Over the past years, Nour Communications has entered into various
contracts in major telecommunications projects with well-known
industry players such as Lucent Technologies, Ericsson, Motorola,
Nokia, Harris Farinon, and the Saudi Telecommunications Company
(STC).
The general overview of the scopes of work of these contracts and
their brief descriptions are presented hereon. This manifestation
fortifies NOUR Communications position as an experienced and
dependable contracting company in telecommunications industry for
both commercial and government endeavors. This string of projects is
brought about by the cohesive teamwork of Nour’s innovative
management and skilled work force as its most important resources.
NOURCOMMUNICATIONS
3
COMPANIES THAT ENGAGED AND CONTRACTED
NOUR IN VARIOUS TELECOMMUNICATIONS
PROJECTS IN SAUDI ARABIA:
Company Project
A. Lucent Technologies : TEP 6 Project
B. L.M. Ericsson : GSM E4, E5 and E6 Projects
C. NOKIA : GSM E5 and E6 Projects
D. Saudi Telecom (STC) : GSM E5 and C&I Projects
E. Motorola : PSD Project
F. Harris Farinon : GID and PSD Projects
NOURCOMMUNICATIONS
4
SOPHISTICATED TEST EQUIPMENTS
Nour Communications has always utilized the state-of-the-art tools
and test equipments to ensure optimum system performance. From
survey to integration, the wide range of equipments assists in
improvement of work quality:
a) Differential GPS Unit: with accuracy of 3m horizontally and less
than 1m vertically in resolution of coordinates and elevation.
b) SDH Analyzer Set : for STM-1 systems.
c) 2 Mb/s BER Tester : for E1 and T1 interface stability and
performance assessment.
NOURCOMMUNICATIONS
5
SOPHISTICATED TEST EQUIPMENTS continued…
d) TEMS Pocket: for GSM Base Station testing and detection of
cross feeders.
e) Site Master : for locating fault in feeders and VSWR testing.
f) MW Test Set (MTS) : for checking of MW O/P power, received
signal level and frequency measurement.
g) IFR : for FM and VHF / UHF systems testing.
h) Set of Spectrum Analyzers and Oscilloscopes as well as set of
tools enough for use of 20 qualified installation teams for rapid
deployment around the Kingdom.
NOURCOMMUNICATIONS
6
A) Lucent Technologies International, Inc. / AT&T Int’l.
TEP6 Project: From June 1996 to September 2000. Project
managed by Lucent Technologies; Norconsult was project
consultant. Contracts for:
1. SITE SURVEY:
Nour was the only survey contractor of Lucent on its
Kingdom wide GSM 200K, 300K and 500K projects.
Total Number of Surveyed Sites in TEP6 = 1, 183 Sites
 Provided with Microwave line of sight (LOS) data between
prospective GSM locations; recorded any path obstructions
and measured site elevation (AMSL) using Altimeter and
Differential GPS.
NOURCOMMUNICATIONS
7
Lucent Technologies continued (TEP6 Site Survey)…
 Ensured that site location was suitable, both demographic
and geographic, for effective GSM propagation and
coverage.
 Using state-of-the-art GPS set, recorded the site geographical
coordinates. Special software and compass to get site
magnetic bearings and other required path data.
 Using the Spectrum Analyzer set, ensured there was no
possible interference or signal propagation to affect the
designated GSM and MW frequency bands.
 GSM survey was based on the mobile coverage RF and MW
objectives taking up to 3 candidate locations per site.
NOURCOMMUNICATIONS
8
Lucent Technologies continued (TEP6)…
2. SKILLED MANPOWER SUPPLY:
 Supplied Lucent with 21 Teams of Transmission Engineers for
Testing & Commissioning of GSM transmission network using
different PDH and SDH equipment such as AT&T Pcom,
Harris MicroStar, and NERA STM 1 microwave radio sets.
 Supplied Lucent with 33 Teams of Antenna Installers /
Riggers, under Lucent’s disposal and direct supervision, to
install GSM antennas and MW dishes of different sizes,
including varied sizes of feeders, transmission cables, wave
guides, jumpers, clamps, and related antenna accessories.
NOURCOMMUNICATIONS
9
Lucent Technologies continued (TEP6)…
3. JUNCTION NETWORK:
Transmission Contract (April 1998 – Nov. 2000). Direct
contract with Lucent Technologies.
Completed Sites = 146 Sites
The Contract called for implementation of:
 Site survey of 146 MW sites; Line-of-site (LOS) survey of
64 MW hops.
 Complete design and optimization of MW hops;
documentation of design and Method of Procedures (MOP)
prior to site installation.
NOURCOMMUNICATIONS
10
Lucent Technologies continued (TEP6 Junction Network)…
 Indoor installation on 146 sites using NERA SDH STM1 MW
Radio with Frequency Diversity; 16 hops with Space
Diversity.
 Outdoor Installation on 146 sites: different sizes of cross-
polarized MW dishes and wave guides.
 Hop alignment, equipment testing and commissioning prior to
site integration into the long-haul MW network.
NOURCOMMUNICATIONS
11
B) L.M. Ericsson
GSM E4 : From March 2000 to December 2001. Direct contract to
Ericsson; project managed by Ericsson; project consultant was
Norconsult. Contracts for implementation of:
1. SITE SURVEY / RADIO SITE INVESTIGATION :
Total Number of Surveyed Sites = 755 Sites
 Site Search/Acquisition Survey. Survey of up to 3 candidate
locations of a prospective new GSM Cell Site giving emphasis on
RF and LOS considerations.
 Change-out Site Survey. To determine the required transmission
installation and Civil Works for a change out of GSM radio
equipment, according to on-site Ericsson instructions, prioritizing
the re-use of existing equipment for transmission, DC power and
battery back up.
NOURCOMMUNICATIONS
12
L.M. Ericsson continued (GSM E4 Site Survey)…
 Radio Site Investigation.
Documentation of both existing and planned radio facilities based on
RSI checklist, floor plan, cable tray, and site lay out drawings, and
detailed photographs of site and equipments.
 Transmission Survey.
Comprehensive transmission equipment survey conducted on MSC
and existing Microwave Sites that were serving as Node Sites in the
GSM mobile communications network.
NOURCOMMUNICATIONS
13
L.M. Ericsson continued (GSM E4) …
2. RADIO INSTALLATION: RBS and Transmission.
Total Number of Completed Sites = 241 Sites
Contract entailed the following scope of work:
 Change out of Lucent BTS 2000 equipment with Ericsson RBS 2202
cabinets with TRX radio units and associated elements.
 Replacements and cut over of GSM antennas to effectively provide
cellular communications in the 900 and 1800 MHz bands.
 Replacements of LDF series feeders, jumpers, cable clamps, and
other related antenna accessories.
NOURCOMMUNICATIONS
14
L.M. Ericsson continued (GSM E4 Radio Installation)…
 Installation of Transmission Microwave Equipment cabinet
including cablings.
 Installation of Mini-Link TMR 9202 both indoor and outdoor units.
 Installation of microwave antenna dish and coaxial cable RG-8.
 Alignment of MW hop and 24-hour BER burn test to ensure
optimum signal gain.
 Installation of batteries and rectifier units (Battery Back Up).
 Cable connections and terminations both outside and inside shelter.
NOURCOMMUNICATIONS
15
L.M. Ericsson continued (GSM E4) …
3. SITE CIVIL WORK CONSTRUCTION.
Total Number of Completed Sites = 243 Sites
 MSC / Indoor Room: Site survey for civil engineering; site design;
construction and installation of raised floor system, FM200 gas
flooding system, coded security access system, cable tray system,
other civil, electrical and mechanical works including HVAC; fire
alarm and detection control, and lighting fixtures; structural steel
materials and electrical conduits.
 New Green Field Site : Surveys for site acquisition and civil
engineering; complete site design; excavation & backfill; supply and
installation of equipment and generator shelters; self-support steel
tower erection and painting; supply and install gantry between tower
and shelter; chain link fence; ship and install power generator; other
civil, electrical and mechanical works like HVAC, lightings, etc.
NOURCOMMUNICATIONS
16
L.M. Ericsson continued (GSM E4 Civil Work ) …
 New Roof Top Site: Site survey for civil engineering; site design;
civil construction and installation of equipment shelter (3m x 3m)
with foundation, cable tray system, antenna support, structural steel
works including mast, electrical circuits and lighting fixtures; and
site cleaning and preparation.
 Change Out / TRU Expansion Site: Detailed site surveys; site
design; existing building analysis; dismantling of Lucent BTS
equipment; installation of new antenna mounts, shelter erection with
foundation; and other civil and electromechanical requirements.
NOURCOMMUNICATIONS
17
L.M. Ericsson
GSM E5 : From August 2001 up to present. Direct contract to
STC; Project supervised by Ericsson; project consultant is
Norconsult Telematics. Contracts for implementation of:
1. SITE SURVEY
Total Number of Surveyed GSME5 Sites = 530 Sites
 Site Search/Acquisition Survey. Survey of up to 3 candidate
locations of a prospective new GSM Cell Site giving emphasis on
RF and LOS considerations.
NOURCOMMUNICATIONS
18
L.M. Ericsson continued ( GSM E5 Survey)…
 Change-out Site Survey.
To determine the required transmission installation and Civil Works
for a change out of GSM radio equipment, according to on-site
Ericsson instructions, prioritizing the re-use of existing equipment
for transmission, DC power and battery back up.
 Site Survey for Civil Engineering.
Detailed survey of existing sites for equipment upgrade; building or
tower analysis (comparative study) for loading capacity; survey
includes electromechanical considerations of increased load capacity
due to planned additional equipment.
NOURCOMMUNICATIONS
19
L.M. Ericsson continued (GSM E5) …
2. SITE CIVIL WORK CONSTRUCTION.
Total Number of Completed Sites = 286 Sites
 MSC / Indoor Room: Site survey for civil engineering; civil design
FDED preparation; construction and installation of raised floor
system, FM200 gas flooding system, coded security access system,
cable tray & trunk system, other civil, electrical and mechanical
works including HVAC; fire alarm and detection control, and
lighting fixtures; structural steel materials and electrical conduits.
 New Green Field Site : Surveys for site acquisition and civil
engineering; civil design FDED preparation; excavation & backfill;
supply and installation of equipment and generator shelters; self-
support steel tower erection and painting; supply and install gantry
between tower and shelter; chain link fence; install power generator;
other civil, and electromechanical works like HVAC, lightings, etc.
NOURCOMMUNICATIONS
20
L.M. Ericsson continued (GSM E5 Civil Work ) …
 New Roof Top Site: Site survey for civil engineering; civil design
FDED preparation; civil construction and installation of equipment
shelter (3m x 3m) with foundation, cable tray system, antenna
support, structural steel works including mast, electrical circuits and
lighting fixtures; and site cleaning and preparation.
 Change Out / TRU Expansion Site: Site survey for civil
engineering; civil design FDED preparation; existing building
analysis; dismantling of Lucent BTS equipment; installation of new
antenna mounts and cable ladder, shelter erection with foundation;
and other civil and electromechanical requirements.
NOURCOMMUNICATIONS
21
L.M. Ericsson continued (GSM E5) …
3. SUPPLY OF COMPLETE EQUIPMENT SHELTER.
Total Number of Shelters Delivered = 187 Shelters
 Inside shelter installation of required equipments and accessories
meeting the approved standards set by STC for GSM environment.
 Completed shelters are being shipped from Nour Warehouse to the
assigned GSM Cell Site.
 Inside shelter installation includes the following:
HVAC units, MDB panel, Halon / Fire Alarm Panel set, Security
Access Control Panel set, battery rack and rectifier units, Tower
Obstruction Light Control (TOLCO), cable and trunk ladder, door
closer, required cablings, and inside / outside lighting fixtures.
NOURCOMMUNICATIONS
22
L.M. Ericsson continued (GSM E5) …
4. SUPPLY OF CONTAINERIZED DUAL DIESEL
GENERATOR
Total Number of GSM Sites Installed with D. Generators = 89 Sites
 Nour is the sole agent in Saudi Arabia of Germany’s SAB
containerized dual generator. To date, 100 sets have been sold and
89 sets installed on GSM Sites not serviced by commercial power.
Deutz is engine make of the 3-phase, 32.5KVA, 26 KW generator.
 As STC approved power generator for GSM sites, it is installed
together with accessories within a 30-foot box container providing a
noise level of 65dB at 10 meter distance.
 Accessories provided with the generators: control panel, starter
batteries, FM200 fire extinguishing system, 220V and 24VDC
lights, ventilation, fuel day tank and buried fuel bulk tank.
NOURCOMMUNICATIONS
23
C) NOKIA
GSM E5 Project : From September 2001 up to present. Direct
contract to Nokia; project managed by Nokia; project consultant is
Norconsult Telematics. Contract for implementation of:
GSM AND TRANSMISSION RADIO INSTALLATION
Total Number of Completed GSME5 Sites = 204 Sites
 Implementation planning based on site specific and network
configurations; radio site investigation survey.
 Change out of Lucent BTS equipment with new Nokia Macro
UltraSite or Micro MetroSite GSM 900/1800 MHz radio including
antennas, feeders and jumpers; and battery back up unit.
NOURCOMMUNICATIONS
24
NOKIA continued (GSME5 Radio Installation)…
 Installation, testing and commissioning of transmission radio Nokia
FlexiHopper or MetroHopper, and associated MW antenna.
 Testing, commissioning and integration of all installed equipments.
GSM E6 Project : Project has just started January 2003 calling for
approximately 130 sites allocated to Nour for complete radio
installation.
Contract entails the same scope of work as that of GSME5 Project.
NOURCOMMUNICATIONS
25
D) Saudi Telecommunications Company (STC)
GSM R&V / C&I Project (Ph I & Ph II) : From July 2001 up to
present. Direct contract to STC; Norconsult Telematics is project
consultant.
SITE CONSTRUCTION (Civil Work and Telecom)
Total Number of Completed C&I GSM Sites = 73 Sites
Contract is for Nour to construct and deliver to STC brand new
GSM Cell sites, located along roads and villages in the Western
Region, on a turn-key basis. Complete site construction requires
both telecom and civil works scope of work as briefly described
below:
Civil Work Implementation:
 Site acquisition survey of up to 3 candidates per site;
 Civil engineering survey and site design (FDED) documentation.
NOURCOMMUNICATIONS
26
Saudi Telecom (STC) continued (C&I Project)…
 Site acquisition survey of up to 3 candidates per site.
 Civil engineering survey and site design (FDED) documentation.
 Site preparation, excavation and backfill, foundation preparation.
 Erection of steel tower and equipment shelter.
 Supply, delivery and installation of Dual Generators and fuel tanks.
 Complete civil and electromechanical works such as gantry and
cable tray system, antenna mounts, HVAC system, cable trenches,
chain link fence, lighting fixtures, tower painting, concreting, and
other works.
NOURCOMMUNICATIONS
27
Saudi Telecom (STC) continued (C&I Project)…
Telecommunications Implementation:
 Complete BTS 2000 equipment installation including RF accessories
like TRX radio units, DDF, GSM 900 MHz antennas and feeders,
internal and external cablings; reconditioning of indoor BTS units.
 Installation of MW transmission equipment using Harris MicroStar
M7 or ATT Pcom radio units; installation of MW antenna dishes up
to 2.4m diameter and IF cable RG-8; hop alignment and BER burn
test to ensure link stability.
 Installation of battery back up DC supply, batteries and rectifier
units.
 Testing and commissioning of all installed equipments.
 Power up and Integration of site into the GSM network.
NOURCOMMUNICATIONS
28
E) Motorola / NASCO
Public Security Directorate (PSD) Transmission Project:
From October 1998 to December 1999. Direct contract with
Motorola and NASCO.
Total Number of Completed Sites = 21 Sites
 Contract called for Installation of transmission equipment on
21 PSD Sites located in Makkah, Jeddah and Taif.
 MW radio used was Alcatel PDH T1 American Standard
 Installation of PSD Monitoring System.
 Transmission documentation of the 21 completed sites.
NOURCOMMUNICATIONS
29
F) Harris Farinon
GID Transmission Project:
Direct contract with Harris Farinon for implementation of:
 Transmission network installation using SDH 4T1 “QuadraLink”
MW radio in the Western Region
 Installation of Omniplex Multiplexer for PTT Line Combining on
Hand Held and Mobile Radios
 Installation of complete Network Management System for the whole
West District over RS-232 modems in Taif and Jeddah.
PSD Transmission Project:
Direct contract with Harris Farinon for implementation of:
 Setting up of Transmission Network and its Network Management
System: five (5) sites in Riyadh and three (3) sites in Madinah.
NOURCOMMUNICATIONS
30
Survey Type
TEP6
Lucent
Technologies
GSME4
Ericsson
GSME5
STC/Ericsson Site Total
Site Search / Site
Acquisition
1,183 100 210 310
Transmission
(Microwave)
0 28 0 28
Radio Site
Investigation
0 31 0 31
Change-out 0 596 320 916
Site Total 1,183 755 530 2,468
SITE SURVEY & RADIO SITE INVESTIGATION
NOURCOMMUNICATIONS
31
Site Category
C & I
STC
GSME4
Ericsson
GSME5
STC/Ericsson Site Total
MSC 0 15 24 39
Indoor / Eqpt.
Room
0 9 10 19
Roof Top Site 0 138 28 166
New Greenfield 73 43 39 82
TRU Expansion 0 0 100 100
Change Out 0 0 64 64
Site Dismantling 0 38 21 59
Site Total 73 243 286 602
CIVIL WORK SITE IMPLEMENTATION
NOURCOMMUNICATIONS
32
Area/City
GSME4
Ericsson
RIYADH 183
QASSIM 40
HAFR AL
BATEN
18
Site Total 241
RADIO INSTALLATION
ERICSSON RBS & TRANSMISSION RADIO
NOURCOMMUNICATIONS
33
Western Region
C & I
STC
GSME5
Nokia
GSME6
Nokia
Site Totals = 73 204 130
RADIO INSTALLATION
STC BTS & NOKIA RBS AND TRANSMISSION RADIO
NOURCOMMUNICATIONS
34
Sold To /
Installed by
Number of
Gensets
NOUR (C&I – 1) 11
NOUR (C&I – 2) 21
SABV-1 1
SABV-2 24
NATEL 4
MADAF 11
MOZOON 10
ACES 5
HICAP 2
Total = 89
DUAL DIESEL GENERATORS INSTALLED ON GSM SITES:
NOURCOMMUNICATIONS
END
OF
PRESENTATION

More Related Content

What's hot

training diary on 6 months training (telecommunication)
training diary on 6 months training (telecommunication)training diary on 6 months training (telecommunication)
training diary on 6 months training (telecommunication)Aakash Sharma
 
data communication using unmanned aerial vehicle
data communication using unmanned aerial vehicledata communication using unmanned aerial vehicle
data communication using unmanned aerial vehicleSreejesh TR
 
Managing interference and overlay in complex network scenarios
Managing interference and overlay in complex network scenariosManaging interference and overlay in complex network scenarios
Managing interference and overlay in complex network scenariosJohn Thor
 
GSA presentation at GTI spectrum workshop at ITU bangkok
GSA presentation at GTI spectrum workshop at ITU bangkokGSA presentation at GTI spectrum workshop at ITU bangkok
GSA presentation at GTI spectrum workshop at ITU bangkokSitha Sok
 
mmWave: Fixed Wireless –Regulatory Aspects
mmWave: Fixed Wireless –Regulatory AspectsmmWave: Fixed Wireless –Regulatory Aspects
mmWave: Fixed Wireless –Regulatory AspectstechUK
 
Andy sutton - Multi-RAT mobile backhaul for Het-Nets
Andy sutton - Multi-RAT mobile backhaul for Het-NetsAndy sutton - Multi-RAT mobile backhaul for Het-Nets
Andy sutton - Multi-RAT mobile backhaul for Het-Netshmatthews1
 
Making 5G New Radio a Reality - by Qualcomm
Making 5G New Radio a Reality - by QualcommMaking 5G New Radio a Reality - by Qualcomm
Making 5G New Radio a Reality - by QualcommAydin Karaer
 
WRC 15 outcomes (ITU)
WRC 15 outcomes (ITU)WRC 15 outcomes (ITU)
WRC 15 outcomes (ITU)ssk
 
5g architecture, Industrial Training
5g architecture, Industrial Training5g architecture, Industrial Training
5g architecture, Industrial TrainingSumanPramanik7
 
Belco presentation november 2014
Belco presentation november 2014Belco presentation november 2014
Belco presentation november 2014belcoproducts
 
3 gpp Document
3 gpp Document3 gpp Document
3 gpp DocumentZTE
 
APT 700 LTE Whitepaper Huawei
APT 700 LTE Whitepaper HuaweiAPT 700 LTE Whitepaper Huawei
APT 700 LTE Whitepaper HuaweiSitha Sok
 
Future use of millimetre waves – outcome of WRC-15 and study priorities for W...
Future use of millimetre waves – outcome of WRC-15 and study priorities for W...Future use of millimetre waves – outcome of WRC-15 and study priorities for W...
Future use of millimetre waves – outcome of WRC-15 and study priorities for W...techUK
 
Mobdiea lte overview_2nd_marketing_2014_0423_최종
Mobdiea lte overview_2nd_marketing_2014_0423_최종Mobdiea lte overview_2nd_marketing_2014_0423_최종
Mobdiea lte overview_2nd_marketing_2014_0423_최종Kevin Kang
 
Second screen prototype for broadcasted digital tv users in ISDB-Tb Standard
Second screen prototype for broadcasted digital tv users in ISDB-Tb StandardSecond screen prototype for broadcasted digital tv users in ISDB-Tb Standard
Second screen prototype for broadcasted digital tv users in ISDB-Tb StandardAndy Juan Sarango Veliz
 
BridgeX_SURVEY_solutions
BridgeX_SURVEY_solutionsBridgeX_SURVEY_solutions
BridgeX_SURVEY_solutionsRobert Asher
 

What's hot (20)

training diary on 6 months training (telecommunication)
training diary on 6 months training (telecommunication)training diary on 6 months training (telecommunication)
training diary on 6 months training (telecommunication)
 
data communication using unmanned aerial vehicle
data communication using unmanned aerial vehicledata communication using unmanned aerial vehicle
data communication using unmanned aerial vehicle
 
Managing interference and overlay in complex network scenarios
Managing interference and overlay in complex network scenariosManaging interference and overlay in complex network scenarios
Managing interference and overlay in complex network scenarios
 
GSA presentation at GTI spectrum workshop at ITU bangkok
GSA presentation at GTI spectrum workshop at ITU bangkokGSA presentation at GTI spectrum workshop at ITU bangkok
GSA presentation at GTI spectrum workshop at ITU bangkok
 
mmWave: Fixed Wireless –Regulatory Aspects
mmWave: Fixed Wireless –Regulatory AspectsmmWave: Fixed Wireless –Regulatory Aspects
mmWave: Fixed Wireless –Regulatory Aspects
 
Andy sutton - Multi-RAT mobile backhaul for Het-Nets
Andy sutton - Multi-RAT mobile backhaul for Het-NetsAndy sutton - Multi-RAT mobile backhaul for Het-Nets
Andy sutton - Multi-RAT mobile backhaul for Het-Nets
 
Making 5G New Radio a Reality - by Qualcomm
Making 5G New Radio a Reality - by QualcommMaking 5G New Radio a Reality - by Qualcomm
Making 5G New Radio a Reality - by Qualcomm
 
WRC 15 outcomes (ITU)
WRC 15 outcomes (ITU)WRC 15 outcomes (ITU)
WRC 15 outcomes (ITU)
 
5g architecture, Industrial Training
5g architecture, Industrial Training5g architecture, Industrial Training
5g architecture, Industrial Training
 
Belco presentation november 2014
Belco presentation november 2014Belco presentation november 2014
Belco presentation november 2014
 
Summary of 41 basic knowledge of LTE
Summary of 41 basic knowledge of LTESummary of 41 basic knowledge of LTE
Summary of 41 basic knowledge of LTE
 
Abdallah Al Sagheir Cv
Abdallah Al Sagheir CvAbdallah Al Sagheir Cv
Abdallah Al Sagheir Cv
 
3 gpp Document
3 gpp Document3 gpp Document
3 gpp Document
 
APT 700 LTE Whitepaper Huawei
APT 700 LTE Whitepaper HuaweiAPT 700 LTE Whitepaper Huawei
APT 700 LTE Whitepaper Huawei
 
Future use of millimetre waves – outcome of WRC-15 and study priorities for W...
Future use of millimetre waves – outcome of WRC-15 and study priorities for W...Future use of millimetre waves – outcome of WRC-15 and study priorities for W...
Future use of millimetre waves – outcome of WRC-15 and study priorities for W...
 
Mobdiea lte overview_2nd_marketing_2014_0423_최종
Mobdiea lte overview_2nd_marketing_2014_0423_최종Mobdiea lte overview_2nd_marketing_2014_0423_최종
Mobdiea lte overview_2nd_marketing_2014_0423_최종
 
LTE Advance Pro
LTE Advance ProLTE Advance Pro
LTE Advance Pro
 
Second screen prototype for broadcasted digital tv users in ISDB-Tb Standard
Second screen prototype for broadcasted digital tv users in ISDB-Tb StandardSecond screen prototype for broadcasted digital tv users in ISDB-Tb Standard
Second screen prototype for broadcasted digital tv users in ISDB-Tb Standard
 
BridgeX_SURVEY_solutions
BridgeX_SURVEY_solutionsBridgeX_SURVEY_solutions
BridgeX_SURVEY_solutions
 
Aeronautical Communications
Aeronautical CommunicationsAeronautical Communications
Aeronautical Communications
 

Similar to Gsm projects

Digital Mobile Network Evolution - from GSM to 5G
Digital Mobile Network Evolution - from GSM to 5GDigital Mobile Network Evolution - from GSM to 5G
Digital Mobile Network Evolution - from GSM to 5G3G4G
 
Lakhbinder Singh Info - Nov 2016
Lakhbinder Singh Info - Nov 2016Lakhbinder Singh Info - Nov 2016
Lakhbinder Singh Info - Nov 2016LAKHBINDER SINGH
 
ACE Balmoria (11) (1) (1) (2)
ACE Balmoria (11) (1) (1) (2)ACE Balmoria (11) (1) (1) (2)
ACE Balmoria (11) (1) (1) (2)Ace Balmoria
 
Hnc2014 wan interconnection huawei new-generation ip long haul microwave solu...
Hnc2014 wan interconnection huawei new-generation ip long haul microwave solu...Hnc2014 wan interconnection huawei new-generation ip long haul microwave solu...
Hnc2014 wan interconnection huawei new-generation ip long haul microwave solu...eieiswe
 
Mawingu: Ideas for the sustainability of Community Networks
Mawingu: Ideas for the sustainability of Community NetworksMawingu: Ideas for the sustainability of Community Networks
Mawingu: Ideas for the sustainability of Community NetworksInternet Society
 
Internet of Space - Communication Systems for Future Space-bases Internet Ser...
Internet of Space - Communication Systems for Future Space-bases Internet Ser...Internet of Space - Communication Systems for Future Space-bases Internet Ser...
Internet of Space - Communication Systems for Future Space-bases Internet Ser...Paulo Milheiro Mendes
 
Receiver Module of Smart power monitoring and metering distribution system u...
Receiver Module of Smart power monitoring and metering  distribution system u...Receiver Module of Smart power monitoring and metering  distribution system u...
Receiver Module of Smart power monitoring and metering distribution system u...IJMER
 
Claude perruche rev5 english
Claude perruche rev5 englishClaude perruche rev5 english
Claude perruche rev5 englishClaude Perruche
 
Claude perruche rev5 english
Claude perruche rev5 englishClaude perruche rev5 english
Claude perruche rev5 englishClaude Perruche
 
Telecommunication infrastructure services
Telecommunication infrastructure servicesTelecommunication infrastructure services
Telecommunication infrastructure servicesessafi
 
Radio communication and the mobile phone
Radio communication and the mobile phoneRadio communication and the mobile phone
Radio communication and the mobile phoneYorkieAndy
 
Marvani Miller Estrella PMP Resume 2016
Marvani Miller Estrella PMP Resume 2016Marvani Miller Estrella PMP Resume 2016
Marvani Miller Estrella PMP Resume 2016Marvani M. GT Estrella
 
Wireless_Communication_PPT_2-_unit_1.pdf
Wireless_Communication_PPT_2-_unit_1.pdfWireless_Communication_PPT_2-_unit_1.pdf
Wireless_Communication_PPT_2-_unit_1.pdfssuser136534
 
Bandwidth enhancement of compact microstrip rectangular antennas for UWB appl...
Bandwidth enhancement of compact microstrip rectangular antennas for UWB appl...Bandwidth enhancement of compact microstrip rectangular antennas for UWB appl...
Bandwidth enhancement of compact microstrip rectangular antennas for UWB appl...TELKOMNIKA JOURNAL
 
Evolution of the generations of mobile Communication system.
Evolution of the generations of mobile Communication system.Evolution of the generations of mobile Communication system.
Evolution of the generations of mobile Communication system.Musfiqur Rahman
 
WC01-Intro_Mobile_Communications.pdf
WC01-Intro_Mobile_Communications.pdfWC01-Intro_Mobile_Communications.pdf
WC01-Intro_Mobile_Communications.pdfchasimp
 
Ooredoo-Tunisia_LLC_Success_Story_CU-109760
Ooredoo-Tunisia_LLC_Success_Story_CU-109760Ooredoo-Tunisia_LLC_Success_Story_CU-109760
Ooredoo-Tunisia_LLC_Success_Story_CU-109760SAYF Shehatha
 

Similar to Gsm projects (20)

Digital Mobile Network Evolution - from GSM to 5G
Digital Mobile Network Evolution - from GSM to 5GDigital Mobile Network Evolution - from GSM to 5G
Digital Mobile Network Evolution - from GSM to 5G
 
Resume
ResumeResume
Resume
 
Lakhbinder Singh Info - Nov 2016
Lakhbinder Singh Info - Nov 2016Lakhbinder Singh Info - Nov 2016
Lakhbinder Singh Info - Nov 2016
 
ACE Balmoria (11) (1) (1) (2)
ACE Balmoria (11) (1) (1) (2)ACE Balmoria (11) (1) (1) (2)
ACE Balmoria (11) (1) (1) (2)
 
Hnc2014 wan interconnection huawei new-generation ip long haul microwave solu...
Hnc2014 wan interconnection huawei new-generation ip long haul microwave solu...Hnc2014 wan interconnection huawei new-generation ip long haul microwave solu...
Hnc2014 wan interconnection huawei new-generation ip long haul microwave solu...
 
Mawingu: Ideas for the sustainability of Community Networks
Mawingu: Ideas for the sustainability of Community NetworksMawingu: Ideas for the sustainability of Community Networks
Mawingu: Ideas for the sustainability of Community Networks
 
Internet of Space - Communication Systems for Future Space-bases Internet Ser...
Internet of Space - Communication Systems for Future Space-bases Internet Ser...Internet of Space - Communication Systems for Future Space-bases Internet Ser...
Internet of Space - Communication Systems for Future Space-bases Internet Ser...
 
Receiver Module of Smart power monitoring and metering distribution system u...
Receiver Module of Smart power monitoring and metering  distribution system u...Receiver Module of Smart power monitoring and metering  distribution system u...
Receiver Module of Smart power monitoring and metering distribution system u...
 
Claude perruche rev5 english
Claude perruche rev5 englishClaude perruche rev5 english
Claude perruche rev5 english
 
Claude perruche rev5 english
Claude perruche rev5 englishClaude perruche rev5 english
Claude perruche rev5 english
 
Mobile phones
Mobile phonesMobile phones
Mobile phones
 
Telecommunication infrastructure services
Telecommunication infrastructure servicesTelecommunication infrastructure services
Telecommunication infrastructure services
 
Radio communication and the mobile phone
Radio communication and the mobile phoneRadio communication and the mobile phone
Radio communication and the mobile phone
 
Marvani Miller Estrella PMP Resume 2016
Marvani Miller Estrella PMP Resume 2016Marvani Miller Estrella PMP Resume 2016
Marvani Miller Estrella PMP Resume 2016
 
TVWS use case in Kenya
TVWS use case in KenyaTVWS use case in Kenya
TVWS use case in Kenya
 
Wireless_Communication_PPT_2-_unit_1.pdf
Wireless_Communication_PPT_2-_unit_1.pdfWireless_Communication_PPT_2-_unit_1.pdf
Wireless_Communication_PPT_2-_unit_1.pdf
 
Bandwidth enhancement of compact microstrip rectangular antennas for UWB appl...
Bandwidth enhancement of compact microstrip rectangular antennas for UWB appl...Bandwidth enhancement of compact microstrip rectangular antennas for UWB appl...
Bandwidth enhancement of compact microstrip rectangular antennas for UWB appl...
 
Evolution of the generations of mobile Communication system.
Evolution of the generations of mobile Communication system.Evolution of the generations of mobile Communication system.
Evolution of the generations of mobile Communication system.
 
WC01-Intro_Mobile_Communications.pdf
WC01-Intro_Mobile_Communications.pdfWC01-Intro_Mobile_Communications.pdf
WC01-Intro_Mobile_Communications.pdf
 
Ooredoo-Tunisia_LLC_Success_Story_CU-109760
Ooredoo-Tunisia_LLC_Success_Story_CU-109760Ooredoo-Tunisia_LLC_Success_Story_CU-109760
Ooredoo-Tunisia_LLC_Success_Story_CU-109760
 

Recently uploaded

Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Serviceankitnayak356677
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneCall girls in Ahmedabad High profile
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfmuskan1121w
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewasmakika9823
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 

Recently uploaded (20)

Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service PuneVIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
VIP Call Girls Pune Kirti 8617697112 Independent Escort Service Pune
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdf
 
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service DewasVip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
Vip Dewas Call Girls #9907093804 Contact Number Escorts Service Dewas
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 

Gsm projects

  • 2. NOURCOMMUNICATIONS 2 Over the past years, Nour Communications has entered into various contracts in major telecommunications projects with well-known industry players such as Lucent Technologies, Ericsson, Motorola, Nokia, Harris Farinon, and the Saudi Telecommunications Company (STC). The general overview of the scopes of work of these contracts and their brief descriptions are presented hereon. This manifestation fortifies NOUR Communications position as an experienced and dependable contracting company in telecommunications industry for both commercial and government endeavors. This string of projects is brought about by the cohesive teamwork of Nour’s innovative management and skilled work force as its most important resources.
  • 3. NOURCOMMUNICATIONS 3 COMPANIES THAT ENGAGED AND CONTRACTED NOUR IN VARIOUS TELECOMMUNICATIONS PROJECTS IN SAUDI ARABIA: Company Project A. Lucent Technologies : TEP 6 Project B. L.M. Ericsson : GSM E4, E5 and E6 Projects C. NOKIA : GSM E5 and E6 Projects D. Saudi Telecom (STC) : GSM E5 and C&I Projects E. Motorola : PSD Project F. Harris Farinon : GID and PSD Projects
  • 4. NOURCOMMUNICATIONS 4 SOPHISTICATED TEST EQUIPMENTS Nour Communications has always utilized the state-of-the-art tools and test equipments to ensure optimum system performance. From survey to integration, the wide range of equipments assists in improvement of work quality: a) Differential GPS Unit: with accuracy of 3m horizontally and less than 1m vertically in resolution of coordinates and elevation. b) SDH Analyzer Set : for STM-1 systems. c) 2 Mb/s BER Tester : for E1 and T1 interface stability and performance assessment.
  • 5. NOURCOMMUNICATIONS 5 SOPHISTICATED TEST EQUIPMENTS continued… d) TEMS Pocket: for GSM Base Station testing and detection of cross feeders. e) Site Master : for locating fault in feeders and VSWR testing. f) MW Test Set (MTS) : for checking of MW O/P power, received signal level and frequency measurement. g) IFR : for FM and VHF / UHF systems testing. h) Set of Spectrum Analyzers and Oscilloscopes as well as set of tools enough for use of 20 qualified installation teams for rapid deployment around the Kingdom.
  • 6. NOURCOMMUNICATIONS 6 A) Lucent Technologies International, Inc. / AT&T Int’l. TEP6 Project: From June 1996 to September 2000. Project managed by Lucent Technologies; Norconsult was project consultant. Contracts for: 1. SITE SURVEY: Nour was the only survey contractor of Lucent on its Kingdom wide GSM 200K, 300K and 500K projects. Total Number of Surveyed Sites in TEP6 = 1, 183 Sites  Provided with Microwave line of sight (LOS) data between prospective GSM locations; recorded any path obstructions and measured site elevation (AMSL) using Altimeter and Differential GPS.
  • 7. NOURCOMMUNICATIONS 7 Lucent Technologies continued (TEP6 Site Survey)…  Ensured that site location was suitable, both demographic and geographic, for effective GSM propagation and coverage.  Using state-of-the-art GPS set, recorded the site geographical coordinates. Special software and compass to get site magnetic bearings and other required path data.  Using the Spectrum Analyzer set, ensured there was no possible interference or signal propagation to affect the designated GSM and MW frequency bands.  GSM survey was based on the mobile coverage RF and MW objectives taking up to 3 candidate locations per site.
  • 8. NOURCOMMUNICATIONS 8 Lucent Technologies continued (TEP6)… 2. SKILLED MANPOWER SUPPLY:  Supplied Lucent with 21 Teams of Transmission Engineers for Testing & Commissioning of GSM transmission network using different PDH and SDH equipment such as AT&T Pcom, Harris MicroStar, and NERA STM 1 microwave radio sets.  Supplied Lucent with 33 Teams of Antenna Installers / Riggers, under Lucent’s disposal and direct supervision, to install GSM antennas and MW dishes of different sizes, including varied sizes of feeders, transmission cables, wave guides, jumpers, clamps, and related antenna accessories.
  • 9. NOURCOMMUNICATIONS 9 Lucent Technologies continued (TEP6)… 3. JUNCTION NETWORK: Transmission Contract (April 1998 – Nov. 2000). Direct contract with Lucent Technologies. Completed Sites = 146 Sites The Contract called for implementation of:  Site survey of 146 MW sites; Line-of-site (LOS) survey of 64 MW hops.  Complete design and optimization of MW hops; documentation of design and Method of Procedures (MOP) prior to site installation.
  • 10. NOURCOMMUNICATIONS 10 Lucent Technologies continued (TEP6 Junction Network)…  Indoor installation on 146 sites using NERA SDH STM1 MW Radio with Frequency Diversity; 16 hops with Space Diversity.  Outdoor Installation on 146 sites: different sizes of cross- polarized MW dishes and wave guides.  Hop alignment, equipment testing and commissioning prior to site integration into the long-haul MW network.
  • 11. NOURCOMMUNICATIONS 11 B) L.M. Ericsson GSM E4 : From March 2000 to December 2001. Direct contract to Ericsson; project managed by Ericsson; project consultant was Norconsult. Contracts for implementation of: 1. SITE SURVEY / RADIO SITE INVESTIGATION : Total Number of Surveyed Sites = 755 Sites  Site Search/Acquisition Survey. Survey of up to 3 candidate locations of a prospective new GSM Cell Site giving emphasis on RF and LOS considerations.  Change-out Site Survey. To determine the required transmission installation and Civil Works for a change out of GSM radio equipment, according to on-site Ericsson instructions, prioritizing the re-use of existing equipment for transmission, DC power and battery back up.
  • 12. NOURCOMMUNICATIONS 12 L.M. Ericsson continued (GSM E4 Site Survey)…  Radio Site Investigation. Documentation of both existing and planned radio facilities based on RSI checklist, floor plan, cable tray, and site lay out drawings, and detailed photographs of site and equipments.  Transmission Survey. Comprehensive transmission equipment survey conducted on MSC and existing Microwave Sites that were serving as Node Sites in the GSM mobile communications network.
  • 13. NOURCOMMUNICATIONS 13 L.M. Ericsson continued (GSM E4) … 2. RADIO INSTALLATION: RBS and Transmission. Total Number of Completed Sites = 241 Sites Contract entailed the following scope of work:  Change out of Lucent BTS 2000 equipment with Ericsson RBS 2202 cabinets with TRX radio units and associated elements.  Replacements and cut over of GSM antennas to effectively provide cellular communications in the 900 and 1800 MHz bands.  Replacements of LDF series feeders, jumpers, cable clamps, and other related antenna accessories.
  • 14. NOURCOMMUNICATIONS 14 L.M. Ericsson continued (GSM E4 Radio Installation)…  Installation of Transmission Microwave Equipment cabinet including cablings.  Installation of Mini-Link TMR 9202 both indoor and outdoor units.  Installation of microwave antenna dish and coaxial cable RG-8.  Alignment of MW hop and 24-hour BER burn test to ensure optimum signal gain.  Installation of batteries and rectifier units (Battery Back Up).  Cable connections and terminations both outside and inside shelter.
  • 15. NOURCOMMUNICATIONS 15 L.M. Ericsson continued (GSM E4) … 3. SITE CIVIL WORK CONSTRUCTION. Total Number of Completed Sites = 243 Sites  MSC / Indoor Room: Site survey for civil engineering; site design; construction and installation of raised floor system, FM200 gas flooding system, coded security access system, cable tray system, other civil, electrical and mechanical works including HVAC; fire alarm and detection control, and lighting fixtures; structural steel materials and electrical conduits.  New Green Field Site : Surveys for site acquisition and civil engineering; complete site design; excavation & backfill; supply and installation of equipment and generator shelters; self-support steel tower erection and painting; supply and install gantry between tower and shelter; chain link fence; ship and install power generator; other civil, electrical and mechanical works like HVAC, lightings, etc.
  • 16. NOURCOMMUNICATIONS 16 L.M. Ericsson continued (GSM E4 Civil Work ) …  New Roof Top Site: Site survey for civil engineering; site design; civil construction and installation of equipment shelter (3m x 3m) with foundation, cable tray system, antenna support, structural steel works including mast, electrical circuits and lighting fixtures; and site cleaning and preparation.  Change Out / TRU Expansion Site: Detailed site surveys; site design; existing building analysis; dismantling of Lucent BTS equipment; installation of new antenna mounts, shelter erection with foundation; and other civil and electromechanical requirements.
  • 17. NOURCOMMUNICATIONS 17 L.M. Ericsson GSM E5 : From August 2001 up to present. Direct contract to STC; Project supervised by Ericsson; project consultant is Norconsult Telematics. Contracts for implementation of: 1. SITE SURVEY Total Number of Surveyed GSME5 Sites = 530 Sites  Site Search/Acquisition Survey. Survey of up to 3 candidate locations of a prospective new GSM Cell Site giving emphasis on RF and LOS considerations.
  • 18. NOURCOMMUNICATIONS 18 L.M. Ericsson continued ( GSM E5 Survey)…  Change-out Site Survey. To determine the required transmission installation and Civil Works for a change out of GSM radio equipment, according to on-site Ericsson instructions, prioritizing the re-use of existing equipment for transmission, DC power and battery back up.  Site Survey for Civil Engineering. Detailed survey of existing sites for equipment upgrade; building or tower analysis (comparative study) for loading capacity; survey includes electromechanical considerations of increased load capacity due to planned additional equipment.
  • 19. NOURCOMMUNICATIONS 19 L.M. Ericsson continued (GSM E5) … 2. SITE CIVIL WORK CONSTRUCTION. Total Number of Completed Sites = 286 Sites  MSC / Indoor Room: Site survey for civil engineering; civil design FDED preparation; construction and installation of raised floor system, FM200 gas flooding system, coded security access system, cable tray & trunk system, other civil, electrical and mechanical works including HVAC; fire alarm and detection control, and lighting fixtures; structural steel materials and electrical conduits.  New Green Field Site : Surveys for site acquisition and civil engineering; civil design FDED preparation; excavation & backfill; supply and installation of equipment and generator shelters; self- support steel tower erection and painting; supply and install gantry between tower and shelter; chain link fence; install power generator; other civil, and electromechanical works like HVAC, lightings, etc.
  • 20. NOURCOMMUNICATIONS 20 L.M. Ericsson continued (GSM E5 Civil Work ) …  New Roof Top Site: Site survey for civil engineering; civil design FDED preparation; civil construction and installation of equipment shelter (3m x 3m) with foundation, cable tray system, antenna support, structural steel works including mast, electrical circuits and lighting fixtures; and site cleaning and preparation.  Change Out / TRU Expansion Site: Site survey for civil engineering; civil design FDED preparation; existing building analysis; dismantling of Lucent BTS equipment; installation of new antenna mounts and cable ladder, shelter erection with foundation; and other civil and electromechanical requirements.
  • 21. NOURCOMMUNICATIONS 21 L.M. Ericsson continued (GSM E5) … 3. SUPPLY OF COMPLETE EQUIPMENT SHELTER. Total Number of Shelters Delivered = 187 Shelters  Inside shelter installation of required equipments and accessories meeting the approved standards set by STC for GSM environment.  Completed shelters are being shipped from Nour Warehouse to the assigned GSM Cell Site.  Inside shelter installation includes the following: HVAC units, MDB panel, Halon / Fire Alarm Panel set, Security Access Control Panel set, battery rack and rectifier units, Tower Obstruction Light Control (TOLCO), cable and trunk ladder, door closer, required cablings, and inside / outside lighting fixtures.
  • 22. NOURCOMMUNICATIONS 22 L.M. Ericsson continued (GSM E5) … 4. SUPPLY OF CONTAINERIZED DUAL DIESEL GENERATOR Total Number of GSM Sites Installed with D. Generators = 89 Sites  Nour is the sole agent in Saudi Arabia of Germany’s SAB containerized dual generator. To date, 100 sets have been sold and 89 sets installed on GSM Sites not serviced by commercial power. Deutz is engine make of the 3-phase, 32.5KVA, 26 KW generator.  As STC approved power generator for GSM sites, it is installed together with accessories within a 30-foot box container providing a noise level of 65dB at 10 meter distance.  Accessories provided with the generators: control panel, starter batteries, FM200 fire extinguishing system, 220V and 24VDC lights, ventilation, fuel day tank and buried fuel bulk tank.
  • 23. NOURCOMMUNICATIONS 23 C) NOKIA GSM E5 Project : From September 2001 up to present. Direct contract to Nokia; project managed by Nokia; project consultant is Norconsult Telematics. Contract for implementation of: GSM AND TRANSMISSION RADIO INSTALLATION Total Number of Completed GSME5 Sites = 204 Sites  Implementation planning based on site specific and network configurations; radio site investigation survey.  Change out of Lucent BTS equipment with new Nokia Macro UltraSite or Micro MetroSite GSM 900/1800 MHz radio including antennas, feeders and jumpers; and battery back up unit.
  • 24. NOURCOMMUNICATIONS 24 NOKIA continued (GSME5 Radio Installation)…  Installation, testing and commissioning of transmission radio Nokia FlexiHopper or MetroHopper, and associated MW antenna.  Testing, commissioning and integration of all installed equipments. GSM E6 Project : Project has just started January 2003 calling for approximately 130 sites allocated to Nour for complete radio installation. Contract entails the same scope of work as that of GSME5 Project.
  • 25. NOURCOMMUNICATIONS 25 D) Saudi Telecommunications Company (STC) GSM R&V / C&I Project (Ph I & Ph II) : From July 2001 up to present. Direct contract to STC; Norconsult Telematics is project consultant. SITE CONSTRUCTION (Civil Work and Telecom) Total Number of Completed C&I GSM Sites = 73 Sites Contract is for Nour to construct and deliver to STC brand new GSM Cell sites, located along roads and villages in the Western Region, on a turn-key basis. Complete site construction requires both telecom and civil works scope of work as briefly described below: Civil Work Implementation:  Site acquisition survey of up to 3 candidates per site;  Civil engineering survey and site design (FDED) documentation.
  • 26. NOURCOMMUNICATIONS 26 Saudi Telecom (STC) continued (C&I Project)…  Site acquisition survey of up to 3 candidates per site.  Civil engineering survey and site design (FDED) documentation.  Site preparation, excavation and backfill, foundation preparation.  Erection of steel tower and equipment shelter.  Supply, delivery and installation of Dual Generators and fuel tanks.  Complete civil and electromechanical works such as gantry and cable tray system, antenna mounts, HVAC system, cable trenches, chain link fence, lighting fixtures, tower painting, concreting, and other works.
  • 27. NOURCOMMUNICATIONS 27 Saudi Telecom (STC) continued (C&I Project)… Telecommunications Implementation:  Complete BTS 2000 equipment installation including RF accessories like TRX radio units, DDF, GSM 900 MHz antennas and feeders, internal and external cablings; reconditioning of indoor BTS units.  Installation of MW transmission equipment using Harris MicroStar M7 or ATT Pcom radio units; installation of MW antenna dishes up to 2.4m diameter and IF cable RG-8; hop alignment and BER burn test to ensure link stability.  Installation of battery back up DC supply, batteries and rectifier units.  Testing and commissioning of all installed equipments.  Power up and Integration of site into the GSM network.
  • 28. NOURCOMMUNICATIONS 28 E) Motorola / NASCO Public Security Directorate (PSD) Transmission Project: From October 1998 to December 1999. Direct contract with Motorola and NASCO. Total Number of Completed Sites = 21 Sites  Contract called for Installation of transmission equipment on 21 PSD Sites located in Makkah, Jeddah and Taif.  MW radio used was Alcatel PDH T1 American Standard  Installation of PSD Monitoring System.  Transmission documentation of the 21 completed sites.
  • 29. NOURCOMMUNICATIONS 29 F) Harris Farinon GID Transmission Project: Direct contract with Harris Farinon for implementation of:  Transmission network installation using SDH 4T1 “QuadraLink” MW radio in the Western Region  Installation of Omniplex Multiplexer for PTT Line Combining on Hand Held and Mobile Radios  Installation of complete Network Management System for the whole West District over RS-232 modems in Taif and Jeddah. PSD Transmission Project: Direct contract with Harris Farinon for implementation of:  Setting up of Transmission Network and its Network Management System: five (5) sites in Riyadh and three (3) sites in Madinah.
  • 30. NOURCOMMUNICATIONS 30 Survey Type TEP6 Lucent Technologies GSME4 Ericsson GSME5 STC/Ericsson Site Total Site Search / Site Acquisition 1,183 100 210 310 Transmission (Microwave) 0 28 0 28 Radio Site Investigation 0 31 0 31 Change-out 0 596 320 916 Site Total 1,183 755 530 2,468 SITE SURVEY & RADIO SITE INVESTIGATION
  • 31. NOURCOMMUNICATIONS 31 Site Category C & I STC GSME4 Ericsson GSME5 STC/Ericsson Site Total MSC 0 15 24 39 Indoor / Eqpt. Room 0 9 10 19 Roof Top Site 0 138 28 166 New Greenfield 73 43 39 82 TRU Expansion 0 0 100 100 Change Out 0 0 64 64 Site Dismantling 0 38 21 59 Site Total 73 243 286 602 CIVIL WORK SITE IMPLEMENTATION
  • 32. NOURCOMMUNICATIONS 32 Area/City GSME4 Ericsson RIYADH 183 QASSIM 40 HAFR AL BATEN 18 Site Total 241 RADIO INSTALLATION ERICSSON RBS & TRANSMISSION RADIO
  • 33. NOURCOMMUNICATIONS 33 Western Region C & I STC GSME5 Nokia GSME6 Nokia Site Totals = 73 204 130 RADIO INSTALLATION STC BTS & NOKIA RBS AND TRANSMISSION RADIO
  • 34. NOURCOMMUNICATIONS 34 Sold To / Installed by Number of Gensets NOUR (C&I – 1) 11 NOUR (C&I – 2) 21 SABV-1 1 SABV-2 24 NATEL 4 MADAF 11 MOZOON 10 ACES 5 HICAP 2 Total = 89 DUAL DIESEL GENERATORS INSTALLED ON GSM SITES: