RESUME –SPPID Administrator / Desigeer
NANA RAJARAM KARANDE
Mobile: +91-7798240248,+917028705346
E-Mail: karande2005@rediffmail.com
Karande2005@gmail.com
OBJECTIVE:-
To take up career positions that will build up skills and experience in the field of engineering and to utilize and
upgrade the career in specialty areas of EPC/PMC related to Oil and Gas, Chemical Industries using present
experiences of Engineering and Design Services and Administrative activities, which provides opportunities to
grow both professionally and as an individual.
SIGNIFICANT STRENGTHS:-
•Expert in Plant Design Automation tools like Intergraph's Smart Plant P & ID.Auto Cad
Sound knowledge of Process concepts
Co -ordination with the Client as well as the team members
•Ability to lead a group of people.
SOFTWARE SKILLS:-
Operating Systems Windows 98/2000/XP.
Plant Design software
Smart Plant P&ID(version 2009,2007&4.3),SPPID Administrator,Auto Cad
PDMS(Modeling).SP3D(Modeling training taken)
Other software’s AutoCAD 2008.Nawis work, Smart Sketch.
PROFESSIONAL SYNOPSIS:-
Present Organization : - Technip AbuDhabi
Position : - SPPID Administrator
Date of Joining : -16th
June 2013 to Till Date
SPP&ID Skill Set:
Project analysis and coordination
Project Setup and User access
Oracle Installation and DB setup
Customization of Reference Database
Definition of Filters for Rules, Display Sets, Symbology, Reports
Definition of Item tag formats for various P&ID objects
Report Customization in SPP&ID such as Piping MTO, Valve list, Specialty Item List, Line
list, Instrument List
DB Cleanup & removal of constrained objects
Excellent understanding of user functionality – Plant Data and Reference Data
Identify the various software versions (and Service Packs) that will be used for the
development effort (Oracle, SPPID, etc.)
Oracle Server Installation
Oracle Instance Creation
Oracle Service Creation
Oracle Project Table space Creation
Smart Plant Engineering Manager Installation
Smart Plant P&ID Installation
Service pack updates
Update of DLL's
Overall Project Details:Technip AbuDhabi UAE
Projects – 1 Al DABBIYA ASR GAS DEVELOPMENT FEED SERVICES
Client’s Name Adco abudhabi UAE
Project Description Conversion of Design Drawings in Smart Plant P&ID .
Roles &
Responsibilities
Working as a SPPID COORDINATOR ,Administrator & Team
Leader of the project.
Planning and Coordination of Project as per Project Schedule
Coordination with other dept. and coordination with clients.
Project raising using ADCO database.
Customization of symbols.
Soft QC of generated P&IDs.
Customization of Plant Reports.
Plant Report generation.
Resolution of database constraints and integrity issues
Projects – 2 Halobutyl EPC Project
Client’s Name KEMYA Saudi Arabia
Project Description Conversion of Design Drawings in Smart Plant P&ID .
Roles &
Responsibilities
Working as a SPPID COORDINATOR ,Administrator & Team
Leader of the project.
Planning and Coordination of Project as per Project Schedule
Coordination with other dept. and coordination with clients.
Project raising using ADCO database.
Customization of symbols.
Soft QC of generated P&IDs.
Customization of Plant Reports.
Plant Report generation.
Resolution of database constraints and integrity issues
Projects – 3 AR Ratawi NGL Train -1 Project
Client’s Name Basara Gas company
Project Description Conversion of Design Drawings in Auto Cad P&ID .
Roles &
Responsibilities
Working as a Process Drafting Team Leader of the project.
Customization of project border template
Coordination with other dept.
Customization of symbols.
Drafting of P&IDs.
Quality checking of drafted P&IDs.
Previous Organization : - Kentz UAE Abudhabi
Position : - SPPID COORDINATOR
Date of Joining : -29TH
SEPT. 2012 to 25TH
March 2013
Projects – 1 FEDD FOR RUMAITHA-SHANAYEL PHASE-III
Client’s Name Abudhabi Company for Onshore Oil Operation (ADCO)
Project Description Conversion of Design Drawings in Smart Plant P&ID .
Roles &
Responsibilities
Working as a SPPID COORDINATOR ,Administrator & Team
Leader of the project.
Planning and Coordination of Project as per Project Schedule
Coordination with other dept. and coordination with clients.
Project raising using ADCO database.
Customization of symbols.
Soft QC of generated P&IDs.
Customization of Plant Reports.
Plant Report generation.
Resolution of database constraints and integrity issues
Previous Organization : - ROLTA INDIA LTD.
Position : - Lead Engineer
Date of Joining : - 03
rd
March. 2008 to 27th
sept.2012
Overall Project Details:
Projects – 1 IBN ZAHAR SPPID PROJECT
Client’s Name IBN ZAHAR SAUDI -ARABIA
Project Description
Conversion of Auto Cad Drawings in Smart Plant P&ID & Data
compliance.
Roles &
Responsibilities
Work as a Administrator & Team Leader of the project.
Planning and Coordination of Project as per Project Schedule
Project raising using IBN ZAHR database.
Data compliance.
Soft QC of generated P&IDs.
Customization of symbols.
Customization of Plant Reports.
Plant Report generation.
Resolution of database constraints and integrity issues
Projects – 2 BHEL SPPID
Client’s Name BHEL INDIA LTD.INDIA
Project Description Conversion of Auto Cad Drawings in Smart Plant P&ID.
Roles &
Responsibilities
Work as a Administrator & Team Leader of the project.
Planning and Coordination of Project as per Project Schedule
Project raising using Bhel database.
Soft QC of generated P&IDs.
Customization of symbols.
KKS-ISA alternate tag implementation
Customization of Plant Reports.
Plant Report generation.
Projects – 3 SHARQ SPPID
Client’s Name Sharq Saudi-Arabia
Project Description Conversion of Auto Cad Drawings in Smart Plant P&ID.
Roles &
Responsibilities
Working as a Administrator &Team Leader of the project.
Planning and Coordination of Project as per Project Schedule
Soft QC of generated P&IDs.
Customization of symbols.
Customization of Plant Reports.
Plant Report generation.
Drawing Publishing in SPF
Error solving of publishing drawwings in SPF
Tools Used SPPID-2009, Office Excel.
Projects – 4
KENTZ
Client’s Name
KENTZ-QATAR
Project Description Conversion of Auto Cad Drawings in Smart Plant P&ID.
Roles &
Responsibilities
Worked as a Administrator &Team Leader of the project
Planning and Coordination of Project as per Project Schedule
Input Verification of Drawing.
Production of Smart Plant P & ID (2009) from Auto Cad input.
Raising issues regarding the projects.
Soft QC of generated P&IDs.
Correction of Mark-Up comments.
Tools Used SPPID-2009, Office Excel.
Projects – 5 SAUDI-ARAMCO SPPID PROJECT. Onsite
Client’s Name ACEC SAUDI ARABIA
Project Description Conversion of Auto Cad Drawings in Smart Plant P&ID.
Roles &
Responsibilities
Involved in the following project execution activities –
Worked as a Administrator of the project.
Restoring SPPID project by using Backup received from Rolta India
ltd at Clint site.
Soft QC of generated P&IDs.
Customization of Plant Reports.
Plant Report generation.
SPPID training given to ACEC executives.
Tools Used SPPID-2009, Office Excel.
Projects – 6 MUSTANG GAS & OIL ENGINEERING (OFFSHORE PLATFORM)
Client’s Name MUSTANG
Project Description The scope includes creation of Piping & Equipment Modeling
Roles &
Responsibilities
Input verification, Preparation of Line list, Equipment list, valve list by given
input.
Equipment modeling, Piping modeling, Extracting of Isometrics using
PDMS, Quality checking, making deliverable ready.
Tools Used PDMS, NAVIS WORK REVIEW, SPR, and Office Excel.
Projects – 7
Reliance Infra (Rosa Thermal Power Project)
Client’s Name
RELIENCE Infrastructures.
Project Description Creation of SPPID drawings for Power Plant in KKS code.
Roles &
Responsibilities
Input Drawing Verifications.
Production of Smart Plant P & ID (2007) from AutoCAD input
Residual Process engineering like Valve Tagging, Line numbering as.
per defined system. Process data co relation for Equipment, Instrument,
Valve & line list generation as per client requirements.
Soft QC of generated P&IDs.
Correction of Mark-Up comments.
Raising issues regarding the projects.
Tools Used SPPID-2007
Projects – 8 SAUDI-ARAMCO
Client’s Name
Saudi-Aramco saudi-Arabia
Project Description Conversion of Auto Cad Drawings in Smart Plant P&ID.
Roles &
Responsibilities
Worked as a Team member of the project.
Conversion of Auto Cad Drawings in Smart Plant P&ID.
Soft QC of generated P&IDs.
Correction of markup comments.
Tools Used SPPID-2009, M S Office 2007, Office Excel, AUTO CAD.
Previous Employer:-
MARKSANS PHARMA LTD. September 2006 to February
2008.
Marksans Pharma Limited is a leading bulk drugs manufacturing company.
Roles and Responsibilities: Shift Engineer (Technology Division)
Worked as a Process Engineer Responsible for whole activity of Production & planning.
Handled Unit Operations & Process (Distillation, Crystallization & Filtration) activities as per GMP
Regulations and SOP's.
Continuous monitoring to maintain standard process parameter & trouble shooting to get Quality
Products.
Production planning, manpower planning & distribution & provide training to develop my Team to
contribute towards production target.
Technical Services including PFD, P & ID preparation required for modifications in Process.
AARTI DRUGS LTD, TARAPUR June 2003 to August 2006.
Aarti Drugs Limited is one of the well known pioneers in pharma line in India
Roles and Responsibilities: Production Officer
Handled process & related activities as per GMP.& ISO 9002.
Batch planning to increase production.
Scale up from R&D level to plant level.
Production planning, manpower planning & distribution & provide
Training to develop team to contribute towards production target.
Material & Energy balance Calculations.
Equipment handled, Hydrogenator, Fluid bed dryer,Tray Dryer, Sparkler Filter, Nuetsch Filter, and
Centrifuges.
Unit Operation handled, High Vacuum Distillation, Crystallization, Precipitation, Drying, Filtration.
Technical Services including PFD, P&ID preparation required for modifications in Process.
TOSHNIWAL CHEMICALS PVT. LTD, TARAPUR July. 2001 to Dec. 2002.
Toshniwal chemicals is leading fine chemicals manufacturing company.
Roles and Responsibilities :Trainee Engineer
Handled process & related activities as per ISO 9002.
To do batch planning which immensely help to increase the production.
Production planning, manpower planning & distribution & provide
Training to develop my team to contribute towards production target.
Material & Energy balance Calculations.
Equipments handled, Chlorination Reactor, FBD, Tray Dryer, Plate & Frame Filter.
Unit Operation handled, High Vacuum Distillation, Crystallization filtration.
Technical Services including PFD, P & ID preparation required for modifications in Process.
EDUCATIONAL QUALIFICATION:-
• B.Tech. Chemical Engineering in May 2001 from UDCT Jalgaon, North Maharashtra University Jalgaon.
Maharashtra. India. with First Class(61%)
PERSONAL PROFILE:-
Name : Nana Rajaram Karande
Date of Birth : 3
rd
March 1976.
Languages Known : English, Marathi & Hindi.
Marital Status : Married.
Pass port No.. : H5001701
DECLARATION:-
I hereby confirm that the information given in this form is true to the best of my knowledge and belief.
Date:-02/02/2016
Place :- Abu Dhabi UAE (Nana Rajaran karande)
Current Ctc: 23500 AED/Month
Expected CTC: Nigotatible
Notice Period- 1 month.

Nana_Rajaram_Karande

  • 1.
    RESUME –SPPID Administrator/ Desigeer NANA RAJARAM KARANDE Mobile: +91-7798240248,+917028705346 E-Mail: karande2005@rediffmail.com Karande2005@gmail.com OBJECTIVE:- To take up career positions that will build up skills and experience in the field of engineering and to utilize and upgrade the career in specialty areas of EPC/PMC related to Oil and Gas, Chemical Industries using present experiences of Engineering and Design Services and Administrative activities, which provides opportunities to grow both professionally and as an individual. SIGNIFICANT STRENGTHS:- •Expert in Plant Design Automation tools like Intergraph's Smart Plant P & ID.Auto Cad Sound knowledge of Process concepts Co -ordination with the Client as well as the team members •Ability to lead a group of people. SOFTWARE SKILLS:- Operating Systems Windows 98/2000/XP. Plant Design software Smart Plant P&ID(version 2009,2007&4.3),SPPID Administrator,Auto Cad PDMS(Modeling).SP3D(Modeling training taken) Other software’s AutoCAD 2008.Nawis work, Smart Sketch. PROFESSIONAL SYNOPSIS:- Present Organization : - Technip AbuDhabi Position : - SPPID Administrator Date of Joining : -16th June 2013 to Till Date SPP&ID Skill Set: Project analysis and coordination Project Setup and User access Oracle Installation and DB setup Customization of Reference Database Definition of Filters for Rules, Display Sets, Symbology, Reports Definition of Item tag formats for various P&ID objects Report Customization in SPP&ID such as Piping MTO, Valve list, Specialty Item List, Line list, Instrument List DB Cleanup & removal of constrained objects Excellent understanding of user functionality – Plant Data and Reference Data Identify the various software versions (and Service Packs) that will be used for the development effort (Oracle, SPPID, etc.)
  • 2.
    Oracle Server Installation OracleInstance Creation Oracle Service Creation Oracle Project Table space Creation Smart Plant Engineering Manager Installation Smart Plant P&ID Installation Service pack updates Update of DLL's Overall Project Details:Technip AbuDhabi UAE Projects – 1 Al DABBIYA ASR GAS DEVELOPMENT FEED SERVICES Client’s Name Adco abudhabi UAE Project Description Conversion of Design Drawings in Smart Plant P&ID . Roles & Responsibilities Working as a SPPID COORDINATOR ,Administrator & Team Leader of the project. Planning and Coordination of Project as per Project Schedule Coordination with other dept. and coordination with clients. Project raising using ADCO database. Customization of symbols. Soft QC of generated P&IDs. Customization of Plant Reports. Plant Report generation. Resolution of database constraints and integrity issues Projects – 2 Halobutyl EPC Project Client’s Name KEMYA Saudi Arabia Project Description Conversion of Design Drawings in Smart Plant P&ID . Roles & Responsibilities Working as a SPPID COORDINATOR ,Administrator & Team Leader of the project. Planning and Coordination of Project as per Project Schedule Coordination with other dept. and coordination with clients. Project raising using ADCO database. Customization of symbols. Soft QC of generated P&IDs. Customization of Plant Reports. Plant Report generation. Resolution of database constraints and integrity issues
  • 3.
    Projects – 3AR Ratawi NGL Train -1 Project Client’s Name Basara Gas company Project Description Conversion of Design Drawings in Auto Cad P&ID . Roles & Responsibilities Working as a Process Drafting Team Leader of the project. Customization of project border template Coordination with other dept. Customization of symbols. Drafting of P&IDs. Quality checking of drafted P&IDs. Previous Organization : - Kentz UAE Abudhabi Position : - SPPID COORDINATOR Date of Joining : -29TH SEPT. 2012 to 25TH March 2013 Projects – 1 FEDD FOR RUMAITHA-SHANAYEL PHASE-III Client’s Name Abudhabi Company for Onshore Oil Operation (ADCO) Project Description Conversion of Design Drawings in Smart Plant P&ID . Roles & Responsibilities Working as a SPPID COORDINATOR ,Administrator & Team Leader of the project. Planning and Coordination of Project as per Project Schedule Coordination with other dept. and coordination with clients. Project raising using ADCO database. Customization of symbols. Soft QC of generated P&IDs. Customization of Plant Reports. Plant Report generation. Resolution of database constraints and integrity issues Previous Organization : - ROLTA INDIA LTD. Position : - Lead Engineer Date of Joining : - 03 rd March. 2008 to 27th sept.2012 Overall Project Details:
  • 4.
    Projects – 1IBN ZAHAR SPPID PROJECT Client’s Name IBN ZAHAR SAUDI -ARABIA Project Description Conversion of Auto Cad Drawings in Smart Plant P&ID & Data compliance. Roles & Responsibilities Work as a Administrator & Team Leader of the project. Planning and Coordination of Project as per Project Schedule Project raising using IBN ZAHR database. Data compliance. Soft QC of generated P&IDs. Customization of symbols. Customization of Plant Reports. Plant Report generation. Resolution of database constraints and integrity issues Projects – 2 BHEL SPPID Client’s Name BHEL INDIA LTD.INDIA Project Description Conversion of Auto Cad Drawings in Smart Plant P&ID. Roles & Responsibilities Work as a Administrator & Team Leader of the project. Planning and Coordination of Project as per Project Schedule Project raising using Bhel database. Soft QC of generated P&IDs. Customization of symbols. KKS-ISA alternate tag implementation Customization of Plant Reports. Plant Report generation. Projects – 3 SHARQ SPPID Client’s Name Sharq Saudi-Arabia Project Description Conversion of Auto Cad Drawings in Smart Plant P&ID.
  • 5.
    Roles & Responsibilities Working asa Administrator &Team Leader of the project. Planning and Coordination of Project as per Project Schedule Soft QC of generated P&IDs. Customization of symbols. Customization of Plant Reports. Plant Report generation. Drawing Publishing in SPF Error solving of publishing drawwings in SPF Tools Used SPPID-2009, Office Excel. Projects – 4 KENTZ Client’s Name KENTZ-QATAR Project Description Conversion of Auto Cad Drawings in Smart Plant P&ID. Roles & Responsibilities Worked as a Administrator &Team Leader of the project Planning and Coordination of Project as per Project Schedule Input Verification of Drawing. Production of Smart Plant P & ID (2009) from Auto Cad input. Raising issues regarding the projects. Soft QC of generated P&IDs. Correction of Mark-Up comments. Tools Used SPPID-2009, Office Excel. Projects – 5 SAUDI-ARAMCO SPPID PROJECT. Onsite Client’s Name ACEC SAUDI ARABIA Project Description Conversion of Auto Cad Drawings in Smart Plant P&ID. Roles & Responsibilities Involved in the following project execution activities – Worked as a Administrator of the project. Restoring SPPID project by using Backup received from Rolta India ltd at Clint site. Soft QC of generated P&IDs. Customization of Plant Reports.
  • 6.
    Plant Report generation. SPPIDtraining given to ACEC executives. Tools Used SPPID-2009, Office Excel. Projects – 6 MUSTANG GAS & OIL ENGINEERING (OFFSHORE PLATFORM) Client’s Name MUSTANG Project Description The scope includes creation of Piping & Equipment Modeling Roles & Responsibilities Input verification, Preparation of Line list, Equipment list, valve list by given input. Equipment modeling, Piping modeling, Extracting of Isometrics using PDMS, Quality checking, making deliverable ready. Tools Used PDMS, NAVIS WORK REVIEW, SPR, and Office Excel. Projects – 7 Reliance Infra (Rosa Thermal Power Project) Client’s Name RELIENCE Infrastructures. Project Description Creation of SPPID drawings for Power Plant in KKS code. Roles & Responsibilities Input Drawing Verifications. Production of Smart Plant P & ID (2007) from AutoCAD input Residual Process engineering like Valve Tagging, Line numbering as. per defined system. Process data co relation for Equipment, Instrument, Valve & line list generation as per client requirements. Soft QC of generated P&IDs. Correction of Mark-Up comments. Raising issues regarding the projects. Tools Used SPPID-2007 Projects – 8 SAUDI-ARAMCO Client’s Name Saudi-Aramco saudi-Arabia Project Description Conversion of Auto Cad Drawings in Smart Plant P&ID. Roles & Responsibilities Worked as a Team member of the project. Conversion of Auto Cad Drawings in Smart Plant P&ID. Soft QC of generated P&IDs. Correction of markup comments. Tools Used SPPID-2009, M S Office 2007, Office Excel, AUTO CAD.
  • 7.
    Previous Employer:- MARKSANS PHARMALTD. September 2006 to February 2008. Marksans Pharma Limited is a leading bulk drugs manufacturing company. Roles and Responsibilities: Shift Engineer (Technology Division) Worked as a Process Engineer Responsible for whole activity of Production & planning. Handled Unit Operations & Process (Distillation, Crystallization & Filtration) activities as per GMP Regulations and SOP's. Continuous monitoring to maintain standard process parameter & trouble shooting to get Quality Products. Production planning, manpower planning & distribution & provide training to develop my Team to contribute towards production target. Technical Services including PFD, P & ID preparation required for modifications in Process. AARTI DRUGS LTD, TARAPUR June 2003 to August 2006. Aarti Drugs Limited is one of the well known pioneers in pharma line in India Roles and Responsibilities: Production Officer Handled process & related activities as per GMP.& ISO 9002. Batch planning to increase production. Scale up from R&D level to plant level. Production planning, manpower planning & distribution & provide Training to develop team to contribute towards production target. Material & Energy balance Calculations. Equipment handled, Hydrogenator, Fluid bed dryer,Tray Dryer, Sparkler Filter, Nuetsch Filter, and Centrifuges. Unit Operation handled, High Vacuum Distillation, Crystallization, Precipitation, Drying, Filtration. Technical Services including PFD, P&ID preparation required for modifications in Process. TOSHNIWAL CHEMICALS PVT. LTD, TARAPUR July. 2001 to Dec. 2002. Toshniwal chemicals is leading fine chemicals manufacturing company. Roles and Responsibilities :Trainee Engineer Handled process & related activities as per ISO 9002. To do batch planning which immensely help to increase the production. Production planning, manpower planning & distribution & provide Training to develop my team to contribute towards production target. Material & Energy balance Calculations. Equipments handled, Chlorination Reactor, FBD, Tray Dryer, Plate & Frame Filter. Unit Operation handled, High Vacuum Distillation, Crystallization filtration. Technical Services including PFD, P & ID preparation required for modifications in Process. EDUCATIONAL QUALIFICATION:-
  • 8.
    • B.Tech. ChemicalEngineering in May 2001 from UDCT Jalgaon, North Maharashtra University Jalgaon. Maharashtra. India. with First Class(61%) PERSONAL PROFILE:- Name : Nana Rajaram Karande Date of Birth : 3 rd March 1976. Languages Known : English, Marathi & Hindi. Marital Status : Married. Pass port No.. : H5001701 DECLARATION:- I hereby confirm that the information given in this form is true to the best of my knowledge and belief. Date:-02/02/2016 Place :- Abu Dhabi UAE (Nana Rajaran karande) Current Ctc: 23500 AED/Month Expected CTC: Nigotatible Notice Period- 1 month.