Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Seminar on Project Preparation
Procurement
Baku, 31 August – 1 September 2015
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Procurement
Procurement
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
How long does it take to procure?
Procurement
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
So you have won a grant and are ready to start implementing your project but to do so you
may need the services of experts, to produce information materials (services), to buy
computer or other equipment (supplies) or in some cases, to commission construction
work (works). That, is you may need to procure services, supplies and/or works.
Procurement
When conducting the procurement procedure, you should take care
that:
• The correct procedure is being used;
• The forms to be utilised are in line with international standards and provisions of
Annex IV of your contract.
• The rule of origin of supplies is applied;
• The eligibility rule is observed;
If the beneficiary (or beneficiary‟s partners) fails to comply with any of these rules
expenditures in question will be considered as not eligible for EC financing.
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Rules for procurement
• Rules for procurement are defined in ‘Annex IV Procurement by grant
Beneficiaries in the context of European Community external actions’
annexed to the grant contract;
• Annex IV is applicable to the Beneficiary and all partners, regardless of
their legal status (public or private) or nationality (EU or partner country);
• For what is NOT described in Annex IV (detailed procedures, tender
documents):
• Either partner’s own procedures, but must be in accordance with
Annex IV rules, in particular „best international practice‟;
• Or may use Chapters 3 (Service), 4 (Supply), 5 (Works) of PraG and
related annexes (templates).
Procurement
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Annex IV requirements
Annex IV:
1. General principles
2. Eligibility for contracts (rules of nationality & origin)
3. Rules common to all tender procedures
4. Rules applicable to service contracts
5. Rules applicable to supply contracts
6. Rules applicable to work contracts
7. Use of negotiated procedure
8. Special cases
BUT
• References to other chapters of PRAG, e.g. what “international open tender” means, etc.
Procurement
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Difference between a call for proposals and a
call for tender
Procurement
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Procurement (Tender) Types
• Service contracts: These cover engagement of service providers, companies
and/or individuals (experts). Service contracts are used for preparation of studies,
evaluation reports, experts‟ or trainers‟ engagement, printing and publishing
services, translation, conference/events organisation, catering etc.
• Supply contracts: These cover the purchase or rental of supplies/equipment. The
delivery of products may in addition include installation and maintenance.
• Works contracts: These cover either the execution, or both the execution and
design of a „work‟. A „work‟ means the outcome of building or civil engineering works
taken as a whole that is sufficient in itself to fulfil an economic or technical function.
• Grants
among them different threshold of publication (see next slide)
Procurement
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Thresholds
Procurement
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Important note!
Artificial slicing in order to avoid
threshold for publication
NOT ALLOWED
Procurement
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
• selection criteria
- eligibility
- financial/economic standing
- technical/professional capacity
• award criteria
- technical criteria
- price
• once published, criteria may not be changed
Selection and award criteria
Procurement
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Awarding principles
• transparency (the tender documents must contain clear and open
criteria and procedures - they must be accessible to all tenderers);
• proportionality (whatever is being requested should be limited to
what is necessary to achieve the specific purpose);
• equal treatment (the award process must be completely impartial -
the bids are selected using published eligibility and evaluation criteria);
• non-discrimination; and
• sound competition.
Procurement
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Why excluding an applicant/tenderer?
a) bankruptcy or similar situation;
b) convicted for offence in their professional conduct;
c) proven grave professional misconduct;
d) not paid social security contributions or taxes;
e) judgement for fraud, corruption, illegal activities;
f) breach of contract financed by EC funds;
Reasons for exclusion
Procurement
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
As well as:
 Attempt to obtain confidential information, to influence committee
decision;
 Misrepresentation in supplying the information required;
 + ethical grounds incl. impartiality/human rights/conflict of interest
(section I.7 of Rules and procedures for contracts financed from
the EC general Budget in the context of external actions).
Procurement
Reasons for exclusion (2)
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Rules of nationality/origin
Participation in tender procedures managed by the Beneficiary(ies) is open
on equal terms to all natural and legal persons of the Member States and
the States and territories of regions expressly covered and/or allowed by the
Financial Regulation and the basic acts or other instruments governing the aid
programme under which the grant is being financed.
Tenderers must state in their tenders the country of which they are nationals
by presenting the usual proof of nationality under their national legislation.
This rule does not apply to the experts proposed under service tenders
financed by the grant.
For each basic act, the detailed list of eligible countries are listed in
Annexes A2a and A2b of Practical Guide.
Procurement
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Origin - definition
The term „origin‟ is defined in the relevant EU legislation on rules of origin for customs purposes: the
Customs Code (Council Regulation (EEC) No 2913/92) in particular its Articles 22 to 24 thereof,
and the Code's implementing provisions (Commission Regulation (EEC) No 2454/93).
• The country of origin is not necessarily the country from which the goods have been shipped
and supplied.
• Two basic concepts are used to determine the origin of goods, namely the concept of “wholly
obtained” products and the concept of products having undergone a "last substantial
transformation".
• If only one country is involved in the production, the "wholly obtained" concept will be
applied. In practice, these goods wholly obtained in a single country shall be regarded as
having their origin in that country. This will be restricted to mostly products obtained in their
natural state and products derived from wholly obtained products.
• If two or more countries are involved in the production of goods it is necessary to
determine which of those countries confers origin on the finished goods. For this purpose the
concept of "last, substantial transformation" is applied.
Procurement
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Rule of origin
All supplies purchased under a procurement contract, or in accordance with a grant
contract, financed under the EU budget or the EDF shall originate from an eligible
country as per the corresponding Instrument.
However, according to the CIR, when the value of the
supplies to be purchased is below 100 000 euros per
purchase, the supplies do not have to originate from an eligible
country (full untying).
Within a grant or works contract, the rules of origin apply only to
supply purchase for an amount equal or above 100 000 euros.
Procurement
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Exceptions to the rule on origin
• Exceptions to the rule on nationality and origin may be made in
some cases;
• The award of such contract is decided on a case-by-case basis
by the Commission before the procedure is launched;
• The derogation must be mentioned in the procurement notice.
Procurement
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Derogation
 The contract notice will have to indicate that the tender
procedure benefits from the derogation.
 If the procurement procedure is to be divided into lots, this
applies per lot.
 The division into lot shall not be used to get around the
rules of origin.
 The services would have to pay special attention to the
legitimacy of the division into lot to avoid artificial slicing.
Procurement
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
How to prepare a
tender dossierProcurement
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Procurement procedures – internet
Procurement
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Procurement
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Procurement
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Tender Launch
 Deadline for Submission = min. 30 days
 Deadline for Questions 21 days
 Deadline for Answers 11 days
Tenders are valid for 90 days
Procurement
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Submission of Tenders
• Tenders must be submitted in accordance with the double
envelope system,
 i.e., in an outer parcel or envelope containing two
separate, sealed envelopes,
 one bearing the words "Envelope A - technical offer" and
 the other "Envelope B - financial offer"
• All parts of the tender other than the financial offer must be
submitted in Envelope A.
Services
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Evaluation Committee
Procurement
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Contracting
• Once tenderer is selected, informed by letter and asked to submit
additional info within 15 days
• Once received, the contract is prepared, signed and sent to
contractor who signs within 30 days
• Once signed by all, other tenderers informed with reasons
• Attention – irregularities:
Sequence not followed;
Contractor forced to sign ASAP and not within 30 days
Services
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Cancel the tender procedure
in exceptional circumstances:
• none of the tenders satisfies the selection/award criteria of the
tender procedure;
• no tender achieves the minimum threshold during the technical
evaluation;
• the total price (comprising both the fees and the provision) of all
tenders exceeds the maximum amount available for the contract;
• irregularities in the procedure, in particular where these have
prevented fair competition;
• force majeure.
Procurement
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Main differences
 Services are awarded based on 80/20 ration of quality and price
while Supplies and Works are awarded to lowest technically
compliant offer;
 You may have services as a part of supply tender, but should not
have supplies as a part of service tender;
 Works - This is the ONLY type of procedure for which CA may ask
Tenderers to “pay” in order to receive the Tender Dossier (to cover
cost of copying and posting).
Procurement
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
What are the key factors to take into account in
procurement?
Procurement
What to do What NOT to do
Do identify the applicable rules to your organisation Do not acquire services, supplies and works ‘as usual’
Do plan all procurement at the beginning of the project Do not assume that procurement can be done quickly
Do be aware of the thresholds for all subcontracting
Do not artificially split contracts to avoid the
requirements e.g. by year or by category or by partner.
Artificial splitting is not allowed and will make the total
amount of all contracts ineligible (more information on
artificial splitting is in section 3.6 below)
Do consult your auditor in case of doubt or just to
double check
Do not trust only your past experience even if you had
similar grants in the past – rules change
Do revise your usual procedures to verify that they are
compliant with Annex IV of your grant contract
Again do not do it ‘as usual’
Do provide all information required, make sure the
Terms of Reference are clear and include check-lists for
tenderers
Do not assume that tenderers have enough experience
to submit eligible bids
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
CONFLICT OF INTEREST
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
32
A Conflict of interest:
…occurs when the impartial and objective exercise of the
functions of the contracting authority, or observance of the
principles of competition, non-discrimination against or equality of
treatment of candidates, tenderers, applicants and contractors…
…is compromised for reasons involving family, emotional life,
political or national affinity, economic interest or any other
shared interest with a beneficiary of EU-funded programmes.
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
33
Conflicts of interests and corruption are not the
same thing!
Corruption usually requires an agreement between at least two
partners and a bribe/payment/advantage of some kind.
A conflict of interests arises where a person may have the
opportunity to put private interests before his or her professional
duties.
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
A conflict of interest may arise where, for instance :
a member of the evaluation committee or someone in the
contracting authority or others involved in the procedure,
grant themselves, or others:
 unjustified direct or indirect advantages by influencing
the outcome;
 or allow an expert or company to obtain information
leading to an unfair advantage in subsequent or related
procedures.
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
TYPES OF CONFLICTS OF INTEREST
Actual conflict of
interest
Perceived conflict
of interest
Potential conflict
of interest
A public official is in
a position to be
influenced by their
private interests
when doing their job.
A public official is in
a position to appear
to be influenced by
their private
interests when doing
their job.
A public official is in
a position where
they may be
influenced in the
future by their
private interests
when doing their job.
Source: ICAC, Managing Conflict of Interest in the Public Sector, November 2004.
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Examples
• The space rented for the project office was part of a residential unit.
Inspection of documents revealed that the real estate belonged to the project
director, the other part being his own living space. Besides the clear case of
conflict of interest, it was unclear how the utilities were charged to the project.
• The office rented for the project was the apartment of the project
accountant/NGO president.
• The accountant of the project was also auditor in the company selected for
expenditure verification.
• NGO awarded several contracts to an IT advisory firm, owned by a member
of the Board of Trustees of the NGO.
• The family members (son, husband) of NGO president were hired in the
project without having proper qualifications and experience.
• A staff member of the final beneficiary of the project was hired as expert.
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Examples
• The spouse of a contracting authority‟s desk officer in charge of
monitoring a tendering procedure works for one of the bidders.
• A person owns shares in a company. This company takes part in a
tendering procedure in which this person is appointed as a member of
the evaluation committee.
• The head of a contracting authority has spent a week‟s holiday with
the CEO of a firm which bids in a tendering procedure launched by
the contracting authority.
• An officer in a contracting authority and the CEO of one of the
tendering firms have responsibilities in the same political party.
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Examples
Tendering and Purchasing: A person owns shares in a company. This
company takes part in a tendering procedure in which this person is appointed as
a member of the evaluation committee.
Staff Recruitment : A member of a selection panel has a close relationship with
one of the applicants for the job. This conflict of interest could bias, or could
reasonably be expected to bias, the decision of the panel.
Secondary employment : Two police officers have second jobs as bouncers at a
nightclub. Local residents have complained to the police several times about
noise levels at the club and problems with drunks and underage drinking, but no
action appears to have been taken. The impartiality of the police officers has
been compromised as it may be perceived that they are using their influence to
make sure the club is not investigated.
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Examples
Dealing with former public officials : A senior employee of a government
department awarded a particular firm several valuable contracts. Shortly after
awarding the contracts, he resigned from his job and went to work for the firm. It
could appear that the offer of employment was a personal benefit, in return for
favors given. Other competitors might be disadvantaged if staff at the agency
were influenced by their previous colleague and continued to award contracts to
his firm. This situation must be carefully managed to ensure favoritism or the
perception of favoritism does not occur.
Gifts, benefits and hospitality: A regular supplier offered the purchasing officer
of a government department a free weekend for two at a beach resort. The
officer's impartiality when dealing with the supplier could be compromised if she
accepted the offer.
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Examples
Local Government Planning Approvals
A senior council planner often had to advise applicants on how to make their
development applications comply with council's codes. He suggested to some
applicants that they should use the services of a local architectural firm where his
brother worked.
Although the necessary work was mainly done by staff at the firm, the planner
was sometimes paid to prepare the drawings himself. The planner's job was to
act in the public interest and to provide impartial advice about council's policies.
By recommending his brother's firm, he put the private interests of his brother and
himself before his public duty.
A similar conflict can occur when councils have a dual role as developer and
regulator. Councils that decide to develop a piece of land they own may make
decisions in their own commercial interest and unfairly disadvantage other
developers. It may be difficult for councils to be impartial when they are effectively
having to assess their own applications.
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Examples
Licensing
A health inspector is friendly with the owner of a local butcher's shop and often
gets given extra meat with his family's order. As part of his job, the inspector has
to inspect the butcher's shop to check it complies with health regulations. The
personal relationship between the butcher and the inspector, and his acceptance
of free meat, could reasonably be expected to influence his assessment of the
health standards in the shop.
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Examples
Elected officials
Many councilors have business and professional interests in the local
government area they represent. Conflicts can arise if their public positions allow
them access to information and opportunities that could be used to advance their
personal and business interests. For example, a councilor may be tempted to
influence an application to set up a new business in the town if his own business
could lose custom as a result
Source: (ICAC Practical Guide, 1996. http://www.icac.nsw.gov.au/files/html/pub2_27cp.htm
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
What action must be taken if a risk of conflict of interests is identified or a
conflict of interests is declared/detected before or during the procedure?
Subject to the relevant national law, relevant measures to safeguard the
public procurement procedure should be taken.
The following steps should be considered, depending on the existence or
not of a declaration of absence of conflict of interests, the nature of the
conflict of interests and the stage of the procedure:
 where appropriate discussing the elements of facts with the
person concerned to clarify the situation
 excluding the person concerned from the public procurement
procedure, whether he/she is a staff member or an external expert,
 change in division of duties and responsibilities among the staff
 cancelling the procurement procedure.
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Declarations of absence of conflicts of interests
It is highly recommended that people be asked to sign a declaration of
absence of conflict of interests as soon as they take part in the procedure.
The declaration of absence of conflict of interests should contain the
definition of a conflict of interests and all the requirements of any code of
conduct or ethics applicable to the process and related to conflict of
interests.
The declaration should give:
(a) a clear reference to the procurement procedure concerned;
(b) the signatory‟s full name, date of birth, position in the organisation, and
function in the public procurement procedure;
(c) the date of signature.
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
The declaration should enable the signatory to declare officially:
 whether to his/her knowledge he/she is in an apparent/potential/actual
conflict of interests linked to the procurement procedure referred to;
 whether there are circumstances that might place him/her in an
apparent/potential/actual conflict of interests in the near future; and
 that he/she commits to declaring immediately any potential conflict of
interests in the event of any circumstance that might lead to such a
conclusion.
The declaration should include a reference to the
disciplinary/administrative/criminal sanctions for making a false
declaration.
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
46
GC -ARTICLE 4 - CONFLICT OF INTERESTS
• The Beneficiary(ies) shall take all necessary measures to prevent or end
any situation that could compromise the impartial and objective
performance of this Contract. Such conflict of interests may arise in
particular as a result of economic interest, political or national affinity,
family or emotional ties, or any other relevant connection or shared
interest.
• Any conflict of interests which may arise during performance of this
Contract must be notified in writing to the Contracting Authority without
delay. In the event of such conflict, the Coordinator shall immediately
take all necessary steps to resolve it.
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
47
GC -ARTICLE 4 - CONFLICT OF INTERESTS
• The Contracting Authority reserves the right to verify that the
measures taken are appropriate and may require additional
measures to be taken if necessary.
• The Beneficiary(ies) shall ensure that its staff, including its
management, is not placed in a situation which could give rise to
conflict of interests. Without prejudice to its obligation under this
Contract, the Beneficiary(ies) shall replace, immediately and
without compensation from the Contracting Authority, any
member of its staff in such a situation.
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Sub-granting - suggested practice
(but please consult with your CA about all the details)
Procurement
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Sub-granting - Background
Procurement
The European Commission (EC) re-introduced in May 2007 the
option of sub-granting in its grant contracts1.
Sub-granting is an indirect financial contribution through an EC
grant Beneficiary to a sub-grant Beneficiary for an action intended
helping to achieve an objective of the EC grant contract.
Before the award of financial support to third parties, the EU
Delegation will have to be informed. The modalities for information
will be defined before signature of the grant contract.
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Guidelines for grant Applicants
Procurement
The Calls for Proposal Guidelines specify that the Applicant must set out the
following in the proposal on sub-granting:
(i) the objectives and results to be obtained with the financial support;
(ii) the different types of activities eligible for financial support, on the basis of
a fixed list;
(iii) the types of persons or categories of persons which may receive financial
support;
(iv) the criteria for selecting these entities and giving the financial support;
(v) the criteria for determining the exact amount of financial support for each
third entity, and
(vi) the maximum amount which may be given.
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Ineligible activities
Procurement
As sub-granting does not imply the transfer of responsibility, the Beneficiary of the
EC grant needs to take into consideration the eligibility of all expenditure and that
costs related to the following actions are considered to be ineligible:
• debts and debt service charges (interest);
• provisions for losses or potential future liabilities;
• costs declared by the Beneficiary(ies) and financed by another action or work
programme receiving a Union (including through EDF) grant;
• purchases of land or buildings, except where necessary for the direct
implementation of the Action, in which case ownership shall be transferred to the
final beneficiaries and/or local Beneficiary(ies), at the latest at the end of the
Action, in accordance with Article 7.5;
• currency exchange losses;
• credits to third parties, unless otherwise specified in the Special Conditions.
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Selection of sub-grant Beneficiaries
Procurement
• Sub-grants awarded by the Beneficiary are subject to the nationality rules as
referred to in Annex IV. (eligibility is governed by the same criteria as for
Beneficiaries and Partners as published in the Call for Proposals
Guidelines for Applicants);
• In order to select the most suitable sub-grant Beneficiary, the Beneficiary has
to evaluate according to the criteria set out in the Description of the Action
(Annex I) and following the principles of transparency, fairness and non-
discrimination, which should be reflected in the selection criteria in a
justifiable and well documented manner.
• The evaluation process of a sub-grant Beneficiary must be well
documented and might be subject to prior approval by the Contracting
Authority.
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Evaluation of sub-grant proposals
Procurement
For the proper evaluation of sub-grant proposals the Beneficiary may use the
following evaluation grid and include the selection criteria as established in
Annex I of the EC grant contract.
Once proposals for sub-granting have been assessed, a list could be
established with the proposed actions ranked according to their total score.
Score
1. Operational criteria
As listed in the Description of the Action (Annex I).
2. Financial criteria
As listed in the Description of the Action (Annex I).
Total score
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Contractual Agreement between Grant Beneficiary
and Sub-grant Beneficiary
Procurement
• Sub-granting is bound by the provisions of the Special and General
Conditions of the EC grant contract.
• The Beneficiary shall be accountable to the Contracting Authority for
the implementation of the Action. It shall undertake that the conditions
applicable to it, especially under Articles 1, 3, 4, 5, 6, 7, 8, 10, 14, 16 and
17 of the General Conditions (Annex II) shall also apply to its sub-grant
Beneficiary.
• The Beneficiary shall include provisions to that effect as appropriate in
its formal agreement with the sub-grant Beneficiary so as to ensure the
proper execution of the EC grant contract.
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Contractual Agreement between Grant Beneficiary
and Sub-grant Beneficiary (1)
Procurement
Below issues could be taken up in a formal agreement between the
Beneficiary and the sub-grant Beneficiary:
A. Purpose of the sub-grant:
In the agreement reference should be made to the fact that the sub-grant is
awarded in the context of an EC grant contract with the Beneficiary
including reference to the Special and General Conditions.
Moreover, a clear description of the activities expected to be carried out by
the sub-grant Beneficiary should be provided.
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Implementing modalities
Procurement
The following issues need to be addressed:
• Implementation period: start and end date;
• Maximum amount of sub-granting in Euro. Please note that reference to local
currency should be avoided in order not to incur exchange rate losses, which are
ineligible;
• Indication of eligible budget items (attach copy of the budget to the agreement
with a clear reference to the budget items sub-granted.)
• Definition of responsibilities of the sub-grant Beneficiary regarding personal
taxes, social and related benefits for the personnel working under the grant;
• Declaration of the sub-grant Beneficiary;
• Contact addresses of the Parties.
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Payment and reporting modalities
Procurement
• Payment arrangements: specify the amount of pre-financing and payment
installments.
• Payments should be based on the periodic financial reports submitted applying the
percentage of EC contribution to the agreed bank account.
• Original documents should be sent with each request for payment and the grant
Beneficiary shall return these documents after stamping them "certified as original".
• Beneficiary should designate authorized signatories and track the transactions
related to the sub-grant.
• Agreement on the type and frequency of narrative and financial reporting:
template to be used in line with EC grant contract.
• Agreement on the consequences of a lower than expected EC payment as a result of
the application of the maximum funding percentage under the EC grant contract: who
pays the sub-grant Beneficiary in case the total eligible costs are lower than
expected.
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Evaluation, audits, visibility
Procurement
• It is advisable that both parties agree about audit approach and
modalities
and
• that monitoring missions and checks of the sub-grant Beneficiary
accounts and records are carried out by the Beneficiary of the EC
grant.
• Any publication or information on the project should be agreed in
advance between the two parties.
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Evaluation, audits, visibility (1)
Procurement
Prior approval by the Contacting Authority should be provided upon
concluding an agreement with the sub-grant Beneficiary.
Should the sub-grant Beneficiary fail to implement the approved
activities in accordance with the Description of the Action (Annex I) and with
a view to achieving the objectives laid down therein, a recovery order of
the sub granted amount should be enforced.
Note that the Contracting Authority does not acknowledge any contractual
link between itself and the sub-grant Beneficiary.
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Information of the Beneficiary of sub-granting
Procurement
The Beneficiary of the EC grant should inform the sub-grant Beneficiary about
the content of the annexes of the Special Conditions of the EC grant contract:
• Annex II: General Conditions applicable to European Community-financed
grant contracts for external Actions;
• Annex III: Budget for the Action;
• Annex IV: Contract-award procedures;
• Annex V: Standard request for payment and financial identification form;
• Annex VI: Model narrative and financial report;
• Annex VII: Model report of factual findings and terms of reference for an
expenditure verification of an EC financed grant contract for external actions;
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Declaration by the Beneficiary of a sub-grant
Procurement
In order to provide the Beneficiary with a reasonable assurance that the sub-
grant Beneficiary is able to carry out the agreed upon actions, the authorised
signatory of the sub-grant Beneficiary should declare that they will be excluded
from participation if:
a) they are bankrupt or being wound up, are having their affairs administered
by the courts, have entered into an arrangement with creditors, have
suspended business activities, are the subject of proceedings concerning
those matters, or are in any analogous situation arising from a similar
procedure provided for in national legislation or regulations;
b) they have been convicted of an offence concerning their professional
conduct by a judgment which has the force of res judicata;
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Declaration by the Beneficiary of a sub-grant (1)
Procurement
c) they have been guilty of grave professional misconduct proven by any means which the
Beneficiary can justify;
d) they have not fulfilled obligations relating to the payment of social security contributions
or the payment of taxes in accordance with the legal provisions of the country in which
they are established or with those of the country of the Beneficiary or those of the country
where the contract is to be performed;
e) they have been the subject of a judgment which has the force of res judicata for fraud,
corruption, involvement in a criminal organisation or any other illegal activity detrimental
to the Communities' financial interests;
f) they are currently subject to an administrative penalty referred to in section 2.3.5 of the
Practical Guide to contract procedures for EC external actions.
The authorised signatory of the sub-grant Beneficiary must certify that he is not in one of the
situations listed above and signed on behalf of the sub-grant holder. At the approval stage the
Contracting Authority will ensure that this declaration is provided by the sub-grant Beneficiary.
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
VAT
Procurement
• As is the case with EC grant Beneficiaries VAT is not eligible for sub-grant
Beneficiaries (except if duly justified).
• In order to insure that zero VAT is granted the Beneficiary shall inform the
Ministry of Finance at an early stage of the sub-granting component of its
EC grant contract.
• If there is any problem in obtaining the zero VAT the EC office should be
informed in order to facilitate the procedure.
• Procedure defers from one country to another.
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Audits
Procurement
• In case of sub-granting in the EC grant contract the auditor should be
informed at an early stage.
• Before submitting a proposal to the EC, an auditor should be consulted
for a price quote, which would take into account the sub-granting as this
would entail more work for the auditor and therefore a higher audit fee.
• Ensure that enough funds are included in the project budget to cover this
type of audit.
Funded by
European Union
Introduction
What is project
Logical Frmwrk
Schedule
Budget
Stakeholders
Partnership
Procurement
Services
M&E
Reporting
Visibility
Audits (1)
Procurement
• During the audit of actions with sub-granting, the auditor should verify
the expenditures of each sub-grant Beneficiary and ensure that the
activities involved are in line with those of the EC grant contract.
• Furthermore, the auditor should verify the eligibility of the costs
incurred by the sub-grant Beneficiary, the respect of the zero-VAT
issues and the use of the correct exchange rates as per the provisions
under the EC grant contract.
• The Beneficiary should keep copies of all supporting documents
related to sub-grants for the period as specified in the General
Conditions of the EC grant contract. As for the sub-grant Beneficiaries
original copies should be kept for the same period.

More Related Content

What's hot

FP7 project negotiation, management and financial rules
FP7 project  negotiation, management and financial rulesFP7 project  negotiation, management and financial rules
FP7 project negotiation, management and financial rulesEuropa Media Trainings
 
How to plan EC-funded projects
How to plan EC-funded projectsHow to plan EC-funded projects
How to plan EC-funded projectsInka Pibilova
 
FP7 Legal Aspects (March 2007)
FP7 Legal Aspects (March 2007)FP7 Legal Aspects (March 2007)
FP7 Legal Aspects (March 2007)CPN_Africa
 
FP7 Financial Issues (March 2007)
FP7 Financial   Issues (March 2007)FP7 Financial   Issues (March 2007)
FP7 Financial Issues (March 2007)CPN_Africa
 
Feasibility study 5 contents
Feasibility study 5 contentsFeasibility study 5 contents
Feasibility study 5 contentsAbdelmoneim Ali
 
Financial management baltic scope final
Financial management baltic scope finalFinancial management baltic scope final
Financial management baltic scope finalLaura Melne
 
CCXG March 2019 Federica Fricano Reflections on COP24 outcomes and upcoming work
CCXG March 2019 Federica Fricano Reflections on COP24 outcomes and upcoming workCCXG March 2019 Federica Fricano Reflections on COP24 outcomes and upcoming work
CCXG March 2019 Federica Fricano Reflections on COP24 outcomes and upcoming workOECD Environment
 
IFAD Procurement Guidelines revised 2008
IFAD Procurement Guidelines revised 2008IFAD Procurement Guidelines revised 2008
IFAD Procurement Guidelines revised 2008IFAD Vietnam
 
Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5
Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5
Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5cesarqueiroz
 

What's hot (20)

H2020 Financial Rules Infoday
H2020 Financial Rules InfodayH2020 Financial Rules Infoday
H2020 Financial Rules Infoday
 
FP7 project negotiation, management and financial rules
FP7 project  negotiation, management and financial rulesFP7 project  negotiation, management and financial rules
FP7 project negotiation, management and financial rules
 
How to plan EC-funded projects
How to plan EC-funded projectsHow to plan EC-funded projects
How to plan EC-funded projects
 
Horizon 2020 ga
Horizon 2020 gaHorizon 2020 ga
Horizon 2020 ga
 
H2020 Infoday Proposals Submission
H2020 Infoday Proposals SubmissionH2020 Infoday Proposals Submission
H2020 Infoday Proposals Submission
 
FP7 Legal Aspects (March 2007)
FP7 Legal Aspects (March 2007)FP7 Legal Aspects (March 2007)
FP7 Legal Aspects (March 2007)
 
FP7 Financial Issues (March 2007)
FP7 Financial   Issues (March 2007)FP7 Financial   Issues (March 2007)
FP7 Financial Issues (March 2007)
 
Feasibility study 5 contents
Feasibility study 5 contentsFeasibility study 5 contents
Feasibility study 5 contents
 
Financial management baltic scope final
Financial management baltic scope finalFinancial management baltic scope final
Financial management baltic scope final
 
Funding opportunities in Horizon 2020
Funding opportunities in Horizon 2020Funding opportunities in Horizon 2020
Funding opportunities in Horizon 2020
 
03 Innovation Procurement in the General / e-Government sector – PCP case exa...
03 Innovation Procurement in the General / e-Government sector – PCP case exa...03 Innovation Procurement in the General / e-Government sector – PCP case exa...
03 Innovation Procurement in the General / e-Government sector – PCP case exa...
 
Kick off dalane vgs SIU
Kick off dalane vgs SIUKick off dalane vgs SIU
Kick off dalane vgs SIU
 
Hands-on guidance roundtables and open discussions (parallel sessions)
Hands-on guidance roundtables and open discussions (parallel sessions)Hands-on guidance roundtables and open discussions (parallel sessions)
Hands-on guidance roundtables and open discussions (parallel sessions)
 
CCXG March 2019 Federica Fricano Reflections on COP24 outcomes and upcoming work
CCXG March 2019 Federica Fricano Reflections on COP24 outcomes and upcoming workCCXG March 2019 Federica Fricano Reflections on COP24 outcomes and upcoming work
CCXG March 2019 Federica Fricano Reflections on COP24 outcomes and upcoming work
 
IFAD's Procurement Guidelines
IFAD's Procurement GuidelinesIFAD's Procurement Guidelines
IFAD's Procurement Guidelines
 
Main steps in an innovation procurement (including steps before the procurement)
Main steps in an innovation procurement (including steps before the procurement)Main steps in an innovation procurement (including steps before the procurement)
Main steps in an innovation procurement (including steps before the procurement)
 
Hands-on guidance roundtables and open discussions (parallel sessions)
Hands-on guidance roundtables and open discussions (parallel sessions)Hands-on guidance roundtables and open discussions (parallel sessions)
Hands-on guidance roundtables and open discussions (parallel sessions)
 
Innovation Procurement in the General / e-Government sector – PCP case exampl...
Innovation Procurement in the General / e-Government sector – PCP case exampl...Innovation Procurement in the General / e-Government sector – PCP case exampl...
Innovation Procurement in the General / e-Government sector – PCP case exampl...
 
IFAD Procurement Guidelines revised 2008
IFAD Procurement Guidelines revised 2008IFAD Procurement Guidelines revised 2008
IFAD Procurement Guidelines revised 2008
 
Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5
Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5
Comp Selec Concession Bsb Pp Pwkshp C Queiroz Jun2010 V5
 

Similar to 5_Procurement, conflict of interest and sub-granting

How to write the full application to the eu info session on 23 july 2014 in kiev
How to write the full application to the eu info session on 23 july 2014 in kievHow to write the full application to the eu info session on 23 july 2014 in kiev
How to write the full application to the eu info session on 23 july 2014 in kievISAR Ednannia
 
Cote d'Ivoire: how to start as an independent power producer?
Cote d'Ivoire: how to start as an independent power producer?Cote d'Ivoire: how to start as an independent power producer?
Cote d'Ivoire: how to start as an independent power producer?S. KOUADIO
 
Understanding Pre Qualification Questionnaires
Understanding Pre Qualification QuestionnairesUnderstanding Pre Qualification Questionnaires
Understanding Pre Qualification QuestionnairesLloyd Sewell
 
Introduction To EU Procurement Rules October 2011
Introduction To EU Procurement Rules October 2011Introduction To EU Procurement Rules October 2011
Introduction To EU Procurement Rules October 2011EuanPirie
 
HNSciCloud Info Day, 7 Sept 2016, Request for Tenders Presentation by Christo...
HNSciCloud Info Day, 7 Sept 2016, Request for Tenders Presentation by Christo...HNSciCloud Info Day, 7 Sept 2016, Request for Tenders Presentation by Christo...
HNSciCloud Info Day, 7 Sept 2016, Request for Tenders Presentation by Christo...Helix Nebula The Science Cloud
 
2 procurement and legal aspects
2 procurement and legal aspects 2 procurement and legal aspects
2 procurement and legal aspects Archiver
 
EU spends 5 MIO EUR for media campaign in Turkey
EU spends 5 MIO EUR for media campaign in Turkey EU spends 5 MIO EUR for media campaign in Turkey
EU spends 5 MIO EUR for media campaign in Turkey Thierry Debels
 
Lawyer in Vietnam - Dr. Oliver Massmann THE WORLD BANK IS ASKING DUANE MORRIS...
Lawyer in Vietnam - Dr. Oliver Massmann THE WORLD BANK IS ASKING DUANE MORRIS...Lawyer in Vietnam - Dr. Oliver Massmann THE WORLD BANK IS ASKING DUANE MORRIS...
Lawyer in Vietnam - Dr. Oliver Massmann THE WORLD BANK IS ASKING DUANE MORRIS...Dr. Oliver Massmann
 
Assessment of Offshore Transmission Tender Round 1 benefits (2014)
Assessment of Offshore Transmission Tender Round 1 benefits (2014)Assessment of Offshore Transmission Tender Round 1 benefits (2014)
Assessment of Offshore Transmission Tender Round 1 benefits (2014)CEPA Ltd
 
Innovate UK's monitoring services procurement - full briefing pack
Innovate UK's monitoring services procurement - full briefing packInnovate UK's monitoring services procurement - full briefing pack
Innovate UK's monitoring services procurement - full briefing packInnovate UK
 

Similar to 5_Procurement, conflict of interest and sub-granting (20)

How to write the full application to the eu info session on 23 july 2014 in kiev
How to write the full application to the eu info session on 23 july 2014 in kievHow to write the full application to the eu info session on 23 july 2014 in kiev
How to write the full application to the eu info session on 23 july 2014 in kiev
 
Cote d'Ivoire: how to start as an independent power producer?
Cote d'Ivoire: how to start as an independent power producer?Cote d'Ivoire: how to start as an independent power producer?
Cote d'Ivoire: how to start as an independent power producer?
 
File download,15592,en
File download,15592,enFile download,15592,en
File download,15592,en
 
Understanding Pre Qualification Questionnaires
Understanding Pre Qualification QuestionnairesUnderstanding Pre Qualification Questionnaires
Understanding Pre Qualification Questionnaires
 
Introduction To EU Procurement Rules October 2011
Introduction To EU Procurement Rules October 2011Introduction To EU Procurement Rules October 2011
Introduction To EU Procurement Rules October 2011
 
HNSciCloud Info Day, 7 Sept 2016, Request for Tenders Presentation by Christo...
HNSciCloud Info Day, 7 Sept 2016, Request for Tenders Presentation by Christo...HNSciCloud Info Day, 7 Sept 2016, Request for Tenders Presentation by Christo...
HNSciCloud Info Day, 7 Sept 2016, Request for Tenders Presentation by Christo...
 
2 procurement and legal aspects
2 procurement and legal aspects 2 procurement and legal aspects
2 procurement and legal aspects
 
Centralised purchasing in a decentralised procurement environment, Ivana Fran...
Centralised purchasing in a decentralised procurement environment, Ivana Fran...Centralised purchasing in a decentralised procurement environment, Ivana Fran...
Centralised purchasing in a decentralised procurement environment, Ivana Fran...
 
EU spends 5 MIO EUR for media campaign in Turkey
EU spends 5 MIO EUR for media campaign in Turkey EU spends 5 MIO EUR for media campaign in Turkey
EU spends 5 MIO EUR for media campaign in Turkey
 
PPT, B Garcia Porras, EC, Third ENP East public procurement conference, Tbili...
PPT, B Garcia Porras, EC, Third ENP East public procurement conference, Tbili...PPT, B Garcia Porras, EC, Third ENP East public procurement conference, Tbili...
PPT, B Garcia Porras, EC, Third ENP East public procurement conference, Tbili...
 
Tf Ct Pqq
Tf Ct PqqTf Ct Pqq
Tf Ct Pqq
 
Lawyer in Vietnam - Dr. Oliver Massmann THE WORLD BANK IS ASKING DUANE MORRIS...
Lawyer in Vietnam - Dr. Oliver Massmann THE WORLD BANK IS ASKING DUANE MORRIS...Lawyer in Vietnam - Dr. Oliver Massmann THE WORLD BANK IS ASKING DUANE MORRIS...
Lawyer in Vietnam - Dr. Oliver Massmann THE WORLD BANK IS ASKING DUANE MORRIS...
 
Chapter -Two (2).pdf
Chapter -Two (2).pdfChapter -Two (2).pdf
Chapter -Two (2).pdf
 
Final standard tender doc
Final standard tender docFinal standard tender doc
Final standard tender doc
 
procurement overview
procurement overviewprocurement overview
procurement overview
 
Assessment of Offshore Transmission Tender Round 1 benefits (2014)
Assessment of Offshore Transmission Tender Round 1 benefits (2014)Assessment of Offshore Transmission Tender Round 1 benefits (2014)
Assessment of Offshore Transmission Tender Round 1 benefits (2014)
 
Innovate UK's monitoring services procurement - full briefing pack
Innovate UK's monitoring services procurement - full briefing packInnovate UK's monitoring services procurement - full briefing pack
Innovate UK's monitoring services procurement - full briefing pack
 
Presentation by Zoran Blazevic, SIGMA Expert, Croatia
Presentation by Zoran Blazevic, SIGMA Expert, CroatiaPresentation by Zoran Blazevic, SIGMA Expert, Croatia
Presentation by Zoran Blazevic, SIGMA Expert, Croatia
 
Presentation "PPPs in the EU- Widespread shortcomings and limited benefits"
Presentation "PPPs in the EU- Widespread shortcomings and limited benefits"Presentation "PPPs in the EU- Widespread shortcomings and limited benefits"
Presentation "PPPs in the EU- Widespread shortcomings and limited benefits"
 
Gsa timing-rx-webinar Presentation
Gsa timing-rx-webinar Presentation Gsa timing-rx-webinar Presentation
Gsa timing-rx-webinar Presentation
 

Recently uploaded

Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfahcitycouncil
 
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...Christina Parmionova
 
EDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxEDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxaaryamanorathofficia
 
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up NumberMs Riya
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...anilsa9823
 
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escortsaditipandeya
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...ResolutionFoundation
 
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)ahcitycouncil
 
Climate change and occupational safety and health.
Climate change and occupational safety and health.Climate change and occupational safety and health.
Climate change and occupational safety and health.Christina Parmionova
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...CedZabala
 
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...Suhani Kapoor
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27JSchaus & Associates
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Call Girls in Nagpur High Profile
 
WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.Christina Parmionova
 
2024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 282024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 28JSchaus & Associates
 

Recently uploaded (20)

Call Girls In Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In  Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In  Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Rohini ꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
How to Save a Place: 12 Tips To Research & Know the Threat
How to Save a Place: 12 Tips To Research & Know the ThreatHow to Save a Place: 12 Tips To Research & Know the Threat
How to Save a Place: 12 Tips To Research & Know the Threat
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdf
 
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
“Exploring the world: One page turn at a time.” World Book and Copyright Day ...
 
EDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptxEDUROOT SME_ Performance upto March-2024.pptx
EDUROOT SME_ Performance upto March-2024.pptx
 
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
 
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore EscortsVIP Russian Call Girls in Indore Ishita 💚😋  9256729539 🚀 Indore Escorts
VIP Russian Call Girls in Indore Ishita 💚😋 9256729539 🚀 Indore Escorts
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...
 
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
(VASUDHA) Call Girls Balaji Nagar ( 7001035870 ) HI-Fi Pune Escorts Service
 
PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)PPT Item # 4 - 231 Encino Ave (Significance Only)
PPT Item # 4 - 231 Encino Ave (Significance Only)
 
Climate change and occupational safety and health.
Climate change and occupational safety and health.Climate change and occupational safety and health.
Climate change and occupational safety and health.
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
 
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
9953330565 Low Rate Call Girls In Adarsh Nagar Delhi NCR
 
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
VIP High Class Call Girls Amravati Anushka 8250192130 Independent Escort Serv...
 
2024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 272024: The FAR, Federal Acquisition Regulations - Part 27
2024: The FAR, Federal Acquisition Regulations - Part 27
 
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
 
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...Top Rated  Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
Top Rated Pune Call Girls Hadapsar ⟟ 6297143586 ⟟ Call Me For Genuine Sex Se...
 
WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.
 
2024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 282024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 28
 

5_Procurement, conflict of interest and sub-granting

  • 1. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Seminar on Project Preparation Procurement Baku, 31 August – 1 September 2015
  • 2. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Procurement Procurement
  • 3. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility How long does it take to procure? Procurement
  • 4. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility So you have won a grant and are ready to start implementing your project but to do so you may need the services of experts, to produce information materials (services), to buy computer or other equipment (supplies) or in some cases, to commission construction work (works). That, is you may need to procure services, supplies and/or works. Procurement When conducting the procurement procedure, you should take care that: • The correct procedure is being used; • The forms to be utilised are in line with international standards and provisions of Annex IV of your contract. • The rule of origin of supplies is applied; • The eligibility rule is observed; If the beneficiary (or beneficiary‟s partners) fails to comply with any of these rules expenditures in question will be considered as not eligible for EC financing.
  • 5. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Rules for procurement • Rules for procurement are defined in ‘Annex IV Procurement by grant Beneficiaries in the context of European Community external actions’ annexed to the grant contract; • Annex IV is applicable to the Beneficiary and all partners, regardless of their legal status (public or private) or nationality (EU or partner country); • For what is NOT described in Annex IV (detailed procedures, tender documents): • Either partner’s own procedures, but must be in accordance with Annex IV rules, in particular „best international practice‟; • Or may use Chapters 3 (Service), 4 (Supply), 5 (Works) of PraG and related annexes (templates). Procurement
  • 6. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Annex IV requirements Annex IV: 1. General principles 2. Eligibility for contracts (rules of nationality & origin) 3. Rules common to all tender procedures 4. Rules applicable to service contracts 5. Rules applicable to supply contracts 6. Rules applicable to work contracts 7. Use of negotiated procedure 8. Special cases BUT • References to other chapters of PRAG, e.g. what “international open tender” means, etc. Procurement
  • 7. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Difference between a call for proposals and a call for tender Procurement
  • 8. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Procurement (Tender) Types • Service contracts: These cover engagement of service providers, companies and/or individuals (experts). Service contracts are used for preparation of studies, evaluation reports, experts‟ or trainers‟ engagement, printing and publishing services, translation, conference/events organisation, catering etc. • Supply contracts: These cover the purchase or rental of supplies/equipment. The delivery of products may in addition include installation and maintenance. • Works contracts: These cover either the execution, or both the execution and design of a „work‟. A „work‟ means the outcome of building or civil engineering works taken as a whole that is sufficient in itself to fulfil an economic or technical function. • Grants among them different threshold of publication (see next slide) Procurement
  • 9. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Thresholds Procurement
  • 10. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Important note! Artificial slicing in order to avoid threshold for publication NOT ALLOWED Procurement
  • 11. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility • selection criteria - eligibility - financial/economic standing - technical/professional capacity • award criteria - technical criteria - price • once published, criteria may not be changed Selection and award criteria Procurement
  • 12. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Awarding principles • transparency (the tender documents must contain clear and open criteria and procedures - they must be accessible to all tenderers); • proportionality (whatever is being requested should be limited to what is necessary to achieve the specific purpose); • equal treatment (the award process must be completely impartial - the bids are selected using published eligibility and evaluation criteria); • non-discrimination; and • sound competition. Procurement
  • 13. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Why excluding an applicant/tenderer? a) bankruptcy or similar situation; b) convicted for offence in their professional conduct; c) proven grave professional misconduct; d) not paid social security contributions or taxes; e) judgement for fraud, corruption, illegal activities; f) breach of contract financed by EC funds; Reasons for exclusion Procurement
  • 14. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility As well as:  Attempt to obtain confidential information, to influence committee decision;  Misrepresentation in supplying the information required;  + ethical grounds incl. impartiality/human rights/conflict of interest (section I.7 of Rules and procedures for contracts financed from the EC general Budget in the context of external actions). Procurement Reasons for exclusion (2)
  • 15. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Rules of nationality/origin Participation in tender procedures managed by the Beneficiary(ies) is open on equal terms to all natural and legal persons of the Member States and the States and territories of regions expressly covered and/or allowed by the Financial Regulation and the basic acts or other instruments governing the aid programme under which the grant is being financed. Tenderers must state in their tenders the country of which they are nationals by presenting the usual proof of nationality under their national legislation. This rule does not apply to the experts proposed under service tenders financed by the grant. For each basic act, the detailed list of eligible countries are listed in Annexes A2a and A2b of Practical Guide. Procurement
  • 16. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Origin - definition The term „origin‟ is defined in the relevant EU legislation on rules of origin for customs purposes: the Customs Code (Council Regulation (EEC) No 2913/92) in particular its Articles 22 to 24 thereof, and the Code's implementing provisions (Commission Regulation (EEC) No 2454/93). • The country of origin is not necessarily the country from which the goods have been shipped and supplied. • Two basic concepts are used to determine the origin of goods, namely the concept of “wholly obtained” products and the concept of products having undergone a "last substantial transformation". • If only one country is involved in the production, the "wholly obtained" concept will be applied. In practice, these goods wholly obtained in a single country shall be regarded as having their origin in that country. This will be restricted to mostly products obtained in their natural state and products derived from wholly obtained products. • If two or more countries are involved in the production of goods it is necessary to determine which of those countries confers origin on the finished goods. For this purpose the concept of "last, substantial transformation" is applied. Procurement
  • 17. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Rule of origin All supplies purchased under a procurement contract, or in accordance with a grant contract, financed under the EU budget or the EDF shall originate from an eligible country as per the corresponding Instrument. However, according to the CIR, when the value of the supplies to be purchased is below 100 000 euros per purchase, the supplies do not have to originate from an eligible country (full untying). Within a grant or works contract, the rules of origin apply only to supply purchase for an amount equal or above 100 000 euros. Procurement
  • 18. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Exceptions to the rule on origin • Exceptions to the rule on nationality and origin may be made in some cases; • The award of such contract is decided on a case-by-case basis by the Commission before the procedure is launched; • The derogation must be mentioned in the procurement notice. Procurement
  • 19. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Derogation  The contract notice will have to indicate that the tender procedure benefits from the derogation.  If the procurement procedure is to be divided into lots, this applies per lot.  The division into lot shall not be used to get around the rules of origin.  The services would have to pay special attention to the legitimacy of the division into lot to avoid artificial slicing. Procurement
  • 20. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility How to prepare a tender dossierProcurement
  • 21. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Procurement procedures – internet Procurement
  • 22. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Procurement
  • 23. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Procurement
  • 24. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Tender Launch  Deadline for Submission = min. 30 days  Deadline for Questions 21 days  Deadline for Answers 11 days Tenders are valid for 90 days Procurement
  • 25. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Submission of Tenders • Tenders must be submitted in accordance with the double envelope system,  i.e., in an outer parcel or envelope containing two separate, sealed envelopes,  one bearing the words "Envelope A - technical offer" and  the other "Envelope B - financial offer" • All parts of the tender other than the financial offer must be submitted in Envelope A. Services
  • 26. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Evaluation Committee Procurement
  • 27. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Contracting • Once tenderer is selected, informed by letter and asked to submit additional info within 15 days • Once received, the contract is prepared, signed and sent to contractor who signs within 30 days • Once signed by all, other tenderers informed with reasons • Attention – irregularities: Sequence not followed; Contractor forced to sign ASAP and not within 30 days Services
  • 28. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Cancel the tender procedure in exceptional circumstances: • none of the tenders satisfies the selection/award criteria of the tender procedure; • no tender achieves the minimum threshold during the technical evaluation; • the total price (comprising both the fees and the provision) of all tenders exceeds the maximum amount available for the contract; • irregularities in the procedure, in particular where these have prevented fair competition; • force majeure. Procurement
  • 29. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Main differences  Services are awarded based on 80/20 ration of quality and price while Supplies and Works are awarded to lowest technically compliant offer;  You may have services as a part of supply tender, but should not have supplies as a part of service tender;  Works - This is the ONLY type of procedure for which CA may ask Tenderers to “pay” in order to receive the Tender Dossier (to cover cost of copying and posting). Procurement
  • 30. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility What are the key factors to take into account in procurement? Procurement What to do What NOT to do Do identify the applicable rules to your organisation Do not acquire services, supplies and works ‘as usual’ Do plan all procurement at the beginning of the project Do not assume that procurement can be done quickly Do be aware of the thresholds for all subcontracting Do not artificially split contracts to avoid the requirements e.g. by year or by category or by partner. Artificial splitting is not allowed and will make the total amount of all contracts ineligible (more information on artificial splitting is in section 3.6 below) Do consult your auditor in case of doubt or just to double check Do not trust only your past experience even if you had similar grants in the past – rules change Do revise your usual procedures to verify that they are compliant with Annex IV of your grant contract Again do not do it ‘as usual’ Do provide all information required, make sure the Terms of Reference are clear and include check-lists for tenderers Do not assume that tenderers have enough experience to submit eligible bids
  • 31. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility CONFLICT OF INTEREST
  • 32. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility 32 A Conflict of interest: …occurs when the impartial and objective exercise of the functions of the contracting authority, or observance of the principles of competition, non-discrimination against or equality of treatment of candidates, tenderers, applicants and contractors… …is compromised for reasons involving family, emotional life, political or national affinity, economic interest or any other shared interest with a beneficiary of EU-funded programmes.
  • 33. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility 33 Conflicts of interests and corruption are not the same thing! Corruption usually requires an agreement between at least two partners and a bribe/payment/advantage of some kind. A conflict of interests arises where a person may have the opportunity to put private interests before his or her professional duties.
  • 34. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility A conflict of interest may arise where, for instance : a member of the evaluation committee or someone in the contracting authority or others involved in the procedure, grant themselves, or others:  unjustified direct or indirect advantages by influencing the outcome;  or allow an expert or company to obtain information leading to an unfair advantage in subsequent or related procedures.
  • 35. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility TYPES OF CONFLICTS OF INTEREST Actual conflict of interest Perceived conflict of interest Potential conflict of interest A public official is in a position to be influenced by their private interests when doing their job. A public official is in a position to appear to be influenced by their private interests when doing their job. A public official is in a position where they may be influenced in the future by their private interests when doing their job. Source: ICAC, Managing Conflict of Interest in the Public Sector, November 2004.
  • 36. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Examples • The space rented for the project office was part of a residential unit. Inspection of documents revealed that the real estate belonged to the project director, the other part being his own living space. Besides the clear case of conflict of interest, it was unclear how the utilities were charged to the project. • The office rented for the project was the apartment of the project accountant/NGO president. • The accountant of the project was also auditor in the company selected for expenditure verification. • NGO awarded several contracts to an IT advisory firm, owned by a member of the Board of Trustees of the NGO. • The family members (son, husband) of NGO president were hired in the project without having proper qualifications and experience. • A staff member of the final beneficiary of the project was hired as expert.
  • 37. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Examples • The spouse of a contracting authority‟s desk officer in charge of monitoring a tendering procedure works for one of the bidders. • A person owns shares in a company. This company takes part in a tendering procedure in which this person is appointed as a member of the evaluation committee. • The head of a contracting authority has spent a week‟s holiday with the CEO of a firm which bids in a tendering procedure launched by the contracting authority. • An officer in a contracting authority and the CEO of one of the tendering firms have responsibilities in the same political party.
  • 38. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Examples Tendering and Purchasing: A person owns shares in a company. This company takes part in a tendering procedure in which this person is appointed as a member of the evaluation committee. Staff Recruitment : A member of a selection panel has a close relationship with one of the applicants for the job. This conflict of interest could bias, or could reasonably be expected to bias, the decision of the panel. Secondary employment : Two police officers have second jobs as bouncers at a nightclub. Local residents have complained to the police several times about noise levels at the club and problems with drunks and underage drinking, but no action appears to have been taken. The impartiality of the police officers has been compromised as it may be perceived that they are using their influence to make sure the club is not investigated.
  • 39. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Examples Dealing with former public officials : A senior employee of a government department awarded a particular firm several valuable contracts. Shortly after awarding the contracts, he resigned from his job and went to work for the firm. It could appear that the offer of employment was a personal benefit, in return for favors given. Other competitors might be disadvantaged if staff at the agency were influenced by their previous colleague and continued to award contracts to his firm. This situation must be carefully managed to ensure favoritism or the perception of favoritism does not occur. Gifts, benefits and hospitality: A regular supplier offered the purchasing officer of a government department a free weekend for two at a beach resort. The officer's impartiality when dealing with the supplier could be compromised if she accepted the offer.
  • 40. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Examples Local Government Planning Approvals A senior council planner often had to advise applicants on how to make their development applications comply with council's codes. He suggested to some applicants that they should use the services of a local architectural firm where his brother worked. Although the necessary work was mainly done by staff at the firm, the planner was sometimes paid to prepare the drawings himself. The planner's job was to act in the public interest and to provide impartial advice about council's policies. By recommending his brother's firm, he put the private interests of his brother and himself before his public duty. A similar conflict can occur when councils have a dual role as developer and regulator. Councils that decide to develop a piece of land they own may make decisions in their own commercial interest and unfairly disadvantage other developers. It may be difficult for councils to be impartial when they are effectively having to assess their own applications.
  • 41. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Examples Licensing A health inspector is friendly with the owner of a local butcher's shop and often gets given extra meat with his family's order. As part of his job, the inspector has to inspect the butcher's shop to check it complies with health regulations. The personal relationship between the butcher and the inspector, and his acceptance of free meat, could reasonably be expected to influence his assessment of the health standards in the shop.
  • 42. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Examples Elected officials Many councilors have business and professional interests in the local government area they represent. Conflicts can arise if their public positions allow them access to information and opportunities that could be used to advance their personal and business interests. For example, a councilor may be tempted to influence an application to set up a new business in the town if his own business could lose custom as a result Source: (ICAC Practical Guide, 1996. http://www.icac.nsw.gov.au/files/html/pub2_27cp.htm
  • 43. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility What action must be taken if a risk of conflict of interests is identified or a conflict of interests is declared/detected before or during the procedure? Subject to the relevant national law, relevant measures to safeguard the public procurement procedure should be taken. The following steps should be considered, depending on the existence or not of a declaration of absence of conflict of interests, the nature of the conflict of interests and the stage of the procedure:  where appropriate discussing the elements of facts with the person concerned to clarify the situation  excluding the person concerned from the public procurement procedure, whether he/she is a staff member or an external expert,  change in division of duties and responsibilities among the staff  cancelling the procurement procedure.
  • 44. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Declarations of absence of conflicts of interests It is highly recommended that people be asked to sign a declaration of absence of conflict of interests as soon as they take part in the procedure. The declaration of absence of conflict of interests should contain the definition of a conflict of interests and all the requirements of any code of conduct or ethics applicable to the process and related to conflict of interests. The declaration should give: (a) a clear reference to the procurement procedure concerned; (b) the signatory‟s full name, date of birth, position in the organisation, and function in the public procurement procedure; (c) the date of signature.
  • 45. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility The declaration should enable the signatory to declare officially:  whether to his/her knowledge he/she is in an apparent/potential/actual conflict of interests linked to the procurement procedure referred to;  whether there are circumstances that might place him/her in an apparent/potential/actual conflict of interests in the near future; and  that he/she commits to declaring immediately any potential conflict of interests in the event of any circumstance that might lead to such a conclusion. The declaration should include a reference to the disciplinary/administrative/criminal sanctions for making a false declaration.
  • 46. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility 46 GC -ARTICLE 4 - CONFLICT OF INTERESTS • The Beneficiary(ies) shall take all necessary measures to prevent or end any situation that could compromise the impartial and objective performance of this Contract. Such conflict of interests may arise in particular as a result of economic interest, political or national affinity, family or emotional ties, or any other relevant connection or shared interest. • Any conflict of interests which may arise during performance of this Contract must be notified in writing to the Contracting Authority without delay. In the event of such conflict, the Coordinator shall immediately take all necessary steps to resolve it.
  • 47. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility 47 GC -ARTICLE 4 - CONFLICT OF INTERESTS • The Contracting Authority reserves the right to verify that the measures taken are appropriate and may require additional measures to be taken if necessary. • The Beneficiary(ies) shall ensure that its staff, including its management, is not placed in a situation which could give rise to conflict of interests. Without prejudice to its obligation under this Contract, the Beneficiary(ies) shall replace, immediately and without compensation from the Contracting Authority, any member of its staff in such a situation.
  • 48. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Sub-granting - suggested practice (but please consult with your CA about all the details) Procurement
  • 49. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Sub-granting - Background Procurement The European Commission (EC) re-introduced in May 2007 the option of sub-granting in its grant contracts1. Sub-granting is an indirect financial contribution through an EC grant Beneficiary to a sub-grant Beneficiary for an action intended helping to achieve an objective of the EC grant contract. Before the award of financial support to third parties, the EU Delegation will have to be informed. The modalities for information will be defined before signature of the grant contract.
  • 50. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Guidelines for grant Applicants Procurement The Calls for Proposal Guidelines specify that the Applicant must set out the following in the proposal on sub-granting: (i) the objectives and results to be obtained with the financial support; (ii) the different types of activities eligible for financial support, on the basis of a fixed list; (iii) the types of persons or categories of persons which may receive financial support; (iv) the criteria for selecting these entities and giving the financial support; (v) the criteria for determining the exact amount of financial support for each third entity, and (vi) the maximum amount which may be given.
  • 51. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Ineligible activities Procurement As sub-granting does not imply the transfer of responsibility, the Beneficiary of the EC grant needs to take into consideration the eligibility of all expenditure and that costs related to the following actions are considered to be ineligible: • debts and debt service charges (interest); • provisions for losses or potential future liabilities; • costs declared by the Beneficiary(ies) and financed by another action or work programme receiving a Union (including through EDF) grant; • purchases of land or buildings, except where necessary for the direct implementation of the Action, in which case ownership shall be transferred to the final beneficiaries and/or local Beneficiary(ies), at the latest at the end of the Action, in accordance with Article 7.5; • currency exchange losses; • credits to third parties, unless otherwise specified in the Special Conditions.
  • 52. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Selection of sub-grant Beneficiaries Procurement • Sub-grants awarded by the Beneficiary are subject to the nationality rules as referred to in Annex IV. (eligibility is governed by the same criteria as for Beneficiaries and Partners as published in the Call for Proposals Guidelines for Applicants); • In order to select the most suitable sub-grant Beneficiary, the Beneficiary has to evaluate according to the criteria set out in the Description of the Action (Annex I) and following the principles of transparency, fairness and non- discrimination, which should be reflected in the selection criteria in a justifiable and well documented manner. • The evaluation process of a sub-grant Beneficiary must be well documented and might be subject to prior approval by the Contracting Authority.
  • 53. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Evaluation of sub-grant proposals Procurement For the proper evaluation of sub-grant proposals the Beneficiary may use the following evaluation grid and include the selection criteria as established in Annex I of the EC grant contract. Once proposals for sub-granting have been assessed, a list could be established with the proposed actions ranked according to their total score. Score 1. Operational criteria As listed in the Description of the Action (Annex I). 2. Financial criteria As listed in the Description of the Action (Annex I). Total score
  • 54. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Contractual Agreement between Grant Beneficiary and Sub-grant Beneficiary Procurement • Sub-granting is bound by the provisions of the Special and General Conditions of the EC grant contract. • The Beneficiary shall be accountable to the Contracting Authority for the implementation of the Action. It shall undertake that the conditions applicable to it, especially under Articles 1, 3, 4, 5, 6, 7, 8, 10, 14, 16 and 17 of the General Conditions (Annex II) shall also apply to its sub-grant Beneficiary. • The Beneficiary shall include provisions to that effect as appropriate in its formal agreement with the sub-grant Beneficiary so as to ensure the proper execution of the EC grant contract.
  • 55. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Contractual Agreement between Grant Beneficiary and Sub-grant Beneficiary (1) Procurement Below issues could be taken up in a formal agreement between the Beneficiary and the sub-grant Beneficiary: A. Purpose of the sub-grant: In the agreement reference should be made to the fact that the sub-grant is awarded in the context of an EC grant contract with the Beneficiary including reference to the Special and General Conditions. Moreover, a clear description of the activities expected to be carried out by the sub-grant Beneficiary should be provided.
  • 56. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Implementing modalities Procurement The following issues need to be addressed: • Implementation period: start and end date; • Maximum amount of sub-granting in Euro. Please note that reference to local currency should be avoided in order not to incur exchange rate losses, which are ineligible; • Indication of eligible budget items (attach copy of the budget to the agreement with a clear reference to the budget items sub-granted.) • Definition of responsibilities of the sub-grant Beneficiary regarding personal taxes, social and related benefits for the personnel working under the grant; • Declaration of the sub-grant Beneficiary; • Contact addresses of the Parties.
  • 57. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Payment and reporting modalities Procurement • Payment arrangements: specify the amount of pre-financing and payment installments. • Payments should be based on the periodic financial reports submitted applying the percentage of EC contribution to the agreed bank account. • Original documents should be sent with each request for payment and the grant Beneficiary shall return these documents after stamping them "certified as original". • Beneficiary should designate authorized signatories and track the transactions related to the sub-grant. • Agreement on the type and frequency of narrative and financial reporting: template to be used in line with EC grant contract. • Agreement on the consequences of a lower than expected EC payment as a result of the application of the maximum funding percentage under the EC grant contract: who pays the sub-grant Beneficiary in case the total eligible costs are lower than expected.
  • 58. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Evaluation, audits, visibility Procurement • It is advisable that both parties agree about audit approach and modalities and • that monitoring missions and checks of the sub-grant Beneficiary accounts and records are carried out by the Beneficiary of the EC grant. • Any publication or information on the project should be agreed in advance between the two parties.
  • 59. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Evaluation, audits, visibility (1) Procurement Prior approval by the Contacting Authority should be provided upon concluding an agreement with the sub-grant Beneficiary. Should the sub-grant Beneficiary fail to implement the approved activities in accordance with the Description of the Action (Annex I) and with a view to achieving the objectives laid down therein, a recovery order of the sub granted amount should be enforced. Note that the Contracting Authority does not acknowledge any contractual link between itself and the sub-grant Beneficiary.
  • 60. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Information of the Beneficiary of sub-granting Procurement The Beneficiary of the EC grant should inform the sub-grant Beneficiary about the content of the annexes of the Special Conditions of the EC grant contract: • Annex II: General Conditions applicable to European Community-financed grant contracts for external Actions; • Annex III: Budget for the Action; • Annex IV: Contract-award procedures; • Annex V: Standard request for payment and financial identification form; • Annex VI: Model narrative and financial report; • Annex VII: Model report of factual findings and terms of reference for an expenditure verification of an EC financed grant contract for external actions;
  • 61. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Declaration by the Beneficiary of a sub-grant Procurement In order to provide the Beneficiary with a reasonable assurance that the sub- grant Beneficiary is able to carry out the agreed upon actions, the authorised signatory of the sub-grant Beneficiary should declare that they will be excluded from participation if: a) they are bankrupt or being wound up, are having their affairs administered by the courts, have entered into an arrangement with creditors, have suspended business activities, are the subject of proceedings concerning those matters, or are in any analogous situation arising from a similar procedure provided for in national legislation or regulations; b) they have been convicted of an offence concerning their professional conduct by a judgment which has the force of res judicata;
  • 62. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Declaration by the Beneficiary of a sub-grant (1) Procurement c) they have been guilty of grave professional misconduct proven by any means which the Beneficiary can justify; d) they have not fulfilled obligations relating to the payment of social security contributions or the payment of taxes in accordance with the legal provisions of the country in which they are established or with those of the country of the Beneficiary or those of the country where the contract is to be performed; e) they have been the subject of a judgment which has the force of res judicata for fraud, corruption, involvement in a criminal organisation or any other illegal activity detrimental to the Communities' financial interests; f) they are currently subject to an administrative penalty referred to in section 2.3.5 of the Practical Guide to contract procedures for EC external actions. The authorised signatory of the sub-grant Beneficiary must certify that he is not in one of the situations listed above and signed on behalf of the sub-grant holder. At the approval stage the Contracting Authority will ensure that this declaration is provided by the sub-grant Beneficiary.
  • 63. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility VAT Procurement • As is the case with EC grant Beneficiaries VAT is not eligible for sub-grant Beneficiaries (except if duly justified). • In order to insure that zero VAT is granted the Beneficiary shall inform the Ministry of Finance at an early stage of the sub-granting component of its EC grant contract. • If there is any problem in obtaining the zero VAT the EC office should be informed in order to facilitate the procedure. • Procedure defers from one country to another.
  • 64. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Audits Procurement • In case of sub-granting in the EC grant contract the auditor should be informed at an early stage. • Before submitting a proposal to the EC, an auditor should be consulted for a price quote, which would take into account the sub-granting as this would entail more work for the auditor and therefore a higher audit fee. • Ensure that enough funds are included in the project budget to cover this type of audit.
  • 65. Funded by European Union Introduction What is project Logical Frmwrk Schedule Budget Stakeholders Partnership Procurement Services M&E Reporting Visibility Audits (1) Procurement • During the audit of actions with sub-granting, the auditor should verify the expenditures of each sub-grant Beneficiary and ensure that the activities involved are in line with those of the EC grant contract. • Furthermore, the auditor should verify the eligibility of the costs incurred by the sub-grant Beneficiary, the respect of the zero-VAT issues and the use of the correct exchange rates as per the provisions under the EC grant contract. • The Beneficiary should keep copies of all supporting documents related to sub-grants for the period as specified in the General Conditions of the EC grant contract. As for the sub-grant Beneficiaries original copies should be kept for the same period.