SlideShare a Scribd company logo
1 of 1
Download to read offline
Helen Yan 716-533-2097
Amherst, NY 14226 helenyan2016@gmail.com
Seeking job opportunity using my Chemical Engineering training and work experience. (8) years of progressive work
experience in the Air Separation Plants with Praxair (China) in process and equipment engineering functions. Defined
process parameters, specified and commissioned plant equipment, and effective follow through monitoring to
successful project conclusion.
Key Skills: CHEMICAL ENGINEERING - AIR SEPARATION INDUSTRY – TEAM LEADER – SPECIFICATION OF PROCESS
PARAMETERS – CAPITAL EQUIPMENT SOURCING AND COMMISSIONING – MS OFFICE - BILINGUAL (CHINESE).
CERTIFICATION: PROJECT MANAGEMENT PROFESSIONAL (PMP), PROFESSIONAL ENGINEER (INTERMEDIATE-CHINA).
The State University of New York, Buffalo Campus Sep 2015 – current
Master of Applied Science program in Chemical Engineering (Class of 2017)
East China University of Science and Technology (2001-2005)
Bachelor of Science in Chemical Engineering (High Honors)
Minor – English Language
PRAXAIR Inc. (China) (left company for advanced study in Chemical Engineering) Jan 2007-July 2015
Merit Awards- Commended for successful efforts in (sales) bid proposals and exceptional performance – financial reward.
Process and Equipment Engineer
 Draft initial EDM (Engineering Design Memo) defining plant process parameters and equipment specifications for centrifugal
and reciprocating compressors, cryogenic pumps, heat exchangers, pressure tanks, vaporizers, chillers, cooling towers, and
others. Validate process parameters with collected field data upon plant commissioning and completion.
 Validate Process and Instrumentation Diagram (P&ID) per equipment procurement plan with Capital Project team.
 Design and verify process conditions using modeling software HTFS and HYSYS - A set of inter-dependent programs for the
simulation and design of air plants, cryogenic air separation systems and other processes.
 Lead cross functional team in thorough hazard identification sessions (HAZOP) with follow through process safety review
(PSR) meetings to implement plant-wide safety recommendations.
 Commission equipment at plant start-up. Evaluate equipment efficiency with follow through action plan for improvements.
 Prepare BID proposals with sales team.
 LCS (Low Cost Sourcing). Explore and qualify new suppliers who are more competitive on equipment cost.
Sample projects highlights -
1. 2007 – 2009 Jinlong 700 ton/day low purity (PL7LP) oxygen plant – Process Engineer
Challenge - to provide low purity Oxygen for the copper furnace with strict mandate to limit flow fluctuation to +/- 200Nm3/hr.
Conceived several proposals for customer’s review. Final adopted solution was to manage flow fluctuation by adding a buffer
volume. Process parameters were fine-tuned using HYSYS dynamic simulation. Recognized for exceptional junior engineer’s
contribution with financial reward.
2. 2009 – 2010 Huizhou Air Separation Plant Expansion – Process Engineer
Challenge - to increase the capacity of an existing Air Separation plant by 10% with severe cost constraint.
Engineered two solution choices – (a) adding a compressor to increase cold box feed air flow, or (b) adding a buffer tank
downstream of Pre-Purifier (PP) to compensate for air shortage caused by the PP repressed operation. Solution (b) was
selected for better cost metrics. Performed thorough analysis using HYSYS’ simulation to devise the control logic, determine
the buffer tank volume and ascertain the allowable pressure fluctuation range. Plant was up and running with targeted capacity
increase within time and budget limits.
3. 2012 – 2014 Jinlong 700 ton/day (PL7LP) plant expansion – Sr. Equipment Engineer
Challenge – to optimally equip Jinlong Copper plant for a 50% capacity expansion.
Team leader for junior engineers. FULL responsibility for all major mechanical equipment. Supervised the translation of
process parameters into equipment specification defining scope and running conditions for the main air compressor, cooling
water systems, heat exchangers, etc. Led supplier technical bid evaluation with the Purchasing function to ensure accuracy
of the Procurement Plan. Updated the Process & Instrumentation Diagram, Plant specific Safety Protocols and followed
through with the construction team to assure proper and timely implementation. Commissioned major equipment at start-up.
Led debrief sessions and documented lessons learned. Project completed fully satisfying time and budget constraints.

More Related Content

What's hot

Sam najmi resume 04-20-2016
Sam najmi resume 04-20-2016Sam najmi resume 04-20-2016
Sam najmi resume 04-20-2016Sam Najmi
 
Episode 30 : Project Execution ( Part 1 )
Episode 30 :  Project Execution ( Part 1 ) Episode 30 :  Project Execution ( Part 1 )
Episode 30 : Project Execution ( Part 1 ) SAJJAD KHUDHUR ABBAS
 
Process design for chemical engineers
Process design for chemical engineersProcess design for chemical engineers
Process design for chemical engineersAmanda Ribeiro
 
Chem Cad And ConcepSys Integration - AiChE Spring 09
Chem Cad And ConcepSys Integration - AiChE Spring 09Chem Cad And ConcepSys Integration - AiChE Spring 09
Chem Cad And ConcepSys Integration - AiChE Spring 09siddiqaa
 
Mahesh kumar with 9.6+ yrs exp process engineer
Mahesh kumar with 9.6+ yrs exp process engineerMahesh kumar with 9.6+ yrs exp process engineer
Mahesh kumar with 9.6+ yrs exp process engineerNavneet Kumar Bhardwaj
 
1 2 chem plantdesign-intro to plant design economics
1 2 chem plantdesign-intro to plant design  economics1 2 chem plantdesign-intro to plant design  economics
1 2 chem plantdesign-intro to plant design economicsayimsevenfold
 
Case studies: Predictive maintenance in the petrochemical industry
Case studies: Predictive maintenance in the petrochemical industryCase studies: Predictive maintenance in the petrochemical industry
Case studies: Predictive maintenance in the petrochemical industryAdvisian
 
Garett Williams' Resume 5
Garett Williams' Resume 5Garett Williams' Resume 5
Garett Williams' Resume 5Garett Williams
 
Episode 33 : Project Execution Part (4)
Episode 33 :  Project Execution Part (4)Episode 33 :  Project Execution Part (4)
Episode 33 : Project Execution Part (4)SAJJAD KHUDHUR ABBAS
 
Episode 47 : CONCEPTUAL DESIGN OF CHEMICAL PROCESSES
Episode 47 :  CONCEPTUAL DESIGN OF CHEMICAL PROCESSESEpisode 47 :  CONCEPTUAL DESIGN OF CHEMICAL PROCESSES
Episode 47 : CONCEPTUAL DESIGN OF CHEMICAL PROCESSESSAJJAD KHUDHUR ABBAS
 
Introduction to plant design economics
Introduction to plant design economicsIntroduction to plant design economics
Introduction to plant design economicsSunita Jobli
 
Decommissioning your offshore assets
Decommissioning your offshore assetsDecommissioning your offshore assets
Decommissioning your offshore assetsAdvisian
 
Compare cryogenic process
Compare cryogenic processCompare cryogenic process
Compare cryogenic processsimachem
 
Experienced MS ChE-Resume of Kaustubh Laturkar
Experienced MS ChE-Resume of Kaustubh LaturkarExperienced MS ChE-Resume of Kaustubh Laturkar
Experienced MS ChE-Resume of Kaustubh LaturkarKaustubh Laturkar
 
Egyps 2017 technical conference power point template
Egyps 2017 technical conference power point template Egyps 2017 technical conference power point template
Egyps 2017 technical conference power point template Dr. Mohamed A. El-Reedy
 
Kapileshwari and Robison- Gulf Coast Green 2010
Kapileshwari and Robison- Gulf Coast Green 2010Kapileshwari and Robison- Gulf Coast Green 2010
Kapileshwari and Robison- Gulf Coast Green 2010Hayley Pallister
 
JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02Jamal Jamil
 
Advisian dynamic process simulation capability june 2019
Advisian dynamic process simulation capability june 2019Advisian dynamic process simulation capability june 2019
Advisian dynamic process simulation capability june 2019Advisian
 

What's hot (19)

Sam najmi resume 04-20-2016
Sam najmi resume 04-20-2016Sam najmi resume 04-20-2016
Sam najmi resume 04-20-2016
 
Episode 30 : Project Execution ( Part 1 )
Episode 30 :  Project Execution ( Part 1 ) Episode 30 :  Project Execution ( Part 1 )
Episode 30 : Project Execution ( Part 1 )
 
Process design for chemical engineers
Process design for chemical engineersProcess design for chemical engineers
Process design for chemical engineers
 
Chem Cad And ConcepSys Integration - AiChE Spring 09
Chem Cad And ConcepSys Integration - AiChE Spring 09Chem Cad And ConcepSys Integration - AiChE Spring 09
Chem Cad And ConcepSys Integration - AiChE Spring 09
 
Mutlaq AL-Busaidi
Mutlaq AL-BusaidiMutlaq AL-Busaidi
Mutlaq AL-Busaidi
 
Mahesh kumar with 9.6+ yrs exp process engineer
Mahesh kumar with 9.6+ yrs exp process engineerMahesh kumar with 9.6+ yrs exp process engineer
Mahesh kumar with 9.6+ yrs exp process engineer
 
1 2 chem plantdesign-intro to plant design economics
1 2 chem plantdesign-intro to plant design  economics1 2 chem plantdesign-intro to plant design  economics
1 2 chem plantdesign-intro to plant design economics
 
Case studies: Predictive maintenance in the petrochemical industry
Case studies: Predictive maintenance in the petrochemical industryCase studies: Predictive maintenance in the petrochemical industry
Case studies: Predictive maintenance in the petrochemical industry
 
Garett Williams' Resume 5
Garett Williams' Resume 5Garett Williams' Resume 5
Garett Williams' Resume 5
 
Episode 33 : Project Execution Part (4)
Episode 33 :  Project Execution Part (4)Episode 33 :  Project Execution Part (4)
Episode 33 : Project Execution Part (4)
 
Episode 47 : CONCEPTUAL DESIGN OF CHEMICAL PROCESSES
Episode 47 :  CONCEPTUAL DESIGN OF CHEMICAL PROCESSESEpisode 47 :  CONCEPTUAL DESIGN OF CHEMICAL PROCESSES
Episode 47 : CONCEPTUAL DESIGN OF CHEMICAL PROCESSES
 
Introduction to plant design economics
Introduction to plant design economicsIntroduction to plant design economics
Introduction to plant design economics
 
Decommissioning your offshore assets
Decommissioning your offshore assetsDecommissioning your offshore assets
Decommissioning your offshore assets
 
Compare cryogenic process
Compare cryogenic processCompare cryogenic process
Compare cryogenic process
 
Experienced MS ChE-Resume of Kaustubh Laturkar
Experienced MS ChE-Resume of Kaustubh LaturkarExperienced MS ChE-Resume of Kaustubh Laturkar
Experienced MS ChE-Resume of Kaustubh Laturkar
 
Egyps 2017 technical conference power point template
Egyps 2017 technical conference power point template Egyps 2017 technical conference power point template
Egyps 2017 technical conference power point template
 
Kapileshwari and Robison- Gulf Coast Green 2010
Kapileshwari and Robison- Gulf Coast Green 2010Kapileshwari and Robison- Gulf Coast Green 2010
Kapileshwari and Robison- Gulf Coast Green 2010
 
JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02
 
Advisian dynamic process simulation capability june 2019
Advisian dynamic process simulation capability june 2019Advisian dynamic process simulation capability june 2019
Advisian dynamic process simulation capability june 2019
 

Viewers also liked

CAL NEFF RESUME 2015
CAL NEFF RESUME 2015CAL NEFF RESUME 2015
CAL NEFF RESUME 2015Cal Neff
 
Doug Levy Resume [Final]
Doug Levy Resume [Final]Doug Levy Resume [Final]
Doug Levy Resume [Final]Doug Levy
 
Resume- Nishant Verma (JEE Consultant with 10+ years ) (1)
Resume- Nishant Verma (JEE Consultant with 10+ years ) (1)Resume- Nishant Verma (JEE Consultant with 10+ years ) (1)
Resume- Nishant Verma (JEE Consultant with 10+ years ) (1)Nishant Verma
 
Dallas Erwin CV- 2015
Dallas Erwin CV- 2015Dallas Erwin CV- 2015
Dallas Erwin CV- 2015Dallas Erwin
 
Faith Hill Kutter resume 2015
Faith Hill Kutter resume 2015Faith Hill Kutter resume 2015
Faith Hill Kutter resume 2015Faith Hill Kutter
 
Resume G Bisanz Detailed Feb22012
Resume G Bisanz Detailed Feb22012Resume G Bisanz Detailed Feb22012
Resume G Bisanz Detailed Feb22012Gregory Bisanz
 
Resume - Suncor
Resume - SuncorResume - Suncor
Resume - SuncorSyed Rizvi
 
Resume of Paul L Marzo - v2
Resume of Paul L Marzo - v2Resume of Paul L Marzo - v2
Resume of Paul L Marzo - v2Paul Marzo
 
Andrew Battisti Senior Project Manager Resume May 2015
Andrew Battisti Senior Project Manager Resume May 2015Andrew Battisti Senior Project Manager Resume May 2015
Andrew Battisti Senior Project Manager Resume May 2015Andrew Battisti
 

Viewers also liked (14)

CAL NEFF RESUME 2015
CAL NEFF RESUME 2015CAL NEFF RESUME 2015
CAL NEFF RESUME 2015
 
Zafar security cv
Zafar security cvZafar security cv
Zafar security cv
 
Doug Levy Resume [Final]
Doug Levy Resume [Final]Doug Levy Resume [Final]
Doug Levy Resume [Final]
 
5-15 Resume
5-15 Resume5-15 Resume
5-15 Resume
 
K Birkman Resume
K Birkman ResumeK Birkman Resume
K Birkman Resume
 
Resume- Nishant Verma (JEE Consultant with 10+ years ) (1)
Resume- Nishant Verma (JEE Consultant with 10+ years ) (1)Resume- Nishant Verma (JEE Consultant with 10+ years ) (1)
Resume- Nishant Verma (JEE Consultant with 10+ years ) (1)
 
Dallas Erwin CV- 2015
Dallas Erwin CV- 2015Dallas Erwin CV- 2015
Dallas Erwin CV- 2015
 
CV
CVCV
CV
 
Faith Hill Kutter resume 2015
Faith Hill Kutter resume 2015Faith Hill Kutter resume 2015
Faith Hill Kutter resume 2015
 
Resume G Bisanz Detailed Feb22012
Resume G Bisanz Detailed Feb22012Resume G Bisanz Detailed Feb22012
Resume G Bisanz Detailed Feb22012
 
Resume-Olivia Pagalilauan
Resume-Olivia PagalilauanResume-Olivia Pagalilauan
Resume-Olivia Pagalilauan
 
Resume - Suncor
Resume - SuncorResume - Suncor
Resume - Suncor
 
Resume of Paul L Marzo - v2
Resume of Paul L Marzo - v2Resume of Paul L Marzo - v2
Resume of Paul L Marzo - v2
 
Andrew Battisti Senior Project Manager Resume May 2015
Andrew Battisti Senior Project Manager Resume May 2015Andrew Battisti Senior Project Manager Resume May 2015
Andrew Battisti Senior Project Manager Resume May 2015
 

Similar to Helen Yan - Resume 2016

Similar to Helen Yan - Resume 2016 (20)

Senior Mechanical Engineer CV
Senior Mechanical Engineer CVSenior Mechanical Engineer CV
Senior Mechanical Engineer CV
 
Richard clark cv
Richard clark cvRichard clark cv
Richard clark cv
 
Ukeje cv updated
Ukeje cv updatedUkeje cv updated
Ukeje cv updated
 
CV - SUNIL VISHWAKARMA
CV - SUNIL VISHWAKARMACV - SUNIL VISHWAKARMA
CV - SUNIL VISHWAKARMA
 
Senior Process Engineer, Sep
Senior Process  Engineer, SepSenior Process  Engineer, Sep
Senior Process Engineer, Sep
 
Mohsin Hashmi_Resume
Mohsin Hashmi_ResumeMohsin Hashmi_Resume
Mohsin Hashmi_Resume
 
Mark_Peterson_Jr_resume
Mark_Peterson_Jr_resumeMark_Peterson_Jr_resume
Mark_Peterson_Jr_resume
 
Akshay Updated CV
Akshay Updated CVAkshay Updated CV
Akshay Updated CV
 
P L Qual Pckg 1 15 2009
P L Qual Pckg 1 15 2009P L Qual Pckg 1 15 2009
P L Qual Pckg 1 15 2009
 
kushal kumar srivastava
kushal kumar srivastavakushal kumar srivastava
kushal kumar srivastava
 
Episode 27 : Project Management Costs
Episode 27 : Project Management Costs Episode 27 : Project Management Costs
Episode 27 : Project Management Costs
 
RyanMoyer_FinalResume
RyanMoyer_FinalResumeRyanMoyer_FinalResume
RyanMoyer_FinalResume
 
Episode 27 : Project Management Costs
Episode 27 : Project Management Costs Episode 27 : Project Management Costs
Episode 27 : Project Management Costs
 
RyanMoyer_FinalResume
RyanMoyer_FinalResumeRyanMoyer_FinalResume
RyanMoyer_FinalResume
 
Engineering & Project Management
Engineering & Project ManagementEngineering & Project Management
Engineering & Project Management
 
Ss 04 cost engineering management training- nov 2017 - moustafa part ii- ch 9
Ss 04 cost engineering management  training- nov 2017 - moustafa part ii- ch 9Ss 04 cost engineering management  training- nov 2017 - moustafa part ii- ch 9
Ss 04 cost engineering management training- nov 2017 - moustafa part ii- ch 9
 
Ashutosh CV
Ashutosh CVAshutosh CV
Ashutosh CV
 
resume Larry Arnold August 2016
resume Larry Arnold August 2016resume Larry Arnold August 2016
resume Larry Arnold August 2016
 
Vg (2)
Vg (2)Vg (2)
Vg (2)
 
Hardik Shah Resume
Hardik Shah ResumeHardik Shah Resume
Hardik Shah Resume
 

Helen Yan - Resume 2016

  • 1. Helen Yan 716-533-2097 Amherst, NY 14226 helenyan2016@gmail.com Seeking job opportunity using my Chemical Engineering training and work experience. (8) years of progressive work experience in the Air Separation Plants with Praxair (China) in process and equipment engineering functions. Defined process parameters, specified and commissioned plant equipment, and effective follow through monitoring to successful project conclusion. Key Skills: CHEMICAL ENGINEERING - AIR SEPARATION INDUSTRY – TEAM LEADER – SPECIFICATION OF PROCESS PARAMETERS – CAPITAL EQUIPMENT SOURCING AND COMMISSIONING – MS OFFICE - BILINGUAL (CHINESE). CERTIFICATION: PROJECT MANAGEMENT PROFESSIONAL (PMP), PROFESSIONAL ENGINEER (INTERMEDIATE-CHINA). The State University of New York, Buffalo Campus Sep 2015 – current Master of Applied Science program in Chemical Engineering (Class of 2017) East China University of Science and Technology (2001-2005) Bachelor of Science in Chemical Engineering (High Honors) Minor – English Language PRAXAIR Inc. (China) (left company for advanced study in Chemical Engineering) Jan 2007-July 2015 Merit Awards- Commended for successful efforts in (sales) bid proposals and exceptional performance – financial reward. Process and Equipment Engineer  Draft initial EDM (Engineering Design Memo) defining plant process parameters and equipment specifications for centrifugal and reciprocating compressors, cryogenic pumps, heat exchangers, pressure tanks, vaporizers, chillers, cooling towers, and others. Validate process parameters with collected field data upon plant commissioning and completion.  Validate Process and Instrumentation Diagram (P&ID) per equipment procurement plan with Capital Project team.  Design and verify process conditions using modeling software HTFS and HYSYS - A set of inter-dependent programs for the simulation and design of air plants, cryogenic air separation systems and other processes.  Lead cross functional team in thorough hazard identification sessions (HAZOP) with follow through process safety review (PSR) meetings to implement plant-wide safety recommendations.  Commission equipment at plant start-up. Evaluate equipment efficiency with follow through action plan for improvements.  Prepare BID proposals with sales team.  LCS (Low Cost Sourcing). Explore and qualify new suppliers who are more competitive on equipment cost. Sample projects highlights - 1. 2007 – 2009 Jinlong 700 ton/day low purity (PL7LP) oxygen plant – Process Engineer Challenge - to provide low purity Oxygen for the copper furnace with strict mandate to limit flow fluctuation to +/- 200Nm3/hr. Conceived several proposals for customer’s review. Final adopted solution was to manage flow fluctuation by adding a buffer volume. Process parameters were fine-tuned using HYSYS dynamic simulation. Recognized for exceptional junior engineer’s contribution with financial reward. 2. 2009 – 2010 Huizhou Air Separation Plant Expansion – Process Engineer Challenge - to increase the capacity of an existing Air Separation plant by 10% with severe cost constraint. Engineered two solution choices – (a) adding a compressor to increase cold box feed air flow, or (b) adding a buffer tank downstream of Pre-Purifier (PP) to compensate for air shortage caused by the PP repressed operation. Solution (b) was selected for better cost metrics. Performed thorough analysis using HYSYS’ simulation to devise the control logic, determine the buffer tank volume and ascertain the allowable pressure fluctuation range. Plant was up and running with targeted capacity increase within time and budget limits. 3. 2012 – 2014 Jinlong 700 ton/day (PL7LP) plant expansion – Sr. Equipment Engineer Challenge – to optimally equip Jinlong Copper plant for a 50% capacity expansion. Team leader for junior engineers. FULL responsibility for all major mechanical equipment. Supervised the translation of process parameters into equipment specification defining scope and running conditions for the main air compressor, cooling water systems, heat exchangers, etc. Led supplier technical bid evaluation with the Purchasing function to ensure accuracy of the Procurement Plan. Updated the Process & Instrumentation Diagram, Plant specific Safety Protocols and followed through with the construction team to assure proper and timely implementation. Commissioned major equipment at start-up. Led debrief sessions and documented lessons learned. Project completed fully satisfying time and budget constraints.