TYPICAL DROPDOWN OFF-GRID SITE
(Kalahari Projects)
These sites could expand to several solar structure modules and several containers.
Dimensioning very much depends on:
* The load requirement
* The battery autonomy required
* Whether grid, wind turbines or generators are available
* Sufficient space is available
* Customer budget
TYPICAL DROPDOWN OFF-GRID SITE
For single container sites, the container is normally partitioned in 3 parts:
1. Equipment room
2. Battery room
3. Generator room
20ft or 40ft shipping containers are cladded with polystyrene and Chromadeck or Stainless steel depending on customer
requirement.
Outer Wall thicknesses are normally 80mm.
Inner wall thicknesses are normally 50mm.
TYPICAL DROPDOWN OFF-GRID SITE OR OFFICE
For single container sites, the container is normally partitioned in 3 parts:
1. Equipment room
2. Battery room
3. Generator room
The drawings below shows the 40ft container version.
Sometimes additional containers with battery banks are added for larger sites / offices.
TYPICAL DROPDOWN OFF-GRID BTS OR TRANSMISSION SITE
Foundations for Towers and Monopoles can be
1. Above ground concrete blocks
2. Under ground Grillage foundations
3. Underground casted foundations
TYPICAL DROPDOWN OFF-GRID BTS OR TRANSMISSION SITE
For rural applications and small sites – small to large cabinets are sometimes required:
TYPICAL GENERATOR ONLY SITE
Co-located BTS site with 16kW average customer load.
3 x 4kW average per phase Generator optimised system with SMC batteries are combined an run of a 65KVA Generator to
allow for rapid charging.
Since these batteries are 10 000 cycle batteries, with a very high charge acceptance rate, they are partially charged 3 times
per day for approximately 2.5hrs per cycle.
During this time the site runs directly from the generator and the batteries are charged off-line at a rate of approximately 30%
of their full capacity.
Every 40th cycle, a full top of charge is done to reset the SOC calculators.
MOBILE APPLICATIONS
1. Transmission site trailer – towed by Land Cruiser or similar
2. Full capacity BTS site with Transmission and 35m mast – towed by a large truck.
MOBILE APPLICATIONS
2. Full capacity BTS site with Transmission and 35m mast – towed by a large truck.
SITE BUILT WITHOUT ANY USE OF CONCRETE
Site is built on a steel frame and levelled with jacks.
Rocks are used as ballast and to fill up inside the fenced area.
SITE

More Related Content

What's hot

Chhatisgarh State Electricity
Chhatisgarh State Electricity Chhatisgarh State Electricity
Chhatisgarh State Electricity Rehan Fazal
 
Coal Handling Plant
Coal Handling PlantCoal Handling Plant
Coal Handling PlantAshrant Dass
 
Accidente Hidroelectrica En Rusia (17 08 09)
Accidente Hidroelectrica En Rusia (17 08 09)Accidente Hidroelectrica En Rusia (17 08 09)
Accidente Hidroelectrica En Rusia (17 08 09)Nelson Hernandez
 
Accident At Russias Biggest Hydroelectric Rev 00
Accident At Russias Biggest Hydroelectric   Rev 00Accident At Russias Biggest Hydroelectric   Rev 00
Accident At Russias Biggest Hydroelectric Rev 00shvax
 
Accident At Russias Biggest Hydroelectric Rev 00
Accident At Russias Biggest Hydroelectric   Rev 00Accident At Russias Biggest Hydroelectric   Rev 00
Accident At Russias Biggest Hydroelectric Rev 00guestdff6c6ec
 
Accident at Russia's Biggest Hydroelectric Plant
Accident at Russia's Biggest Hydroelectric PlantAccident at Russia's Biggest Hydroelectric Plant
Accident at Russia's Biggest Hydroelectric Planthalffast
 
Accident At Russias Biggest Hydroelectric Rev 00
Accident At Russias Biggest Hydroelectric   Rev 00Accident At Russias Biggest Hydroelectric   Rev 00
Accident At Russias Biggest Hydroelectric Rev 00jaken98
 
Accident At Russias Biggest Hydroelectric Rev 00
Accident At Russias Biggest Hydroelectric   Rev 00Accident At Russias Biggest Hydroelectric   Rev 00
Accident At Russias Biggest Hydroelectric Rev 00vidiratla
 
Accident At Russias Biggest Hydroelectric Plant
Accident At Russias Biggest Hydroelectric PlantAccident At Russias Biggest Hydroelectric Plant
Accident At Russias Biggest Hydroelectric PlantWinson Ng
 
Accident At Russias Biggest Hydroelectric Rev 00
Accident At Russias Biggest Hydroelectric   Rev 00Accident At Russias Biggest Hydroelectric   Rev 00
Accident At Russias Biggest Hydroelectric Rev 00terrygff
 
Coal handling stages hiren patel
Coal handling stages   hiren patelCoal handling stages   hiren patel
Coal handling stages hiren patelHiren Patel
 
Electrical system in automobile shabaz
Electrical system in automobile  shabazElectrical system in automobile  shabaz
Electrical system in automobile shabazShahbaz Bhati
 
Wind power generation presentation by vikas gupta
Wind power generation presentation by vikas guptaWind power generation presentation by vikas gupta
Wind power generation presentation by vikas guptaVikas Gupta
 
6 weeks it on ntpc
6 weeks it on ntpc 6 weeks it on ntpc
6 weeks it on ntpc Uttam Kumar
 
study of alternator and switchgear,vizag steel plant ppt
study of alternator and switchgear,vizag steel plant pptstudy of alternator and switchgear,vizag steel plant ppt
study of alternator and switchgear,vizag steel plant pptsushi roy
 

What's hot (20)

generators
generatorsgenerators
generators
 
Chhatisgarh State Electricity
Chhatisgarh State Electricity Chhatisgarh State Electricity
Chhatisgarh State Electricity
 
Coal Handling Plant
Coal Handling PlantCoal Handling Plant
Coal Handling Plant
 
Chapter#32
Chapter#32Chapter#32
Chapter#32
 
Accidente Hidroelectrica En Rusia (17 08 09)
Accidente Hidroelectrica En Rusia (17 08 09)Accidente Hidroelectrica En Rusia (17 08 09)
Accidente Hidroelectrica En Rusia (17 08 09)
 
Accident At Russias Biggest Hydroelectric Rev 00
Accident At Russias Biggest Hydroelectric   Rev 00Accident At Russias Biggest Hydroelectric   Rev 00
Accident At Russias Biggest Hydroelectric Rev 00
 
Accident At Russias Biggest Hydroelectric Rev 00
Accident At Russias Biggest Hydroelectric   Rev 00Accident At Russias Biggest Hydroelectric   Rev 00
Accident At Russias Biggest Hydroelectric Rev 00
 
Accident at Russia's Biggest Hydroelectric Plant
Accident at Russia's Biggest Hydroelectric PlantAccident at Russia's Biggest Hydroelectric Plant
Accident at Russia's Biggest Hydroelectric Plant
 
Accident At Russias Biggest Hydroelectric Rev 00
Accident At Russias Biggest Hydroelectric   Rev 00Accident At Russias Biggest Hydroelectric   Rev 00
Accident At Russias Biggest Hydroelectric Rev 00
 
Accident At Russias Biggest Hydroelectric Rev 00
Accident At Russias Biggest Hydroelectric   Rev 00Accident At Russias Biggest Hydroelectric   Rev 00
Accident At Russias Biggest Hydroelectric Rev 00
 
Accident At Russias Biggest Hydroelectric Plant
Accident At Russias Biggest Hydroelectric PlantAccident At Russias Biggest Hydroelectric Plant
Accident At Russias Biggest Hydroelectric Plant
 
Accident At Russias Biggest Hydroelectric Rev 00
Accident At Russias Biggest Hydroelectric   Rev 00Accident At Russias Biggest Hydroelectric   Rev 00
Accident At Russias Biggest Hydroelectric Rev 00
 
Fuel cell
Fuel cellFuel cell
Fuel cell
 
2. Tewac Generator
2. Tewac Generator2. Tewac Generator
2. Tewac Generator
 
6. Balance Of Plant
6. Balance Of Plant6. Balance Of Plant
6. Balance Of Plant
 
Coal handling stages hiren patel
Coal handling stages   hiren patelCoal handling stages   hiren patel
Coal handling stages hiren patel
 
Electrical system in automobile shabaz
Electrical system in automobile  shabazElectrical system in automobile  shabaz
Electrical system in automobile shabaz
 
Wind power generation presentation by vikas gupta
Wind power generation presentation by vikas guptaWind power generation presentation by vikas gupta
Wind power generation presentation by vikas gupta
 
6 weeks it on ntpc
6 weeks it on ntpc 6 weeks it on ntpc
6 weeks it on ntpc
 
study of alternator and switchgear,vizag steel plant ppt
study of alternator and switchgear,vizag steel plant pptstudy of alternator and switchgear,vizag steel plant ppt
study of alternator and switchgear,vizag steel plant ppt
 

Viewers also liked

Big Water Visitor Center
Big Water Visitor CenterBig Water Visitor Center
Big Water Visitor CenterRay Rankin
 
Wiideman Consulting: Success Stories for Driving Local Value for Your Brand #...
Wiideman Consulting: Success Stories for Driving Local Value for Your Brand #...Wiideman Consulting: Success Stories for Driving Local Value for Your Brand #...
Wiideman Consulting: Success Stories for Driving Local Value for Your Brand #...Rio SEO
 
Infectología en banco de sangre 2003
Infectología en banco de sangre 2003Infectología en banco de sangre 2003
Infectología en banco de sangre 2003guestde6550
 
Generating Insight from Big Data in Energy and the Environment
Generating Insight from Big Data in Energy and the EnvironmentGenerating Insight from Big Data in Energy and the Environment
Generating Insight from Big Data in Energy and the EnvironmentDavid Wallom
 
LEÇON 46 – Dieu est l’Amour dans lequel je pardonne.
LEÇON 46 – Dieu est l’Amour dans lequel je pardonne.LEÇON 46 – Dieu est l’Amour dans lequel je pardonne.
LEÇON 46 – Dieu est l’Amour dans lequel je pardonne.Pierrot Caron
 

Viewers also liked (8)

Plantilla rafael f
Plantilla rafael fPlantilla rafael f
Plantilla rafael f
 
Big Water Visitor Center
Big Water Visitor CenterBig Water Visitor Center
Big Water Visitor Center
 
Tarjeta madre
Tarjeta madreTarjeta madre
Tarjeta madre
 
Wiideman Consulting: Success Stories for Driving Local Value for Your Brand #...
Wiideman Consulting: Success Stories for Driving Local Value for Your Brand #...Wiideman Consulting: Success Stories for Driving Local Value for Your Brand #...
Wiideman Consulting: Success Stories for Driving Local Value for Your Brand #...
 
Adiksi seksual
Adiksi seksualAdiksi seksual
Adiksi seksual
 
Infectología en banco de sangre 2003
Infectología en banco de sangre 2003Infectología en banco de sangre 2003
Infectología en banco de sangre 2003
 
Generating Insight from Big Data in Energy and the Environment
Generating Insight from Big Data in Energy and the EnvironmentGenerating Insight from Big Data in Energy and the Environment
Generating Insight from Big Data in Energy and the Environment
 
LEÇON 46 – Dieu est l’Amour dans lequel je pardonne.
LEÇON 46 – Dieu est l’Amour dans lequel je pardonne.LEÇON 46 – Dieu est l’Amour dans lequel je pardonne.
LEÇON 46 – Dieu est l’Amour dans lequel je pardonne.
 

Similar to Off-Grid Site Components

Electric drive
Electric driveElectric drive
Electric drivekudkelwar1
 
Electric drive
Electric driveElectric drive
Electric drivekudkelwar1
 
Avdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhesh kumar NIET
 
E044039044
E044039044E044039044
E044039044inventy
 
Study of generator and switchgear Vizag steel plant report
Study of generator and switchgear Vizag steel plant reportStudy of generator and switchgear Vizag steel plant report
Study of generator and switchgear Vizag steel plant reportsushi roy
 
Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Pratap Bhunia
 
Cable size available guidelines network design
Cable size available guidelines network designCable size available guidelines network design
Cable size available guidelines network designManikandan Mani
 
(Keshav) report file on kali sindh thermal power project, jhalawar
(Keshav) report file on kali sindh thermal power project, jhalawar(Keshav) report file on kali sindh thermal power project, jhalawar
(Keshav) report file on kali sindh thermal power project, jhalawarKeshav Meena
 
1550091 634842733511023750
1550091 6348427335110237501550091 634842733511023750
1550091 634842733511023750Mdtarique Anwar
 
kota thermal power plant
kota thermal power plantkota thermal power plant
kota thermal power plantravi kant
 
electric plan distribution design for large campus building
electric plan distribution design for large campus building electric plan distribution design for large campus building
electric plan distribution design for large campus building Somesh Siddharth
 
Accessories track electrifiction
Accessories  track electrifictionAccessories  track electrifiction
Accessories track electrifictionvishalgohel12195
 
18047730-Electric-Traction.pptx
18047730-Electric-Traction.pptx18047730-Electric-Traction.pptx
18047730-Electric-Traction.pptxAryan630616
 
Introduction
IntroductionIntroduction
Introductionmittal434
 
132 KV Grid Station Intern ship training report
132 KV Grid Station Intern ship training report132 KV Grid Station Intern ship training report
132 KV Grid Station Intern ship training reportMuntazir Mehdi
 
Ramendra summer training presentation
Ramendra summer training presentationRamendra summer training presentation
Ramendra summer training presentationRamendra Dhiman
 

Similar to Off-Grid Site Components (20)

Electric drive
Electric driveElectric drive
Electric drive
 
Electric drive
Electric driveElectric drive
Electric drive
 
HOTEL LOAD
HOTEL LOADHOTEL LOAD
HOTEL LOAD
 
Avdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kotaAvdhehs kumar presention kstps kota
Avdhehs kumar presention kstps kota
 
E044039044
E044039044E044039044
E044039044
 
Study of generator and switchgear Vizag steel plant report
Study of generator and switchgear Vizag steel plant reportStudy of generator and switchgear Vizag steel plant report
Study of generator and switchgear Vizag steel plant report
 
Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...Engineering Final Year Project Report on "Electrical Safety and Protection of...
Engineering Final Year Project Report on "Electrical Safety and Protection of...
 
Cable size available guidelines network design
Cable size available guidelines network designCable size available guidelines network design
Cable size available guidelines network design
 
(Keshav) report file on kali sindh thermal power project, jhalawar
(Keshav) report file on kali sindh thermal power project, jhalawar(Keshav) report file on kali sindh thermal power project, jhalawar
(Keshav) report file on kali sindh thermal power project, jhalawar
 
1550091 634842733511023750
1550091 6348427335110237501550091 634842733511023750
1550091 634842733511023750
 
kota thermal power plant
kota thermal power plantkota thermal power plant
kota thermal power plant
 
GenDesign
GenDesignGenDesign
GenDesign
 
Solar ppt
Solar pptSolar ppt
Solar ppt
 
electric plan distribution design for large campus building
electric plan distribution design for large campus building electric plan distribution design for large campus building
electric plan distribution design for large campus building
 
Accessories track electrifiction
Accessories  track electrifictionAccessories  track electrifiction
Accessories track electrifiction
 
18047730-Electric-Traction.pptx
18047730-Electric-Traction.pptx18047730-Electric-Traction.pptx
18047730-Electric-Traction.pptx
 
Hec1
Hec1Hec1
Hec1
 
Introduction
IntroductionIntroduction
Introduction
 
132 KV Grid Station Intern ship training report
132 KV Grid Station Intern ship training report132 KV Grid Station Intern ship training report
132 KV Grid Station Intern ship training report
 
Ramendra summer training presentation
Ramendra summer training presentationRamendra summer training presentation
Ramendra summer training presentation
 

Off-Grid Site Components

  • 1. TYPICAL DROPDOWN OFF-GRID SITE (Kalahari Projects) These sites could expand to several solar structure modules and several containers. Dimensioning very much depends on: * The load requirement * The battery autonomy required * Whether grid, wind turbines or generators are available * Sufficient space is available * Customer budget
  • 2. TYPICAL DROPDOWN OFF-GRID SITE For single container sites, the container is normally partitioned in 3 parts: 1. Equipment room 2. Battery room 3. Generator room 20ft or 40ft shipping containers are cladded with polystyrene and Chromadeck or Stainless steel depending on customer requirement. Outer Wall thicknesses are normally 80mm. Inner wall thicknesses are normally 50mm.
  • 3. TYPICAL DROPDOWN OFF-GRID SITE OR OFFICE For single container sites, the container is normally partitioned in 3 parts: 1. Equipment room 2. Battery room 3. Generator room The drawings below shows the 40ft container version. Sometimes additional containers with battery banks are added for larger sites / offices.
  • 4. TYPICAL DROPDOWN OFF-GRID BTS OR TRANSMISSION SITE Foundations for Towers and Monopoles can be 1. Above ground concrete blocks 2. Under ground Grillage foundations 3. Underground casted foundations
  • 5. TYPICAL DROPDOWN OFF-GRID BTS OR TRANSMISSION SITE For rural applications and small sites – small to large cabinets are sometimes required:
  • 6. TYPICAL GENERATOR ONLY SITE Co-located BTS site with 16kW average customer load. 3 x 4kW average per phase Generator optimised system with SMC batteries are combined an run of a 65KVA Generator to allow for rapid charging. Since these batteries are 10 000 cycle batteries, with a very high charge acceptance rate, they are partially charged 3 times per day for approximately 2.5hrs per cycle. During this time the site runs directly from the generator and the batteries are charged off-line at a rate of approximately 30% of their full capacity. Every 40th cycle, a full top of charge is done to reset the SOC calculators.
  • 7. MOBILE APPLICATIONS 1. Transmission site trailer – towed by Land Cruiser or similar 2. Full capacity BTS site with Transmission and 35m mast – towed by a large truck.
  • 8. MOBILE APPLICATIONS 2. Full capacity BTS site with Transmission and 35m mast – towed by a large truck.
  • 9. SITE BUILT WITHOUT ANY USE OF CONCRETE Site is built on a steel frame and levelled with jacks. Rocks are used as ballast and to fill up inside the fenced area. SITE