Hussain, Mohammad
Mobile : +919666291652
Email Id : hussainmd491@gmail.com
Career Objective:
Aspiring admission into a premier organization, where I can synergize my skills with the
resources of the organization for mutual growth to the stratum of transcendence in the field of
Designing.
Overview:
• A Professional Design Engineer with over 5+ years of experience in Design Dept. can
understand any kind of Layout drawings and develop Machine Drawings. I have
developed excellent design skills from my prior experience as a Plant Design Engineer
and Product Engineer.
• I have a friendly personality with an intuitive understanding of people which makes me a
good Design Engineer.
• I bring a positive attitude, good communication skills and passion to work.
Area of Expertise:
2D & 3D Drafting Intelligent P&ID’s 2D CAD/CAM
Proposal Layouts
Educational Credentials:
• Diploma in mechanical engineering at COL.DS.RAJU.polytechnic in poduru.
• S.S.C - Board of Secondary School Education in kamavarapukota.
Employment Details:
Company: ADECCO INDIA PVT. LTD., Chennai.
Designation: Product Engineering Service on deputation to our client “Wipro Limited”
Hyderabad.
Duration: January 2015 to Present.
Company: Avineon India Pvt., Ltd., Hyderabad.
Designation: Designer- Plant Design and Automation.
Duration: January 2010 to May 2014.
ENGINEERING SOFTWARES:
• Smart Plant P&Id. (Process and instrumentation Drawing)
• AutoCAD Plant 3D 2015 - English (2d,drawings for P&ID)
• Autodesk Inventor 2015
• Autodesk Navisworks Manage 2015
• AUTO CAD ( 2D,3D AND SOLID DRAWING)
• Programming of amada laser cutting machine ( 2D CAD, CAM)
• Desktop tools: MS-Office, Internet.
• Operating system: Window XP/8/7.
Experience Details
Project # 1
Project Title: SOFCON As-built
Client: Saudi Arabian Oil Company,
Software: Smart Plant P&ID
Project Description: The objective of this project is to convert its As-Built P&ID’s from PDS
2D to Intergraph Smart Plant P&ID's. The scope includes customization of symbols, attributes
and merging of the databases.
Responsibilities:
• Creating Intelligent P & ID’s
• Reports Generating
• Generating Line lists
• Generating Instrument lists
• Onscreen Quality Check (Soft QC using EDE) of the P&ID.
• Final QA/QC of the project files.
Project # 2
Project Title : GASCO
Client : Abu Dhabi Gas Industries Ltd, ABU DHABI
Software : Smart Plant P&ID
Project Description: The objective of this project is to convert its As-Built P&ID’s from PDS
2D to Intergraph Smart Plant P&ID's. The scope includes customization of symbols, attributes
and merging of the databases.
Responsibilities:
• Creating Intelligent P & ID’s
• Reports Generating
• Generating Line lists
• Generating Instrument lists
• Onscreen Quality Check (Soft QC using EDE) of the P&ID.
• Final QA/QC of the project files.
Project # 3
Project Title : Takreer As-Built
Client : NAMA Mott MacDonald Company, ABU DHABI
Software : Smart Plant P&ID
Project Description: The objective of this project is to convert its As-Built P&ID’s from PDS
2D to Intergraph Smart Plant P&ID's. The scope includes customization of symbols, attributes
and merging of the databases.
Responsibilities:
• Creating Intelligent P & ID’s
• Reports Generating
• Generating Line lists
• Generating Instrument lists
• Onscreen Quality Check (Soft QC using EDE) of the P&ID.
• Final QA/QC of the project files.
Project # 4
Project Title : RasGas As-Built
Client : RasGas Company Limited, Qatar
Software : Smart Plant P&ID
Project Description: The objective of this project is to convert its As-Built P&ID’s from PDS
2D to Intergraph Smart Plant P&ID's. The scope includes customization of symbols, attributes
and merging of the databases.
Responsibilities:
• Creating Intelligent P & ID’s
• Reports Generating
• Generating Line lists
• Generating Instrument lists
• Onscreen Quality Check (Soft QC using EDE) of the P&ID.
• Final QA/QC of the project files.
• QAQC
Project # 5
Project Title : Intergraph As-Built
Client : Intergraph-Singapore
Software : Smart Plant P&ID
Project Description: The objective of this project is to convert its As-Built P&ID’s from PDS
2D to Intergraph Smart Plant P&ID's. The scope includes customization of symbols, attributes
and merging of the databases.
Role:
• Creating Intelligent P & ID’s
• Reports Generating
• Generating Line lists
• Generating Instrument lists
• Onscreen Quality Check (Soft QC using EDE) of the P&ID.
Company: INVOLUTE AUTO MACHINE PVT.LTD IN BALANAGAR HYD.
Designation: Jr.Design Executive.
Duration: Jan_2008 to Jan_2010
Responsibilities:
• To study & understand assembly drawings. (Wight calculations also)
• To change the assemble drawing into the part drawings.
• To order the raw material according to the part drawing.
• To prepare bill of material & raw material in project...
• To maintain the project status.
• To dispatch the project in the given period.
• Website: www.involuteautomation.com
 Products: auto ladles, gear box, sprayers, extractor, pedestals,
Company has manufacturing units in two locations in Hyderabad (State of Andhra Pradesh in
India), well
equipped with design, machining and integration facilities. Involutes Automation is an ISO 9001:
2008
certified company.
Over the years strength of the company has been in developing fully indigenous and customized
automation
solutions for Foundry, forging, Solar, Pharmaceutical, and Defense industries. Involute
Automation is a
certified system integrator for M/s ABB Robotics and Cognex vision Systems.
Personal Details:
Personal Details:
• Father’s name : Mr. Mohammad Yousef Ali
• Date of Birth : 21st
Jun 1989
• Languages known : English, Hindi, Telugu,
• Martial status : Married
• Address for correspondence : H:NO 1-9a/11,
Kamavarapukota,
Kothuru, West Godavari District,
Andhra Pradesh- 534449
DECLARATION:
I here by declaring that the above mentioned information is True and best of my knowledge and
experience.
Yours Sincerely,
Place: (Md Hussain)
Date:
Yours Sincerely,
Place: (Md Hussain)
Date:

Hussain Cv spid

  • 1.
    Hussain, Mohammad Mobile :+919666291652 Email Id : hussainmd491@gmail.com Career Objective: Aspiring admission into a premier organization, where I can synergize my skills with the resources of the organization for mutual growth to the stratum of transcendence in the field of Designing. Overview: • A Professional Design Engineer with over 5+ years of experience in Design Dept. can understand any kind of Layout drawings and develop Machine Drawings. I have developed excellent design skills from my prior experience as a Plant Design Engineer and Product Engineer. • I have a friendly personality with an intuitive understanding of people which makes me a good Design Engineer. • I bring a positive attitude, good communication skills and passion to work. Area of Expertise: 2D & 3D Drafting Intelligent P&ID’s 2D CAD/CAM Proposal Layouts Educational Credentials: • Diploma in mechanical engineering at COL.DS.RAJU.polytechnic in poduru. • S.S.C - Board of Secondary School Education in kamavarapukota. Employment Details: Company: ADECCO INDIA PVT. LTD., Chennai. Designation: Product Engineering Service on deputation to our client “Wipro Limited” Hyderabad. Duration: January 2015 to Present. Company: Avineon India Pvt., Ltd., Hyderabad. Designation: Designer- Plant Design and Automation. Duration: January 2010 to May 2014. ENGINEERING SOFTWARES: • Smart Plant P&Id. (Process and instrumentation Drawing) • AutoCAD Plant 3D 2015 - English (2d,drawings for P&ID) • Autodesk Inventor 2015
  • 2.
    • Autodesk NavisworksManage 2015 • AUTO CAD ( 2D,3D AND SOLID DRAWING) • Programming of amada laser cutting machine ( 2D CAD, CAM) • Desktop tools: MS-Office, Internet. • Operating system: Window XP/8/7. Experience Details Project # 1 Project Title: SOFCON As-built Client: Saudi Arabian Oil Company, Software: Smart Plant P&ID Project Description: The objective of this project is to convert its As-Built P&ID’s from PDS 2D to Intergraph Smart Plant P&ID's. The scope includes customization of symbols, attributes and merging of the databases. Responsibilities: • Creating Intelligent P & ID’s • Reports Generating • Generating Line lists • Generating Instrument lists • Onscreen Quality Check (Soft QC using EDE) of the P&ID. • Final QA/QC of the project files. Project # 2 Project Title : GASCO Client : Abu Dhabi Gas Industries Ltd, ABU DHABI Software : Smart Plant P&ID Project Description: The objective of this project is to convert its As-Built P&ID’s from PDS 2D to Intergraph Smart Plant P&ID's. The scope includes customization of symbols, attributes and merging of the databases. Responsibilities: • Creating Intelligent P & ID’s • Reports Generating • Generating Line lists • Generating Instrument lists • Onscreen Quality Check (Soft QC using EDE) of the P&ID. • Final QA/QC of the project files. Project # 3 Project Title : Takreer As-Built Client : NAMA Mott MacDonald Company, ABU DHABI
  • 3.
    Software : SmartPlant P&ID Project Description: The objective of this project is to convert its As-Built P&ID’s from PDS 2D to Intergraph Smart Plant P&ID's. The scope includes customization of symbols, attributes and merging of the databases. Responsibilities: • Creating Intelligent P & ID’s • Reports Generating • Generating Line lists • Generating Instrument lists • Onscreen Quality Check (Soft QC using EDE) of the P&ID. • Final QA/QC of the project files. Project # 4 Project Title : RasGas As-Built Client : RasGas Company Limited, Qatar Software : Smart Plant P&ID Project Description: The objective of this project is to convert its As-Built P&ID’s from PDS 2D to Intergraph Smart Plant P&ID's. The scope includes customization of symbols, attributes and merging of the databases. Responsibilities: • Creating Intelligent P & ID’s • Reports Generating • Generating Line lists • Generating Instrument lists • Onscreen Quality Check (Soft QC using EDE) of the P&ID. • Final QA/QC of the project files. • QAQC Project # 5 Project Title : Intergraph As-Built Client : Intergraph-Singapore Software : Smart Plant P&ID Project Description: The objective of this project is to convert its As-Built P&ID’s from PDS 2D to Intergraph Smart Plant P&ID's. The scope includes customization of symbols, attributes and merging of the databases. Role: • Creating Intelligent P & ID’s • Reports Generating • Generating Line lists
  • 4.
    • Generating Instrumentlists • Onscreen Quality Check (Soft QC using EDE) of the P&ID. Company: INVOLUTE AUTO MACHINE PVT.LTD IN BALANAGAR HYD. Designation: Jr.Design Executive. Duration: Jan_2008 to Jan_2010 Responsibilities: • To study & understand assembly drawings. (Wight calculations also) • To change the assemble drawing into the part drawings. • To order the raw material according to the part drawing. • To prepare bill of material & raw material in project... • To maintain the project status. • To dispatch the project in the given period. • Website: www.involuteautomation.com  Products: auto ladles, gear box, sprayers, extractor, pedestals, Company has manufacturing units in two locations in Hyderabad (State of Andhra Pradesh in India), well equipped with design, machining and integration facilities. Involutes Automation is an ISO 9001: 2008 certified company. Over the years strength of the company has been in developing fully indigenous and customized automation solutions for Foundry, forging, Solar, Pharmaceutical, and Defense industries. Involute Automation is a certified system integrator for M/s ABB Robotics and Cognex vision Systems. Personal Details: Personal Details: • Father’s name : Mr. Mohammad Yousef Ali • Date of Birth : 21st Jun 1989 • Languages known : English, Hindi, Telugu, • Martial status : Married • Address for correspondence : H:NO 1-9a/11, Kamavarapukota, Kothuru, West Godavari District, Andhra Pradesh- 534449 DECLARATION: I here by declaring that the above mentioned information is True and best of my knowledge and experience.
  • 5.
  • 6.