Jeremy Thake, SharePoint MVP and AvePoint Enterprise Architect, will introduce why organizations leverage extranets, share the common issues found in customers’ extranet environments, and discuss the advantages and disadvantages with the available approaches for authentication and topologies. Jeremy will then illustrate the importance of instilling appropriate governance for extranets built upon SharePoint to ensure that the common issues identified are mitigated, including guidance on what processes can be put in place to ensure a better user experience.
Ich möchte die Erfahrung aus verschiedenen Projekten zum Thema Migration zusammenfassen und in Form einer Checkliste für die Administratoren veröffentlichen. Dabei möchte ich verschiedenste mögliche Anpassungen erläutern, die in SharePoint möglich sind. Darunter z.B.:
- Site Templates (supported / non supported ID’s)
- Solutions
- Webparts
- Sprache
- IIS Einstellungen
- SQL Transactions Logs / Festplattenspeicher
Diese und weitere sollen den Administratoren helfen Anpassungen zu identifizieren und schließlich zu migrieren. Als Referenzprojekt die Migration von 1 TB von SharePoint 2007 nach 2013 über 2010. Details, Tücken und warum es mit SharePoint 2013 einfacherer geworden ist.
Live Demo zur Migration von SharePoint 2010 auf 2013
Migration und ihre Tücken – Welche Anpassungen gibt es?Dennis Hobmaier
Ich möchte die Erfahrung aus verschiedenen Projekten zum Thema Migration zusammenfassen und in Form einer Checkliste für die Administratoren veröffentlichen. Dabei möchte ich verschiedenste mögliche Anpassungen erläutern, die in SharePoint möglich sind. Darunter z.B.:
• Site Templates (supported / non supported ID’s)
• Solutions
• Webparts
• Sprache
• IIS Einstellungen
• SQL Transactions Logs / Festplattenspeicher
Diese und weitere sollen den Administratoren helfen Anpassungen zu identifizieren und schließlich zu migrieren. Als Referenzprojekt die Migration von 1 TB von SharePoint 2003 nach 2010 über 2007. Details und Tücken.
Referentenprofil: Dennis Hobmaier ist Technical Solutions Professional bei AvePoint mit langjähriger Erfahrung im Microsoft Umfeld mit dem Fokus auf Infrastrukturthemen wie Active Directory, Exchange, SharePoint, Deployment und Security.
The general purpose computing and storage environment of Amazon Web Services integrates perfectly into your existing ecosystem. Join customers who have taken advantage of this environment in parallel to their on-premise infrastructure to hear tales, tips, and tricks of best practices of integrating AWS with existing resources securely using services such as Amazon Virtual Private Cloud, AWS Direct Connect, and AWS Storage Gateway.
Ich möchte die Erfahrung aus verschiedenen Projekten zum Thema Migration zusammenfassen und in Form einer Checkliste für die Administratoren veröffentlichen. Dabei möchte ich verschiedenste mögliche Anpassungen erläutern, die in SharePoint möglich sind. Darunter z.B.:
- Site Templates (supported / non supported ID’s)
- Solutions
- Webparts
- Sprache
- IIS Einstellungen
- SQL Transactions Logs / Festplattenspeicher
Diese und weitere sollen den Administratoren helfen Anpassungen zu identifizieren und schließlich zu migrieren. Als Referenzprojekt die Migration von 1 TB von SharePoint 2007 nach 2013 über 2010. Details, Tücken und warum es mit SharePoint 2013 einfacherer geworden ist.
Live Demo zur Migration von SharePoint 2010 auf 2013
Migration und ihre Tücken – Welche Anpassungen gibt es?Dennis Hobmaier
Ich möchte die Erfahrung aus verschiedenen Projekten zum Thema Migration zusammenfassen und in Form einer Checkliste für die Administratoren veröffentlichen. Dabei möchte ich verschiedenste mögliche Anpassungen erläutern, die in SharePoint möglich sind. Darunter z.B.:
• Site Templates (supported / non supported ID’s)
• Solutions
• Webparts
• Sprache
• IIS Einstellungen
• SQL Transactions Logs / Festplattenspeicher
Diese und weitere sollen den Administratoren helfen Anpassungen zu identifizieren und schließlich zu migrieren. Als Referenzprojekt die Migration von 1 TB von SharePoint 2003 nach 2010 über 2007. Details und Tücken.
Referentenprofil: Dennis Hobmaier ist Technical Solutions Professional bei AvePoint mit langjähriger Erfahrung im Microsoft Umfeld mit dem Fokus auf Infrastrukturthemen wie Active Directory, Exchange, SharePoint, Deployment und Security.
The general purpose computing and storage environment of Amazon Web Services integrates perfectly into your existing ecosystem. Join customers who have taken advantage of this environment in parallel to their on-premise infrastructure to hear tales, tips, and tricks of best practices of integrating AWS with existing resources securely using services such as Amazon Virtual Private Cloud, AWS Direct Connect, and AWS Storage Gateway.
As a technology solutions provider, it’s in POINTWEST’s nature to innovate. Embracing
change, becoming agile -- this is how we do things, and it shows in the solutions we build. Know more about Pointwest, the largest fully Filipino-owned IT-BPO company that's blazing trails to the top.
www.pointwest.com.ph
For enterprises looking to automate and simplify the delivery of IT services for the private cloud, public cloud, and hybrid cloud, ASG offers a comprehensive solution proven to significantly reduce costs and decrease time to market.
ASG’s CloudFactory provides comprehensive cloud orchestration that provisions multi-vendor environments and automates the most application delivery types - eliminating vendor lock-in.
TechEd Africa 2011 - Collaborating with Extranet Partners on SharePoint 2010Michael Noel
Organizations planning for Extranet access to SharePoint 2010 or faced with providing access to an Intranet from multiple internal authentication platforms often find it challenging to properly architect SharePoint for extranets, to isolate content, and to manage identities across disparate systems. The complexity involved in understanding how to isolate content from a security perspective but still provide for a collaborative space for end users is complex, and if not done correctly can lead to security breaches and confusion. This session focuses on understanding the various extranet models for SharePoint 2010 and providing real world guidance on how to implement them. Covered are extranet content models and extranet authentication options, including Claims-based authentication and also covering advanced options using tools such as Microsoft's Forefront Identity Manager (FIM) 2010 to centralize identity management to SharePoint 2010 farms, allowing for better control, automatic account provisioning, and synchronization of profile information across multiple SharePoint authentication providers. • Review Extranet design options with SharePoint 2010 • Understand the need for identity management across SharePoint farms • Examine real world deployment guidance and architecture for SharePoint environments using multiple authentication providers
Planning Extranet Environments with SharePoint 2010Michael Noel
Organizations planning for Extranet access to SharePoint 2010 or faced with providing access to an Intranet from multiple internal authentication platforms often find it challenging to properly architect SharePoint for extranets, to isolate content, and to manage identities across disparate systems. The complexity involved in understanding how to isolate content from a security perspective but still provide for a collaborative space for end users is complex, and if not done correctly can lead to security breaches and confusion. This session focuses on understanding the various extranet models for SharePoint 2010 and providing real world guidance on how to implement them. Covered are extranet content models and extranet authentication options, including advanced options using tools such as Microsoft's Forefront Identity Manager (FIM) 2010 to centralize identity management to SharePoint 2010 farms, allowing for better control, automatic account provisioning, and synchronization of profile information across multiple SharePoint authentication providers.
As a technology solutions provider, it’s in POINTWEST’s nature to innovate. Embracing
change, becoming agile -- this is how we do things, and it shows in the solutions we build. Know more about Pointwest, the largest fully Filipino-owned IT-BPO company that's blazing trails to the top.
www.pointwest.com.ph
For enterprises looking to automate and simplify the delivery of IT services for the private cloud, public cloud, and hybrid cloud, ASG offers a comprehensive solution proven to significantly reduce costs and decrease time to market.
ASG’s CloudFactory provides comprehensive cloud orchestration that provisions multi-vendor environments and automates the most application delivery types - eliminating vendor lock-in.
TechEd Africa 2011 - Collaborating with Extranet Partners on SharePoint 2010Michael Noel
Organizations planning for Extranet access to SharePoint 2010 or faced with providing access to an Intranet from multiple internal authentication platforms often find it challenging to properly architect SharePoint for extranets, to isolate content, and to manage identities across disparate systems. The complexity involved in understanding how to isolate content from a security perspective but still provide for a collaborative space for end users is complex, and if not done correctly can lead to security breaches and confusion. This session focuses on understanding the various extranet models for SharePoint 2010 and providing real world guidance on how to implement them. Covered are extranet content models and extranet authentication options, including Claims-based authentication and also covering advanced options using tools such as Microsoft's Forefront Identity Manager (FIM) 2010 to centralize identity management to SharePoint 2010 farms, allowing for better control, automatic account provisioning, and synchronization of profile information across multiple SharePoint authentication providers. • Review Extranet design options with SharePoint 2010 • Understand the need for identity management across SharePoint farms • Examine real world deployment guidance and architecture for SharePoint environments using multiple authentication providers
Planning Extranet Environments with SharePoint 2010Michael Noel
Organizations planning for Extranet access to SharePoint 2010 or faced with providing access to an Intranet from multiple internal authentication platforms often find it challenging to properly architect SharePoint for extranets, to isolate content, and to manage identities across disparate systems. The complexity involved in understanding how to isolate content from a security perspective but still provide for a collaborative space for end users is complex, and if not done correctly can lead to security breaches and confusion. This session focuses on understanding the various extranet models for SharePoint 2010 and providing real world guidance on how to implement them. Covered are extranet content models and extranet authentication options, including advanced options using tools such as Microsoft's Forefront Identity Manager (FIM) 2010 to centralize identity management to SharePoint 2010 farms, allowing for better control, automatic account provisioning, and synchronization of profile information across multiple SharePoint authentication providers.
Airlines 2.0: Using technology for innovative branding through the recessionSimpliFlying
This is a slideshow of how airlines can build a stronger brand by using technology. Viewers can learn how major airlines around the world have enhanced their marketing strategy by leveraging new technologies to build brand loyalty.
These slides were first used in an online seminar for airline executives conducted by Shashank Nigam of SimpliFlying.com
Social Media and Promoting your Crowdfunding CampaignPatch of Land
Social Media and Promoting your Crowdfunding Campaign was a presentation given by Manolis Sfinarolakis, the Founder of Reality Crowd TV Media Corporation, at the University of Hartford.
Learn practical strategies for leveraging your existing customers and social media presence to magnify the impact and reach of a Crowdfunding campaign. We’ll review:
• How to engage your target market on social media
• Where to find the most influential social media prospects
• How to convert them into your own brand ambassadors
• Practical strategies and tools for driving traffic to your Crowdfunding campaign.
Instructor: Manolis Sfinarolakis, Reality Crowd TV Media Corporation
Presentation for an Acando seminar about social intranets explaining how the traditional corporate intranet will need to be transformed into a platform that provides the opportunity for wide participation by most or all employees in order to deal with the business challenges most organizations are facing.
This is a talk I gave at Harvard for the National Collegiate Research Conference. It's more theoretical than my typical presentation but kind of fun - it looks at what makes innovation happen.
We expect a lot from the intranet home page and it can play many roles in an organisation. This presentation features many screenshots whilst exploring the purposes of the home page and what that might look like.
This slideshow presents 31 examples of intranet homepage design concepts, with example screenshots.
We've pulled the screenshots from the entries in the My Beautiful Intranet 2014 competition.
Get the Mobile Commerce Playbook: www.psfk.com/report/mobile-commerce-playbook
The Mobile Commerce Playbook is intended to help businesses take a forward looking approach to leveraging mobile as a core part of their offerings to deliver personalization, relevancy and convenience to every consumer at key moments in this commerce journey. Created in partnership with Braintree, the report offers recommendations that are designed to inspire startups, brands and retailers as they look to create best-in-class mobile commerce experiences that sync with the reality of today’s consumer lifestyles.
- Featured within the 40+ page report, readers can find:
- 11 strategies to redefine mobile commerce
- Unique user experience paths built for brands, agencies, and startups to follow
- Perspectives from leading mobile commerce experts across the globe
If you are interested in seeing a presentation of this report or would like to understand how PSFK can help your team ideate new possibilities for your brand, contact us at sales@psfk.com
Ver. 1 | Published January 2015
All rights reserved. No parts of this publication may be reproduced without the written permission of PSFK Labs.
SharePoint Governance - Jetzt mit Struktur @CollabDaysDennis Hobmaier
Infrastruktur Administratoren müssen vielerlei Aufgaben bewältigen und sich mit den unterschiedlichsten Produkten zurecht finden: Microsoft Active Directory, Windows 8, Office 2013… Gerade für die effektive Verwaltung von Client Systemen bieten sich Gruppenrichtlinien an – doch was ist mit SharePoint?
In diesem Vortrag zeigen wir Ihnen:
Wie Sie Einstellungen, wie Versionierung, effektiv setzen und dauerhaft gesetzt lassen können;
wie Provisionierung out-of-the-Box mit SharePoint funktioniert
und stellen Ihnen ein Self-Service Portal mithilfe von AvePoint Governance Automation bereit.
Presenter: Timothy Boettcher, AvePoint Client Services Director
Original presentation date: April 4, 2016
Event: The Modern Workplace Series Seminar
In conjunction with Microsoft, AvePoint Singapore hosted an event to shed light on the new Office 365 Entrprise E5 suite. We're sharing best practices for migrating to the cloud as well as methods to manage and protect data in the cloud.
More from AvePoint:
http://www.avepoint.com/community
Putting on Your Design Bootstraps: Intro to Responsive Design and SharePointAvePoint
Presented by D'arce Hess, AvePoint Strategic Consultant on October 3, 2015 at SharePoint Saturday DC/Reston
Bootstrap is a framework that is widely used in web development to create beautiful responsive websites. Applying this framework to SharePoint requires skill and patience. In this session, we will begin with a basic mock-up of a site. We will review how to break-down the elements of the mock-up and being the mark-up for your master page and page layout using Bootstrap. You will learn the basic structure, language, CSS resets and use of coding techniques such as Sass to adapt this framework to your SharePoint project.
More from AvePoint: http://www.avepoint.com/community
Cloud computing has firmly cemented itself as a viable option for hosting and managing your Microsoft SharePoint content. Now that your business has made the decision to incorporate cloud computing into your enterprise collaboration initiative, how does this affect your governance and management strategies?
SharePoint Governance - Jetzt mit Struktur (6. Alzenauer Innovationstage)Dennis Hobmaier
Auf den 6. Alzenauer Innovationstagen am 24. und 25.9.2014 habe ich einen Vortrag zum Thema "SharePoint Governance - Jetzt mit Struktur" gehalten.
Vielen Dank für das zahlreiche Erscheinen.
Im Vortrag selbst zeige ich Ihnen:
- Was Governance bedeutet
- Wie man solche Richtlinien im tagtäglichen Leben findet
- Wo man in der IT tagtäglich zu tun hat, z.B. Office, GPO...
- Sinnvolle Beispiele aus der Praxis zur Überwachung von Versionierungseinstellungen und Berechtigungen.
- Provisionierung - damit sich die IT zurück lehnen kann. Da bleibt mehr Zeit für Kaffee und andere Dinge.
AvePoint Webinar - Microsoft Office 365 or Windows Azure: Have it Your WayAvePoint
This presentation is from a webinar led by AvePoint Senior Product Manager Shyam Oza, giving attendees a blueprint for navigating which cloud deployment option is best suited to house their respective Microsoft SharePoint infrastructures. The session also explained governance and compliance considerations to help determine whether "all in" cloud, hybrid, or an on-premises approach is best. Best practices for beginning to implement the architecture that best meets organizations' specific business goals are also highlighted in this webinar. For more information, please visit www.avepoint.com/resources/webinars.
Wer, was, wo: Inhalte schützen und unberechtigte Zugriffe verhindernDennis Hobmaier
Der Einsatz von Collaboration Platforms wie Microsoft SharePoint stellt Unternehmen vor neue Herausforderungen und Anforderungen auch im Bereich Compliance: Das Vernetzen von Mitarbeitern weltweit, der Zugriff auf Dokumente von intern und extern sowie die stetig wachsende Datenmenge erhöhen das Risiko von Verstößen gegen Datenschutzrichtlinien und von ungewollten Zugriffen auf vertrauliche Informationen.
In diesem Webinar lernen Sie mithilfe technischer Unterstützung:
• Multifaktor-Authentifizierung und Geofencing: trusted users, trusted devices, trusted locations
• Automatisiertes Klassifizieren und Taggen von Inhalten
• Data Leakage Prevention
For many years we've been told that SharePoint is not easily governable. Because of this, IT departments have often chosen to use restriction as the main method of controlling SharePoint platforms.
In this session, we will demystify the concept of governance. We will share how to redefine governance as a global agreement between all members of an organization that allows business needs and technology requirements to align in the form of SharePoint as a Service.
By offering SharePoint as a Service, your organization can not only transform unstructured business processes into managed services offered to the end user, but also guarantee compliance with organizational policies through automation.
Drive Business Value with Winning Data Governance and Compliance StrategiesDux Raymond Sy
Cloud computing has become a very compelling solution for large enterprises looking to reduce total cost of ownership and improve global access to content. For these organizations, while maximizing cloud based technologies like Microsoft Azure or Office 365 can drive better communication and knowledge sharing to help drive productivity, the platform can lose its effectiveness and present compliance risks without proper data governance and compliance. It comes with significant concerns around storing business data outside the walls of their enterprises. Join AvePoint Public Sector CTO Dux Raymond Sy in this interactive session focused on how to adopt an effective data governance strategy and effectively implement proven tactics & winning strategies to ensure your cloud investment is successfully meeting business needs.
Similar to How to create a secure efficient extranet user experience (20)
Using Microsoft Teams to enhance your organizational productivityJeremy Thake
Microsoft Teams became generally available on March 14th and is on by default in all Office 365 tenants. Spend 45 mins with Jeremy Thake learning how Microsoft Teams can encourage your employees to unlock the value of all of Office 365. Microsoft Teams is built on top of Office 365 Connected Groups which gives members access to Planner, Shared Calendars, Document Libraries and much more. Jeremy will show you some cool integration stories between all these products to take advantage of what you are already using in Microsoft products.
Why watch this over a standard Microsoft presentation? Jeremy will give his candid opinion of what Teams is great for, where there are gaps to be aware of and some killer tips to get the most out of it.
Jeremy Thake is the VP of Product Technology at Hyperfish. With over 15 years of experience in the industry, focused on Microsoft Technology. His experience ranges from consulting, development, marketing and product management. Jeremy worked at Microsoft HQ for 3 years on Office 365 extensibility and Azure application platform space. He has spoken across the globe to business and developer audiences. He was recognized by Microsoft for five years as a SharePoint MVP before joining Microsoft for his expertise and contributions to the community.
Connect with your customers wherever they are with an azure based mobile solu...Jeremy Thake
Smartphones represent the fastest technology adoption in history, twice as fast as the internet, three times faster than social media and ten times faster than PCs. Your customers are more mobile than ever and you need to stay connected with them whenever and wherever they are with tailored experiences based on their interests and behavior while reducing your time to market to keep up with demand. See how to provide the mobile experiences your customers crave at the speed they desire with cloud services, tools, and DevOps designed for delivering mobile solutions. You leave this session with a set of recommended architectures for your digital marketing solution and an understanding of how to quickly get started with your own solution.
https://techcommunity.microsoft.com/t5/Microsoft-Ignite-Content/BRK2042-Connect-with-your-customers-wherever-they-are-with-a/m-p/9679/highlight/true#M189
Understand the future of software development in the cloud with the azure app...Jeremy Thake
The Microsoft Azure Application Platform comprises of a rich set of PaaS Services that allows you to be more productive when you're developing applications in the cloud. In this session we look at the current state of the Azure Application Platform and look ahead to where the platform is heading.
https://techcommunity.microsoft.com/t5/Microsoft-Ignite-Content/BRK2085-Understand-the-future-of-software-development-in-the/m-p/10215/highlight/true#M251
Connect with your customers wherever they are with an azure based mobile solu...Jeremy Thake
Smartphones represent the fastest technology adoption in history, twice as fast as the internet, three times faster than social media and ten times faster than PCs. Your customers are more mobile than ever and you need to stay connected with them whenever and wherever they are with tailored experiences based on their interests and behavior while reducing your time to market to keep up with demand. See how to provide the mobile experiences your customers crave at the speed they desire with cloud services, tools, and DevOps designed for delivering mobile solutions. You leave this session with a set of recommended architectures for your digital marketing solution and an understanding of how to quickly get started with your own solution.
Getting started with SharePoint 2013 online developmentJeremy Thake
Getting started with SharePoint 2010 Online development
Jeremy Thake, SharePoint MVP, will introduce SharePoint 2013 Online as an application development platform inside Office 365. The session will explain how to get started with the different approaches from web UI configurations, to SharePoint Designer 2013 customizations to full blown Visual Studio development with Sandbox Solutions. Jeremy will introduce the concepts of how Application Lifecycle Management can be introduced to this along with migrating existing applications across from on-premise.
From this session you should walk away with:
Using SharePoint Online 2013 as an Application Development Platform
Getting Started with SharePoint Online 2013 development
Application Lifecycle Management with SharePoint Online 2013 in Office 365
Migrating SharePoint 2013 Apps to SharePoint Online 2013
Introducing the new SharePoint 2013 app modelJeremy Thake
Jeremy will introduce the new App Model and compare it to the existing app models available in SharePoint. Attendees will leave this session with a better understanding of:
• How Windows Azure can be leveraged in SharePoint apps, showcasing the oAuth and auto provisioning features
• An overview of the new SharePoint App model to bring your products to the Marketplace
• An comparison between the new App Model and existing Solutions Model in SharePoint
Getting started with Office 365 SharePoint 2010 online developmentJeremy Thake
Getting started with SharePoint 2010 Online development
Jeremy Thake, SharePoint MVP, will introduce SharePoint 2010 Online as an application development platform inside Office 365. The session will explain how to get started with the different approaches from web UI configurations, to SharePoint Designer 2010 customizations to full blown Visual Studio development with Sandbox Solutions. Jeremy will introduce the concepts of how Application Lifecycle Management can be introduced to this along with migrating existing applications across from on-premise.
From this session you should walk away with:
Using SharePoint Online 2010 as an Application Development Platform
Getting Started with SharePoint Online 2010 development
Application Lifecycle Management with SharePoint Online 2010 in Office 365
Migrating SharePoint 2010 Apps to SharePoint Online 2010
Jeremy thake introducing alm to share point development implementations (ap...Jeremy Thake
An introduction to SharePoint 2010 Development with ALM. Demonstrates Static Code Analysis with SPDisposeCheck, check-in policies and TFS 2010 Build automation.
Securing your Kubernetes cluster_ a step-by-step guide to success !KatiaHIMEUR1
Today, after several years of existence, an extremely active community and an ultra-dynamic ecosystem, Kubernetes has established itself as the de facto standard in container orchestration. Thanks to a wide range of managed services, it has never been so easy to set up a ready-to-use Kubernetes cluster.
However, this ease of use means that the subject of security in Kubernetes is often left for later, or even neglected. This exposes companies to significant risks.
In this talk, I'll show you step-by-step how to secure your Kubernetes cluster for greater peace of mind and reliability.
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdfPaige Cruz
Monitoring and observability aren’t traditionally found in software curriculums and many of us cobble this knowledge together from whatever vendor or ecosystem we were first introduced to and whatever is a part of your current company’s observability stack.
While the dev and ops silo continues to crumble….many organizations still relegate monitoring & observability as the purview of ops, infra and SRE teams. This is a mistake - achieving a highly observable system requires collaboration up and down the stack.
I, a former op, would like to extend an invitation to all application developers to join the observability party will share these foundational concepts to build on:
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...DanBrown980551
Do you want to learn how to model and simulate an electrical network from scratch in under an hour?
Then welcome to this PowSyBl workshop, hosted by Rte, the French Transmission System Operator (TSO)!
During the webinar, you will discover the PowSyBl ecosystem as well as handle and study an electrical network through an interactive Python notebook.
PowSyBl is an open source project hosted by LF Energy, which offers a comprehensive set of features for electrical grid modelling and simulation. Among other advanced features, PowSyBl provides:
- A fully editable and extendable library for grid component modelling;
- Visualization tools to display your network;
- Grid simulation tools, such as power flows, security analyses (with or without remedial actions) and sensitivity analyses;
The framework is mostly written in Java, with a Python binding so that Python developers can access PowSyBl functionalities as well.
What you will learn during the webinar:
- For beginners: discover PowSyBl's functionalities through a quick general presentation and the notebook, without needing any expert coding skills;
- For advanced developers: master the skills to efficiently apply PowSyBl functionalities to your real-world scenarios.
Essentials of Automations: Optimizing FME Workflows with ParametersSafe Software
Are you looking to streamline your workflows and boost your projects’ efficiency? Do you find yourself searching for ways to add flexibility and control over your FME workflows? If so, you’re in the right place.
Join us for an insightful dive into the world of FME parameters, a critical element in optimizing workflow efficiency. This webinar marks the beginning of our three-part “Essentials of Automation” series. This first webinar is designed to equip you with the knowledge and skills to utilize parameters effectively: enhancing the flexibility, maintainability, and user control of your FME projects.
Here’s what you’ll gain:
- Essentials of FME Parameters: Understand the pivotal role of parameters, including Reader/Writer, Transformer, User, and FME Flow categories. Discover how they are the key to unlocking automation and optimization within your workflows.
- Practical Applications in FME Form: Delve into key user parameter types including choice, connections, and file URLs. Allow users to control how a workflow runs, making your workflows more reusable. Learn to import values and deliver the best user experience for your workflows while enhancing accuracy.
- Optimization Strategies in FME Flow: Explore the creation and strategic deployment of parameters in FME Flow, including the use of deployment and geometry parameters, to maximize workflow efficiency.
- Pro Tips for Success: Gain insights on parameterizing connections and leveraging new features like Conditional Visibility for clarity and simplicity.
We’ll wrap up with a glimpse into future webinars, followed by a Q&A session to address your specific questions surrounding this topic.
Don’t miss this opportunity to elevate your FME expertise and drive your projects to new heights of efficiency.
State of ICS and IoT Cyber Threat Landscape Report 2024 previewPrayukth K V
The IoT and OT threat landscape report has been prepared by the Threat Research Team at Sectrio using data from Sectrio, cyber threat intelligence farming facilities spread across over 85 cities around the world. In addition, Sectrio also runs AI-based advanced threat and payload engagement facilities that serve as sinks to attract and engage sophisticated threat actors, and newer malware including new variants and latent threats that are at an earlier stage of development.
The latest edition of the OT/ICS and IoT security Threat Landscape Report 2024 also covers:
State of global ICS asset and network exposure
Sectoral targets and attacks as well as the cost of ransom
Global APT activity, AI usage, actor and tactic profiles, and implications
Rise in volumes of AI-powered cyberattacks
Major cyber events in 2024
Malware and malicious payload trends
Cyberattack types and targets
Vulnerability exploit attempts on CVEs
Attacks on counties – USA
Expansion of bot farms – how, where, and why
In-depth analysis of the cyber threat landscape across North America, South America, Europe, APAC, and the Middle East
Why are attacks on smart factories rising?
Cyber risk predictions
Axis of attacks – Europe
Systemic attacks in the Middle East
Download the full report from here:
https://sectrio.com/resources/ot-threat-landscape-reports/sectrio-releases-ot-ics-and-iot-security-threat-landscape-report-2024/
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdfPeter Spielvogel
Building better applications for business users with SAP Fiori.
• What is SAP Fiori and why it matters to you
• How a better user experience drives measurable business benefits
• How to get started with SAP Fiori today
• How SAP Fiori elements accelerates application development
• How SAP Build Code includes SAP Fiori tools and other generative artificial intelligence capabilities
• How SAP Fiori paves the way for using AI in SAP apps
A tale of scale & speed: How the US Navy is enabling software delivery from l...sonjaschweigert1
Rapid and secure feature delivery is a goal across every application team and every branch of the DoD. The Navy’s DevSecOps platform, Party Barge, has achieved:
- Reduction in onboarding time from 5 weeks to 1 day
- Improved developer experience and productivity through actionable findings and reduction of false positives
- Maintenance of superior security standards and inherent policy enforcement with Authorization to Operate (ATO)
Development teams can ship efficiently and ensure applications are cyber ready for Navy Authorizing Officials (AOs). In this webinar, Sigma Defense and Anchore will give attendees a look behind the scenes and demo secure pipeline automation and security artifacts that speed up application ATO and time to production.
We will cover:
- How to remove silos in DevSecOps
- How to build efficient development pipeline roles and component templates
- How to deliver security artifacts that matter for ATO’s (SBOMs, vulnerability reports, and policy evidence)
- How to streamline operations with automated policy checks on container images
Welocme to ViralQR, your best QR code generator.ViralQR
Welcome to ViralQR, your best QR code generator available on the market!
At ViralQR, we design static and dynamic QR codes. Our mission is to make business operations easier and customer engagement more powerful through the use of QR technology. Be it a small-scale business or a huge enterprise, our easy-to-use platform provides multiple choices that can be tailored according to your company's branding and marketing strategies.
Our Vision
We are here to make the process of creating QR codes easy and smooth, thus enhancing customer interaction and making business more fluid. We very strongly believe in the ability of QR codes to change the world for businesses in their interaction with customers and are set on making that technology accessible and usable far and wide.
Our Achievements
Ever since its inception, we have successfully served many clients by offering QR codes in their marketing, service delivery, and collection of feedback across various industries. Our platform has been recognized for its ease of use and amazing features, which helped a business to make QR codes.
Our Services
At ViralQR, here is a comprehensive suite of services that caters to your very needs:
Static QR Codes: Create free static QR codes. These QR codes are able to store significant information such as URLs, vCards, plain text, emails and SMS, Wi-Fi credentials, and Bitcoin addresses.
Dynamic QR codes: These also have all the advanced features but are subscription-based. They can directly link to PDF files, images, micro-landing pages, social accounts, review forms, business pages, and applications. In addition, they can be branded with CTAs, frames, patterns, colors, and logos to enhance your branding.
Pricing and Packages
Additionally, there is a 14-day free offer to ViralQR, which is an exceptional opportunity for new users to take a feel of this platform. One can easily subscribe from there and experience the full dynamic of using QR codes. The subscription plans are not only meant for business; they are priced very flexibly so that literally every business could afford to benefit from our service.
Why choose us?
ViralQR will provide services for marketing, advertising, catering, retail, and the like. The QR codes can be posted on fliers, packaging, merchandise, and banners, as well as to substitute for cash and cards in a restaurant or coffee shop. With QR codes integrated into your business, improve customer engagement and streamline operations.
Comprehensive Analytics
Subscribers of ViralQR receive detailed analytics and tracking tools in light of having a view of the core values of QR code performance. Our analytics dashboard shows aggregate views and unique views, as well as detailed information about each impression, including time, device, browser, and estimated location by city and country.
So, thank you for choosing ViralQR; we have an offer of nothing but the best in terms of QR code services to meet business diversity!
Transcript: Selling digital books in 2024: Insights from industry leaders - T...BookNet Canada
The publishing industry has been selling digital audiobooks and ebooks for over a decade and has found its groove. What’s changed? What has stayed the same? Where do we go from here? Join a group of leading sales peers from across the industry for a conversation about the lessons learned since the popularization of digital books, best practices, digital book supply chain management, and more.
Link to video recording: https://bnctechforum.ca/sessions/selling-digital-books-in-2024-insights-from-industry-leaders/
Presented by BookNet Canada on May 28, 2024, with support from the Department of Canadian Heritage.
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Ramesh Iyer
In today's fast-changing business world, Companies that adapt and embrace new ideas often need help to keep up with the competition. However, fostering a culture of innovation takes much work. It takes vision, leadership and willingness to take risks in the right proportion. Sachin Dev Duggal, co-founder of Builder.ai, has perfected the art of this balance, creating a company culture where creativity and growth are nurtured at each stage.
Accelerate your Kubernetes clusters with Varnish CachingThijs Feryn
A presentation about the usage and availability of Varnish on Kubernetes. This talk explores the capabilities of Varnish caching and shows how to use the Varnish Helm chart to deploy it to Kubernetes.
This presentation was delivered at K8SUG Singapore. See https://feryn.eu/presentations/accelerate-your-kubernetes-clusters-with-varnish-caching-k8sug-singapore-28-2024 for more details.
2. Jeremy Thake
• Enterprise Architect – AvePoint
• SharePoint MVP since July ‘10
• Founded SharePointDevWiki.com
• Co-founder of NothingButSharePoint.com
• Speaker at MS TechEd 2009/10, SPC 11
jeremy.thake@avepoint.com
gplus.to/jthake
@jthake
www.linkedin.com/in/jeremythake
Jeremy Thake, SharePoint MVP and AvePoint Enterprise Architect, will introduce why organizations leverage extranets, share the common issues found in customers’ extranet environments, and discuss the advantages and disadvantages with the available approaches for authentication and topologies. Jeremy will then illustrate the importance of instilling appropriate governance for extranets built upon SharePoint to ensure that the common issues identified are mitigated, including guidance on what processes can be put in place to ensure a better user experience.
In the simplest example, a firewall such as Microsoft Forefront Unified Access Gateway is used to allow external users to access SharePoint that is hosted in the internal network. Internal users can access the SharePoint instance directly without going through the firewall.ProsSimplest solution – if you already have an existing SharePoint environment, you can just open up a few ports and get goingInside Corporate network – for most organizations hosting this internally will not be seen as a negative thing and having the content stored inside is more secure.ConsSecurity model complex – users will have to be provisioned as discussed in last section inside Active Directory.One site for both internal/external – the IA can get hard because you need areas that aren’t seen by external users and areas that are seen by both. Often sub sites are used here.Sensitive docs visibleSingle firewall separates corporate network from the internet
In this approach, the server farm is isolated in a separate perimeter network. Each layer can be isolated for more security via routers. Internal network requests can be directed through the internal facing ISA server or routed through the public one.ProsIsolated to single farmExternal user access is isolated to perimeter networkConsAdditional n/w gear req.Single firewall separates corporate network from the internet
The back-to-back perimeter network can be made more secure by moving the Services farm internally within the network for service applications such as User Profile, Search, Business Data Connectivity, and Management Metadata. This in turn means that the Extranet can consume some of the same services that other workloads like the Intranet may be consuming on internal farms.ProsIsolation from corporateNetwork traffic isolationPrevents sensitive doc leaksShared services managed corporateConsAdditional SP farm req.Additional n/w gear req.Two way trusts req. for someNo mechanism to publish content internal to external
The next typical thing we see from a security perspective is that a content staging farm be put in place. This means that all versioning of draft documents are created in the staging farm and only once content has gone through the approval process will the content be pushed through to the Extranet farm. This does benefit from the ability for internal users to store documents that are related to the content being published to the extranet in the same place.ProsIsolation from corporateNetwork traffic isolationPrevents sensitive doc leaksShared services managed corporateAbility to publish content from internal to externalConsAdditional SP farm req.Additional n/w gear req.Two way trusts req. for someContent management complexNo two-way content sync (read-only)
In this example, the web front ends and possibly application servers are moved into the perimeter network for performance reasons.ProSQL stored in corporate n/wConDomain trust requiredComplex architectureInterfarmcomms in 2 n/wOne site for both internal/externalSensitive docs visible
ProsSQL stored in corporate n/wConsDomain trust requiredComplex architectureInterfarmcomms in 2 n/wOne site for both internal/externalSensitive docs visible
Same as last but introducing the content publishing.ProsSQL stored in corporate n/wAbility to publish content from internal to externalConsDomain trust requiredComplex architectureInterfarmcomms in 2 n/wContent management complexNo two-way content sync (read-only)
SharePoint Online is a scenario that keeps coming up in this scenario due to the speed to deploy. ProsQuick to setupProvisioning users outside ADConsAdditional costs of subscriber modelSome features not availableNo supported OOTB content publishing