layout. - Check the stability of the power and water supply to ensure the safety of the warehouse. 2. Moving the machine - Check the entrance to avoid collisions while moving. - Move each machine component to a selected area in preparation for installation. 3. Installation the machine - Check the machine components carefully before assembling to avoid damage during usage. - Check whether the water and electricity pipes meet the required standards. - Sturdy and safe assembly. 4. Testing quality - Test the machine performance during peak time of a day: 8 am to 12 noon and 2 pm to 7 pm. - People-in-charge: - Mr. A, Dragon Fruit warehouse owner - Mr. B, machine supplier - Mr. C, machine purchaser - Mr. D, Mr. E, machine assembly engineer Timeline:
  • 3. NB 3 | P a g e - P r o j e c t M a n a g e m e n t - H W / A s s i g n m e n t W 1 0 To ensure the productivity and durability of the machine, we run the machine for testing at dif- ferent times under different conditions. The trial time period is determined from 5th May to 7th May. Due to the special relation, the area selection, moving the machine and installation the machine sampling activities are completed in 1 day. Morning Afternoon Evening High dragon fruit capacity (7h – 10h) Normal dragon fruit capacity (10h – 11h30) High dragon fruit capacity (12h – 16h) Normal dragon fruit capacity (16h – 18h) High dragon fruit capacity (6h – 8h) Normal dragon fruit capacity (8h – 10h) 5th May Area selec- tion Moving the machine Installation the machine Installation the machine 6th May Testing quality Testing quality Testing quali- ty 7th May Testing qual- ity Testing qual- ity Testing quality Summary of conducted activities: Area selection Moving the machine Installation the machine Testing quality Sample unit Measurement Vehicle and people Tools and engi- neer Engineer, electricity and water Sample size • 5 different sizes • 5 types of vehicle • 5 people • 2 engineers • 2 engineers • 1 electricity supply • 1 water supply Sample procure Choose 5 different ways to place the machine namely vertical, horizontal, diagonal, corner, zigzag and calculate to save the most ar- ea. Choose 5 types of ve- hicles such as trolley, forklift, … and check whether the machine can fit through the entrance. Find the most suitable vehicle for moving. 2 engineers check machine components and assemble care- fully to avoid re- dismantling when detecting errors. 2 engineers test the ma- chine for 2 days with stable electricity and water at different times. Find the time when the machine is running at the highest productivity in minimal time.
  • 4. NB 4 | P a g e - P r o j e c t M a n a g e m e n t - H W / A s s i g n m e n t W 1 0 b) The main tasks to ensure quality of our project. ✰ Monitoring & controlling: Perform quality control - Assigning quality management responsibility of particular activities/tasks for each person. - Sticking to the project requirements. Ensure the deliverables are correct and free of defects and focus on quality from the beginning to the end of the project. - Requirements management and quality management go hand in hand. We should focus on improving the requirements process — eliciting, analyzing, documenting and validating them. - Performing inspections to identify defects. - Working and checking carefully in order to bring a defective or non-conforming items into compliance with quality standards. - Often reviewing acceptable range of stakeholders’ expectation with current situation. - Identifying and correcting defects close to the point of origin saves time and money - Following quality assurance to make improvements. - Usually having interaction with other departments/people to keep track the situation. - Updating the cost, budget, risk, schedule continuously to replanning quality management ✰ Planning: Plan quality - Building quality policies, quality control plan and quality assurance plan for each activity/ product/ deliverables to achieve objectives. Consider risk factors and complexity of the pro- ject and adapt processes to provide the requisite level of quality. - Identifying professional standards and regulations in the field of construction including legal, environmental, economic, and construction safety. - Collecting the scope statement: project deliverables, project objectives. - Building framework for quality control, together with sampling plan - Building good data representation (mind mapping, logical data model,...) for supporting data such as: budget, cost, risk, schedule,... to make it easy to construct the plans - Balancing needs and expectations of customers and stakeholders with cost, schedule, and professional standards. - Evaluating the costs and benefits of selected quality objectives and the processes to be used to achieve objectives. ✰ Executing: Perform quality assurance - Gathering the results of quality control measurements. - Conducting quality audits (both scheduled and randomly) to identify some improvements can be made to the project in case you have unexpected, negative or whimsical trends in meas- urements.
  • 5. NB 5 | P a g e - P r o j e c t M a n a g e m e n t - H W / A s s i g n m e n t W 1 0 - Quantitatively recognizing the effect of each source of mistakes or defects. - Setting weekly meetings to review the plan regularly. - Inspecting a process, e.g. construction schedule, to determine whether it’s functioning timely and optimally. - Benchmarking process-improvement objectives to enhance process results. - Distinguishing multiple factors within the process that can be modified in conjunction with one another to enhance to process.