5 procedure method for quality control management system
• Quality control policy
• Objective and target
• Implement and operation
• Checking and corrective action
• Management review
3
Quality control management procedure
Policy
Checking and
correct
Review
Objective
Implement
Continuous
improvement
4
Quality control management procedure
1. Quality control policy
- quality control is all of our department’s duty
- all of our employees must work on quality control policy.
- have procedures for the implementation and monitoring of quality control
- frequent appraisals of the quality system
- to provide customers with reliable service
- maintain quality systems aimed at achieving 100% customer satisfaction
5
Quality control management procedure
2. Objective and target
Objective and target for our company is
- customer satisfaction
- continuousquality improvement
- build quality at all levels
- maintain a level of quality which enhancethe company’s reputationwith customer
6
Quality control management procedure
3. Implement and operation
3.1 Organization chart
k. prasarn
section manager
k. surapong
k. thapenarin k. prapon k. sittisak
design and estimate section
k. kriengkrai
Navanakorn Prajinbure,chachengsao Bangkok
k. piyathape, k. nopporn
Chief engineer Chief engineer Chief engineer Chief engineer
site engineer site engineer site engineer site engineer
supervisor , foreman supervisor , foreman supervisor , foreman supervisor , foreman
engineer
แผนกวิศวกรรม
k. mengkuang , k. chanchai
Asst. manager
section manager
Main structure
Quality controlling Organization chart ( Thai staff )
Chief engineer
Bangpakong,Rayong
k. anon
Division manager
7
Quality control management procedure
3. Implement and operation
3.2 responsibility for quality
A. Design system
responsibilities for
- checkingcustomer requirement with thai regulationstandard
- electrical specification control
- design by fit cost with customer requirement
- designing control by professionallicense engineer
8
Quality control management procedure
3. Implement and operation
3.2 responsibility for quality
B. Procurement system
responsibilities for
- provide qualitymaterial with reasonablecost
- material qualitycontrol ( materialspecification compare , material delivery
time , project reference)
- provide qualityworker ( certificate, project reference)
- co-ordinateand build relationshipwith supplier
- supplierevaluate
9
Quality control management procedure
3. Implement and operation
3.2 responsibility for quality
C. Construction process system
C.1 during construction
responsibilities for
- project constructionschedule planning control
- shop drawing approval beforeconstruction
- constructionmethod control
- electrical checklist inspectioncontrol
- site inspection process by engineer , qualitycontrol committee
- factory inspectionfor importantequipment ( electricalpanel , transformer )
10
Quality control management procedure
3. Implement and operation
3.2 responsibility for quality
C. Construction process system
C.2 After complete of construction and before energize
responsibilities for
- visual inspection checksuch as
 installedin accordance with drawing.
 all connectingpoints have been tightened securely.
- electrical data test from measurementsuch as
 Insulationresistancedata test
 phase sequence and polaritytest
11
Quality control management procedure
3. Implement and operation
3.2 responsibility for quality
C. Construction process system
C.2 After completion of construction and after energize
responsibilities for
- electrical data test from measurementsuch as
 primary and secondary voltagecheck
 illumIination data check
- operationcontrol system check ( motor control , communicationcontrol )
12
Environment management procedure
3. Implement and operation
3.2 responsibility for quality
B. Service system
responsibilities for
- customer training
- 1 years warranty
- maintenance from request after warranty
13
Quality control management procedure
4. Checking and corrective action
- Monitoringand measurement in the activitieswhich impact
- Corrective andpreventive actionin what is not follows the bound.
- Monitoringthe effectiveness of the corrective action and prevention
5. Management review
- Review qualitycontrol system by senior executives of the organization
- Continuous improveto ensure effective quality control management of
organizations.
14
Quality control management procedure
Policy
Checking and
correct
Review
Objective
Implement
Continuous
improvement

More Related Content

What's hot

MillsAddendum-QualityManagerResponsibilitiesatMetoKote.docx
MillsAddendum-QualityManagerResponsibilitiesatMetoKote.docxMillsAddendum-QualityManagerResponsibilitiesatMetoKote.docx
MillsAddendum-QualityManagerResponsibilitiesatMetoKote.docxWilliam Mills
 
Anbalagan_Aug'16
Anbalagan_Aug'16Anbalagan_Aug'16
Anbalagan_Aug'16Anbalagan M
 
Quality Control and Quality Assurance
Quality Control and Quality Assurance Quality Control and Quality Assurance
Quality Control and Quality Assurance Mohamed Saber
 
Ricky's Resume
Ricky's ResumeRicky's Resume
Ricky's ResumeRicky Moll
 
Managerial skills required for Civil engineers
Managerial skills required for Civil engineersManagerial skills required for Civil engineers
Managerial skills required for Civil engineersThanigaivel Asokan
 
Vendor Quality_Chander Parkash
Vendor Quality_Chander ParkashVendor Quality_Chander Parkash
Vendor Quality_Chander ParkashChander Parkash
 
Insepction and quality control
Insepction and quality controlInsepction and quality control
Insepction and quality controlSOURAV4798
 
Case Study: Telecom Equipment Manufacturer Enhances QMS to Streamline Returns...
Case Study: Telecom Equipment Manufacturer Enhances QMS to Streamline Returns...Case Study: Telecom Equipment Manufacturer Enhances QMS to Streamline Returns...
Case Study: Telecom Equipment Manufacturer Enhances QMS to Streamline Returns...Paul Adamson
 

What's hot (20)

MillsAddendum-QualityManagerResponsibilitiesatMetoKote.docx
MillsAddendum-QualityManagerResponsibilitiesatMetoKote.docxMillsAddendum-QualityManagerResponsibilitiesatMetoKote.docx
MillsAddendum-QualityManagerResponsibilitiesatMetoKote.docx
 
Quality assurance
Quality assuranceQuality assurance
Quality assurance
 
Anbalagan_Aug'16
Anbalagan_Aug'16Anbalagan_Aug'16
Anbalagan_Aug'16
 
Qaqc in civil construction
Qaqc in civil constructionQaqc in civil construction
Qaqc in civil construction
 
Quality Control and Quality Assurance
Quality Control and Quality Assurance Quality Control and Quality Assurance
Quality Control and Quality Assurance
 
Ricky's Resume
Ricky's ResumeRicky's Resume
Ricky's Resume
 
CV Mohan
CV MohanCV Mohan
CV Mohan
 
Quality management
Quality managementQuality management
Quality management
 
QA vs QC
QA vs QCQA vs QC
QA vs QC
 
JB Resume
JB ResumeJB Resume
JB Resume
 
Quality inspection presentation
Quality inspection presentationQuality inspection presentation
Quality inspection presentation
 
Contractor Best Practices in Construction Quality Assurance
Contractor Best Practices in Construction Quality AssuranceContractor Best Practices in Construction Quality Assurance
Contractor Best Practices in Construction Quality Assurance
 
Quality assurance (qa) online training
Quality assurance (qa) online trainingQuality assurance (qa) online training
Quality assurance (qa) online training
 
Managerial skills required for Civil engineers
Managerial skills required for Civil engineersManagerial skills required for Civil engineers
Managerial skills required for Civil engineers
 
Vendor Quality_Chander Parkash
Vendor Quality_Chander ParkashVendor Quality_Chander Parkash
Vendor Quality_Chander Parkash
 
Insepction and quality control
Insepction and quality controlInsepction and quality control
Insepction and quality control
 
Mohit chaudhary link
Mohit chaudhary linkMohit chaudhary link
Mohit chaudhary link
 
Case Study: Telecom Equipment Manufacturer Enhances QMS to Streamline Returns...
Case Study: Telecom Equipment Manufacturer Enhances QMS to Streamline Returns...Case Study: Telecom Equipment Manufacturer Enhances QMS to Streamline Returns...
Case Study: Telecom Equipment Manufacturer Enhances QMS to Streamline Returns...
 
Resume 04.10.2015
Resume 04.10.2015Resume 04.10.2015
Resume 04.10.2015
 
Qa qc
Qa qcQa qc
Qa qc
 

Viewers also liked

Patología respiratoria2
Patología respiratoria2Patología respiratoria2
Patología respiratoria2LUZENIR Amaral
 
ABC Varstva Avtorskih Pravic
ABC Varstva Avtorskih PravicABC Varstva Avtorskih Pravic
ABC Varstva Avtorskih Pravicsasasirk
 
The Two Laws of Viral-ity by David Guilfoyle
The Two Laws of Viral-ity by David GuilfoyleThe Two Laws of Viral-ity by David Guilfoyle
The Two Laws of Viral-ity by David GuilfoyleL&T Co.
 
бг 2016 мп строительство
бг 2016 мп строительствобг 2016 мп строительство
бг 2016 мп строительствоMoreBriz
 
Hertek hart voor-uw-zaak @zaandelta
Hertek hart voor-uw-zaak @zaandeltaHertek hart voor-uw-zaak @zaandelta
Hertek hart voor-uw-zaak @zaandeltaZaandelta
 
Claves de la semana del 18 al 24 de enero
Claves de la semana del 18 al 24 de eneroClaves de la semana del 18 al 24 de enero
Claves de la semana del 18 al 24 de eneroCesce
 
Po pameti na facebook in internet
Po pameti na facebook in internetPo pameti na facebook in internet
Po pameti na facebook in internetBenjamin Lesjak
 
Lasertech Floorplans Ppt 01 20 2010
Lasertech Floorplans  Ppt 01 20 2010Lasertech Floorplans  Ppt 01 20 2010
Lasertech Floorplans Ppt 01 20 2010guestd6bfc4
 
FAULT DETECTION ON OVERHEAD TRANSMISSION LINE USING ARTIFICIAL NEURAL NET...
 FAULT DETECTION ON OVERHEAD TRANSMISSION LINE  USING ARTIFICIAL NEURAL NET... FAULT DETECTION ON OVERHEAD TRANSMISSION LINE  USING ARTIFICIAL NEURAL NET...
FAULT DETECTION ON OVERHEAD TRANSMISSION LINE USING ARTIFICIAL NEURAL NET...Politeknik Negeri Ujung Pandang
 

Viewers also liked (20)

Patología respiratoria2
Patología respiratoria2Patología respiratoria2
Patología respiratoria2
 
ABC Varstva Avtorskih Pravic
ABC Varstva Avtorskih PravicABC Varstva Avtorskih Pravic
ABC Varstva Avtorskih Pravic
 
Fornetti per taratura termocoppie, pt100, termoresistenze - GIGA TECH SRL
Fornetti per taratura termocoppie, pt100, termoresistenze - GIGA TECH SRLFornetti per taratura termocoppie, pt100, termoresistenze - GIGA TECH SRL
Fornetti per taratura termocoppie, pt100, termoresistenze - GIGA TECH SRL
 
Dan Petruccelli
Dan PetruccelliDan Petruccelli
Dan Petruccelli
 
The Two Laws of Viral-ity by David Guilfoyle
The Two Laws of Viral-ity by David GuilfoyleThe Two Laws of Viral-ity by David Guilfoyle
The Two Laws of Viral-ity by David Guilfoyle
 
klein_stephen_thesis_ot_fr
klein_stephen_thesis_ot_frklein_stephen_thesis_ot_fr
klein_stephen_thesis_ot_fr
 
бг 2016 мп строительство
бг 2016 мп строительствобг 2016 мп строительство
бг 2016 мп строительство
 
Hertek hart voor-uw-zaak @zaandelta
Hertek hart voor-uw-zaak @zaandeltaHertek hart voor-uw-zaak @zaandelta
Hertek hart voor-uw-zaak @zaandelta
 
Claves de la semana del 18 al 24 de enero
Claves de la semana del 18 al 24 de eneroClaves de la semana del 18 al 24 de enero
Claves de la semana del 18 al 24 de enero
 
1ª Pregunta:
1ª Pregunta:1ª Pregunta:
1ª Pregunta:
 
Acquire learning
Acquire learningAcquire learning
Acquire learning
 
summer-2007 copy
summer-2007 copysummer-2007 copy
summer-2007 copy
 
Kisi kisi uts
Kisi kisi utsKisi kisi uts
Kisi kisi uts
 
Misura scariche parziali - Sensori MC Monitoring PDC24-1000
Misura scariche parziali - Sensori MC Monitoring PDC24-1000Misura scariche parziali - Sensori MC Monitoring PDC24-1000
Misura scariche parziali - Sensori MC Monitoring PDC24-1000
 
Po pameti na facebook in internet
Po pameti na facebook in internetPo pameti na facebook in internet
Po pameti na facebook in internet
 
Evans Data DevRel 2016
Evans Data DevRel 2016 Evans Data DevRel 2016
Evans Data DevRel 2016
 
Lasertech Floorplans Ppt 01 20 2010
Lasertech Floorplans  Ppt 01 20 2010Lasertech Floorplans  Ppt 01 20 2010
Lasertech Floorplans Ppt 01 20 2010
 
Bca 1 st year
Bca 1 st yearBca 1 st year
Bca 1 st year
 
FAULT DETECTION ON OVERHEAD TRANSMISSION LINE USING ARTIFICIAL NEURAL NET...
 FAULT DETECTION ON OVERHEAD TRANSMISSION LINE  USING ARTIFICIAL NEURAL NET... FAULT DETECTION ON OVERHEAD TRANSMISSION LINE  USING ARTIFICIAL NEURAL NET...
FAULT DETECTION ON OVERHEAD TRANSMISSION LINE USING ARTIFICIAL NEURAL NET...
 
Miasis o gusaneras
Miasis o gusanerasMiasis o gusaneras
Miasis o gusaneras
 

Similar to QUALITY CONTROLPROCEDURE

Statistical quality control 1,2
Statistical quality control 1,2Statistical quality control 1,2
Statistical quality control 1,2ROBERA WEGI
 
Controlling Quality by Waqas Ali Tunio
Controlling Quality by Waqas Ali TunioControlling Quality by Waqas Ali Tunio
Controlling Quality by Waqas Ali TunioWaqas Ali Tunio
 
Module 6 qaqc training
Module 6 qaqc trainingModule 6 qaqc training
Module 6 qaqc trainingDiaz Susetyo
 
presentation quality awareness draft02.pptx
presentation quality awareness draft02.pptxpresentation quality awareness draft02.pptx
presentation quality awareness draft02.pptxAhmedAltantawi
 
Validation of pharmaceutical industries
Validation of pharmaceutical industriesValidation of pharmaceutical industries
Validation of pharmaceutical industriesPrima Ramadhani
 
PROJECT MANAGEMENT- QUALITY PROCESSEC.ppt
PROJECT MANAGEMENT- QUALITY PROCESSEC.pptPROJECT MANAGEMENT- QUALITY PROCESSEC.ppt
PROJECT MANAGEMENT- QUALITY PROCESSEC.pptTHULASIMANOHARAN2
 
PHARMACEUTICAL CALIBRATION & VALIDATION.ppt
PHARMACEUTICAL CALIBRATION & VALIDATION.pptPHARMACEUTICAL CALIBRATION & VALIDATION.ppt
PHARMACEUTICAL CALIBRATION & VALIDATION.pptrjshaha58
 
Quality Management
Quality ManagementQuality Management
Quality ManagementAldo Arecco
 
Peregrine's Quality Presentation
Peregrine's Quality PresentationPeregrine's Quality Presentation
Peregrine's Quality PresentationRFSOI
 
Chapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptx
Chapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptxChapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptx
Chapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptxVandaMnica1
 
Chapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptx
Chapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptxChapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptx
Chapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptxMohammedAbuBakkerSid2
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Controlshrinivas kulkarni
 

Similar to QUALITY CONTROLPROCEDURE (20)

Statistical quality control 1,2
Statistical quality control 1,2Statistical quality control 1,2
Statistical quality control 1,2
 
Session 12 4th edition PMP
Session  12 4th edition PMPSession  12 4th edition PMP
Session 12 4th edition PMP
 
Controlling Quality by Waqas Ali Tunio
Controlling Quality by Waqas Ali TunioControlling Quality by Waqas Ali Tunio
Controlling Quality by Waqas Ali Tunio
 
Module 6 qaqc training
Module 6 qaqc trainingModule 6 qaqc training
Module 6 qaqc training
 
presentation quality awareness draft02.pptx
presentation quality awareness draft02.pptxpresentation quality awareness draft02.pptx
presentation quality awareness draft02.pptx
 
Quality management mod
Quality management modQuality management mod
Quality management mod
 
Validation of pharmaceutical industries
Validation of pharmaceutical industriesValidation of pharmaceutical industries
Validation of pharmaceutical industries
 
PROJECT MANAGEMENT- QUALITY PROCESSEC.ppt
PROJECT MANAGEMENT- QUALITY PROCESSEC.pptPROJECT MANAGEMENT- QUALITY PROCESSEC.ppt
PROJECT MANAGEMENT- QUALITY PROCESSEC.ppt
 
PHARMACEUTICAL CALIBRATION & VALIDATION.ppt
PHARMACEUTICAL CALIBRATION & VALIDATION.pptPHARMACEUTICAL CALIBRATION & VALIDATION.ppt
PHARMACEUTICAL CALIBRATION & VALIDATION.ppt
 
Quality Management
Quality ManagementQuality Management
Quality Management
 
Process and product inspection
Process and product inspectionProcess and product inspection
Process and product inspection
 
Quality r (2) (2)
Quality r (2) (2)Quality r (2) (2)
Quality r (2) (2)
 
Quality r (2) (2)
Quality r (2) (2)Quality r (2) (2)
Quality r (2) (2)
 
cv2
cv2cv2
cv2
 
Peregrine's Quality Presentation
Peregrine's Quality PresentationPeregrine's Quality Presentation
Peregrine's Quality Presentation
 
Chapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptx
Chapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptxChapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptx
Chapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptx
 
Chapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptx
Chapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptxChapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptx
Chapter 1 (Lecture 1-3)-Basic Concept of Quality and Quality Control.pptx
 
Production Planning and Control
Production Planning and ControlProduction Planning and Control
Production Planning and Control
 
Resume
ResumeResume
Resume
 
Quality Control-1
Quality Control-1Quality Control-1
Quality Control-1
 

QUALITY CONTROLPROCEDURE

  • 2. 2 Quality control management procedure 5 procedure method for quality control management system • Quality control policy • Objective and target • Implement and operation • Checking and corrective action • Management review
  • 3. 3 Quality control management procedure Policy Checking and correct Review Objective Implement Continuous improvement
  • 4. 4 Quality control management procedure 1. Quality control policy - quality control is all of our department’s duty - all of our employees must work on quality control policy. - have procedures for the implementation and monitoring of quality control - frequent appraisals of the quality system - to provide customers with reliable service - maintain quality systems aimed at achieving 100% customer satisfaction
  • 5. 5 Quality control management procedure 2. Objective and target Objective and target for our company is - customer satisfaction - continuousquality improvement - build quality at all levels - maintain a level of quality which enhancethe company’s reputationwith customer
  • 6. 6 Quality control management procedure 3. Implement and operation 3.1 Organization chart k. prasarn section manager k. surapong k. thapenarin k. prapon k. sittisak design and estimate section k. kriengkrai Navanakorn Prajinbure,chachengsao Bangkok k. piyathape, k. nopporn Chief engineer Chief engineer Chief engineer Chief engineer site engineer site engineer site engineer site engineer supervisor , foreman supervisor , foreman supervisor , foreman supervisor , foreman engineer แผนกวิศวกรรม k. mengkuang , k. chanchai Asst. manager section manager Main structure Quality controlling Organization chart ( Thai staff ) Chief engineer Bangpakong,Rayong k. anon Division manager
  • 7. 7 Quality control management procedure 3. Implement and operation 3.2 responsibility for quality A. Design system responsibilities for - checkingcustomer requirement with thai regulationstandard - electrical specification control - design by fit cost with customer requirement - designing control by professionallicense engineer
  • 8. 8 Quality control management procedure 3. Implement and operation 3.2 responsibility for quality B. Procurement system responsibilities for - provide qualitymaterial with reasonablecost - material qualitycontrol ( materialspecification compare , material delivery time , project reference) - provide qualityworker ( certificate, project reference) - co-ordinateand build relationshipwith supplier - supplierevaluate
  • 9. 9 Quality control management procedure 3. Implement and operation 3.2 responsibility for quality C. Construction process system C.1 during construction responsibilities for - project constructionschedule planning control - shop drawing approval beforeconstruction - constructionmethod control - electrical checklist inspectioncontrol - site inspection process by engineer , qualitycontrol committee - factory inspectionfor importantequipment ( electricalpanel , transformer )
  • 10. 10 Quality control management procedure 3. Implement and operation 3.2 responsibility for quality C. Construction process system C.2 After complete of construction and before energize responsibilities for - visual inspection checksuch as  installedin accordance with drawing.  all connectingpoints have been tightened securely. - electrical data test from measurementsuch as  Insulationresistancedata test  phase sequence and polaritytest
  • 11. 11 Quality control management procedure 3. Implement and operation 3.2 responsibility for quality C. Construction process system C.2 After completion of construction and after energize responsibilities for - electrical data test from measurementsuch as  primary and secondary voltagecheck  illumIination data check - operationcontrol system check ( motor control , communicationcontrol )
  • 12. 12 Environment management procedure 3. Implement and operation 3.2 responsibility for quality B. Service system responsibilities for - customer training - 1 years warranty - maintenance from request after warranty
  • 13. 13 Quality control management procedure 4. Checking and corrective action - Monitoringand measurement in the activitieswhich impact - Corrective andpreventive actionin what is not follows the bound. - Monitoringthe effectiveness of the corrective action and prevention 5. Management review - Review qualitycontrol system by senior executives of the organization - Continuous improveto ensure effective quality control management of organizations.
  • 14. 14 Quality control management procedure Policy Checking and correct Review Objective Implement Continuous improvement