Our AIM...

In sharing our work in the ‘Prepare Phase’, we aim
to challenge each of us to foster and grow school
cultures that use the right drivers to realise the
hope that comes from creating the solutions needed




                                  Count on from one number to find the total of two collections
to ensure a better future for all.


 Mark Walker & Penny Vanderkruk
 Elsternwick Primary School
 2012
‘culture‘ is the driver for change
                                                               Fullan

Culture includes : values, norms, skills, behaviours and relationships



   “ Choosing the wrong drivers for whole system reform”,
   M Fullan Published by Centre for Strategic Education 2011
Our Inspiration...

Comes from nature; known by the Maori, (from New
Zealand) as a ‘KORU’ plant.




                        Count on from one number to find the total of two collections
Why
PREPARE?
Key accelerators driving cultural change
• Capacity building to make learning more exciting,
more engaging, and more linked to the assessment
feedback loops around the achievement of higher order
thinking skills. (building data literacy is necessary but
not sufficient)
• Building collaborative groups with high ‘social capital’
(strong peer to peer relationships), teacher ownership
focused on continuous instructional improvement,
(where moral imperative is realised)
• It’s systemic (all of these elements are
interconnected) where trust is built over
        time               M Fullan
Objectivesaim
       Our
Organize for Collaborative Work:In sharing our work in
•To share the process we undertook to Build for we
                                the Prepare Phase,
Collaborative Work, particularlyaim towe make our staff
                                 how challenge all of
norms ‘stick’                   us to build cultures that
                                use the right drivers to
Build Data Literacy:
  Count on from one number to find the total of two collections




                                realise the hope that
• What influences the development of data literacy in
                                comes from creating the
educators? What the research says.
                                solutions needed to
• To share our journey; what worked and what
                                ensure a better future
didn’t and why.
                                for all. BELIEF
• Our future plans to develop a culture of data
literate teachers (and students)?
A way to visualise our work... a ‘swoosh’ within the ‘swoosh’




                                Count on from one number to find the total of two collections
Count on from one number to find the total of two collections
                                                                How we Organized for Collaborative Work...
Count on from one number to find the total of two collections
                                                                Building Norms...
‘Hot Dot’ Protocol to identify priorities for the
           content of our Norms...
Count on from one number to find the total of two collections
                                                                Our first attempt...
Staff Meeting Norms
We arrive on time & sign attendance roll
(Meetings start when everyone is present)
We are active participants
(We do required pre work and feedback : facilitators organise check ins e.g. cold calls)
Turn off mobile Phones
(We wait till phones are silent)
We actively listen to speakers
(We wait till side conversations are finished or Penny tells us to shush)
We become courageous inquirers: asking questions, reflecting upon
our practice and take action.
(We assume positive intentionality and Mark to speak with teachers who
appear disengaged between meetings)
Parking lot items answered
(at meeting or email within 48 hrs)




                                          What do you notice?
Count on from one number to find the total of two collections
                                                                Our second attempt...
EPS Meeting Norms
Our meetings are effective therefore we arrive on time and sign
attendance rolls.

We are active participants therefore we will complete all
required readings and tasks before meetings.

We want to engage in our work free from distractions therefore we
turn off our mobiles, listen to speakers and stop side conversations.

We are courageous inquirers therefore we assume positive
intentionality, ask questions, reflect upon our practice and take
action.

We value feedback therefore we will actively collect it and respond in
a timely manner.


                               What do you notice?
Students building norms...
Count on from one number to find the total of two collections
                                                                        Another aspect of
                                                                Building for Collaborative Work...
Timed Staff Meeting Agenda
4.10 – 4.13 pm   Norms: MW (seeking feedback on 2)
4.13 – 4.16 pm   Staff Room Renovation MW
4.16 – 4.30 pm   Workforce Planning Discussion: MW
4.30 – 4.40 pm   2011 end of cycle review: MW
4.40 – 4.50 pm   2012 review process & timeline: MW
4.50 – 5.03 pm   2012 Cash Budget review MW
5.03 – 5.13 pm   Data Wise Process. PV (term 2)
5.13 – 5.16 pm   Feedback on staff norms (teacher??)
5.16 – 5.20 pm   Feedback (plus / delta) all
The Plus/Delta Protocol



                        Count on from one number to find the total of two collections
We seek feedback at the end of each meeting...
Plus                                              Delta
 “lunch appreciated” √√√√√√√√√√√√√√√√√√√√√√        .more team planning time appreciated and
Data made it easy to plan and even get to know     clearer agendas √√√
your kids √√√√                                     Balance long lunch with getting more done in
Liked how Penny, Demos and Rosie came to talk      class and swapping tables at lunch to get to know
about our team √                                   others √√
Time in teams √√√√√√√√√√√√√√√√ (sharing            Decide timetable changes prior year
norms) √                                           More time in classrooms √
Getting to know roles of teams (and individuals)   Like sample book pack √
√and getting points clarified                      Overview of excursions and inquiry
On time and succinct √                             Graduate would have liked some direct
Leaders catching up for consistency                instruction help
Talking about someone else (introductions)         More planning time √√√√√√√ (not so much
√√√√√√√√√√√√√√√                                    admin)
Time to set up√√√√                                 More input on roles
Norms √√                                           More on norms √
                                                   More time discussing behaviour management
                                                   plans and consequences
Unpacking norms √√√ √ (photo board good idea)      Snack – brain food √√√
Sticking to time /good pace / organised ?agenda    Question time √√
√√√√√√√√√√                                         Norms in 1 session
Handouts clear /Inquiry folders √√√√√√ /           Copy of agenda before hand
calendar √√
Games /interactive way to reinforce roles and
manuals great / engaging
√√√√√√√√√√√√√√√√√√√√√√√√√
Modelling restorative script good √√
Plus                                                         Delta
Meetings                                                                   Meetings
    Nice to finish early √ √                                                  Meeting time does not match with school bell
    Good to get feedback on norms so that they feel more relevant. If         hence some late comers (need to check all
    we don’t refer to agreed norms then they were done to “tick a box’.       clocks the same) √
    Loved the way you kept to time √ √ √ √ √ √ – AND allowed wait time        “Chalk and talk” but understood that its
    √ √and time for questions after you provided the information √ √ √        needed
    √√ √ √ √                                                                  Referred to keeping on time to often
    I think the staff were well behaved – stuck to the norms                  No brainfood √ √ √
    There were lots of ideas to take in however could follow easily           Agenda and items needed for meetings well
    (clear) (good to load all the admin stuff into one meeting to get it      before (24 hrs)
    out of way) √ √                                                         Meeting Focus
    Good pace, detailed agenda and not too crammed/stuck to agenda            Looking forward to the 1 on 1 data meeting
    / management √√ √ √                                                       Management – feels like many items need to
    Presenters were explicit / clear intentions of meeting connected          be achieved all of a sudden (PDP’s) – more
    ideas √ √ √ √ √                                                           warning on PDP’s
Meeting Focus
    Nice to hear (eager) that we will have a data meeting with Penny-
    this sounds like it will be useful (re formative assessment) (data
    analysing a bit overwhelming)– was clear (Penny’s reflection
    insightful and interesting)√ √ √ √ √ √ √ √ √
    Nice to connect data wise to school work – see how it fits in (think I
    understand DATAWISE protocol fits across everything (explicitness,
    timing, intentions, outcomes) √ √ √
    Good to clarify and be informative, transparent √ √and efficient on
    important management items (workforce plan – teacher positions
    and teacher review process) (giving temp staff “heads up” on jobs) √
    √√√
Other
    I stayed awake – I must be rested
    Well Done – great meetings
Meeting 2                Compare        Meeting 8
Data made it easy to plan           Good to get feedback on norms so
and even get to know your           that they feel more relevant. If we
kids √√√√                           don’t refer to agreed norms then
                                    they were done to “tick a box’.
Time in teams
√√√√√√√√√√√√√√√√                    Loved the way you kept to time √ √
                                    √ √ √ √ – AND allowed wait time √
(sharing norms) √                   √and time for questions after you
Getting to know roles of            provided the information √ √ √ √√ √
teams (and individuals)             √√
√and getting points clarified       I think the staff were well behaved
On time and succinct                – stuck to the norms
√Unpacking norms √√√ √              Nice to hear (eager) that we will
(photo board good idea)             have a data meeting with Penny-
                                    this sounds like it will be useful (re
Sticking to time /good pace         formative assessment) (data
/ organised ?agenda                 analysing a bit overwhelming)– was
√√√√√√√√√√                          clear (Penny’s reflection insightful
Games /interactive way to           and interesting)√ √ √ √ √ √ √ √ √
reinforce roles and manuals         Nice to connect data wise to school
great / engaging                    work – see how it fits in (think I
√√√√√√√√√√√√√√√√√√√√√√              understand DATAWISE protocol fits
√√√                                 across everything (explicitness,
                                    timing, intentions, outcomes) √ √ √
Feedback on team leaders norm reflecting upon practices
            (phrases heard during the meeting )

 “I probably mucked up there!”
 “We need to add this to or document for next time so
 there is no confusion”
 “What does or doesn’t work well is…….”
 “We didn’t do this last time so …………..”
 “We could use this as a broad overview”
 “We could use the so what/now what protocol”
 “We sound so incredibly organised”
Count on from one number to find the total of two collections
                                                                The next phase of work...
Agenda & Minutes
•Clear before meeting - put out 24 hrs before (goals for meeting / team has educational question to inquire
about) with high priority items first (pre reading handed out before) and reminders about expected items to
bring
•Chance for all to add ideas
•Timed agenda / stick to time / start on time / feedback / uninterrupted time
•Sitting in circle or round tables so that everyone can be seen
•Minutes (write properly distributed promptly with action items listed that are followed up at the next
meeting – possible role rotations: timer, minute taker) and end with a focus for next meeting
•Time for celebrations and acknowledgments in team

Norms & Team Vision
•Follow norms
       Listen to all – deep and active listening / respect others / turn taking / all have voice/ share the load /
      punctual /no blame no shame / collegial / able to challenge respectfully/ safe
       Provide feedback to members as required
•Develop a collective responsibility – all active members – delegate roles and tasks – willingness to share

Content
•Discuss curriculum planning (pedagogy) and student well being as well as small % of admin
•Curriculum
       Have key focus areas (rotate focus areas perhaps on a fortnightly basis: e.g. not always starting with
     reading or reading each week and discuss learning intentions and success criteria (highest priority) for
     the following period (week/fortnight)
       Share data, artefacts (e.g. annotated samples) and resources
       Time for modelling or discussing teaching strategies
•Walk away feeling prepared
Suggested format for year level team meetings
Time      Agenda Items
3-5 min   Review norms / feedback from last meeting/ agenda/ objectives and
          celebrations
35 min    Curriculum Area 1 (rotate reading and writing workshops)
          bring artefacts or data to review, analysis and inform planning (content) and
          instruction
35 min    Curriculum Area 2 (rotate mathematics & Inquiry Learning)
          bring artefacts or data to review, analysis and inform planning (content) and
          instruction
15 min    Student well being and/or admin on excursions, camps / reporting

3-5 min   Meeting feedback/ agreed actions (in between meetings and formative
          assessment artefacts and agenda focus for next meeting)
AgitateCultural         History of change towards
      Change             Building Data Literacy...
           2007              Structural
  Individual to Team         Response
                              (timetable)
Cohort Assessment data           2010
     Cultural                      Solutions focused Cultural
    Response                               Response
           2011                                2011-2012
                                      Relational Learning + Data Wise
                                    Inquiries + intersecting leadership
                                                  journeys

    Structural                                          Cultural
    Response                                           Challenges
     STREAMING                                          Lack of trust
           2011                                    “teach/assess my child”
Count on from one number to find the total of two collections
                                                                Building Data Literacy...
A check-inaim our objectives for Step 2
      Our on
                                In sharing our work in
Build Data Literacy:
                                the Prepare Phase, we
• What influences the development of data literacy in
                                aim to challenge all of
educators? What the research says.
                                us to build cultures that
                                use the right drivers to
•To share our journey; what worked and what
  Count on from one number to find the total of two collections




                                realise the hope that
didn’t and why.
                                comes from creating the
                                solutions needed to
•Our future plans to develop a culture of data
                                ensure a better future
literate teachers (and students)?
                                for all. BELIEF
Influences on development of data literacy...
In my unpublished MASTERS research, I discovered
several factors which impeded the teacher
understanding, and use of formative data. These
included...




                            Count on from one number to find the total of two collections
Influences on development of data literacy...
•A teachers experience with assessment as a
learner; that is the extent to which they had or had not,
engaged in formative assessment within their
schooling.
•A teachers perception of the role of the student




                                     Count on from one number to find the total of two collections
and the role of the teacher in relation to assessment;
in so much as whose task is it to assess learning?


         These factors exert more
        influence than pre-service
           training and ongoing
        professional development
Influences on development of data literacy...
•Finally, is the need for teachers to view data as part
of a collective, (not just in relation to students in ‘my
class’); that is, the significance for teaching teams to
feel a sense of collective responsibility for the




                               Count on from one number to find the total of two collections
educational outcomes of all students.
Continuing the journey of Building Data
Literacy...

1. Presenting Cohort achievement data to
teaching teams...



                      Count on from one number to find the total of two collections
Year 6 COHORT NUMBER data: March 2011
6




5




4




3




2




1




0
Year 6 COHORT NUMBER data: March 2011
6




5




                                            Expected Achievement Level
4




3




2




1




0
Year 6 COHORT NUMBER data: March 2011
6




5




4




3




2
     This student (aged 12 & about to enter Middle School) is
     performing at the Expected Level of an 8 year old)
1




0
Year 6 COHORT NUMBER data: March 2011
6
    This student (aged 12 & about to enter Middle School) is
    performing at the Expected Level of a 15-16 year old)
5




4




3




2
          This student (aged 12 & about to enter Middle School) is
          performing at the Expected Level of an 8 year old)
1




0
Our aim
                                                           This data set was reminiscent of the work in
                                                                                   In sharing our cohort
                                                           range of achievement in the Prepareacrosswe
                                                                                   Number, Phase, the
                                                           school.                 aim to challenge all of
                                                                                         us to build cultures that
                                                                                         use the right drivers to
Count on from one number to find the total of two collections




                                                                                         realise the hope that
                                                                If you saw this data, what might you
                                                                                         comes from creating the
                                                                recommend to teachers?   solutions needed to
                                                                                         ensure a better future
                                                                                         for all. BELIEF
What was the response of teachers?




                  Count on from one number to find the total of two collections
  Cohort groupings...TRACKING!
Count on from one number to find the total of two collections
                                                                     instructional dilemma...
                                                                An organisational response to an
Anonymous anecdotal comments on the
                                                      Our aim
                                                       challenges encountered... in
                                                                     In sharing our work
•I feel like I’m not seeing my students enough to
                                 the Prepare Phase, we
know where they are.             aim to challenge all of
•I feel like I’m losing control of knowing cultures that
                                 us to build how my kids
are going.                       use the right drivers to
  Count on from one number to find the total of two collections




                                 realise the hope that
•How do I report to parents, when I haven’t taught
them?                            comes from creating the
•What if I don’t get any data from their needed to
                                 solutions instructional
teacher? How will I report to their parents? future
                                 ensure a better
•What if I don’t trust where thefor all. BELIEF
                                   other teacher
has put them? How would I know?
Revisiting the research...

Parr and Timperley’s, (2008) study of teachers
in literacy which determined that teacher
professional learning was required in two



                        Count on from one number to find the total of two collections
areas; the understanding and skills to gather
and interpret evidence and the content
knowledge to know the specific area that the
data refers to, and how to teach this to
address the need.
A change of direction...
 Exploring the individual endeavour involved in Building
 Data Literacy.

Reflecting on the success I’d experienced (within the




                             Count on from one number to find the total of two collections
case study methodology of my Masters), involved
                  Reconnecting with the
                   Instructional coach
working one-on-one (as an Instructional Coach) to
Build the Data Literacy within...individual.
                         of the
2. One-to-one data meetings




                              Count on from one number to find the total of two collections
The ‘I see, I wonder...’ protocol around their
data and planning artefacts was used to
commence discussion and enabled me to
determine the existing data skills of each
teacher.
2. One-to-one data meetings
                                                                             I don’t know what I
                                                                             don’t know...
                                                                             Modelling how to ‘read’
                                                                             data, look for trends to
                                                                             inform an instructional plan
                                                                             in relation to:




             Count on from one number to find the total of two collections
                                                                             1. CONTENT
                                                                             2. INSTRUCTIONAL STRATEGIES
                                                                             3. FORMATIVE ASSESSMENT
                                                                             OPPORTUNITIES
2. One-to-one data meetings
                                                                             Differentiated
                                                                             Professional
                                                                             Learning:
                                                                             Catering for the different
                                                                             professional learning




             Count on from one number to find the total of two collections
                                                                             requirements of each
                                                                             teacher, and
                                                                             differentiate accordingly;
                                                                             operating along the
                                                                             Mentor/Coaching
                                                                             continuum
0
                                  1
                                      2
                                          3
                                              4
                                                  5
                                                      6
                                                          7
   Use data to identify my
    next teaching target



     Use online resources



        Try new teaching
     strategies (eg: mixed-
         ability groups)


    Differentiate with one
       open-ended task


 Use a range of formative
assessment strategies (eg:
         photos)



Try a new lesson structure
                                                               learning has given me confidence to...
                                                              As a result of my Data meeting, my new
                                                                                                        Feedback from 1:1 Data meeting...




Improve student reflection
  and use it as formative
       assessment
Our next steps in Building Data
Literacy...
Moderating evidence for mid-year parent academic
progress reports...
  Teachers have committed to bring the assessment
  artefacts, (photos, student reflections, anecdotal




                               Count on from one number to find the total of two collections
  notes, checklists, pre and post assessments) of focal
  students, in order to moderate in a 1:1 session with
  both their sub-school leader and myself.
plant?
                                                                the ‘Koru’
                                                                Remember




Count on from one number to find the total of two collections
Harvard presentation final

Harvard presentation final

  • 1.
    Our AIM... In sharingour work in the ‘Prepare Phase’, we aim to challenge each of us to foster and grow school cultures that use the right drivers to realise the hope that comes from creating the solutions needed Count on from one number to find the total of two collections to ensure a better future for all. Mark Walker & Penny Vanderkruk Elsternwick Primary School 2012
  • 2.
    ‘culture‘ is thedriver for change Fullan Culture includes : values, norms, skills, behaviours and relationships “ Choosing the wrong drivers for whole system reform”, M Fullan Published by Centre for Strategic Education 2011
  • 3.
    Our Inspiration... Comes fromnature; known by the Maori, (from New Zealand) as a ‘KORU’ plant. Count on from one number to find the total of two collections
  • 5.
  • 6.
    Key accelerators drivingcultural change • Capacity building to make learning more exciting, more engaging, and more linked to the assessment feedback loops around the achievement of higher order thinking skills. (building data literacy is necessary but not sufficient) • Building collaborative groups with high ‘social capital’ (strong peer to peer relationships), teacher ownership focused on continuous instructional improvement, (where moral imperative is realised) • It’s systemic (all of these elements are interconnected) where trust is built over time M Fullan
  • 7.
    Objectivesaim Our Organize for Collaborative Work:In sharing our work in •To share the process we undertook to Build for we the Prepare Phase, Collaborative Work, particularlyaim towe make our staff how challenge all of norms ‘stick’ us to build cultures that use the right drivers to Build Data Literacy: Count on from one number to find the total of two collections realise the hope that • What influences the development of data literacy in comes from creating the educators? What the research says. solutions needed to • To share our journey; what worked and what ensure a better future didn’t and why. for all. BELIEF • Our future plans to develop a culture of data literate teachers (and students)?
  • 8.
    A way tovisualise our work... a ‘swoosh’ within the ‘swoosh’ Count on from one number to find the total of two collections
  • 9.
    Count on fromone number to find the total of two collections How we Organized for Collaborative Work...
  • 10.
    Count on fromone number to find the total of two collections Building Norms...
  • 11.
    ‘Hot Dot’ Protocolto identify priorities for the content of our Norms...
  • 12.
    Count on fromone number to find the total of two collections Our first attempt...
  • 13.
    Staff Meeting Norms Wearrive on time & sign attendance roll (Meetings start when everyone is present) We are active participants (We do required pre work and feedback : facilitators organise check ins e.g. cold calls) Turn off mobile Phones (We wait till phones are silent) We actively listen to speakers (We wait till side conversations are finished or Penny tells us to shush) We become courageous inquirers: asking questions, reflecting upon our practice and take action. (We assume positive intentionality and Mark to speak with teachers who appear disengaged between meetings) Parking lot items answered (at meeting or email within 48 hrs) What do you notice?
  • 14.
    Count on fromone number to find the total of two collections Our second attempt...
  • 15.
    EPS Meeting Norms Ourmeetings are effective therefore we arrive on time and sign attendance rolls. We are active participants therefore we will complete all required readings and tasks before meetings. We want to engage in our work free from distractions therefore we turn off our mobiles, listen to speakers and stop side conversations. We are courageous inquirers therefore we assume positive intentionality, ask questions, reflect upon our practice and take action. We value feedback therefore we will actively collect it and respond in a timely manner. What do you notice?
  • 16.
  • 17.
    Count on fromone number to find the total of two collections Another aspect of Building for Collaborative Work...
  • 18.
    Timed Staff MeetingAgenda 4.10 – 4.13 pm Norms: MW (seeking feedback on 2) 4.13 – 4.16 pm Staff Room Renovation MW 4.16 – 4.30 pm Workforce Planning Discussion: MW 4.30 – 4.40 pm 2011 end of cycle review: MW 4.40 – 4.50 pm 2012 review process & timeline: MW 4.50 – 5.03 pm 2012 Cash Budget review MW 5.03 – 5.13 pm Data Wise Process. PV (term 2) 5.13 – 5.16 pm Feedback on staff norms (teacher??) 5.16 – 5.20 pm Feedback (plus / delta) all
  • 19.
    The Plus/Delta Protocol Count on from one number to find the total of two collections We seek feedback at the end of each meeting...
  • 20.
    Plus Delta “lunch appreciated” √√√√√√√√√√√√√√√√√√√√√√ .more team planning time appreciated and Data made it easy to plan and even get to know clearer agendas √√√ your kids √√√√ Balance long lunch with getting more done in Liked how Penny, Demos and Rosie came to talk class and swapping tables at lunch to get to know about our team √ others √√ Time in teams √√√√√√√√√√√√√√√√ (sharing Decide timetable changes prior year norms) √ More time in classrooms √ Getting to know roles of teams (and individuals) Like sample book pack √ √and getting points clarified Overview of excursions and inquiry On time and succinct √ Graduate would have liked some direct Leaders catching up for consistency instruction help Talking about someone else (introductions) More planning time √√√√√√√ (not so much √√√√√√√√√√√√√√√ admin) Time to set up√√√√ More input on roles Norms √√ More on norms √ More time discussing behaviour management plans and consequences Unpacking norms √√√ √ (photo board good idea) Snack – brain food √√√ Sticking to time /good pace / organised ?agenda Question time √√ √√√√√√√√√√ Norms in 1 session Handouts clear /Inquiry folders √√√√√√ / Copy of agenda before hand calendar √√ Games /interactive way to reinforce roles and manuals great / engaging √√√√√√√√√√√√√√√√√√√√√√√√√ Modelling restorative script good √√
  • 21.
    Plus Delta Meetings Meetings Nice to finish early √ √ Meeting time does not match with school bell Good to get feedback on norms so that they feel more relevant. If hence some late comers (need to check all we don’t refer to agreed norms then they were done to “tick a box’. clocks the same) √ Loved the way you kept to time √ √ √ √ √ √ – AND allowed wait time “Chalk and talk” but understood that its √ √and time for questions after you provided the information √ √ √ needed √√ √ √ √ Referred to keeping on time to often I think the staff were well behaved – stuck to the norms No brainfood √ √ √ There were lots of ideas to take in however could follow easily Agenda and items needed for meetings well (clear) (good to load all the admin stuff into one meeting to get it before (24 hrs) out of way) √ √ Meeting Focus Good pace, detailed agenda and not too crammed/stuck to agenda Looking forward to the 1 on 1 data meeting / management √√ √ √ Management – feels like many items need to Presenters were explicit / clear intentions of meeting connected be achieved all of a sudden (PDP’s) – more ideas √ √ √ √ √ warning on PDP’s Meeting Focus Nice to hear (eager) that we will have a data meeting with Penny- this sounds like it will be useful (re formative assessment) (data analysing a bit overwhelming)– was clear (Penny’s reflection insightful and interesting)√ √ √ √ √ √ √ √ √ Nice to connect data wise to school work – see how it fits in (think I understand DATAWISE protocol fits across everything (explicitness, timing, intentions, outcomes) √ √ √ Good to clarify and be informative, transparent √ √and efficient on important management items (workforce plan – teacher positions and teacher review process) (giving temp staff “heads up” on jobs) √ √√√ Other I stayed awake – I must be rested Well Done – great meetings
  • 22.
    Meeting 2 Compare Meeting 8 Data made it easy to plan Good to get feedback on norms so and even get to know your that they feel more relevant. If we kids √√√√ don’t refer to agreed norms then they were done to “tick a box’. Time in teams √√√√√√√√√√√√√√√√ Loved the way you kept to time √ √ √ √ √ √ – AND allowed wait time √ (sharing norms) √ √and time for questions after you Getting to know roles of provided the information √ √ √ √√ √ teams (and individuals) √√ √and getting points clarified I think the staff were well behaved On time and succinct – stuck to the norms √Unpacking norms √√√ √ Nice to hear (eager) that we will (photo board good idea) have a data meeting with Penny- this sounds like it will be useful (re Sticking to time /good pace formative assessment) (data / organised ?agenda analysing a bit overwhelming)– was √√√√√√√√√√ clear (Penny’s reflection insightful Games /interactive way to and interesting)√ √ √ √ √ √ √ √ √ reinforce roles and manuals Nice to connect data wise to school great / engaging work – see how it fits in (think I √√√√√√√√√√√√√√√√√√√√√√ understand DATAWISE protocol fits √√√ across everything (explicitness, timing, intentions, outcomes) √ √ √
  • 23.
    Feedback on teamleaders norm reflecting upon practices (phrases heard during the meeting ) “I probably mucked up there!” “We need to add this to or document for next time so there is no confusion” “What does or doesn’t work well is…….” “We didn’t do this last time so …………..” “We could use this as a broad overview” “We could use the so what/now what protocol” “We sound so incredibly organised”
  • 24.
    Count on fromone number to find the total of two collections The next phase of work...
  • 25.
    Agenda & Minutes •Clearbefore meeting - put out 24 hrs before (goals for meeting / team has educational question to inquire about) with high priority items first (pre reading handed out before) and reminders about expected items to bring •Chance for all to add ideas •Timed agenda / stick to time / start on time / feedback / uninterrupted time •Sitting in circle or round tables so that everyone can be seen •Minutes (write properly distributed promptly with action items listed that are followed up at the next meeting – possible role rotations: timer, minute taker) and end with a focus for next meeting •Time for celebrations and acknowledgments in team Norms & Team Vision •Follow norms Listen to all – deep and active listening / respect others / turn taking / all have voice/ share the load / punctual /no blame no shame / collegial / able to challenge respectfully/ safe Provide feedback to members as required •Develop a collective responsibility – all active members – delegate roles and tasks – willingness to share Content •Discuss curriculum planning (pedagogy) and student well being as well as small % of admin •Curriculum Have key focus areas (rotate focus areas perhaps on a fortnightly basis: e.g. not always starting with reading or reading each week and discuss learning intentions and success criteria (highest priority) for the following period (week/fortnight) Share data, artefacts (e.g. annotated samples) and resources Time for modelling or discussing teaching strategies •Walk away feeling prepared
  • 26.
    Suggested format foryear level team meetings Time Agenda Items 3-5 min Review norms / feedback from last meeting/ agenda/ objectives and celebrations 35 min Curriculum Area 1 (rotate reading and writing workshops) bring artefacts or data to review, analysis and inform planning (content) and instruction 35 min Curriculum Area 2 (rotate mathematics & Inquiry Learning) bring artefacts or data to review, analysis and inform planning (content) and instruction 15 min Student well being and/or admin on excursions, camps / reporting 3-5 min Meeting feedback/ agreed actions (in between meetings and formative assessment artefacts and agenda focus for next meeting)
  • 27.
    AgitateCultural History of change towards Change Building Data Literacy... 2007 Structural Individual to Team Response (timetable) Cohort Assessment data 2010 Cultural Solutions focused Cultural Response Response 2011 2011-2012 Relational Learning + Data Wise Inquiries + intersecting leadership journeys Structural Cultural Response Challenges STREAMING Lack of trust 2011 “teach/assess my child”
  • 28.
    Count on fromone number to find the total of two collections Building Data Literacy...
  • 29.
    A check-inaim ourobjectives for Step 2 Our on In sharing our work in Build Data Literacy: the Prepare Phase, we • What influences the development of data literacy in aim to challenge all of educators? What the research says. us to build cultures that use the right drivers to •To share our journey; what worked and what Count on from one number to find the total of two collections realise the hope that didn’t and why. comes from creating the solutions needed to •Our future plans to develop a culture of data ensure a better future literate teachers (and students)? for all. BELIEF
  • 30.
    Influences on developmentof data literacy... In my unpublished MASTERS research, I discovered several factors which impeded the teacher understanding, and use of formative data. These included... Count on from one number to find the total of two collections
  • 31.
    Influences on developmentof data literacy... •A teachers experience with assessment as a learner; that is the extent to which they had or had not, engaged in formative assessment within their schooling. •A teachers perception of the role of the student Count on from one number to find the total of two collections and the role of the teacher in relation to assessment; in so much as whose task is it to assess learning? These factors exert more influence than pre-service training and ongoing professional development
  • 32.
    Influences on developmentof data literacy... •Finally, is the need for teachers to view data as part of a collective, (not just in relation to students in ‘my class’); that is, the significance for teaching teams to feel a sense of collective responsibility for the Count on from one number to find the total of two collections educational outcomes of all students.
  • 33.
    Continuing the journeyof Building Data Literacy... 1. Presenting Cohort achievement data to teaching teams... Count on from one number to find the total of two collections
  • 34.
    Year 6 COHORTNUMBER data: March 2011 6 5 4 3 2 1 0
  • 35.
    Year 6 COHORTNUMBER data: March 2011 6 5 Expected Achievement Level 4 3 2 1 0
  • 36.
    Year 6 COHORTNUMBER data: March 2011 6 5 4 3 2 This student (aged 12 & about to enter Middle School) is performing at the Expected Level of an 8 year old) 1 0
  • 37.
    Year 6 COHORTNUMBER data: March 2011 6 This student (aged 12 & about to enter Middle School) is performing at the Expected Level of a 15-16 year old) 5 4 3 2 This student (aged 12 & about to enter Middle School) is performing at the Expected Level of an 8 year old) 1 0
  • 38.
    Our aim This data set was reminiscent of the work in In sharing our cohort range of achievement in the Prepareacrosswe Number, Phase, the school. aim to challenge all of us to build cultures that use the right drivers to Count on from one number to find the total of two collections realise the hope that If you saw this data, what might you comes from creating the recommend to teachers? solutions needed to ensure a better future for all. BELIEF
  • 39.
    What was theresponse of teachers? Count on from one number to find the total of two collections Cohort groupings...TRACKING!
  • 40.
    Count on fromone number to find the total of two collections instructional dilemma... An organisational response to an
  • 41.
    Anonymous anecdotal commentson the Our aim challenges encountered... in In sharing our work •I feel like I’m not seeing my students enough to the Prepare Phase, we know where they are. aim to challenge all of •I feel like I’m losing control of knowing cultures that us to build how my kids are going. use the right drivers to Count on from one number to find the total of two collections realise the hope that •How do I report to parents, when I haven’t taught them? comes from creating the •What if I don’t get any data from their needed to solutions instructional teacher? How will I report to their parents? future ensure a better •What if I don’t trust where thefor all. BELIEF other teacher has put them? How would I know?
  • 42.
    Revisiting the research... Parrand Timperley’s, (2008) study of teachers in literacy which determined that teacher professional learning was required in two Count on from one number to find the total of two collections areas; the understanding and skills to gather and interpret evidence and the content knowledge to know the specific area that the data refers to, and how to teach this to address the need.
  • 43.
    A change ofdirection... Exploring the individual endeavour involved in Building Data Literacy. Reflecting on the success I’d experienced (within the Count on from one number to find the total of two collections case study methodology of my Masters), involved Reconnecting with the Instructional coach working one-on-one (as an Instructional Coach) to Build the Data Literacy within...individual. of the
  • 44.
    2. One-to-one datameetings Count on from one number to find the total of two collections The ‘I see, I wonder...’ protocol around their data and planning artefacts was used to commence discussion and enabled me to determine the existing data skills of each teacher.
  • 45.
    2. One-to-one datameetings I don’t know what I don’t know... Modelling how to ‘read’ data, look for trends to inform an instructional plan in relation to: Count on from one number to find the total of two collections 1. CONTENT 2. INSTRUCTIONAL STRATEGIES 3. FORMATIVE ASSESSMENT OPPORTUNITIES
  • 46.
    2. One-to-one datameetings Differentiated Professional Learning: Catering for the different professional learning Count on from one number to find the total of two collections requirements of each teacher, and differentiate accordingly; operating along the Mentor/Coaching continuum
  • 47.
    0 1 2 3 4 5 6 7 Use data to identify my next teaching target Use online resources Try new teaching strategies (eg: mixed- ability groups) Differentiate with one open-ended task Use a range of formative assessment strategies (eg: photos) Try a new lesson structure learning has given me confidence to... As a result of my Data meeting, my new Feedback from 1:1 Data meeting... Improve student reflection and use it as formative assessment
  • 48.
    Our next stepsin Building Data Literacy... Moderating evidence for mid-year parent academic progress reports... Teachers have committed to bring the assessment artefacts, (photos, student reflections, anecdotal Count on from one number to find the total of two collections notes, checklists, pre and post assessments) of focal students, in order to moderate in a 1:1 session with both their sub-school leader and myself.
  • 49.
    plant? the ‘Koru’ Remember Count on from one number to find the total of two collections

Editor's Notes

  • #2 Don’t want the challenge to be oppressive for people, but rather that they leave with a feeling of hope that they can change their organisation, and the belief that it can be done. The prepare phase is about getting people to see that stuff makes sense…why wouldn’t we do that?
  • #4 Don’t want the challenge to be oppressive for people, but rather that they leave with a feeling of hope that they can change their organisation, and the belief that it can be done. The prepare phase is about getting people to see that stuff makes sense…why wouldn’t we do that?
  • #6 We see the PREPARE Phase as being the subterranean part of DWIP; the foundation; the root of the process. Without deep roots in the culture of an organisation, the DWIP might just become a ‘recipe’ for problem-solving; NOT an opportunity for an organisation to INQUIRE to find solutions.
  • #8 Don’t want the challenge to be oppressive for people, but rather that they leave with a feeling of hope that they can change their organisation, and the belief that it can be done. The prepare phase is about getting people to see that stuff makes sense…why wouldn’t we do that?
  • #30 Don’t want the challenge to be oppressive for people, but rather that they leave with a feeling of hope that they can change their organisation, and the belief that it can be done. The prepare phase is about getting people to see that stuff makes sense…why wouldn’t we do that?
  • #42 Don’t want the challenge to be oppressive for people, but rather that they leave with a feeling of hope that they can change their organisation, and the belief that it can be done. The prepare phase is about getting people to see that stuff makes sense…why wouldn’t we do that?